Project Leader:   Brian Boyce Jr.                          Master Black Belt:
                                                           Steven Bonacorsi
                  Customer Engineer/ Certified Greenbelt
Start Date:
                  April 30, 2002
Six Sigma in Action
                                                                                                                                       Image Updates
Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company
Business Problem & Impact                                                                                                    Process Capability – Before (0 Sigma)
All PC Equipment issued to GEAE end-users is preloaded
by GE ITS with a standard image. These images are
updated & maintained by GEAE. All released images must
be replicated to the GE ITS servers so they can be loaded
on end-user equipment. The current process could take as
long as one week with extensive administration involvement.
Measure & Analyze
Data Collection: The time it took to transfer an image was
measured at 34.78 Hours. The existing process sigma was 0.
Root Causes: No notification by GEAE Image Group and no                                                                Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time
clear process documentation were identified as the main root                                                                 Process Capability – After (Over 6 Sigma)
causes.                                             P roc es s D at a
                                                                                                                                                                                                                   U SL

Improve & Control                                              US L
                                                               T arget
                                                                                           17. 0000
                                                                                                       *
                                                                                                                                                                                                                            W it

Robocopy program implemented and scheduledean run daily
                                                   M
                                                        to     LS L
                                                                          0. 3888
                                                                                                       *                                                                                                                    O ve

with automatic e-mail notification. Team set up to ple N
                                                   S am receive e- 40
                                                   S t D ev (W it hin) 0. 000000
mail notification and will be alerted if update didS tnot voccur.
                                                       D ev (O erall)  0. 147566

Cycletime Improved to 0.39 Hours!
                                                                P ot ent ial (W it hin) C apabilit y

Results/Benefits                                               Cp
                                                               CP U                     7. 47E + 16
                                                                                                       *


Eliminated administration cost due to process automation.      CP L                               *
                                               C pk    7. 47E + 16
All equipment now issued to end users with current images.                                                 0.0.30
                                                                                                           0.1040
                                                                                                            0.1550
                                                                                                            0.2055
                                                                                                             05 45
                                                                                                             0.35
                                                                                                              0.
                                                                                                              0.
                                                                                                               25
                                                               C pm                                    *

                                                                      O v erall C apabilit y                     O bs erv ed P erf orm anc e             E x p. "W it hin" P erf orm anc e         E x p. "O v erall" P erf orm an


                          A Total Savings of US $11K Annually! Pp
                                                               PPU
                                                               PPL
                                                                                               37. 52
                                                                                                       *


                                                                                                       *
                                                                                                             P P M < LS L
                                                                                                             P P M > US L
                                                                                                             P P M T ot al
                                                                                                                                                   *
                                                                                                                                               0. 00
                                                                                                                                               0. 00
                                                                                                                                                       P P M < LS L
                                                                                                                                                       P P M > US L
                                                                                                                                                       P P M T ot al
                                                                                                                                                                                       0. 00
                                                                                                                                                                                       0. 00
                                                                                                                                                                                             *   P P M < LS L
                                                                                                                                                                                                 P P M > US L
                                                                                                                                                                                                 P P M T ot al

More Related Content

Viewers also liked

Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
Steven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
Steven Bonacorsi
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
Body of Knowledge
 
Minitab powerpoint
Minitab powerpointMinitab powerpoint
Minitab powerpointEnglish202c
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
Nitesh Verma
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
Nitesh Verma
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Studysanjay_asati
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
Rabia Sgh S
 

Viewers also liked (8)

Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Minitab powerpoint
Minitab powerpointMinitab powerpoint
Minitab powerpoint
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 

Similar to Serrver Imaging Six Sigma Case Study

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Steven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Steven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Kevin Egan
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
CCT International
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI Workshop
Marc Serieys
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.maryNASAPMC
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
Steven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
Steven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
Kevin Egan
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
IRJET Journal
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Guatemala User Group
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applications
Dr. Jimmy Schwarzkopf
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
Hakeem-Ur- Rehman
 
Training for applications with industry solutions in sap utilities
Training for applications with industry solutions in sap utilitiesTraining for applications with industry solutions in sap utilities
Training for applications with industry solutions in sap utilities
Arvind Bhardwaj [AB]
 

Similar to Serrver Imaging Six Sigma Case Study (20)

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI Workshop
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.mary
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
System X - About Benchmarks
System X - About BenchmarksSystem X - About Benchmarks
System X - About Benchmarks
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applications
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
 
Moving Early Stage Technologies
Moving Early Stage TechnologiesMoving Early Stage Technologies
Moving Early Stage Technologies
 
Training for applications with industry solutions in sap utilities
Training for applications with industry solutions in sap utilitiesTraining for applications with industry solutions in sap utilities
Training for applications with industry solutions in sap utilities
 

More from Steven Bonacorsi

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
Steven Bonacorsi
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
Steven Bonacorsi
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
Steven Bonacorsi
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
Steven Bonacorsi
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
Steven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
Steven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
Steven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
Steven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
Steven Bonacorsi
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
Steven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
Steven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
Steven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
Steven Bonacorsi
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
Steven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
Steven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
Steven Bonacorsi
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 

More from Steven Bonacorsi (20)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 

Serrver Imaging Six Sigma Case Study

  • 1. Image Update GEAE Account Project Leader: Brian Boyce Jr. Master Black Belt: Steven Bonacorsi Customer Engineer/ Certified Greenbelt Start Date: April 30, 2002
  • 2. Six Sigma in Action Image Updates Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company Business Problem & Impact Process Capability – Before (0 Sigma) All PC Equipment issued to GEAE end-users is preloaded by GE ITS with a standard image. These images are updated & maintained by GEAE. All released images must be replicated to the GE ITS servers so they can be loaded on end-user equipment. The current process could take as long as one week with extensive administration involvement. Measure & Analyze Data Collection: The time it took to transfer an image was measured at 34.78 Hours. The existing process sigma was 0. Root Causes: No notification by GEAE Image Group and no Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time clear process documentation were identified as the main root Process Capability – After (Over 6 Sigma) causes. P roc es s D at a U SL Improve & Control US L T arget 17. 0000 * W it Robocopy program implemented and scheduledean run daily M to LS L 0. 3888 * O ve with automatic e-mail notification. Team set up to ple N S am receive e- 40 S t D ev (W it hin) 0. 000000 mail notification and will be alerted if update didS tnot voccur. D ev (O erall) 0. 147566 Cycletime Improved to 0.39 Hours! P ot ent ial (W it hin) C apabilit y Results/Benefits Cp CP U 7. 47E + 16 * Eliminated administration cost due to process automation. CP L * C pk 7. 47E + 16 All equipment now issued to end users with current images. 0.0.30 0.1040 0.1550 0.2055 05 45 0.35 0. 0. 25 C pm * O v erall C apabilit y O bs erv ed P erf orm anc e E x p. "W it hin" P erf orm anc e E x p. "O v erall" P erf orm an A Total Savings of US $11K Annually! Pp PPU PPL 37. 52 * * P P M < LS L P P M > US L P P M T ot al * 0. 00 0. 00 P P M < LS L P P M > US L P P M T ot al 0. 00 0. 00 * P P M < LS L P P M > US L P P M T ot al