SlideShare a Scribd company logo
Six Sigma in Action:
                   Web Application Performance




Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                                    TEDS Systems Performance
Customer Profile - 31,000 active Training & Employee
Development System (TEDS) users – and potentially every GE
Medical Systems employee, contractor, and vendor.                                                                   Process Capability Analysis for Module 2nd C
                                                                                                            Process Capability – Before
                                                                                                                                  USL
Business Problem & Impact                                               USL
                                                                                 Process Data
                                                                                              4.00000                                                                                                                 ST
                                                                                                                                                                                                                      LT
Average web page load time was 5.8 seconds. GEMS Learning               Target
                                                                        LSL
                                                                                                        *
                                                                                                        *
                                                                        Mean                  4.70867
Solutions General Manager Pete McCabe requested a 4 sec.                Sample N
                                                                        StDev (ST)           0.607092
                                                                                                       21


average time based on general rules from other web applications,        StDev (LT)           0.624410


such as the GEMS homepage.                                               Potential (ST) Capability
                                                                        Cp                              *


Measure & Analyze                                                       CPU
                                                                        CPL
                                                                        Cpk
                                                                                                 -0.39


                                                                                                 -0.39
                                                                                                        *


Data Collection: Web page load time was measured. The existing          Cpm                             *
                                                                                                               3                       4                    5                             6                7


process sigma was less than 1.                                               Overall (LT) Capability            Observed Performance                  Expected ST Performance                  Expected LT Performance
                                                                        Pp                              *     PPM < LSL                    *     PPM < LSL                        *           PPM < LSL                  *
Root Cause: The JRun server was improperly configured not to            PPU
                                                                        PPL
                                                                                                 -0.38
                                                                                                        *
                                                                                                              PPM > USL
                                                                                                              PPM Total
                                                                                                                                904761.90
                                                                                                                                904761.90
                                                                                                                                                 PPM > USL
                                                                                                                                                 PPM Total
                                                                                                                                                                       878458.02
                                                                                                                                                                       878458.02
                                                                                                                                                                                              PPM > USL
                                                                                                                                                                                              PPM Total
                                                                                                                                                                                                               871799.38
                                                                                                                                                                                                               871799.38

compile data, which slowed down many processes.                         Ppk                      -0.38




Improve & Control                                                                                                    Process Capability Analysis for Module 2nd C
Removed the Djava.compiler=none setting from JRun server,                                                    Process Capability – After                                                                   USL
taking it out of debug mode and allowing it to run more                 USL
                                                                                 Process Data
                                                                                              4.00000                                                                                                                    ST
                                                                        Target                          *                                                                                                                LT
efficiently. Load times decreased 3.1 seconds and the sigma             LSL                             *
                                                                        Mean                  1.69512
increased to greater than 6. To control the process, the TEDS           Sample N                       52
                                                                        StDev (ST)           0.276561
server was placed under the Topaz monitoring scheme, which              StDev (LT)           0.325387


sends a text message alert to a pager when the page load                 Potential (ST) Capability

time drops below 4 seconds.                                             Cp
                                                                        CPU                       2.78
                                                                                                        *


                                                                        CPL                             *

Results/Benefits                                                        Cpk
                                                                        Cpm
                                                                                                  2.78
                                                                                                        *
                                                                                                                    1.0          1.5           2.0               2.5        3.0                3.5         4.0
By decreasing the web page load time of the average TEDS page                Overall (LT) Capability               Observed Performance               Expected ST Performance                   Expected LT Performance
by 3.1 seconds (making it 47% faster), this frees up over $34K in       Pp
                                                                        PPU                       2.36
                                                                                                        *     PPM < LSL
                                                                                                              PPM > USL                0.00
                                                                                                                                           *         PPM < LSL
                                                                                                                                                     PPM > USL               0.00
                                                                                                                                                                                      *       PPM < LSL
                                                                                                                                                                                              PPM > USL              0.00
                                                                                                                                                                                                                             *


productivity cost savings per year. Additionally, all page load times   PPL
                                                                        Ppk                       2.36
                                                                                                        *     PPM Total                0.00          PPM Total               0.00             PPM Total              0.00


average less than 4 seconds, satisfying the main customer CTQ.


                    A savings of over $34,000 per year.

More Related Content

Viewers also liked

해운대호텔요금 노보텔엠베서더
해운대호텔요금 노보텔엠베서더해운대호텔요금 노보텔엠베서더
해운대호텔요금 노보텔엠베서더
giefheoie
 
ConTENIDOS DIGITALES
ConTENIDOS DIGITALESConTENIDOS DIGITALES
ConTENIDOS DIGITALES
cetis 17
 
전기장판
전기장판전기장판
전기장판
giefheoie
 
Small Print - Baker & Coffee Maker
Small Print - Baker & Coffee MakerSmall Print - Baker & Coffee Maker
Small Print - Baker & Coffee Maker
PrintHall
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
Steven Bonacorsi
 
Coluna cris ed 22 brugges
Coluna cris ed 22 bruggesColuna cris ed 22 brugges
Coluna cris ed 22 bruggeskarllilienwald
 
Preguntes avaluació inicial sessió1
Preguntes avaluació inicial sessió1Preguntes avaluació inicial sessió1
Preguntes avaluació inicial sessió1Cristina Campos
 
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.Josi Kely Andrade
 

Viewers also liked (10)

해운대호텔요금 노보텔엠베서더
해운대호텔요금 노보텔엠베서더해운대호텔요금 노보텔엠베서더
해운대호텔요금 노보텔엠베서더
 
ConTENIDOS DIGITALES
ConTENIDOS DIGITALESConTENIDOS DIGITALES
ConTENIDOS DIGITALES
 
전기장판
전기장판전기장판
전기장판
 
Small Print - Baker & Coffee Maker
Small Print - Baker & Coffee MakerSmall Print - Baker & Coffee Maker
Small Print - Baker & Coffee Maker
 
updatedresume
updatedresumeupdatedresume
updatedresume
 
Pecunia
PecuniaPecunia
Pecunia
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Coluna cris ed 22 brugges
Coluna cris ed 22 bruggesColuna cris ed 22 brugges
Coluna cris ed 22 brugges
 
Preguntes avaluació inicial sessió1
Preguntes avaluació inicial sessió1Preguntes avaluació inicial sessió1
Preguntes avaluació inicial sessió1
 
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.
A avaliação da aprendizagem como um princípio no desenvolvimento da autoria.
 

Similar to Web Page Load Cycle Time Six Sigma Case Study

Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
Steven Bonacorsi
 
Print Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case StudyPrint Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case Study
Steven Bonacorsi
 
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise ITIT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
Bob Rhubart
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
Steven Bonacorsi
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
Steven Bonacorsi
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
Steven Bonacorsi
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
Kevin Egan
 
Michel izygon
Michel izygonMichel izygon
Michel izygonNASAPMC
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Steven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Steven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Steven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
Kevin Egan
 
IT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXIT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIX
LeanIX GmbH
 
Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2
lasinducharith
 
Linked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And ScalabilityLinked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And ScalabilityConSanFrancisco123
 
Symposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT KanpurSymposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT KanpurRishi Pathak
 
Les.sorge
Les.sorgeLes.sorge
Les.sorgeNASAPMC
 
Les.sorge
Les.sorgeLes.sorge
Les.sorgeNASAPMC
 

Similar to Web Page Load Cycle Time Six Sigma Case Study (20)

Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Print Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case StudyPrint Server Availability Six Sigma Case Study
Print Server Availability Six Sigma Case Study
 
System X - About Benchmarks
System X - About BenchmarksSystem X - About Benchmarks
System X - About Benchmarks
 
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise ITIT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
IT-as-a-Service: Cloud Computing and the Evolving Role of Enterprise IT
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Michel izygon
Michel izygonMichel izygon
Michel izygon
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
IT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXIT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIX
 
Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2Internship Project (Lasindu) WSO2
Internship Project (Lasindu) WSO2
 
Linked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And ScalabilityLinked In Lessons Learned And Growth And Scalability
Linked In Lessons Learned And Growth And Scalability
 
Symposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT KanpurSymposium on HPC Applications – IIT Kanpur
Symposium on HPC Applications – IIT Kanpur
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
 
Les.sorge
Les.sorgeLes.sorge
Les.sorge
 

More from Steven Bonacorsi

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
Steven Bonacorsi
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
Steven Bonacorsi
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
Steven Bonacorsi
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
Steven Bonacorsi
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
Steven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
Steven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
Steven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
Steven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
Steven Bonacorsi
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
Steven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
Steven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
Steven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
Steven Bonacorsi
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
Steven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
Steven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
Steven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
Steven Bonacorsi
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 

More from Steven Bonacorsi (20)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 

Web Page Load Cycle Time Six Sigma Case Study

  • 1. Six Sigma in Action: Web Application Performance Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action TEDS Systems Performance Customer Profile - 31,000 active Training & Employee Development System (TEDS) users – and potentially every GE Medical Systems employee, contractor, and vendor. Process Capability Analysis for Module 2nd C Process Capability – Before USL Business Problem & Impact USL Process Data 4.00000 ST LT Average web page load time was 5.8 seconds. GEMS Learning Target LSL * * Mean 4.70867 Solutions General Manager Pete McCabe requested a 4 sec. Sample N StDev (ST) 0.607092 21 average time based on general rules from other web applications, StDev (LT) 0.624410 such as the GEMS homepage. Potential (ST) Capability Cp * Measure & Analyze CPU CPL Cpk -0.39 -0.39 * Data Collection: Web page load time was measured. The existing Cpm * 3 4 5 6 7 process sigma was less than 1. Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance Pp * PPM < LSL * PPM < LSL * PPM < LSL * Root Cause: The JRun server was improperly configured not to PPU PPL -0.38 * PPM > USL PPM Total 904761.90 904761.90 PPM > USL PPM Total 878458.02 878458.02 PPM > USL PPM Total 871799.38 871799.38 compile data, which slowed down many processes. Ppk -0.38 Improve & Control Process Capability Analysis for Module 2nd C Removed the Djava.compiler=none setting from JRun server, Process Capability – After USL taking it out of debug mode and allowing it to run more USL Process Data 4.00000 ST Target * LT efficiently. Load times decreased 3.1 seconds and the sigma LSL * Mean 1.69512 increased to greater than 6. To control the process, the TEDS Sample N 52 StDev (ST) 0.276561 server was placed under the Topaz monitoring scheme, which StDev (LT) 0.325387 sends a text message alert to a pager when the page load Potential (ST) Capability time drops below 4 seconds. Cp CPU 2.78 * CPL * Results/Benefits Cpk Cpm 2.78 * 1.0 1.5 2.0 2.5 3.0 3.5 4.0 By decreasing the web page load time of the average TEDS page Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance by 3.1 seconds (making it 47% faster), this frees up over $34K in Pp PPU 2.36 * PPM < LSL PPM > USL 0.00 * PPM < LSL PPM > USL 0.00 * PPM < LSL PPM > USL 0.00 * productivity cost savings per year. Additionally, all page load times PPL Ppk 2.36 * PPM Total 0.00 PPM Total 0.00 PPM Total 0.00 average less than 4 seconds, satisfying the main customer CTQ. A savings of over $34,000 per year.