SIX STEPS TO QUALITY
Exterior Concrete
 It is often the forgotten investment. Siding gets
painted, flooring waxed, and furniture stain-
proofed. Meanwhile, the concrete driveways,
sidewalks and patios in the northern Midwest are
subject to some of the harshest weather
conditions.Yet, with a little bit of care, your
choice of a concrete driveway will last you
decades.
 Requirement #1
PROPER SUBGRADE PREPARATION
• Subgrade is the existing soil after the topsoil is
removed.
• Any pockets of soft soil that cannot be
uniformly compacted must be removed and
replaced with suitable material such as
compactable gravel.
• Slope the subgrade away from structures 1/4"
per lineal foot to ensure good drainage.
• Never place concrete on frozen or muddy
subgrade.
 Requirement #2
PROPER SLAB DESIGN
• Use a minimum thickness of 4 inches.
• Control joints should be placed as soon as possible with a
minimum depth of 1/4 the slab thickness never less than 1 inch.
• Joints should be spaced 2 to 2 1/2 the thickness of the slab
converted to feet (example - 4"x2 1/2 = 10 feet). It should never
be more than 15'.
• Aspect ratio should be maximum 1:1.5 (length to width ratio).
Make sure to incorporate restraint points into your joint layout.
• As with the sub base, slope the concrete surface 1/4" per lineal
foot.
• Isolation joints are required at existing slabs, structures, and
objects. Isolation joints should run the full depth of the slab.
 Requirement #3
PROPER CONCRETE MIX DESIGN
The mix must be a maximum water/cementitious
ratio of .45 air entrained concrete which would
equate to a minimum of 4500 psi meeting the
following requirements:
• Air content when placed: 6 percent, plus or minus 1
percent.
• Slump: 4 inches, plus or minus 1 inch.
• Coarse and fine aggregate: shall meetWisconsin
Department ofTransportation specifications.
Note:The air content and strength of the mix will be
effected by any re-tempering water added at the
jobsite.
 Requirement #4
PROPER PLACING AND FINISHING
• Place the concrete as near to final position as possible.
• No finishing operations shall be performed when there is excess
moisture or bleed water on the surface.
•The only finishing operations required are: screeding or strike-
off; bull floating prior to the appearance of any bleed water; a
waiting period for the water sheen to disappear; edging and
jointing; and a broom texture (the safest and most durable final
finish).
• Protection of the concrete from the hot sun, high winds, or
freezing temperatures is required until the concrete has a chance
to gain adequate strength and cure properly.
• All concrete should be placed within 90 minutes from the time
the truck was loaded. Hot-weather practices call for shorter
placement time limits.
 Requirement #5
PROPER CURING
•The concrete must be cured immediately after finishing!
Curing greatly increases the strength and durability of the
concrete surface and its resistance to freezing and thawing
as well as de-icer salts.
• Curing is a process where a satisfactory moisture content
and temperature must be maintained for a period of time.
•There are several methods of curing, however the most
common method is the use of high quality spray on curing
compound applied at the manufacturer's recommendation.
• In spring and fall when average temperatures are below
50 degrees, use cold weather concrete practices to
maintain temperature and cure the concrete for at least 7
days.
 Requirement #6
CONSUMER SEALING & AFTERCARE
• Keep vehicles off of freshly placed concrete for
at least 7 days.
• Freshly placed concrete should be sealed per
manufacturer's instructions. Consider resealing
aged concrete every several years or as wear in
high traffic areas begins to show.
• Sealing is a process where a protective coating
or penetrating water repellant material is applied
to keep moisture and contaminates out of the
concrete.
 •The use of down spouts can help ensure that
drain water does NOT undermine the slab which
can cause settlement cracks.
• Prevent snow and ice from accumulating on
the concrete especially the first winter. Sand can
always be used for traction.
• Never use de-icers containing fertilizer
ingredients such as ammonium sulfate,
ammonium nitrate, calcium chloride, and
magnesium chloride.These chemicals WILL
ATTACK AND DESTROY CONCRETE BY
CHEMICAL REACTION. NEVER USETHESE
PRODUCTS!
 Follow us on:
 Facebook –
https://www.facebook.com/NorthernConcreteConstruction
 Twitter - @concretewisc
 Pinterest - http://pinterest.com/concretewisc/
 Blog - http://www.northernconcreteinc.com/blog/
 For more information, Call 920.863.3043

More Related Content

What's hot

Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
Zelkhan
 
INTERNAL PLASTERING BY SK SANIUL HODA
INTERNAL PLASTERING BY SK SANIUL HODAINTERNAL PLASTERING BY SK SANIUL HODA
INTERNAL PLASTERING BY SK SANIUL HODA
Sk Saniul Hoda
 
Cons126
Cons126Cons126
Flooring
FlooringFlooring
Flooring
Jitesh Dhule
 
Lecture 02
Lecture 02Lecture 02
Lecture 02
Zed Sourav
 
flooring and types
flooring and typesflooring and types
flooring and types
manjiri bhojane
 
Cement Plastering procedure
Cement Plastering procedureCement Plastering procedure
Cement Plastering procedure
Syed Javed
 
Laying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to GuideLaying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to Guide
Topline - DIY, Home & Garden
 
Tyoes of Flooring
Tyoes of FlooringTyoes of Flooring
Tyoes of Flooring
Geetika Singla
 
INTERLOCKING TILES ∕ PAVERS
INTERLOCKING TILES ∕ PAVERSINTERLOCKING TILES ∕ PAVERS
INTERLOCKING TILES ∕ PAVERS
SANJEEV Wazir
 
Module 4 finishing works
Module 4 finishing worksModule 4 finishing works
Module 4 finishing works
Remya V.R
 
REPORT ON PLASTERING
REPORT ON PLASTERINGREPORT ON PLASTERING
REPORT ON PLASTERING
Mehul Gohil
 
Sample Specification for M10 Proprietary Quick Drying Levelling Screeds
Sample Specification for M10 Proprietary Quick Drying Levelling ScreedsSample Specification for M10 Proprietary Quick Drying Levelling Screeds
Sample Specification for M10 Proprietary Quick Drying Levelling Screeds
FlexiDry Global Ltd
 
TYPES OF FLOORING MATERIALS
TYPES OF FLOORING MATERIALS   TYPES OF FLOORING MATERIALS
TYPES OF FLOORING MATERIALS
Divya Suresh
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
KHUSHBU SHAH
 
Cons 127
Cons 127Cons 127
Cons 127
Sewar Khasawneh
 
Vinyl flooring
Vinyl flooringVinyl flooring
Vinyl flooring
Rashi Jain
 

What's hot (19)

Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 
INTERNAL PLASTERING BY SK SANIUL HODA
INTERNAL PLASTERING BY SK SANIUL HODAINTERNAL PLASTERING BY SK SANIUL HODA
INTERNAL PLASTERING BY SK SANIUL HODA
 
Cons126
Cons126Cons126
Cons126
 
Industrial flooring
Industrial flooringIndustrial flooring
Industrial flooring
 
Flooring
FlooringFlooring
Flooring
 
Lecture 02
Lecture 02Lecture 02
Lecture 02
 
flooring and types
flooring and typesflooring and types
flooring and types
 
Cement Plastering procedure
Cement Plastering procedureCement Plastering procedure
Cement Plastering procedure
 
Laying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to GuideLaying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to Guide
 
Tyoes of Flooring
Tyoes of FlooringTyoes of Flooring
Tyoes of Flooring
 
INTERLOCKING TILES ∕ PAVERS
INTERLOCKING TILES ∕ PAVERSINTERLOCKING TILES ∕ PAVERS
INTERLOCKING TILES ∕ PAVERS
 
Module 4 finishing works
Module 4 finishing worksModule 4 finishing works
Module 4 finishing works
 
REPORT ON PLASTERING
REPORT ON PLASTERINGREPORT ON PLASTERING
REPORT ON PLASTERING
 
Sample Specification for M10 Proprietary Quick Drying Levelling Screeds
Sample Specification for M10 Proprietary Quick Drying Levelling ScreedsSample Specification for M10 Proprietary Quick Drying Levelling Screeds
Sample Specification for M10 Proprietary Quick Drying Levelling Screeds
 
TYPES OF FLOORING MATERIALS
TYPES OF FLOORING MATERIALS   TYPES OF FLOORING MATERIALS
TYPES OF FLOORING MATERIALS
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Cons 127
Cons 127Cons 127
Cons 127
 
Vinyl flooring
Vinyl flooringVinyl flooring
Vinyl flooring
 
FLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGSFLOOR FINISHES AND COVERINGS
FLOOR FINISHES AND COVERINGS
 

Viewers also liked

Steps to quality
Steps to qualitySteps to quality
Steps to quality
dhaughto
 
3 Simple Steps to Control Termites
3 Simple Steps to Control Termites3 Simple Steps to Control Termites
3 Simple Steps to Control Termites
Termite Solutions
 
Stair Steps to Quality Silage: Pioneer Inoculant Development
Stair Steps to Quality Silage: Pioneer Inoculant DevelopmentStair Steps to Quality Silage: Pioneer Inoculant Development
Stair Steps to Quality Silage: Pioneer Inoculant Development
DuPont Pioneer
 
Quality Control Circles(QCC) حلقه هاي كيفيت
Quality Control Circles(QCC) حلقه هاي كيفيتQuality Control Circles(QCC) حلقه هاي كيفيت
Quality Control Circles(QCC) حلقه هاي كيفيت
Yaser Zabolestani
 
The Importance of Quality Control Steps in Experiments
The Importance of Quality Control Steps in ExperimentsThe Importance of Quality Control Steps in Experiments
The Importance of Quality Control Steps in Experiments
QIAGEN
 
5 Steps to your Quality Manual
5 Steps to your Quality Manual5 Steps to your Quality Manual
5 Steps to your Quality Manual
Extly Extensions - JoomGap
 
Quality Management Presentation
Quality Management PresentationQuality Management Presentation
Quality Management Presentation
brianbish10795
 
Quality Control
Quality ControlQuality Control
Quality Control
vishakeb
 
Quality control in clinical laboratory
Quality control in clinical laboratoryQuality control in clinical laboratory
Quality control in clinical laboratory
drgomi basar
 

Viewers also liked (10)

Steps to quality
Steps to qualitySteps to quality
Steps to quality
 
3 Simple Steps to Control Termites
3 Simple Steps to Control Termites3 Simple Steps to Control Termites
3 Simple Steps to Control Termites
 
Stair Steps to Quality Silage: Pioneer Inoculant Development
Stair Steps to Quality Silage: Pioneer Inoculant DevelopmentStair Steps to Quality Silage: Pioneer Inoculant Development
Stair Steps to Quality Silage: Pioneer Inoculant Development
 
Quality Control Circles(QCC) حلقه هاي كيفيت
Quality Control Circles(QCC) حلقه هاي كيفيتQuality Control Circles(QCC) حلقه هاي كيفيت
Quality Control Circles(QCC) حلقه هاي كيفيت
 
The Importance of Quality Control Steps in Experiments
The Importance of Quality Control Steps in ExperimentsThe Importance of Quality Control Steps in Experiments
The Importance of Quality Control Steps in Experiments
 
5 Steps to your Quality Manual
5 Steps to your Quality Manual5 Steps to your Quality Manual
5 Steps to your Quality Manual
 
Quality control
Quality controlQuality control
Quality control
 
Quality Management Presentation
Quality Management PresentationQuality Management Presentation
Quality Management Presentation
 
Quality Control
Quality ControlQuality Control
Quality Control
 
Quality control in clinical laboratory
Quality control in clinical laboratoryQuality control in clinical laboratory
Quality control in clinical laboratory
 

Similar to Six steps to quality

Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
Himanshu Gupta
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
swethasekhar5
 
CONCRETE PPT SA JBP
CONCRETE PPT SA JBPCONCRETE PPT SA JBP
CONCRETE PPT SA JBP
Suyash Awasthi
 
porous and previous roads
porous and previous roadsporous and previous roads
porous and previous roads
Shubham Singh [NITK]
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
ARUNKUMARC39
 
Classification, manufacturing & uses of cement
 Classification, manufacturing & uses of cement Classification, manufacturing & uses of cement
Classification, manufacturing & uses of cement
Firoz Mahmud
 
Water proofing
Water proofing Water proofing
Water proofing
shahbaz hassan
 
R22 bunker storage of grains
R22 bunker storage of grainsR22 bunker storage of grains
R22 bunker storage of grains
Maya Sharma
 
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptxcf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
KavithaSuresh31
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
Prabhat chhirolya
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Latha Reddy
 
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación..."Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
Instituto del cemento y Hormigón de Chile
 
QSCM.pptx
QSCM.pptxQSCM.pptx
QSCM.pptx
harishg6783
 
Self curing-concrete-civil
Self curing-concrete-civilSelf curing-concrete-civil
Self curing-concrete-civil
Bharani Rajavel
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
y Sahaja
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
Rimpi Baro
 
Curing
CuringCuring
diaphragm and basement construction.pptx
diaphragm and basement construction.pptxdiaphragm and basement construction.pptx
diaphragm and basement construction.pptx
ChinnuNinan
 

Similar to Six steps to quality (20)

Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
 
Sanchit
SanchitSanchit
Sanchit
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
 
CONCRETE PPT SA JBP
CONCRETE PPT SA JBPCONCRETE PPT SA JBP
CONCRETE PPT SA JBP
 
porous and previous roads
porous and previous roadsporous and previous roads
porous and previous roads
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
 
Classification, manufacturing & uses of cement
 Classification, manufacturing & uses of cement Classification, manufacturing & uses of cement
Classification, manufacturing & uses of cement
 
Water proofing
Water proofing Water proofing
Water proofing
 
R22 bunker storage of grains
R22 bunker storage of grainsR22 bunker storage of grains
R22 bunker storage of grains
 
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptxcf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
cf_Special Concrete SHOTCRETE PRESENTATION_124_CE60021543644600-1.pptx
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Cip
CipCip
Cip
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación..."Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
"Cómo el concreto y los pavimentos permeables ayudan a reducir la acumulación...
 
QSCM.pptx
QSCM.pptxQSCM.pptx
QSCM.pptx
 
Self curing-concrete-civil
Self curing-concrete-civilSelf curing-concrete-civil
Self curing-concrete-civil
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Curing
CuringCuring
Curing
 
diaphragm and basement construction.pptx
diaphragm and basement construction.pptxdiaphragm and basement construction.pptx
diaphragm and basement construction.pptx
 

Recently uploaded

The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 

Recently uploaded (20)

The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 

Six steps to quality

  • 1. SIX STEPS TO QUALITY Exterior Concrete
  • 2.  It is often the forgotten investment. Siding gets painted, flooring waxed, and furniture stain- proofed. Meanwhile, the concrete driveways, sidewalks and patios in the northern Midwest are subject to some of the harshest weather conditions.Yet, with a little bit of care, your choice of a concrete driveway will last you decades.
  • 3.  Requirement #1 PROPER SUBGRADE PREPARATION • Subgrade is the existing soil after the topsoil is removed. • Any pockets of soft soil that cannot be uniformly compacted must be removed and replaced with suitable material such as compactable gravel. • Slope the subgrade away from structures 1/4" per lineal foot to ensure good drainage. • Never place concrete on frozen or muddy subgrade.
  • 4.  Requirement #2 PROPER SLAB DESIGN • Use a minimum thickness of 4 inches. • Control joints should be placed as soon as possible with a minimum depth of 1/4 the slab thickness never less than 1 inch. • Joints should be spaced 2 to 2 1/2 the thickness of the slab converted to feet (example - 4"x2 1/2 = 10 feet). It should never be more than 15'. • Aspect ratio should be maximum 1:1.5 (length to width ratio). Make sure to incorporate restraint points into your joint layout. • As with the sub base, slope the concrete surface 1/4" per lineal foot. • Isolation joints are required at existing slabs, structures, and objects. Isolation joints should run the full depth of the slab.
  • 5.  Requirement #3 PROPER CONCRETE MIX DESIGN The mix must be a maximum water/cementitious ratio of .45 air entrained concrete which would equate to a minimum of 4500 psi meeting the following requirements: • Air content when placed: 6 percent, plus or minus 1 percent. • Slump: 4 inches, plus or minus 1 inch. • Coarse and fine aggregate: shall meetWisconsin Department ofTransportation specifications. Note:The air content and strength of the mix will be effected by any re-tempering water added at the jobsite.
  • 6.  Requirement #4 PROPER PLACING AND FINISHING • Place the concrete as near to final position as possible. • No finishing operations shall be performed when there is excess moisture or bleed water on the surface. •The only finishing operations required are: screeding or strike- off; bull floating prior to the appearance of any bleed water; a waiting period for the water sheen to disappear; edging and jointing; and a broom texture (the safest and most durable final finish). • Protection of the concrete from the hot sun, high winds, or freezing temperatures is required until the concrete has a chance to gain adequate strength and cure properly. • All concrete should be placed within 90 minutes from the time the truck was loaded. Hot-weather practices call for shorter placement time limits.
  • 7.  Requirement #5 PROPER CURING •The concrete must be cured immediately after finishing! Curing greatly increases the strength and durability of the concrete surface and its resistance to freezing and thawing as well as de-icer salts. • Curing is a process where a satisfactory moisture content and temperature must be maintained for a period of time. •There are several methods of curing, however the most common method is the use of high quality spray on curing compound applied at the manufacturer's recommendation. • In spring and fall when average temperatures are below 50 degrees, use cold weather concrete practices to maintain temperature and cure the concrete for at least 7 days.
  • 8.  Requirement #6 CONSUMER SEALING & AFTERCARE • Keep vehicles off of freshly placed concrete for at least 7 days. • Freshly placed concrete should be sealed per manufacturer's instructions. Consider resealing aged concrete every several years or as wear in high traffic areas begins to show. • Sealing is a process where a protective coating or penetrating water repellant material is applied to keep moisture and contaminates out of the concrete.
  • 9.  •The use of down spouts can help ensure that drain water does NOT undermine the slab which can cause settlement cracks. • Prevent snow and ice from accumulating on the concrete especially the first winter. Sand can always be used for traction. • Never use de-icers containing fertilizer ingredients such as ammonium sulfate, ammonium nitrate, calcium chloride, and magnesium chloride.These chemicals WILL ATTACK AND DESTROY CONCRETE BY CHEMICAL REACTION. NEVER USETHESE PRODUCTS!
  • 10.
  • 11.
  • 12.
  • 13.  Follow us on:  Facebook – https://www.facebook.com/NorthernConcreteConstruction  Twitter - @concretewisc  Pinterest - http://pinterest.com/concretewisc/  Blog - http://www.northernconcreteinc.com/blog/  For more information, Call 920.863.3043