SIMULATION MODELING
A Presentation on
K.K. Parekh Institute of Management Studies
(Amreli)
Prepared by :-
Mehul Rasadiya
INTRODUCTION
 It is a technique(Quantitative) for carrying out
experiments for analyzing the behavior and evaluating
the performance of a proposed system under assumed
condition of reality.
 An experiment or relatively simplified experimental model
of a system is used to examine the components or
properties of system, their behavior I relation to each
other and in relation to the entire system at a point of
time and over period of time, under different assume
condition.
 The alternative courses, inputs, components, properties
and variables of the system are experimentally
manipulated in several way to find out their interactions
and impact on the system’s operation and behavior.
SIMULATION DEFINATION
• Simulation is the imitation of the
operation of a real world system over
time.
• Simulation involves the generation of an
artificial history of the system and the
drawing of inferences from it.
REASON FOR USING SIMULATION
 Many practical problem where mathematical
simplification is not feasible.
 There is no sufficient time to allow the system to operate
extensively.
 Simulation model can be used to conduct experiments
without disrupting real system.
 Enable a manager to provide insights into certain
problem where the actual environment is difficult to
observe.
 The non technical manager can comprehend simulation
more easily than a complex mathematical model.
The Process of Simulation
ADVANTAGES
1. Flexibility
2. Can handle large and complex systems
3. Can answer “what-if” questions
4. Does not interfere with the real system
5. Allows study of interaction among
variables
6. “Time compression” is possible
7. Handles complications that other
methods can’t
DISADVANTAGES
1. Can be expensive and time consuming
2. Does not generate optimal solutions
3. Managers must choose solutions they
want to try (“what-if” scenarios)
4. Each model is unique
APPLICATION OF SIMULATION
 Manufacturing and other process
 Scheduling production processes
 Design of system(marketing, information,
inventory, weapon, manpower employment,
traffic light-timing, etc.)
 Facilities(hospitals, harbors, railways, libraries,
schools, design of parking lots, communication
system, etc)
 Resource development programmers( water
resources, human resources, petro-chemical,
energy resources, and so on)
Deterministic Model
All data are assumed
to be known with
certainty
Probabilistic Model
Some data are described
by probability distribution.
System Simulation
An experiment used to
describe sequences of events
that occur over time.
(inventory, queuing,
manufacturing process)
Simulation Models
Monte Carlo Simulation
A sampling experiment whose
purpose is to estimate the
distribution of an outcome variable
that depends on several
probabilistic input variables. (profit
projection, stock portfolio).
Steps Involved in Simulation
(Monte Carlo Technique)
 Find the cumulative Probability
 Assign random numbers Interval corresponding to the
Probability.
 From the random number tables, choose a set of
required random numbers from any part of the table.
This can be done by following any fixed pattern like
row wise, column wise, diagonal wise.
 Choice of random numbers whether single digit,
double digit, triple digit etc. depends upon the number
of places to which Probability is known. Eg- If the
prob. have been calculated to two decimal places,
which add up to 1.00, we need 100 numbers of 2 digit
to represent each point of probability. Thus we take
random no.s 00-99 to represent them.
CASE STUDY
A company manufactures 30 units/day. The sale of these items
depends upon demand which has the following distribution.
 The production cost and sales price of each unit are Rs. 40 and Rs.
50, respectively. Any unsold product is to be disposed off at loss of
Rs. 15. There is a penalty of Rs. 5 per unit if the demand is not met.
 Using the following random numbers, estimate the total profit/loss for
the company for the next ten days. 10, 99, 65, 99, 01, 79, 11, 16, 20
 If the company decides to produce 29 units per day, what is the
advantage or disadvantage of the company?
Sales (Unit) Probability
27 0.10
28 0.15
29 0.20
30 0.35
31 0.15
32 0.05
Sales (unit) Probability Cumulative
probability
Random No.
Interval
27 0.10 0.10
28 0.15
29 0.20
30 0.35
31 0.15
32 0.05
Sales (unit) Probability Cumulative
probability
Random No.
Interval
27 0.10 0.10
28 0.15 0.25
29 0.20 0.45
30 0.35 0.80
31 0.15 0.95
32 0.05 1.00
Sales (unit) Probability Cumulative
probability
Random No.
Interval
27 0.10 0.10 00-09
28 0.15 0.25 10-24
29 0.20 0.45 25-44
30 0.35 0.80 45-79
31 0.15 0.95 80-94
32 0.05 1.00 95-99
As the first step, random numbers 00-99 are allocated to various
possible sales values in production to the probabilities associated
with them.
 Now we simulate the demand for the next 10 days using
the given random numbers.
From the given following information, we have
Profit per unit sold = Rs. 50 – Rs. 40= Rs. 10
Loss per unit unsold = Rs. 15
Penalty for using demand = Rs. 5 per unit
 Using these inputs, the profit/loss for the 10 days is
calculated, first when production is 30 units per day and
then when it is 29 units.
 It is evident that the total profit/loss for the 10 days is Rs.
2695 when 30 units are produced. Also, if the company
decides to produce 29 units per day, the total profit works
out to be the same.
Days Random
Numbers
Estimat
ed
Sales
(units)
Profit/Loss per day with production
30 units 29 units
1 10 28
2 99
3 65
4 99
5 95
6 01
7 79
8 1
9 16
10 20
Days Random
Numbers
Estimat
ed
Sales
(units)
Profit/Loss per day with production
30 units 29 units
1 10 28
2 99 32
3 65 30
4 99 32
5 95 32
6 01 27
7 79 30
8 1 28
9 16 28
10 20 28
Days Random
Number
s
Estimate
d Sales
(units)
Profit/Loss per day with production
30 units 29 units
1 10 28 28*10-2*15 = Rs. 250
2 99 32
3 65 30
4 99 32
5 95 32
6 01 27
7 79 30
8 1 28
9 16 28
10 20 28
Days Random
Number
s
Estimate
d Sales
(units)
Profit/Loss per day with production
30 units
1 10 28 28*10-2*15 = Rs. 250
2 99 32 30*10-2*5 = Rs. 290
3 65 30 30*10 = Rs. 300
4 99 32 30*10-2*5 = Rs. 290
5 95 32 30*10-2*5 = Rs. 290
6 01 27 27*10-3*15 = Rs. 225
7 79 30 30*10 = Rs. 300
8 1 28 28*10-2*15 = Rs. 250
9 16 28 28*10-2*15 = Rs. 250
10 20 28 28*10-2*15 = Rs. 250
Total Profit = Rs. 2695
Days Rando
m
Number
s
Estimate
d Sales
(units)
Profit/Loss per day with production
30 units 29 units
1 10 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265
2 99 32 30*10-2*5 = Rs. 290
3 65 30 30*10 = Rs. 300
4 99 32 30*10-2*5 = Rs. 290
5 95 32 30*10-2*15 = Rs. 290
6 01 27 27*10-3*15 = Rs. 225
7 79 30 30*10 = Rs. 300
8 1 28 28*10-2*15 = Rs. 250
9 16 28 28*10-2*15 = Rs. 250
10 20 28 28*10-2*15 = Rs. 250
Total Profit = Rs. 2695
Days Rando
m
Number
s
Estimate
d Sales
(units)
Profit/Loss per day with production
30 units 29 units
1 10 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265
2 99 32 30*10-2*5 = Rs. 290 29*10-3*5 = Rs. 275
3 65 30 30*10 = Rs. 300 29*10-1*5 = Rs. 285
4 99 32 30*10-2*5 = Rs. 290 29*10-3*5 = Rs. 275
5 95 32 30*10-2*15 = Rs. 290 29*10-3*5 = Rs. 265
6 01 27 27*10-3*15 = Rs. 225 27*10-2*15 = Rs. 240
7 79 30 30*10 = Rs. 300 29*10-1*5 = Rs. 285
8 1 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265
9 16 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265
10 20 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265
Total Profit = Rs. 2695 = Rs. 2695
When company decides to produce 29 units per
day, so that time no change in profit or loss.
Compare to 30 units per day.
When company
produce 30 units
When company
produce 29 units
Total Profit =
Rs. 2695
Total Profit =
Rs. 2695
Simulation (qa ii)

More Related Content

What's hot

Models of Operational research, Advantages & disadvantages of Operational res...
Models of Operational research, Advantages & disadvantages of Operational res...Models of Operational research, Advantages & disadvantages of Operational res...
Models of Operational research, Advantages & disadvantages of Operational res...
Sunny Mervyne Baa
 
Operations research - an overview
Operations research -  an overviewOperations research -  an overview
Operations research - an overview
Joseph Konnully
 
Goal programming
Goal programmingGoal programming
Goal programming
Hakeem-Ur- Rehman
 
OR (JNTUK) III Mech Unit 8 simulation
OR (JNTUK) III Mech Unit 8  simulationOR (JNTUK) III Mech Unit 8  simulation
OR (JNTUK) III Mech Unit 8 simulation
Nageswara Rao Thots
 
Applications of simulation in Business with Example
Applications of simulation in Business with ExampleApplications of simulation in Business with Example
Applications of simulation in Business with Example
Pratima Ray
 
Replacement Theory Models in Operations Research by Dr. Rajesh Timane
Replacement Theory Models in Operations Research by Dr. Rajesh TimaneReplacement Theory Models in Operations Research by Dr. Rajesh Timane
Replacement Theory Models in Operations Research by Dr. Rajesh Timane
Rajesh Timane, PhD
 
Queueing Theory and its BusinessS Applications
Queueing Theory and its BusinessS ApplicationsQueueing Theory and its BusinessS Applications
Queueing Theory and its BusinessS Applications
Biswajit Bhattacharjee
 
Game theory
Game theoryGame theory
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
Sujeet TAMBE
 
Decision theory
Decision theoryDecision theory
Decision theory
KULDEEP MATHUR
 
Sequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and ProblemsSequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and Problems
Sundar B N
 
Operations Research - Models
Operations Research - ModelsOperations Research - Models
Operations Research - Models
Sundar B N
 
Decision making under uncertaionity
Decision making under uncertaionityDecision making under uncertaionity
Decision making under uncertaionity
Suresh Thengumpallil
 
Replacement Model - Types and Problem
Replacement Model - Types and ProblemReplacement Model - Types and Problem
Replacement Model - Types and Problem
Sundar B N
 
Introduction to Operations Research
Introduction to Operations ResearchIntroduction to Operations Research
Introduction to Operations Research
Sundar B N
 
OPERATION RESEARCH Simulation
OPERATION RESEARCH SimulationOPERATION RESEARCH Simulation
OPERATION RESEARCH Simulation
Komal Hambir
 
Demand forcasting
Demand forcastingDemand forcasting
Demand forcasting
Naganandini Devi
 
Operation research history and overview application limitation
Operation research history and overview application limitationOperation research history and overview application limitation
Operation research history and overview application limitation
Balaji P
 
decision making criterion
decision making criteriondecision making criterion
decision making criterion
Gaurav Sonkar
 
Models of Operations Research is addressed
Models of Operations Research is addressedModels of Operations Research is addressed
Models of Operations Research is addressed
Sundar B N
 

What's hot (20)

Models of Operational research, Advantages & disadvantages of Operational res...
Models of Operational research, Advantages & disadvantages of Operational res...Models of Operational research, Advantages & disadvantages of Operational res...
Models of Operational research, Advantages & disadvantages of Operational res...
 
Operations research - an overview
Operations research -  an overviewOperations research -  an overview
Operations research - an overview
 
Goal programming
Goal programmingGoal programming
Goal programming
 
OR (JNTUK) III Mech Unit 8 simulation
OR (JNTUK) III Mech Unit 8  simulationOR (JNTUK) III Mech Unit 8  simulation
OR (JNTUK) III Mech Unit 8 simulation
 
Applications of simulation in Business with Example
Applications of simulation in Business with ExampleApplications of simulation in Business with Example
Applications of simulation in Business with Example
 
Replacement Theory Models in Operations Research by Dr. Rajesh Timane
Replacement Theory Models in Operations Research by Dr. Rajesh TimaneReplacement Theory Models in Operations Research by Dr. Rajesh Timane
Replacement Theory Models in Operations Research by Dr. Rajesh Timane
 
Queueing Theory and its BusinessS Applications
Queueing Theory and its BusinessS ApplicationsQueueing Theory and its BusinessS Applications
Queueing Theory and its BusinessS Applications
 
Game theory
Game theoryGame theory
Game theory
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Decision theory
Decision theoryDecision theory
Decision theory
 
Sequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and ProblemsSequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and Problems
 
Operations Research - Models
Operations Research - ModelsOperations Research - Models
Operations Research - Models
 
Decision making under uncertaionity
Decision making under uncertaionityDecision making under uncertaionity
Decision making under uncertaionity
 
Replacement Model - Types and Problem
Replacement Model - Types and ProblemReplacement Model - Types and Problem
Replacement Model - Types and Problem
 
Introduction to Operations Research
Introduction to Operations ResearchIntroduction to Operations Research
Introduction to Operations Research
 
OPERATION RESEARCH Simulation
OPERATION RESEARCH SimulationOPERATION RESEARCH Simulation
OPERATION RESEARCH Simulation
 
Demand forcasting
Demand forcastingDemand forcasting
Demand forcasting
 
Operation research history and overview application limitation
Operation research history and overview application limitationOperation research history and overview application limitation
Operation research history and overview application limitation
 
decision making criterion
decision making criteriondecision making criterion
decision making criterion
 
Models of Operations Research is addressed
Models of Operations Research is addressedModels of Operations Research is addressed
Models of Operations Research is addressed
 

Similar to Simulation (qa ii)

onstraints on labour productivity-a case study
onstraints on labour productivity-a case studyonstraints on labour productivity-a case study
onstraints on labour productivity-a case study
theijes
 
Constraints on labour productivity-a case study
Constraints on labour productivity-a case studyConstraints on labour productivity-a case study
Constraints on labour productivity-a case study
theijes
 
Unit2 montecarlosimulation
Unit2 montecarlosimulationUnit2 montecarlosimulation
Unit2 montecarlosimulation
DevaKumari Vijay
 
Unit 4 simulation and queing theory(m/m/1)
Unit 4  simulation and queing theory(m/m/1)Unit 4  simulation and queing theory(m/m/1)
Unit 4 simulation and queing theory(m/m/1)
DevaKumari Vijay
 
SIMULATION.pptx
SIMULATION.pptxSIMULATION.pptx
SIMULATION.pptx
jerryhusnah
 
Simulation theory
Simulation theorySimulation theory
Simulation theory
Abu Bashar
 
1. intro. to or & lp
1. intro. to or & lp1. intro. to or & lp
1. intro. to or & lp
Hakeem-Ur- Rehman
 
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of SimulationIRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET Journal
 
Incorporation risk1
Incorporation risk1Incorporation risk1
Incorporation risk1
Zulfiqar Ansari
 
Modeling__Simulation computer science and engineering
Modeling__Simulation computer science and engineeringModeling__Simulation computer science and engineering
Modeling__Simulation computer science and engineering
VishalPandat2
 
Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 new
mohsinmmm
 
Production function [ management ]
Production function [ management ] Production function [ management ]
Production function [ management ]
Dhairya Joshi
 
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docx
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docxModule CSimulationQNT 5160 Data Driven Decision MakingMo.docx
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docx
gilpinleeanna
 
Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
Modeling and Analysis of a Manufacturing Plant Using Discrete Event SimulationModeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
IJERA Editor
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Modeling and simulation
Modeling and simulationModeling and simulation
Modeling and simulation
Payel Rani
 
4_5821003798000177081.pdf
4_5821003798000177081.pdf4_5821003798000177081.pdf
4_5821003798000177081.pdf
ozgenn4242
 
MSD 340 Spring 2014Homework 1Note• Due date Feb 12, W.docx
MSD 340      Spring 2014Homework 1Note• Due date Feb 12, W.docxMSD 340      Spring 2014Homework 1Note• Due date Feb 12, W.docx
MSD 340 Spring 2014Homework 1Note• Due date Feb 12, W.docx
rosemarybdodson23141
 
SIMULATION AND MODELLING
SIMULATION AND MODELLINGSIMULATION AND MODELLING
SIMULATION AND MODELLING
MR Z
 
Simulation.pps.pdf
Simulation.pps.pdfSimulation.pps.pdf
Simulation.pps.pdf
AmanSaini399586
 

Similar to Simulation (qa ii) (20)

onstraints on labour productivity-a case study
onstraints on labour productivity-a case studyonstraints on labour productivity-a case study
onstraints on labour productivity-a case study
 
Constraints on labour productivity-a case study
Constraints on labour productivity-a case studyConstraints on labour productivity-a case study
Constraints on labour productivity-a case study
 
Unit2 montecarlosimulation
Unit2 montecarlosimulationUnit2 montecarlosimulation
Unit2 montecarlosimulation
 
Unit 4 simulation and queing theory(m/m/1)
Unit 4  simulation and queing theory(m/m/1)Unit 4  simulation and queing theory(m/m/1)
Unit 4 simulation and queing theory(m/m/1)
 
SIMULATION.pptx
SIMULATION.pptxSIMULATION.pptx
SIMULATION.pptx
 
Simulation theory
Simulation theorySimulation theory
Simulation theory
 
1. intro. to or & lp
1. intro. to or & lp1. intro. to or & lp
1. intro. to or & lp
 
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of SimulationIRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of Simulation
 
Incorporation risk1
Incorporation risk1Incorporation risk1
Incorporation risk1
 
Modeling__Simulation computer science and engineering
Modeling__Simulation computer science and engineeringModeling__Simulation computer science and engineering
Modeling__Simulation computer science and engineering
 
Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 new
 
Production function [ management ]
Production function [ management ] Production function [ management ]
Production function [ management ]
 
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docx
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docxModule CSimulationQNT 5160 Data Driven Decision MakingMo.docx
Module CSimulationQNT 5160 Data Driven Decision MakingMo.docx
 
Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
Modeling and Analysis of a Manufacturing Plant Using Discrete Event SimulationModeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Modeling and simulation
Modeling and simulationModeling and simulation
Modeling and simulation
 
4_5821003798000177081.pdf
4_5821003798000177081.pdf4_5821003798000177081.pdf
4_5821003798000177081.pdf
 
MSD 340 Spring 2014Homework 1Note• Due date Feb 12, W.docx
MSD 340      Spring 2014Homework 1Note• Due date Feb 12, W.docxMSD 340      Spring 2014Homework 1Note• Due date Feb 12, W.docx
MSD 340 Spring 2014Homework 1Note• Due date Feb 12, W.docx
 
SIMULATION AND MODELLING
SIMULATION AND MODELLINGSIMULATION AND MODELLING
SIMULATION AND MODELLING
 
Simulation.pps.pdf
Simulation.pps.pdfSimulation.pps.pdf
Simulation.pps.pdf
 

More from Mehul Rasadiya

Search Engine Marketing
Search Engine Marketing Search Engine Marketing
Search Engine Marketing
Mehul Rasadiya
 
PLC analysis of Nokia and Samsung
PLC analysis of Nokia and SamsungPLC analysis of Nokia and Samsung
PLC analysis of Nokia and Samsung
Mehul Rasadiya
 
New product devlopment process of TATA NANO
New product devlopment process of TATA NANONew product devlopment process of TATA NANO
New product devlopment process of TATA NANO
Mehul Rasadiya
 
Ratan tata. as a strategic leader,,
Ratan tata. as a strategic leader,,Ratan tata. as a strategic leader,,
Ratan tata. as a strategic leader,,
Mehul Rasadiya
 
Contract of agency
Contract of agencyContract of agency
Contract of agency
Mehul Rasadiya
 
Research report on Consumer perception towards BAJAJ two wheelers
Research report on Consumer perception towards BAJAJ two wheelersResearch report on Consumer perception towards BAJAJ two wheelers
Research report on Consumer perception towards BAJAJ two wheelers
Mehul Rasadiya
 
Logistic
LogisticLogistic
Logistic
Mehul Rasadiya
 
Adveritising strategy of toi
Adveritising strategy of toiAdveritising strategy of toi
Adveritising strategy of toi
Mehul Rasadiya
 
Tata cost leadership
Tata cost leadershipTata cost leadership
Tata cost leadership
Mehul Rasadiya
 
Jit in mc donald's
Jit in mc donald'sJit in mc donald's
Jit in mc donald's
Mehul Rasadiya
 
Excel crop care ltd
Excel crop care ltdExcel crop care ltd
Excel crop care ltd
Mehul Rasadiya
 
Axis
AxisAxis
Promotion mix (mm)
Promotion mix (mm)Promotion mix (mm)
Promotion mix (mm)
Mehul Rasadiya
 
Brading positioning of garneir
Brading positioning of garneirBrading positioning of garneir
Brading positioning of garneir
Mehul Rasadiya
 
Amul distri
Amul distriAmul distri
Amul distri
Mehul Rasadiya
 
Essar oil (cma)
Essar oil (cma)Essar oil (cma)
Essar oil (cma)
Mehul Rasadiya
 
Promotionmixppt
PromotionmixpptPromotionmixppt
Promotionmixppt
Mehul Rasadiya
 
Promotionmixppt
PromotionmixpptPromotionmixppt
Promotionmixppt
Mehul Rasadiya
 
Promotional mix
Promotional mixPromotional mix
Promotional mix
Mehul Rasadiya
 
Promotion mix (tools)
Promotion mix (tools)Promotion mix (tools)
Promotion mix (tools)
Mehul Rasadiya
 

More from Mehul Rasadiya (20)

Search Engine Marketing
Search Engine Marketing Search Engine Marketing
Search Engine Marketing
 
PLC analysis of Nokia and Samsung
PLC analysis of Nokia and SamsungPLC analysis of Nokia and Samsung
PLC analysis of Nokia and Samsung
 
New product devlopment process of TATA NANO
New product devlopment process of TATA NANONew product devlopment process of TATA NANO
New product devlopment process of TATA NANO
 
Ratan tata. as a strategic leader,,
Ratan tata. as a strategic leader,,Ratan tata. as a strategic leader,,
Ratan tata. as a strategic leader,,
 
Contract of agency
Contract of agencyContract of agency
Contract of agency
 
Research report on Consumer perception towards BAJAJ two wheelers
Research report on Consumer perception towards BAJAJ two wheelersResearch report on Consumer perception towards BAJAJ two wheelers
Research report on Consumer perception towards BAJAJ two wheelers
 
Logistic
LogisticLogistic
Logistic
 
Adveritising strategy of toi
Adveritising strategy of toiAdveritising strategy of toi
Adveritising strategy of toi
 
Tata cost leadership
Tata cost leadershipTata cost leadership
Tata cost leadership
 
Jit in mc donald's
Jit in mc donald'sJit in mc donald's
Jit in mc donald's
 
Excel crop care ltd
Excel crop care ltdExcel crop care ltd
Excel crop care ltd
 
Axis
AxisAxis
Axis
 
Promotion mix (mm)
Promotion mix (mm)Promotion mix (mm)
Promotion mix (mm)
 
Brading positioning of garneir
Brading positioning of garneirBrading positioning of garneir
Brading positioning of garneir
 
Amul distri
Amul distriAmul distri
Amul distri
 
Essar oil (cma)
Essar oil (cma)Essar oil (cma)
Essar oil (cma)
 
Promotionmixppt
PromotionmixpptPromotionmixppt
Promotionmixppt
 
Promotionmixppt
PromotionmixpptPromotionmixppt
Promotionmixppt
 
Promotional mix
Promotional mixPromotional mix
Promotional mix
 
Promotion mix (tools)
Promotion mix (tools)Promotion mix (tools)
Promotion mix (tools)
 

Recently uploaded

What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 

Recently uploaded (20)

What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 

Simulation (qa ii)

  • 1. SIMULATION MODELING A Presentation on K.K. Parekh Institute of Management Studies (Amreli) Prepared by :- Mehul Rasadiya
  • 2. INTRODUCTION  It is a technique(Quantitative) for carrying out experiments for analyzing the behavior and evaluating the performance of a proposed system under assumed condition of reality.  An experiment or relatively simplified experimental model of a system is used to examine the components or properties of system, their behavior I relation to each other and in relation to the entire system at a point of time and over period of time, under different assume condition.  The alternative courses, inputs, components, properties and variables of the system are experimentally manipulated in several way to find out their interactions and impact on the system’s operation and behavior.
  • 3. SIMULATION DEFINATION • Simulation is the imitation of the operation of a real world system over time. • Simulation involves the generation of an artificial history of the system and the drawing of inferences from it.
  • 4. REASON FOR USING SIMULATION  Many practical problem where mathematical simplification is not feasible.  There is no sufficient time to allow the system to operate extensively.  Simulation model can be used to conduct experiments without disrupting real system.  Enable a manager to provide insights into certain problem where the actual environment is difficult to observe.  The non technical manager can comprehend simulation more easily than a complex mathematical model.
  • 5. The Process of Simulation
  • 6. ADVANTAGES 1. Flexibility 2. Can handle large and complex systems 3. Can answer “what-if” questions 4. Does not interfere with the real system 5. Allows study of interaction among variables 6. “Time compression” is possible 7. Handles complications that other methods can’t
  • 7. DISADVANTAGES 1. Can be expensive and time consuming 2. Does not generate optimal solutions 3. Managers must choose solutions they want to try (“what-if” scenarios) 4. Each model is unique
  • 8. APPLICATION OF SIMULATION  Manufacturing and other process  Scheduling production processes  Design of system(marketing, information, inventory, weapon, manpower employment, traffic light-timing, etc.)  Facilities(hospitals, harbors, railways, libraries, schools, design of parking lots, communication system, etc)  Resource development programmers( water resources, human resources, petro-chemical, energy resources, and so on)
  • 9. Deterministic Model All data are assumed to be known with certainty Probabilistic Model Some data are described by probability distribution. System Simulation An experiment used to describe sequences of events that occur over time. (inventory, queuing, manufacturing process) Simulation Models Monte Carlo Simulation A sampling experiment whose purpose is to estimate the distribution of an outcome variable that depends on several probabilistic input variables. (profit projection, stock portfolio).
  • 10. Steps Involved in Simulation (Monte Carlo Technique)  Find the cumulative Probability  Assign random numbers Interval corresponding to the Probability.  From the random number tables, choose a set of required random numbers from any part of the table. This can be done by following any fixed pattern like row wise, column wise, diagonal wise.  Choice of random numbers whether single digit, double digit, triple digit etc. depends upon the number of places to which Probability is known. Eg- If the prob. have been calculated to two decimal places, which add up to 1.00, we need 100 numbers of 2 digit to represent each point of probability. Thus we take random no.s 00-99 to represent them.
  • 11. CASE STUDY A company manufactures 30 units/day. The sale of these items depends upon demand which has the following distribution.  The production cost and sales price of each unit are Rs. 40 and Rs. 50, respectively. Any unsold product is to be disposed off at loss of Rs. 15. There is a penalty of Rs. 5 per unit if the demand is not met.  Using the following random numbers, estimate the total profit/loss for the company for the next ten days. 10, 99, 65, 99, 01, 79, 11, 16, 20  If the company decides to produce 29 units per day, what is the advantage or disadvantage of the company? Sales (Unit) Probability 27 0.10 28 0.15 29 0.20 30 0.35 31 0.15 32 0.05
  • 12.
  • 13. Sales (unit) Probability Cumulative probability Random No. Interval 27 0.10 0.10 28 0.15 29 0.20 30 0.35 31 0.15 32 0.05
  • 14. Sales (unit) Probability Cumulative probability Random No. Interval 27 0.10 0.10 28 0.15 0.25 29 0.20 0.45 30 0.35 0.80 31 0.15 0.95 32 0.05 1.00
  • 15. Sales (unit) Probability Cumulative probability Random No. Interval 27 0.10 0.10 00-09 28 0.15 0.25 10-24 29 0.20 0.45 25-44 30 0.35 0.80 45-79 31 0.15 0.95 80-94 32 0.05 1.00 95-99 As the first step, random numbers 00-99 are allocated to various possible sales values in production to the probabilities associated with them.
  • 16.  Now we simulate the demand for the next 10 days using the given random numbers. From the given following information, we have Profit per unit sold = Rs. 50 – Rs. 40= Rs. 10 Loss per unit unsold = Rs. 15 Penalty for using demand = Rs. 5 per unit  Using these inputs, the profit/loss for the 10 days is calculated, first when production is 30 units per day and then when it is 29 units.  It is evident that the total profit/loss for the 10 days is Rs. 2695 when 30 units are produced. Also, if the company decides to produce 29 units per day, the total profit works out to be the same.
  • 17. Days Random Numbers Estimat ed Sales (units) Profit/Loss per day with production 30 units 29 units 1 10 28 2 99 3 65 4 99 5 95 6 01 7 79 8 1 9 16 10 20
  • 18. Days Random Numbers Estimat ed Sales (units) Profit/Loss per day with production 30 units 29 units 1 10 28 2 99 32 3 65 30 4 99 32 5 95 32 6 01 27 7 79 30 8 1 28 9 16 28 10 20 28
  • 19. Days Random Number s Estimate d Sales (units) Profit/Loss per day with production 30 units 29 units 1 10 28 28*10-2*15 = Rs. 250 2 99 32 3 65 30 4 99 32 5 95 32 6 01 27 7 79 30 8 1 28 9 16 28 10 20 28
  • 20. Days Random Number s Estimate d Sales (units) Profit/Loss per day with production 30 units 1 10 28 28*10-2*15 = Rs. 250 2 99 32 30*10-2*5 = Rs. 290 3 65 30 30*10 = Rs. 300 4 99 32 30*10-2*5 = Rs. 290 5 95 32 30*10-2*5 = Rs. 290 6 01 27 27*10-3*15 = Rs. 225 7 79 30 30*10 = Rs. 300 8 1 28 28*10-2*15 = Rs. 250 9 16 28 28*10-2*15 = Rs. 250 10 20 28 28*10-2*15 = Rs. 250 Total Profit = Rs. 2695
  • 21. Days Rando m Number s Estimate d Sales (units) Profit/Loss per day with production 30 units 29 units 1 10 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265 2 99 32 30*10-2*5 = Rs. 290 3 65 30 30*10 = Rs. 300 4 99 32 30*10-2*5 = Rs. 290 5 95 32 30*10-2*15 = Rs. 290 6 01 27 27*10-3*15 = Rs. 225 7 79 30 30*10 = Rs. 300 8 1 28 28*10-2*15 = Rs. 250 9 16 28 28*10-2*15 = Rs. 250 10 20 28 28*10-2*15 = Rs. 250 Total Profit = Rs. 2695
  • 22. Days Rando m Number s Estimate d Sales (units) Profit/Loss per day with production 30 units 29 units 1 10 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265 2 99 32 30*10-2*5 = Rs. 290 29*10-3*5 = Rs. 275 3 65 30 30*10 = Rs. 300 29*10-1*5 = Rs. 285 4 99 32 30*10-2*5 = Rs. 290 29*10-3*5 = Rs. 275 5 95 32 30*10-2*15 = Rs. 290 29*10-3*5 = Rs. 265 6 01 27 27*10-3*15 = Rs. 225 27*10-2*15 = Rs. 240 7 79 30 30*10 = Rs. 300 29*10-1*5 = Rs. 285 8 1 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265 9 16 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265 10 20 28 28*10-2*15 = Rs. 250 28*10-1*15 = Rs. 265 Total Profit = Rs. 2695 = Rs. 2695
  • 23. When company decides to produce 29 units per day, so that time no change in profit or loss. Compare to 30 units per day. When company produce 30 units When company produce 29 units Total Profit = Rs. 2695 Total Profit = Rs. 2695