Definition
A semi-submersible (semi submerged ship) is a specialized
marine vessel with legs/pontoons for buoyancy to float,
and weight to keep the structure upright, which used in
a number of specific offshore roles as,
• offshore drilling rigs,
• heavy lift cranes,
• oil production platforms,
• safety vessels.
They are designed with good stability and sea keeping
characteristics.
Semi-Submersible
• Exploratory and production purposes;
• floating structure;
• towed to the site,
• ballasted and moored;
• large vertical columns connected to large
pontoons/legs,
• columns support deck structure and equipment.
Semi-Submersible
• Water depth 200m to 3000m,
• Offers large deck space,
• Exceptional stability and sea keeping,
• Withstand rough waters,
• Highly flexible and efficient,
• Can be moved from place to place.
Applications
• Mobile offshore drilling units (MODU) or
Semi–Submersible Drilling Units (SSDU)
• Semi-Submersible crane vessels (SSCV)
• Offshore support vessels (OSV)
• Offshore production platforms
Semi-Submersible Drilling Units
(SSDU)
Based on the way the rig is submerged in the
water, there are two main types
• Bottle-type semi-subs and
• Column-stabilized semi-subs
Bottle-type semi-subs
• Hull below the drilling deck is Bottle-shaped.
• Hull can be submerged by ballasting.
• Originally bottles below the rig were completely
submerged, resting on ocean floor.
• As time progressed bottles were only partially
submerged.
• Offers exceptional stability for drilling operations.
Column-Stabilized semi-subs
• More popular design
• Two horizontal hulls are connected via cylindrical
or rectangular columns to the drilling deck above
the water
• Smaller diagonal columns are used to support the
structure
• Mooring lines and dynamic positioning help to
keep the semi-sub on location
Mobile offshore drilling units (MODU)
Semi–Submersible Drilling Units SSDU classified
by IMO
Semi-Submersible crane vessels (SSCV)
• De-ballasted during transit; only part of the
lower hull is submerged.
• The vessel Ballasted during lifting operations.
• High stability allows them to lift extreme high
loads
Semi-Submersible crane vessels (SSCV)
Offshore support vessels (OSV)
Semi-submersibles are used as number of offshore
support vessels because of their good stability, large
deck areas, and variable deck load (VDL).
 Construction support vessel,
 Diving Support Vessel (DSV),
 Offshore Safety support vessel,
 Offshore accommodation platform,
 Offshore Multiservice Vessel (MSV),
E.g.- Ocean Odyssey – Converted semi-submersible
drilling rig used as a rocket launch pad.
Offshore production platforms
• When oil fields were first developed in offshore
locations, drilling semi-submersibles were converted
for use as combined drilling and production platforms.
• As progressed to deeper water and harsh
environments, purpose-built production semi-
submersible platforms were designed.
• Offers very stable and cost effective platforms.
• Mostly converted semi-submersible vessels.
Mooring patterns and Dynamic
positioning
• Spread Mooring patterns and Dynamic positioning
used to keep the floating rig in place
• Mooring is similar to multiple anchors
• Chosen depending on shape of unit and sea conditions
• Dynamic positioning uses different motors or
propulsion units to counteract motions of water
• Dynamic positioning system is guided by telemetry
signals from beacons, satellite information and the
angular movements of a cable.
Semi–Submersible Drilling Units – SSDU
Advantages Disadvantages
1. Semi-submersibles can achieve good
(small) motion response and, therefore,
can be more easily positioned over a well
template for drilling.
2. Most stable of any floating rig.
3. Semi-submersibles allow for a large
number of flexible risers.
4. Provides large deck area.
5. Transportation from location to location
is easy.
6. Can be reused and converted to other
support vessels.
1. High initial and operating costs.
2. Pipeline infrastructure or other means is
required to export produced oil.
3. Building schedules for semi-submersibles
are usually longer than jack-up rigs.
4. Limited deck load (low reserve
buoyancy).
5. Structural fatigue.
6. Expensive to move large distances.
7. Limited dry-docking facilities available.
8. Difficult to handle mooring systems and
riser in rough seas.
Thank You
Questions?

More Related Content

What's hot

FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
BnBn25
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
InGu Lee
 
Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157
Shaoor Kamal
 
Offshore drilling
Offshore drillingOffshore drilling
Offshore drilling
Ahmed Ehab
 

What's hot (20)

Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
Offshore Structure
Offshore StructureOffshore Structure
Offshore Structure
 
Petroleum Drilling Overview
Petroleum Drilling  OverviewPetroleum Drilling  Overview
Petroleum Drilling Overview
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Ppt report on offshore Platform Designs
Ppt report on offshore Platform DesignsPpt report on offshore Platform Designs
Ppt report on offshore Platform Designs
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas field
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Then and Now - Offshore Support Vessel
Then and Now - Offshore Support VesselThen and Now - Offshore Support Vessel
Then and Now - Offshore Support Vessel
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157
 
Oil Drilling
Oil DrillingOil Drilling
Oil Drilling
 
Offshore drilling
Offshore drillingOffshore drilling
Offshore drilling
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
Drillships
DrillshipsDrillships
Drillships
 

Viewers also liked

Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
Choong KW
 
LOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, IndiaLOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, India
Project Sales Corp
 

Viewers also liked (19)

Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Slammimng & Dek Wetness
Slammimng & Dek WetnessSlammimng & Dek Wetness
Slammimng & Dek Wetness
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211
 
[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions
 
13. Introaction of pielines
13. Introaction of pielines13. Introaction of pielines
13. Introaction of pielines
 
Introduction to dredging
Introduction to dredgingIntroduction to dredging
Introduction to dredging
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
VARIOUS SHIP TYPES
VARIOUS SHIP TYPESVARIOUS SHIP TYPES
VARIOUS SHIP TYPES
 
SHIP TYPES INFORMATION
SHIP TYPES INFORMATIONSHIP TYPES INFORMATION
SHIP TYPES INFORMATION
 
Saipem 7000 ALLEGATO_E
Saipem 7000 ALLEGATO_ESaipem 7000 ALLEGATO_E
Saipem 7000 ALLEGATO_E
 
C2VSim Workshop 6 - Closing
C2VSim Workshop 6 - ClosingC2VSim Workshop 6 - Closing
C2VSim Workshop 6 - Closing
 
Davie Hill QHSE Manager Case Studies
Davie Hill QHSE Manager  Case StudiesDavie Hill QHSE Manager  Case Studies
Davie Hill QHSE Manager Case Studies
 
LOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, IndiaLOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, India
 
Explore new corrosion control technologies
Explore new corrosion control technologiesExplore new corrosion control technologies
Explore new corrosion control technologies
 
Offshore Oil Drilling
Offshore Oil DrillingOffshore Oil Drilling
Offshore Oil Drilling
 
Offshore oil rigs
Offshore oil rigsOffshore oil rigs
Offshore oil rigs
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 

Similar to Semi submersible

OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
Nardipta Pratama
 

Similar to Semi submersible (20)

Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Oil and gas industry 1.1
Oil and gas industry 1.1Oil and gas industry 1.1
Oil and gas industry 1.1
 
Cac loai gian khoan
Cac loai gian khoanCac loai gian khoan
Cac loai gian khoan
 
Types of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsTypes of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigs
 
Offshore_Technology.pptx
Offshore_Technology.pptxOffshore_Technology.pptx
Offshore_Technology.pptx
 
94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptx
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Chinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship reportChinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship report
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
Offshore
Offshore Offshore
Offshore
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
 
Jsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiJsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghi
 
Sadeghi
SadeghiSadeghi
Sadeghi
 

More from Indian Maritime University, Visakhapatnam

More from Indian Maritime University, Visakhapatnam (19)

AUV
AUVAUV
AUV
 
CONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORTCONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORT
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
Preliminary ship-design
 
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORTHINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
 
MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT
 
Environmental presentation
Environmental presentationEnvironmental presentation
Environmental presentation
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
St. lawrence seaway.
St. lawrence seaway.St. lawrence seaway.
St. lawrence seaway.
 
DEEP SEA DIVING
DEEP SEA DIVINGDEEP SEA DIVING
DEEP SEA DIVING
 
Ocean waves
Ocean wavesOcean waves
Ocean waves
 
Water surface
Water surfaceWater surface
Water surface
 
Ocean properties
Ocean propertiesOcean properties
Ocean properties
 
Buoyancy & Stability
Buoyancy & StabilityBuoyancy & Stability
Buoyancy & Stability
 
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECTINTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
 
Marine hydrodynamics
Marine hydrodynamicsMarine hydrodynamics
Marine hydrodynamics
 
Programming and problem solving with c++, 3rd edition
Programming and problem solving with c++, 3rd editionProgramming and problem solving with c++, 3rd edition
Programming and problem solving with c++, 3rd edition
 
INDUSTRIAL WATER POLLUTION
INDUSTRIAL WATER POLLUTIONINDUSTRIAL WATER POLLUTION
INDUSTRIAL WATER POLLUTION
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 

Semi submersible

  • 1.
  • 2. Definition A semi-submersible (semi submerged ship) is a specialized marine vessel with legs/pontoons for buoyancy to float, and weight to keep the structure upright, which used in a number of specific offshore roles as, • offshore drilling rigs, • heavy lift cranes, • oil production platforms, • safety vessels. They are designed with good stability and sea keeping characteristics.
  • 3.
  • 4.
  • 5. Semi-Submersible • Exploratory and production purposes; • floating structure; • towed to the site, • ballasted and moored; • large vertical columns connected to large pontoons/legs, • columns support deck structure and equipment.
  • 6. Semi-Submersible • Water depth 200m to 3000m, • Offers large deck space, • Exceptional stability and sea keeping, • Withstand rough waters, • Highly flexible and efficient, • Can be moved from place to place.
  • 7.
  • 8. Applications • Mobile offshore drilling units (MODU) or Semi–Submersible Drilling Units (SSDU) • Semi-Submersible crane vessels (SSCV) • Offshore support vessels (OSV) • Offshore production platforms
  • 9. Semi-Submersible Drilling Units (SSDU) Based on the way the rig is submerged in the water, there are two main types • Bottle-type semi-subs and • Column-stabilized semi-subs
  • 10. Bottle-type semi-subs • Hull below the drilling deck is Bottle-shaped. • Hull can be submerged by ballasting. • Originally bottles below the rig were completely submerged, resting on ocean floor. • As time progressed bottles were only partially submerged. • Offers exceptional stability for drilling operations.
  • 11. Column-Stabilized semi-subs • More popular design • Two horizontal hulls are connected via cylindrical or rectangular columns to the drilling deck above the water • Smaller diagonal columns are used to support the structure • Mooring lines and dynamic positioning help to keep the semi-sub on location
  • 12. Mobile offshore drilling units (MODU)
  • 13.
  • 14. Semi–Submersible Drilling Units SSDU classified by IMO
  • 15. Semi-Submersible crane vessels (SSCV) • De-ballasted during transit; only part of the lower hull is submerged. • The vessel Ballasted during lifting operations. • High stability allows them to lift extreme high loads
  • 17. Offshore support vessels (OSV) Semi-submersibles are used as number of offshore support vessels because of their good stability, large deck areas, and variable deck load (VDL).  Construction support vessel,  Diving Support Vessel (DSV),  Offshore Safety support vessel,  Offshore accommodation platform,  Offshore Multiservice Vessel (MSV), E.g.- Ocean Odyssey – Converted semi-submersible drilling rig used as a rocket launch pad.
  • 18.
  • 19. Offshore production platforms • When oil fields were first developed in offshore locations, drilling semi-submersibles were converted for use as combined drilling and production platforms. • As progressed to deeper water and harsh environments, purpose-built production semi- submersible platforms were designed. • Offers very stable and cost effective platforms. • Mostly converted semi-submersible vessels.
  • 20.
  • 21. Mooring patterns and Dynamic positioning • Spread Mooring patterns and Dynamic positioning used to keep the floating rig in place • Mooring is similar to multiple anchors • Chosen depending on shape of unit and sea conditions • Dynamic positioning uses different motors or propulsion units to counteract motions of water • Dynamic positioning system is guided by telemetry signals from beacons, satellite information and the angular movements of a cable.
  • 22. Semi–Submersible Drilling Units – SSDU Advantages Disadvantages 1. Semi-submersibles can achieve good (small) motion response and, therefore, can be more easily positioned over a well template for drilling. 2. Most stable of any floating rig. 3. Semi-submersibles allow for a large number of flexible risers. 4. Provides large deck area. 5. Transportation from location to location is easy. 6. Can be reused and converted to other support vessels. 1. High initial and operating costs. 2. Pipeline infrastructure or other means is required to export produced oil. 3. Building schedules for semi-submersibles are usually longer than jack-up rigs. 4. Limited deck load (low reserve buoyancy). 5. Structural fatigue. 6. Expensive to move large distances. 7. Limited dry-docking facilities available. 8. Difficult to handle mooring systems and riser in rough seas.