CONTENTS
SUBSTATION
SINGLE LINE DIAGRAM
CONCEPT OF BUS
ISOLATOR
LIGHTNING ARRESTER
RELAY
INSTRUMENT TRANSFORMER
POWER OF TRANSFORMER
PARTS OF TRANSFORMER
REFERENCES
SUBSTATION
Part of Electrical Generation
Transmission of Electricity
Distribution of Electricity
Voltage is transform high to
low or low to high using
Transforms
Ex 400KV/220KV substation
220KV/132KV substation
132KV/33KV substation
33KV/11KV substation
SINGLE LINE DIAGRAME
 single lines and symbols a simplified layout of a three-
phase electrical system
to include all the necessary data while keeping the
diagram easy to read
Information provided in a SLD
Isolator
Circuit breaker
Fuse
Current transformer
Potential transformer
Light arrester
VCB(Vacuum circuit breaker
Transformer
CONCEPT OF BUS BAR
1.The concept of bus is Same as the concept of a
node in an electrical circuit.
2. There is one bus for each phase.
3.Shown in SLDsas lines connecting equipment
to the buses.
4.Made of aluminum or copper bars or pipes and
can be several meters long.
5.The impedance of buses is very low, practically
zero, so electrically the whole bus is at the same
potential.
EQUIPMENTS
1. ISOLATOR
2. LIGHTNING ARRESTOR
3. CIRCUIT BREAKER
4. RELAY
5. INSTRUMENT TRANSFORMER(CT
&PT)
6. POWER TRANSFORMER
ISOLATOR
Isolator are used to open a
circuit under no load
Isolator is meant only for
interrupting the power
during maintenance or
repair
LIGHTNING ARRESTER
Protect the Insulation &
Conductors of the system from
damaging effect of Lightning
The typical lightning arrester
has a high voltage terminal and
ground terminal
CIRCUIT BREAKER
Automatically operated
electrical switch condition
Designed to protect the
circuit from over load or short
circuit
Separate healthy and faulty
section of circuit
Operate at on load
RELAY
Protecting relay is a sensing
device and designed to detect
operating conditions on an
electrical circuit .
It trips the circuit breaker
when fault is detected
TYPE OF RELAY
 Overcurrent relay
 Differential relay
 Tripping relay
 Directional Relay
 Auxiliary Relay
INSTRUMENT TRANSFORMER
A) CURRENT TRANSFORMER
o Current measure in circuit
o If current in very high it reduce
the current accurately
B) POTENTIAL TRANSFORMER
o Used in a system for stepping down
the system voltage to a safe value
INSTRUMENT TRANSFORMERS are used for measurement and protective
applications together with equipments such as meters & relays
Types-
POWER TRANSFORMER
A Static Device.
Transfer Power from One circuit to
another circuit
No Change in Frequency.
Principle-Faraday’s Law of
Electromagnetic Induction.
Types- 1. STEP UP TRANSFORMER
O/P Voltage > I/P Voltage.
2. STEP DOWN
TRANSFORMER
O/P Voltage < I/P Voltage.
PART OF TRANSFORMER
 core
 Winding(H.V winding, L.V winding)
 Control panel
 transformer OILS
 Pressure Relief
device
 Breather
 Cooling fans
 Conservator
 Radiator
 Tap changer
 Tank
BATTERY ROOM
 DC battery shell be installed in the power house for
 Emergency power.
 Protection.
 Alarm and indication.
TRANSFORMERS
Also known as the heart
of substations. These are
used to reduce the
voltages at appropriate
levels
CURRENT/ VOLTAGE
TRANSFORMERS
It is a used in power systems to
step down extra high
voltage signals and provide a low
voltage signal, for measurement
or to operate a protective relay
WAVETRAP
Traps the high frequency
signalsISOLATORS
Used for maintenance of
the circuit in no load
condition
CIRCUIT BREAKER
used to protect the
equipment by opening
the circuit for over
current and over voltages
LIGHTINING ARRESTER
Used for protecting the
equipment from surge
voltages
SUMMARY OF EQUIPMENTs
RELAY
Used to sense
the faults
REFERENCES
https://en.wikipedia.org/wiki/Electrical_substation
http://timesofindia.indiatimes.com/topic/uttar-
Pradesh-power-corporation-limited
http://www.uppclonline.com/en_GB/Transmission_Link_
Document/07042009030435grid_code[1].html
https://www.sciencedirect.com/topics/engineering/distri
bution-substation
summer internship

More Related Content

What's hot

Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
IAES-IJPEDS
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
surendra rawat
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
Prabhu R
 
Transformer Seminar - Buck-Boost
Transformer Seminar - Buck-BoostTransformer Seminar - Buck-Boost
Transformer Seminar - Buck-Boost
Acme Electric
 
Thyristor technology
Thyristor technologyThyristor technology
Thyristor technology
SHIMI S L
 
Grid Voltage Regulation
Grid Voltage RegulationGrid Voltage Regulation
Grid Voltage Regulation
Aditya Nehwal
 
Multi level inverter
Multi level inverterMulti level inverter
Multi level inverter
Hamza saeed Khan
 
statcom
statcomstatcom
statcom
D Målîk
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
Burdwan University
 
Modulation and control of transformer less upfc
Modulation and control of transformer less upfcModulation and control of transformer less upfc
Modulation and control of transformer less upfc
I3E Technologies
 
An overview of FACTS devices
An overview of FACTS devicesAn overview of FACTS devices
An overview of FACTS devices
Indian Institute of Technology Guwahati
 
EE201 -Chapter 6
EE201 -Chapter 6EE201 -Chapter 6
EE201 -Chapter 6
ruhiyah
 
Facts devices
Facts devicesFacts devices
Facts devices
Vinod Srivastava
 
Online classes pe ac voltage controller
Online classes pe ac voltage controllerOnline classes pe ac voltage controller
Online classes pe ac voltage controller
Amit Kulkarni
 
HVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
HVDC and FACTS for Improved Power Delivery Through Long Transmission LinesHVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
HVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
Rajaram Meena
 
Ch18 "Case Study 3: DC-DC Power Converter"
Ch18 "Case Study 3: DC-DC Power Converter"Ch18 "Case Study 3: DC-DC Power Converter"
Ch18 "Case Study 3: DC-DC Power Converter"
Aya Mahmoud
 
TCSC
TCSCTCSC
Harmonics analysis of single phase inverter
Harmonics analysis of single phase inverterHarmonics analysis of single phase inverter
Harmonics analysis of single phase inverter
BINOD PATEL
 
Scr (07 Ece 109)
Scr (07 Ece 109)Scr (07 Ece 109)
Scr (07 Ece 109)
Snehashis Paul
 

What's hot (20)

Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
Design of Three-Phase Three-Switch Buck-Type Rectifier for Pre-Charging Appli...
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
 
Transformer Seminar - Buck-Boost
Transformer Seminar - Buck-BoostTransformer Seminar - Buck-Boost
Transformer Seminar - Buck-Boost
 
Thyristor technology
Thyristor technologyThyristor technology
Thyristor technology
 
Grid Voltage Regulation
Grid Voltage RegulationGrid Voltage Regulation
Grid Voltage Regulation
 
Multi level inverter
Multi level inverterMulti level inverter
Multi level inverter
 
statcom
statcomstatcom
statcom
 
Stability of power
Stability of powerStability of power
Stability of power
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
 
Modulation and control of transformer less upfc
Modulation and control of transformer less upfcModulation and control of transformer less upfc
Modulation and control of transformer less upfc
 
An overview of FACTS devices
An overview of FACTS devicesAn overview of FACTS devices
An overview of FACTS devices
 
EE201 -Chapter 6
EE201 -Chapter 6EE201 -Chapter 6
EE201 -Chapter 6
 
Facts devices
Facts devicesFacts devices
Facts devices
 
Online classes pe ac voltage controller
Online classes pe ac voltage controllerOnline classes pe ac voltage controller
Online classes pe ac voltage controller
 
HVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
HVDC and FACTS for Improved Power Delivery Through Long Transmission LinesHVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
HVDC and FACTS for Improved Power Delivery Through Long Transmission Lines
 
Ch18 "Case Study 3: DC-DC Power Converter"
Ch18 "Case Study 3: DC-DC Power Converter"Ch18 "Case Study 3: DC-DC Power Converter"
Ch18 "Case Study 3: DC-DC Power Converter"
 
TCSC
TCSCTCSC
TCSC
 
Harmonics analysis of single phase inverter
Harmonics analysis of single phase inverterHarmonics analysis of single phase inverter
Harmonics analysis of single phase inverter
 
Scr (07 Ece 109)
Scr (07 Ece 109)Scr (07 Ece 109)
Scr (07 Ece 109)
 

Similar to summer internship

introductory presentation on the transformer
introductory presentation on the transformer   introductory presentation on the transformer
introductory presentation on the transformer
Sagarkv3
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
Ravi Phadtare
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
Hariomgupta90
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptx
AdityaRaj873503
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptx
AdityaRaj873503
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
Anuj Bansal
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
sahid raja khan
 
PED drivers t5656979089897877ghvvnvgcxxn
PED drivers t5656979089897877ghvvnvgcxxnPED drivers t5656979089897877ghvvnvgcxxn
PED drivers t5656979089897877ghvvnvgcxxn
nightbot15
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
Devendra khairiya
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharing
Vivek Arun
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
fallinhay
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
Dashrath047
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
Sogendra Rajput
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Yatendra Parashar
 
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar Singh
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
Arpit Gupta
 
Transformer.pptx
Transformer.pptxTransformer.pptx
Transformer.pptx
Mohammed Faizan
 

Similar to summer internship (20)

introductory presentation on the transformer
introductory presentation on the transformer   introductory presentation on the transformer
introductory presentation on the transformer
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptx
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptx
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
PED drivers t5656979089897877ghvvnvgcxxn
PED drivers t5656979089897877ghvvnvgcxxnPED drivers t5656979089897877ghvvnvgcxxn
PED drivers t5656979089897877ghvvnvgcxxn
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharing
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
Harvindar 132 KV GSS from ARYA college (fb.com/hrrock)
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
GENERATORS
GENERATORS GENERATORS
GENERATORS
 
Transformer.pptx
Transformer.pptxTransformer.pptx
Transformer.pptx
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 

summer internship

  • 1. GALGOTIAS COLLEGE OF ENGINEERING and technology PRESENTATION ON SUMMER INTERNSHIP FROM UPPCL 33/11 SUB STATION BARAUT PRESENTED BY : SHAHID MALIK ROLL NO:xxxxxxxxx SUBMETTED TO; XXX (……………………..)
  • 2. CONTENTS SUBSTATION SINGLE LINE DIAGRAM CONCEPT OF BUS ISOLATOR LIGHTNING ARRESTER RELAY INSTRUMENT TRANSFORMER POWER OF TRANSFORMER PARTS OF TRANSFORMER REFERENCES
  • 3. SUBSTATION Part of Electrical Generation Transmission of Electricity Distribution of Electricity Voltage is transform high to low or low to high using Transforms Ex 400KV/220KV substation 220KV/132KV substation 132KV/33KV substation 33KV/11KV substation
  • 4. SINGLE LINE DIAGRAME  single lines and symbols a simplified layout of a three- phase electrical system to include all the necessary data while keeping the diagram easy to read Information provided in a SLD Isolator Circuit breaker Fuse Current transformer Potential transformer Light arrester VCB(Vacuum circuit breaker Transformer
  • 5.
  • 6.
  • 7. CONCEPT OF BUS BAR 1.The concept of bus is Same as the concept of a node in an electrical circuit. 2. There is one bus for each phase. 3.Shown in SLDsas lines connecting equipment to the buses. 4.Made of aluminum or copper bars or pipes and can be several meters long. 5.The impedance of buses is very low, practically zero, so electrically the whole bus is at the same potential.
  • 8.
  • 9. EQUIPMENTS 1. ISOLATOR 2. LIGHTNING ARRESTOR 3. CIRCUIT BREAKER 4. RELAY 5. INSTRUMENT TRANSFORMER(CT &PT) 6. POWER TRANSFORMER
  • 10. ISOLATOR Isolator are used to open a circuit under no load Isolator is meant only for interrupting the power during maintenance or repair
  • 11. LIGHTNING ARRESTER Protect the Insulation & Conductors of the system from damaging effect of Lightning The typical lightning arrester has a high voltage terminal and ground terminal
  • 12. CIRCUIT BREAKER Automatically operated electrical switch condition Designed to protect the circuit from over load or short circuit Separate healthy and faulty section of circuit Operate at on load
  • 13. RELAY Protecting relay is a sensing device and designed to detect operating conditions on an electrical circuit . It trips the circuit breaker when fault is detected TYPE OF RELAY  Overcurrent relay  Differential relay  Tripping relay  Directional Relay  Auxiliary Relay
  • 14. INSTRUMENT TRANSFORMER A) CURRENT TRANSFORMER o Current measure in circuit o If current in very high it reduce the current accurately B) POTENTIAL TRANSFORMER o Used in a system for stepping down the system voltage to a safe value INSTRUMENT TRANSFORMERS are used for measurement and protective applications together with equipments such as meters & relays Types-
  • 15. POWER TRANSFORMER A Static Device. Transfer Power from One circuit to another circuit No Change in Frequency. Principle-Faraday’s Law of Electromagnetic Induction. Types- 1. STEP UP TRANSFORMER O/P Voltage > I/P Voltage. 2. STEP DOWN TRANSFORMER O/P Voltage < I/P Voltage.
  • 16. PART OF TRANSFORMER  core  Winding(H.V winding, L.V winding)  Control panel  transformer OILS  Pressure Relief device  Breather  Cooling fans  Conservator  Radiator  Tap changer  Tank
  • 17. BATTERY ROOM  DC battery shell be installed in the power house for  Emergency power.  Protection.  Alarm and indication.
  • 18. TRANSFORMERS Also known as the heart of substations. These are used to reduce the voltages at appropriate levels CURRENT/ VOLTAGE TRANSFORMERS It is a used in power systems to step down extra high voltage signals and provide a low voltage signal, for measurement or to operate a protective relay WAVETRAP Traps the high frequency signalsISOLATORS Used for maintenance of the circuit in no load condition CIRCUIT BREAKER used to protect the equipment by opening the circuit for over current and over voltages LIGHTINING ARRESTER Used for protecting the equipment from surge voltages SUMMARY OF EQUIPMENTs RELAY Used to sense the faults