Advanced SOC
Advanced SOC
Features and Capabilities
Use Case Management – Workshop
Incident Management
Traditional SOCs were driven by Compliance and Have the basic
features as follows:-
1. Detect and react to threats, mostly triggered by log correlation
rules
2. Perform log collection, correlation and monitoring to meet
compliance requirements.
3. SIEM tradionally has log collectors/connectors to collect logs
from multiple sources and loggers/processors for processing
and storing log data for several years (6 months online and 7-8
years offline) and a console for monitoring events.
4. Monitor attacks and detect threats to manage and respond to
those attacks Alerting for incidents/ critical actions.
5. A ticketing system is generally used to track tickets for security
violations.
6. Generic and compliance focused use cases, mostly single
device correlation and generates generic reports
7. Popular models were in house and outsourced / leveraged
SOC
Next generation SOCs are driven by threat mitigation, proactive
monitoring and intelligence
1. More focus on identifying new / unknown threats and anticipate
threats and mitigate risks
2. Integrate with NBAD, forensics and Integration with threat
intelligence communities and social sites – to predict the attack
3. Big data analysis a part of SOC tool set; Integrated with national
agencies and international CERTs.
4. Proactively provide alerts for financial frauds and violations in
business processes. SOC will act as a single agency to prevent
security incidents, frauds happening in E-Systems, compliance of
regional laws across geographic boundaries
5. Automated response run books, real live simulations and IM
framework automated by workflow, collaboration and intelligence
tools
6. Customized risk and threat aligned use cases, some modeled on
kill chain concept and provides risk aligned and analytical
reporting and visualization
7. Popular model changed to expertise based onsite and offshore
managed SIEM model.
2
Evolution of A-SOC
3
Advanced SOC - Features
Threat Assessment and Hunting
– Knowing Threats and Adversaries
– Their tools and methods
– Critical assets as targets
– Existing Controls and Weakness
– Monitoring presence , IOC Management
and Hunting
Threat Intelligence
– Internal threat intelligence
– External threat intelligence
– Application of threat intelligence
– Automated consumption of threat
intelligence (updated SIEM rules/
runbook)
Situational Awareness
– Context and enrichment
(Post correlation, joining the dots to see the
attack chain)
– Visibility
(Visualization to the state of security)
Security Analytics
– Behavioral profiling for users and
systems
– Database searches and statistical
modeling, reporting and visualization
– Forensics capability (Netflow/ replay)
Requirement Capability Sources
IAM Integration
User Context
User Activity Monitoring
IAM
Packaged Applications
Unsupported Sources
Network
Application Monitoring
Logs
DLP Integration
Data Context
Data Monitoring
Internal
and External
Intelligence
Pattern Recognition
Anomaly Detection
Early Attack Detection
Event Stream
Integration
Cloud-Sourced
Application Monitoring
Internal
and Cloud
4
A-SOC Capabilities
SOC 2.0 Strategy
Program vision, objectives, approach, initiatives, roadmap
SIEM Admin Operation
• Tool / Log Integration
• Reporting and Dashboards
• Rule Administration
• Device Administration
Threat Monitoring and Response
• Monitoring and Notification
• Validation and Triage
• Analysis and Escalation
Threat Hunting and Intelligence
• Internal Threat Intelligence
(Assets/ Vulnerabilities/ Alerts
• External Threat Intelligence
(Feeds, analysis, actionable)
SOC 2.0 Governance
SOC Organization, Reporting, Service Level Management, Policy Approvals, Recommendations,
Escalation.
NBAD and Forensics
Network flow monitoring and anomaly
detection
Full packet capture for forensics
SOC 2.0 Operation Function
• Active Threat Hunting
• Run Book / Response Management
• IOC Management
• Use Case Management
• Intelligence Analysis
SOC 2.0 Strategy
& Governance
SOC 2.0
Operations
SIEM Technology
Log collection, processing and
correlation
Data sources – structure, referential and
unstructured
Incident Management Tool
Ticketing, run book automation, incident
response and collaboration and KPI
monitoring
SOC 2.0
Technology Analytics
Big data – User Behavior Analytics
And System Analytics
Historical log and network and
application data correlation
Integration
CMDB - Asset Modeling
VM – Vulnerability Mapping
Incident Mgt – Ticketing / Workflow
Threat Intelligence Feeds
Business Intelligence
Security Dashboard
Visualization – Integrated Security
Posture
Risk and Analysis Report
SOC 2.0 Business Function
• Requirement Analysis
• Risk Management
• Audit and Compliance Management
• Legal and Fraud Management
SOC 2.0 Technology Function
• Architecture and Integration
• Development
• Server Management
• Application, User and Data monitoring
Soc 2.0 - CSIRT
• Incident Response / Emergency
Response
• Forensics
5
A-SOC Framework
• Data collection capabilities and compliance benefits of log management,
• The correlation, normalization and analysis capabilities of SIEM (security information and event
management)
• The network visibility and advanced threat detection of NBAD (network behavior anomaly detection), and
user behavior anomaly detection by machine learning - User Behavior Analytics
• The ability to reduce breaches and ensure compliance provided by Risk Management,
• The network traffic and application content insight afforded by Network Forensics.
• The automation of Incident Response by Artificial Intelligence / Run Books
• IOC / VM Management by Threat Intelligence
• Reporting and Visualization provided by Presentation Layer
SIEM as a platform should be a truly integrated solution built on a common codebase, with a single data
management architecture and a single user interface.
6
A-SOC Technical Capabilities
Monitor everything
Logs, network traffic, user activity
Correlate intelligently
Connect the dots of disparate activity
Detect anomalies
Unusual yet hidden behavior
Prioritize for action
Attack high-priority incidents
Threat Intelligence
• Logs
• Contextual Data
• Vulnerability
Assessments
• Asset Inventories
• Reports and Analytics
Internal
• XFORCE
• CrowdStrike
• SecureWorks
• Deepsight
External
Threat Ingestion - Structured Threat Information
eXpression (STIX™)
SIEM
Environment
Single, Unified and
Integrated Management
Console
Machine Learning – Analytics
Artificial Intelligence
Incident Management
Automation
* Source - IBM
7
A-SOC Architecture
D A T A S O U R C E S L I N K E D D A T A A N A L Y S I S
Security Data
Network Data
End Point/Identity data
Firewall
/IPS/IDS
Threat
Intel
SIEM
Alerts
Network
Data
Flow
Data
Proxy/WiFi
Data
Endpoint
Data
User
Data /AD
Database
Data
Client Devices Assets
Internal
Servers
Websites
Users
Dynamic
Knowledge
Extraction
Source
Collaboration
ANALYTICSENGINE RISK ENGINE
SEARCH
EXPLORATION
REPORTS
RISKS
!
• A-SOCs leverages Threat Intelligence from multiple commercial and open sources and integrated into a platform for
collaboration, correlation, visualization and actionable analysis.
• A-SOCs leverages Big Data Platform for UBA, System analytics, visualization and reporting.
• Platform is also used for running hunt missions, query engine, reporting and AI for ticketing and incident
remediation.
8
A-SOC Big Data Tool-Set – Analytics/ UBA and TH
• What all patterns have been built and what algorithm the
technology uses for machine learning
• How accurate is the system in detecting anomalies for
malware and behavior
• How does it compare it with other similar products;
what criteria should be used for evaluation.
• Threat Intelligence comes in many forms, difficult to
ingest and requires capabilities and continuous
analysis and actionables
MACHINE LEARNING AND ARTIFICIAL
INTELLIGENCE
SECURITY ANALYTICS – NBAD AND END
POINT AND USER ANALYTICS
THREAT INTELLIGENCE AND HUNTING
9
A-SOC Technical Queries
Other Internal Teams
Systems
Applications
Network
Database
Vulnerability / Patch
Business
Risk / Compliance
Information
Technology
Information
Security and Risk
Management
CISO
CEO , COO, CRO
Board / Shareholders
Incident Responder
L2/L3 SOC Analysts
Service Desk
L-1 Monitoring Team
SOC Manager
SIEM Admins Incident Response
Threat Hunter
Country CERT
Regulatory Bodies
CIO
SOC Team
Internal SOC organization associated roles
and responsibilities should be clearly
defined. The following is a sample
organization structure.
Threat Intelligence
10
A-SOC Organization Structure and Functions
Event Management
• Event monitoring, analysis and
correlation
• Triage and Escalation
• Containment
• Proactive intelligence and situational
awareness
• Response collaboration
Vulnerability & Patch Mgmt
• Vulnerability research
• Patch management
• Identification
• Dissemination
• Compliance monitoring
• Configuration / Control baselines
• Antivirus signature management
• Microsoft updates
Incident Response
• IM Charter, SIRT and TIG Reporting Structure, R&R
• Incident Handling Process and Procedures for:
• Identification, validation, declaration, escalation, containment,
investigation, forensics, eradication, recovery, post incident
• Cross functional RACI and coordindation for response
• Forms and Templates
Threat Specific Response Procedures
• Phishhing / Spear Phishing
• Malware (virus, worms, trojans, spyware)
• NetFlow Abnormal Behavior Incident
• Network Behavior Analysis Incident
• (Distributed) Denial of Service
• Domain hijack or DNS cache poisoning
• Website defacement
• Web application incident
• Unauthorized access
• User account compromise
• Host compromise
• Network compromise
• Advanced persistent threat
• Suspicious user activity
SOC
• Charter
• Organization
• Roles and responsibilities
• Business requirements, scope
and architecture
• Service Catalogue
• SOC operations and
management procedures
• SOC metrics and KPIs
• SOC process and procedure
manual (all processes and
procedures including
tool/solution specific)
• SOC security policy
• SOC business continuity and
disaster recovery
Threat Hunting
• Threat Intelligence
• Threat Hunting
• Device / source inclusion and
exclusion process
11
A-SOC Processes
12
Advanced SOC Services
• Custom parser creation and log source addition/integration per device type/days
1. Threat Hunting
2. Perform API integration of Vulnerability Management, Business Systems, CMDB etc.
3. Integrate with threat intelligence and automate responses with actionable
Additional Services
1. Incident Management – Monitoring, Validation, Notification, Tracking Response and Closure
2. SIEM Administration – Managing Licenses, Patches, all SIEM Components, Health checks, log sources integrity, users
and reports
3. Reporting and Dashboard – Creation and emailing the reports and dashboards to stakeholders with trend analysis
4. Use Case Management – New use case creation and fine tuning of existing use cases based on monitoring
5. Log Source Addition – Additional addition of devices and log sources, custom parser creation
BAU Service
Effort
Time
1
2
3
12mths 24 mths 36 mths
1
• Focus on Critical Assets – AD, Network, Core Web application used for
transaction, Security Devices like Firewall, IPS, Proxy, Critical OS and
Database to be monitored under SIEM
• Monitor “what matters the most” (Web Apps, Core OS, Databases, etc.)
• Keep the number of correlation rules in the order of risk, initially 10-12 Multi-
Device correlation use cases
• Create Three basic processes – Monitoring and Notification, Incident
Management and Service Desk/ Ticketing Management
• Create basic reporting and trends, alerts and notification and Incident
Response summary
• Start developing SOC related policies, procedures and workflows
2
• Perform 100% coverage for log sources; Include enterprise applications
• Customization and Integration of application log sources
• Add NetFlow and Forensics module
• Create Forensics and Run Book processes
• Add Threat Intelligence and build analytics for threat hunting
• Monitor and Adapt Rule Bases – Fine tune rules
• Create additional 10-12 Use Cases for Applications, Flows like file export/
protocol and IP and Forensics
3
• Automate Threat Intelligence Actionable
• Define Threat Intelligence process for threat hunting, asset criticality and
vulnerability identification and actionable
• Implement User and system behavior analytics
• Add use cases with statistical modeling
• Additional reporting and visualization for key systems and data
13
Advanced SOC Services – Maturity Model
21
Example
Carbanak – A-SOC Capabilities
2
Malicious Web
server sends or
reflects exploit code
<click>
1
Install Malware
Mail-Client
5
Victim
Domain
Name
Server
Attacker
Used Spearphised
emails
Command
& Control
4 web-page +
3 Follow link
Lateral Movement
Screen capture/ Video recording
9
6
Remotely Control
Malware
Contact Updater
By IP Address (C&C)
7
8
Word file with MA
Data upload – Screens
and VR
22
Example
Carbanak – A-SOC Capabilities
2
Malicious Web
server sends or
reflects exploit code
<click>
1
Install Malware
Mail-Client
5
Victim
Domain
Name
Server
Attacker
Using Spearphised emails
Command
& Control
4 web-page +
3 Follow link
9
6
Remotely Control
Malware
Contact Updater
By IP Address (C&C)
7
8
Word file with MA
Lateral Movement
Screen capture/
Video recording
Data upload – Screens
and VR
d) Monitor Web Traffic
a) Monitor DNS
c) Monitor Port &
Protocol Usage
b) Monitor NetFlow
e) Data in HTML
Response - Netflow
b) Monitor NetFlow
Advanced SOC Use Case Management – Workshop
17
Use Case
Introduction to Use Cases
• Different names are used to define rules that generate alerts in SIEM
• There common terminologies used are as follows
• SIEM Rules
• Correlation Rules
• Use Cases
• SIEM Alert is typically a rule which does not require enumeration and there is no correlation of 2 conditions.
It is a simple log condition that is interesting. For example – Administrative password change, file access, new
user added, new table created, configuration change, PO approved etc.
• SIEM rules/ alerts are typically simple log matching rules, another example is If I see string ABC 123 in HIPS
logs that raise an alert or alert me if the configuration of the router has changed.
• One can create some conditions in SIEM alerts and call it a SIEM rule which gives context. For Example –
Administrative password changed from XX IP for YY user which is in “white list”. Here too, there is nothing
abnormal but an alert to state that interesting event has happened. One can investigate to see why the
password was changed or similarly why a table was created and is there a change ticket or an approval for
the same.
• Correlation is the act of linking multiple events together to detect strange behavior. It is the
association of different but related events to provide broader context than a single event can
provide.
• Correlation rules aka known as chaining of SIEM rules or SIEM alerts/events and typically
make 2 conditions to match.
• Correlation is built on rules for known attack patterns. One has to know what elements
constitutes an attack patterns or elements of a compliance requirement in order to determine
which device and event types should be linked. Also while correlating we have to factor in the
time, because events do not happen simultaneously, so there is a window of time within which
events are likely to be related.
• So in a nutshell a correlation rule is “combining of multiple SIEM rule/alerts”. It can be from the
same device or desperate devices.
• E.g. Failed login attempts followed by successful login is correlation condition from same
device but a scan detected by firewall, followed by access to application from application logs
and then creation of a user in the application is a directory service of database logs creating a
COMPROMISE condition.
18
Use Case
Co-relation Rules
• The term use case is used for one or more correlation rules to describe a condition.
• A Use Case is a set of steps, representing a business goal or defining interactions between a
role (or an "actor") and a system to achieve a goal. The actor can be a human or an external
system.
In a nutshell a use case in our term is a customized set of conditions occurring from a
combination of one or more correlation rule, generally industry specific that constitute an attack
vector and also has a response mechanism.
• Every use case has a Logic Flow, i.e. something unique to the environment and needs to be
defined accordingly.
• Use Case Response: After implementation, the Use Case need to be made as a valuable
resource by Defining a Use Case Response. This is the stage where you would define “What
action needs to be taken and how it needs to be taken”.
19
Use Case
Co-relation Rules
• Use Case Name - Privilege Activity Monitoring – Windows
and Linux
• Category: Access Control (AC)
• Limit facility and information access to authorized
users, processes acting on behalf of authorized users,
or devices (including other information systems) and to
the authorized activities and transactions.
• Use Case Number: 1 and 2
• Accounts having Privileged access, e.g. Admin, Sudo
should be monitored on activity performed by ID.
• References:
• ISO/IEC 27001 A.11
• SANS Top 20: CSC 16
• PCI
• Internal Policy Compliance
• Use Case Description:
• Accounts with administrator and/or root privileges
should be monitored and flagged if they are locked due
to multiple authentication failures. This could indicate
potentially malicious activity and alerted on,
accordingly. Generate report.
• Log Sources:
• Active Directory
• UNIX Systems
• Sample Rule Description:
Privileged Role Violations:
• Identify IDs not in Security Administration group that
have made changes to user IDs and AD groups
• Create an active list with users within the Security
Admin group.
• Create a rule to fire when a user not on the active
list makes a change to a user ID and/or AD
groups.
• Event Name/Category - Use account got locked out
• Event Attribute
• - User Name
• - Source IP Address/Host Name
• - Destination IP Address/Host Name
• - Event Name // - Event Time Stamp
• - Log Source Event Code // Event description
20
Use Cases
Sample Use Case
Advanced SOC Incident Response
Situational
Awareness
Ability to identify what is happening in the networks
Reconnaissance
Weaponization
& Delivery
Lateral
Movement
Data Exfiltration
Persistency
Identification and selection of the target/s host or network by active scanning
Transmission/Inject of the malicious payload in to the target/s
Detect, exploit and compromise other vulnerable hosts
Steal and exhilarate data
Establish a foothold in the corporate network
 In military strategy, a “Kill Chain” is a phase model to describe the stages of an attack, which also helps inform
ways to prevent attacks.
22
Incident Response
Kill Chain Model for Use Cases Assist in IR
Know your
adversaries
and their
methods
Detect threat
activity in kill
chain
Disrupt the kill
chain and stop
the attack
Eradicate
threat agent
and remove
the threat
 Our Best Defence against advanced cyber threats has our built in threat intelligence, security
operations and incident response working in cordial manner defined by our processes
Threat Intelligence
Security Operation
Incident Response
Response StrategyThreat Indicators
23
Incident Response
Threat Indicators – Our defence in Cyber Kill Chain
Topic Descriptions / Actions
Purpose The purpose of this document is the provide guidance to Tier2 Triage and Tier 3 Response
analysts on the approach to incident remediation.
Scope The scope of this guidance includes 3 stages:
 Containment
 Eradication
 Recovery
Containment The intention of this stage is to limit the damage caused by the incident without yet removing the
cause of the incident. This is typically done as the first step as it may take additional time to
understand the cause of the incident and the appropriate eradication strategy. Examples of
containment may include shutting down of affected systems, closing firewall ports etc.
Eradication This stage is typically done after the containment stage where the cause of the incident is
removed. Eradication can only be performed before containment if the incident cause is
immediately clear and eradication can be performed swiftly before additional damage is caused
by the incident. Examples of eradication include deleting malicious code, removing malicious
accounts etc.
Recovery This stage is done once the “victim” system impacted is no longer vulnerable. Examples of
recovery include restoring from backup, patching servers etc.
24
Incident Response
IR response process
Topic Descriptions / Actions
Attack Category Authentication
Attack Sub Categories Misc Login Succeeded, General Authentication Failed, User Login Failure, Unknown Authentication, Host
Login Succeeded, Host Login Failed, Misc Login Failed, Privilege Escalation Failed, Privilege Escalation
Succeeded, Mail Service Login Succeeded, Mail Service Login Failed, Auth Server Login Failed, Auth
Server, Group Added, Group Changed, Group Removed, Computer Account Added, Computer Account
Changed, Computer Account Removed, Remote Access Login Succeeded, Remote Access Login
Failed, General Authentication Successful, Telnet Login Succeeded, Telnet Login Failed, Suspicious
Password, Samba Login Succeeded, Samba Login Failed and etc
Response Remediation
Options
1. Containment
a. Terminate processes with any active connections with attacker IP or port
b. Disable user id in question
2. Eradication
a. Work with network team to physically locate internal attacker
b. Physically remove internal attacker
c. Turn off switch port of internal attacker
d. Remove user access
3. Recovery
a. Implement strong password policy
b. Reconfigure vulnerable service as applicable
c. Restore to previous good state from backup or recovery application
25
Incident Response
IR response process
1. Extract attack source IP from Helpdesk/IR Ticket
2. Notify application owner of attack
3. Implement firewall rule to block attacker IP
4. If attack source is on local network, remote to a machine within same
subnet of unauthorized device
5. Ping offending machine IP
6. Run “arp –a” command on command prompt to extract MAC Address
26
Incident Response
IR Steps from Playbook
SQL Injection
Questions? Questions, Comments and Feedback

SOC Architecture Workshop - Part 1

  • 1.
    Advanced SOC Advanced SOC Featuresand Capabilities Use Case Management – Workshop Incident Management
  • 2.
    Traditional SOCs weredriven by Compliance and Have the basic features as follows:- 1. Detect and react to threats, mostly triggered by log correlation rules 2. Perform log collection, correlation and monitoring to meet compliance requirements. 3. SIEM tradionally has log collectors/connectors to collect logs from multiple sources and loggers/processors for processing and storing log data for several years (6 months online and 7-8 years offline) and a console for monitoring events. 4. Monitor attacks and detect threats to manage and respond to those attacks Alerting for incidents/ critical actions. 5. A ticketing system is generally used to track tickets for security violations. 6. Generic and compliance focused use cases, mostly single device correlation and generates generic reports 7. Popular models were in house and outsourced / leveraged SOC Next generation SOCs are driven by threat mitigation, proactive monitoring and intelligence 1. More focus on identifying new / unknown threats and anticipate threats and mitigate risks 2. Integrate with NBAD, forensics and Integration with threat intelligence communities and social sites – to predict the attack 3. Big data analysis a part of SOC tool set; Integrated with national agencies and international CERTs. 4. Proactively provide alerts for financial frauds and violations in business processes. SOC will act as a single agency to prevent security incidents, frauds happening in E-Systems, compliance of regional laws across geographic boundaries 5. Automated response run books, real live simulations and IM framework automated by workflow, collaboration and intelligence tools 6. Customized risk and threat aligned use cases, some modeled on kill chain concept and provides risk aligned and analytical reporting and visualization 7. Popular model changed to expertise based onsite and offshore managed SIEM model. 2 Evolution of A-SOC
  • 3.
    3 Advanced SOC -Features Threat Assessment and Hunting – Knowing Threats and Adversaries – Their tools and methods – Critical assets as targets – Existing Controls and Weakness – Monitoring presence , IOC Management and Hunting Threat Intelligence – Internal threat intelligence – External threat intelligence – Application of threat intelligence – Automated consumption of threat intelligence (updated SIEM rules/ runbook) Situational Awareness – Context and enrichment (Post correlation, joining the dots to see the attack chain) – Visibility (Visualization to the state of security) Security Analytics – Behavioral profiling for users and systems – Database searches and statistical modeling, reporting and visualization – Forensics capability (Netflow/ replay)
  • 4.
    Requirement Capability Sources IAMIntegration User Context User Activity Monitoring IAM Packaged Applications Unsupported Sources Network Application Monitoring Logs DLP Integration Data Context Data Monitoring Internal and External Intelligence Pattern Recognition Anomaly Detection Early Attack Detection Event Stream Integration Cloud-Sourced Application Monitoring Internal and Cloud 4 A-SOC Capabilities
  • 5.
    SOC 2.0 Strategy Programvision, objectives, approach, initiatives, roadmap SIEM Admin Operation • Tool / Log Integration • Reporting and Dashboards • Rule Administration • Device Administration Threat Monitoring and Response • Monitoring and Notification • Validation and Triage • Analysis and Escalation Threat Hunting and Intelligence • Internal Threat Intelligence (Assets/ Vulnerabilities/ Alerts • External Threat Intelligence (Feeds, analysis, actionable) SOC 2.0 Governance SOC Organization, Reporting, Service Level Management, Policy Approvals, Recommendations, Escalation. NBAD and Forensics Network flow monitoring and anomaly detection Full packet capture for forensics SOC 2.0 Operation Function • Active Threat Hunting • Run Book / Response Management • IOC Management • Use Case Management • Intelligence Analysis SOC 2.0 Strategy & Governance SOC 2.0 Operations SIEM Technology Log collection, processing and correlation Data sources – structure, referential and unstructured Incident Management Tool Ticketing, run book automation, incident response and collaboration and KPI monitoring SOC 2.0 Technology Analytics Big data – User Behavior Analytics And System Analytics Historical log and network and application data correlation Integration CMDB - Asset Modeling VM – Vulnerability Mapping Incident Mgt – Ticketing / Workflow Threat Intelligence Feeds Business Intelligence Security Dashboard Visualization – Integrated Security Posture Risk and Analysis Report SOC 2.0 Business Function • Requirement Analysis • Risk Management • Audit and Compliance Management • Legal and Fraud Management SOC 2.0 Technology Function • Architecture and Integration • Development • Server Management • Application, User and Data monitoring Soc 2.0 - CSIRT • Incident Response / Emergency Response • Forensics 5 A-SOC Framework
  • 6.
    • Data collectioncapabilities and compliance benefits of log management, • The correlation, normalization and analysis capabilities of SIEM (security information and event management) • The network visibility and advanced threat detection of NBAD (network behavior anomaly detection), and user behavior anomaly detection by machine learning - User Behavior Analytics • The ability to reduce breaches and ensure compliance provided by Risk Management, • The network traffic and application content insight afforded by Network Forensics. • The automation of Incident Response by Artificial Intelligence / Run Books • IOC / VM Management by Threat Intelligence • Reporting and Visualization provided by Presentation Layer SIEM as a platform should be a truly integrated solution built on a common codebase, with a single data management architecture and a single user interface. 6 A-SOC Technical Capabilities
  • 7.
    Monitor everything Logs, networktraffic, user activity Correlate intelligently Connect the dots of disparate activity Detect anomalies Unusual yet hidden behavior Prioritize for action Attack high-priority incidents Threat Intelligence • Logs • Contextual Data • Vulnerability Assessments • Asset Inventories • Reports and Analytics Internal • XFORCE • CrowdStrike • SecureWorks • Deepsight External Threat Ingestion - Structured Threat Information eXpression (STIX™) SIEM Environment Single, Unified and Integrated Management Console Machine Learning – Analytics Artificial Intelligence Incident Management Automation * Source - IBM 7 A-SOC Architecture
  • 8.
    D A TA S O U R C E S L I N K E D D A T A A N A L Y S I S Security Data Network Data End Point/Identity data Firewall /IPS/IDS Threat Intel SIEM Alerts Network Data Flow Data Proxy/WiFi Data Endpoint Data User Data /AD Database Data Client Devices Assets Internal Servers Websites Users Dynamic Knowledge Extraction Source Collaboration ANALYTICSENGINE RISK ENGINE SEARCH EXPLORATION REPORTS RISKS ! • A-SOCs leverages Threat Intelligence from multiple commercial and open sources and integrated into a platform for collaboration, correlation, visualization and actionable analysis. • A-SOCs leverages Big Data Platform for UBA, System analytics, visualization and reporting. • Platform is also used for running hunt missions, query engine, reporting and AI for ticketing and incident remediation. 8 A-SOC Big Data Tool-Set – Analytics/ UBA and TH
  • 9.
    • What allpatterns have been built and what algorithm the technology uses for machine learning • How accurate is the system in detecting anomalies for malware and behavior • How does it compare it with other similar products; what criteria should be used for evaluation. • Threat Intelligence comes in many forms, difficult to ingest and requires capabilities and continuous analysis and actionables MACHINE LEARNING AND ARTIFICIAL INTELLIGENCE SECURITY ANALYTICS – NBAD AND END POINT AND USER ANALYTICS THREAT INTELLIGENCE AND HUNTING 9 A-SOC Technical Queries
  • 10.
    Other Internal Teams Systems Applications Network Database Vulnerability/ Patch Business Risk / Compliance Information Technology Information Security and Risk Management CISO CEO , COO, CRO Board / Shareholders Incident Responder L2/L3 SOC Analysts Service Desk L-1 Monitoring Team SOC Manager SIEM Admins Incident Response Threat Hunter Country CERT Regulatory Bodies CIO SOC Team Internal SOC organization associated roles and responsibilities should be clearly defined. The following is a sample organization structure. Threat Intelligence 10 A-SOC Organization Structure and Functions
  • 11.
    Event Management • Eventmonitoring, analysis and correlation • Triage and Escalation • Containment • Proactive intelligence and situational awareness • Response collaboration Vulnerability & Patch Mgmt • Vulnerability research • Patch management • Identification • Dissemination • Compliance monitoring • Configuration / Control baselines • Antivirus signature management • Microsoft updates Incident Response • IM Charter, SIRT and TIG Reporting Structure, R&R • Incident Handling Process and Procedures for: • Identification, validation, declaration, escalation, containment, investigation, forensics, eradication, recovery, post incident • Cross functional RACI and coordindation for response • Forms and Templates Threat Specific Response Procedures • Phishhing / Spear Phishing • Malware (virus, worms, trojans, spyware) • NetFlow Abnormal Behavior Incident • Network Behavior Analysis Incident • (Distributed) Denial of Service • Domain hijack or DNS cache poisoning • Website defacement • Web application incident • Unauthorized access • User account compromise • Host compromise • Network compromise • Advanced persistent threat • Suspicious user activity SOC • Charter • Organization • Roles and responsibilities • Business requirements, scope and architecture • Service Catalogue • SOC operations and management procedures • SOC metrics and KPIs • SOC process and procedure manual (all processes and procedures including tool/solution specific) • SOC security policy • SOC business continuity and disaster recovery Threat Hunting • Threat Intelligence • Threat Hunting • Device / source inclusion and exclusion process 11 A-SOC Processes
  • 12.
    12 Advanced SOC Services •Custom parser creation and log source addition/integration per device type/days 1. Threat Hunting 2. Perform API integration of Vulnerability Management, Business Systems, CMDB etc. 3. Integrate with threat intelligence and automate responses with actionable Additional Services 1. Incident Management – Monitoring, Validation, Notification, Tracking Response and Closure 2. SIEM Administration – Managing Licenses, Patches, all SIEM Components, Health checks, log sources integrity, users and reports 3. Reporting and Dashboard – Creation and emailing the reports and dashboards to stakeholders with trend analysis 4. Use Case Management – New use case creation and fine tuning of existing use cases based on monitoring 5. Log Source Addition – Additional addition of devices and log sources, custom parser creation BAU Service
  • 13.
    Effort Time 1 2 3 12mths 24 mths36 mths 1 • Focus on Critical Assets – AD, Network, Core Web application used for transaction, Security Devices like Firewall, IPS, Proxy, Critical OS and Database to be monitored under SIEM • Monitor “what matters the most” (Web Apps, Core OS, Databases, etc.) • Keep the number of correlation rules in the order of risk, initially 10-12 Multi- Device correlation use cases • Create Three basic processes – Monitoring and Notification, Incident Management and Service Desk/ Ticketing Management • Create basic reporting and trends, alerts and notification and Incident Response summary • Start developing SOC related policies, procedures and workflows 2 • Perform 100% coverage for log sources; Include enterprise applications • Customization and Integration of application log sources • Add NetFlow and Forensics module • Create Forensics and Run Book processes • Add Threat Intelligence and build analytics for threat hunting • Monitor and Adapt Rule Bases – Fine tune rules • Create additional 10-12 Use Cases for Applications, Flows like file export/ protocol and IP and Forensics 3 • Automate Threat Intelligence Actionable • Define Threat Intelligence process for threat hunting, asset criticality and vulnerability identification and actionable • Implement User and system behavior analytics • Add use cases with statistical modeling • Additional reporting and visualization for key systems and data 13 Advanced SOC Services – Maturity Model
  • 14.
    21 Example Carbanak – A-SOCCapabilities 2 Malicious Web server sends or reflects exploit code <click> 1 Install Malware Mail-Client 5 Victim Domain Name Server Attacker Used Spearphised emails Command & Control 4 web-page + 3 Follow link Lateral Movement Screen capture/ Video recording 9 6 Remotely Control Malware Contact Updater By IP Address (C&C) 7 8 Word file with MA Data upload – Screens and VR
  • 15.
    22 Example Carbanak – A-SOCCapabilities 2 Malicious Web server sends or reflects exploit code <click> 1 Install Malware Mail-Client 5 Victim Domain Name Server Attacker Using Spearphised emails Command & Control 4 web-page + 3 Follow link 9 6 Remotely Control Malware Contact Updater By IP Address (C&C) 7 8 Word file with MA Lateral Movement Screen capture/ Video recording Data upload – Screens and VR d) Monitor Web Traffic a) Monitor DNS c) Monitor Port & Protocol Usage b) Monitor NetFlow e) Data in HTML Response - Netflow b) Monitor NetFlow
  • 16.
    Advanced SOC UseCase Management – Workshop
  • 17.
    17 Use Case Introduction toUse Cases • Different names are used to define rules that generate alerts in SIEM • There common terminologies used are as follows • SIEM Rules • Correlation Rules • Use Cases • SIEM Alert is typically a rule which does not require enumeration and there is no correlation of 2 conditions. It is a simple log condition that is interesting. For example – Administrative password change, file access, new user added, new table created, configuration change, PO approved etc. • SIEM rules/ alerts are typically simple log matching rules, another example is If I see string ABC 123 in HIPS logs that raise an alert or alert me if the configuration of the router has changed. • One can create some conditions in SIEM alerts and call it a SIEM rule which gives context. For Example – Administrative password changed from XX IP for YY user which is in “white list”. Here too, there is nothing abnormal but an alert to state that interesting event has happened. One can investigate to see why the password was changed or similarly why a table was created and is there a change ticket or an approval for the same.
  • 18.
    • Correlation isthe act of linking multiple events together to detect strange behavior. It is the association of different but related events to provide broader context than a single event can provide. • Correlation rules aka known as chaining of SIEM rules or SIEM alerts/events and typically make 2 conditions to match. • Correlation is built on rules for known attack patterns. One has to know what elements constitutes an attack patterns or elements of a compliance requirement in order to determine which device and event types should be linked. Also while correlating we have to factor in the time, because events do not happen simultaneously, so there is a window of time within which events are likely to be related. • So in a nutshell a correlation rule is “combining of multiple SIEM rule/alerts”. It can be from the same device or desperate devices. • E.g. Failed login attempts followed by successful login is correlation condition from same device but a scan detected by firewall, followed by access to application from application logs and then creation of a user in the application is a directory service of database logs creating a COMPROMISE condition. 18 Use Case Co-relation Rules
  • 19.
    • The termuse case is used for one or more correlation rules to describe a condition. • A Use Case is a set of steps, representing a business goal or defining interactions between a role (or an "actor") and a system to achieve a goal. The actor can be a human or an external system. In a nutshell a use case in our term is a customized set of conditions occurring from a combination of one or more correlation rule, generally industry specific that constitute an attack vector and also has a response mechanism. • Every use case has a Logic Flow, i.e. something unique to the environment and needs to be defined accordingly. • Use Case Response: After implementation, the Use Case need to be made as a valuable resource by Defining a Use Case Response. This is the stage where you would define “What action needs to be taken and how it needs to be taken”. 19 Use Case Co-relation Rules
  • 20.
    • Use CaseName - Privilege Activity Monitoring – Windows and Linux • Category: Access Control (AC) • Limit facility and information access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems) and to the authorized activities and transactions. • Use Case Number: 1 and 2 • Accounts having Privileged access, e.g. Admin, Sudo should be monitored on activity performed by ID. • References: • ISO/IEC 27001 A.11 • SANS Top 20: CSC 16 • PCI • Internal Policy Compliance • Use Case Description: • Accounts with administrator and/or root privileges should be monitored and flagged if they are locked due to multiple authentication failures. This could indicate potentially malicious activity and alerted on, accordingly. Generate report. • Log Sources: • Active Directory • UNIX Systems • Sample Rule Description: Privileged Role Violations: • Identify IDs not in Security Administration group that have made changes to user IDs and AD groups • Create an active list with users within the Security Admin group. • Create a rule to fire when a user not on the active list makes a change to a user ID and/or AD groups. • Event Name/Category - Use account got locked out • Event Attribute • - User Name • - Source IP Address/Host Name • - Destination IP Address/Host Name • - Event Name // - Event Time Stamp • - Log Source Event Code // Event description 20 Use Cases Sample Use Case
  • 21.
  • 22.
    Situational Awareness Ability to identifywhat is happening in the networks Reconnaissance Weaponization & Delivery Lateral Movement Data Exfiltration Persistency Identification and selection of the target/s host or network by active scanning Transmission/Inject of the malicious payload in to the target/s Detect, exploit and compromise other vulnerable hosts Steal and exhilarate data Establish a foothold in the corporate network  In military strategy, a “Kill Chain” is a phase model to describe the stages of an attack, which also helps inform ways to prevent attacks. 22 Incident Response Kill Chain Model for Use Cases Assist in IR
  • 23.
    Know your adversaries and their methods Detectthreat activity in kill chain Disrupt the kill chain and stop the attack Eradicate threat agent and remove the threat  Our Best Defence against advanced cyber threats has our built in threat intelligence, security operations and incident response working in cordial manner defined by our processes Threat Intelligence Security Operation Incident Response Response StrategyThreat Indicators 23 Incident Response Threat Indicators – Our defence in Cyber Kill Chain
  • 24.
    Topic Descriptions /Actions Purpose The purpose of this document is the provide guidance to Tier2 Triage and Tier 3 Response analysts on the approach to incident remediation. Scope The scope of this guidance includes 3 stages:  Containment  Eradication  Recovery Containment The intention of this stage is to limit the damage caused by the incident without yet removing the cause of the incident. This is typically done as the first step as it may take additional time to understand the cause of the incident and the appropriate eradication strategy. Examples of containment may include shutting down of affected systems, closing firewall ports etc. Eradication This stage is typically done after the containment stage where the cause of the incident is removed. Eradication can only be performed before containment if the incident cause is immediately clear and eradication can be performed swiftly before additional damage is caused by the incident. Examples of eradication include deleting malicious code, removing malicious accounts etc. Recovery This stage is done once the “victim” system impacted is no longer vulnerable. Examples of recovery include restoring from backup, patching servers etc. 24 Incident Response IR response process
  • 25.
    Topic Descriptions /Actions Attack Category Authentication Attack Sub Categories Misc Login Succeeded, General Authentication Failed, User Login Failure, Unknown Authentication, Host Login Succeeded, Host Login Failed, Misc Login Failed, Privilege Escalation Failed, Privilege Escalation Succeeded, Mail Service Login Succeeded, Mail Service Login Failed, Auth Server Login Failed, Auth Server, Group Added, Group Changed, Group Removed, Computer Account Added, Computer Account Changed, Computer Account Removed, Remote Access Login Succeeded, Remote Access Login Failed, General Authentication Successful, Telnet Login Succeeded, Telnet Login Failed, Suspicious Password, Samba Login Succeeded, Samba Login Failed and etc Response Remediation Options 1. Containment a. Terminate processes with any active connections with attacker IP or port b. Disable user id in question 2. Eradication a. Work with network team to physically locate internal attacker b. Physically remove internal attacker c. Turn off switch port of internal attacker d. Remove user access 3. Recovery a. Implement strong password policy b. Reconfigure vulnerable service as applicable c. Restore to previous good state from backup or recovery application 25 Incident Response IR response process
  • 26.
    1. Extract attacksource IP from Helpdesk/IR Ticket 2. Notify application owner of attack 3. Implement firewall rule to block attacker IP 4. If attack source is on local network, remote to a machine within same subnet of unauthorized device 5. Ping offending machine IP 6. Run “arp –a” command on command prompt to extract MAC Address 26 Incident Response IR Steps from Playbook SQL Injection
  • 27.