SlideShare a Scribd company logo
Selection and Deployment of
Project Management Software
By
Mohammad Ashraf Khan
On March 2014
Objective
To select and implement a software which will help in
automating the work at XX org and result in higher
productivity of the organization
The Challenge
• The availability of too many software to choose from
• Lack of local representatives for the software companies
• The time and weekend difference between Afghanistan and
the software provider companies
• Lack of clear requirements on behalf of XX Org
• Unrealistic expectations of the employees from the
software
The progress
• Review of templates used by the project management unit
• General understanding of employees’ expectation from the
software, including M&E and, finance, and Communication
departments
• Review and trial use of more than 15 web-based project
management software
• Participating in 5 online demo sessions
• Review of various solutions provided by Microsoft
The Solutions available
The solutions available can be broadly grouped into four categories
1. Web-Based Solutions
2. Stand alone or desktop software
3. Intranet based solutions
4. Stand alone + web-based
The Solutions available: Web-based
1. Price: Based on functionalities the software can cost from 5 $/user/month to 30
$/user/month
2. Total average price: 12x15x20= 3600 USD per year
3. Common functionalities: Planning, tracking, collaboration, report generation
4. Pros 1: Simple to use and no IT infrastructure to setup
5. Pros 2: No need for heavy initial investment, No maintenance costs
6. Cons 1: Needs dedicated internet
The Solutions available:
Stand alone or Desktop
1. Price: Based on functionalities the a software can cost from 400 USD to 1200 USD per
license
2. Common Functionalities: planning, report generation, tracking
3. Total price minimum: 400x15 = 6000 USD one time
4. Pros: One time investment, no need for extra IT equipment or skills
5. Cons: No collaboration or and little ability to track project by higher management
Suggestion: Can be a solution. Can be a good first step. Will greatly help in planning and
reporting, and to some part tracking the project. But no collaboration available without
Sharepoint or Project Server
The Solutions available:
Intranet Based Solutions
1. Price: Can cost between 5,000 USD to 30,000 USD for
2. Functionalities: project management functionalities plus collaboration
3. Pros 1: No need for high speed internet
4. Cons 1: Heavy initial investment
5. Cons 2: Need for constant maintenance and IT skills
Suggestions 1: Can be a solution.
Suggestion 2: there is one particular company which is ready to install its software through intranet but
charge base on per user per month. Can be a good start.
Suggestion 3: We may start with stand alone MS project and migrate to Intranet based later on.
The Solutions available:
Stand Alone + Web-Based
1. Price: Can cost between 25 USD/User/month to 60/user/month based on functionalities
2. Functionalities: Planning, reporting, tracking, and less or more collaboration
3. Pros 1: No need for high speed internet
4. Pros 2: No heavy initial investment
5. Pros 3: No need for maintenance and IT skills
6. Cons 1: Higher functionalities are expensive
7. Cons 2: Only option is Microsoft
8. Cons 3: The online version must be heavy for our current internet speed
9. Cons 4: Hard to get full information because the solution is currently sold for Afghanistan
Suggestions 1: Can be the ideal solution provided we get full information
1. Potential Software: Open ERP
Software Name: OpenERP
Type: Locally hosted (Intranet based)
Cost: 35,000 to 45,000 USD one time investment
1. Pros 1: local company is ready to install the software
2. Pros 2: locally used
3. Cons 1: Fundamentally not a project management software
4. Cons 2: has less functionalities than other available software
5. Cons 3: heavy investment
Suggestion: Can be an option
2. Possible Software: MS Project
Type: Locally hosted or can be desktop + web-based
Cost web-based: 25 USD/User to 60 USD/user
Cost Locally hosted: 15,000 to 25,000 USD
1. Pros 1: Various versions to choose from
2. Pros 2: Less risk for web based version
3. Pros 3: Can be web-based and desktop based
4. Pros 4: Good functionalities
5. Cons 1: High functionalities can be expensive
6. Cons 2: The collaboration features may need us to be online 100% of time
Suggestion: The Desktop + Web-based version can be the ideal option. But we still do not
exactly know how it works.
Part No Description Unit Price QTY Total Price
H22-
02491
PrjctSvr 2013 OLP NL Gov $
4,391.2
8 1 $ 4,391.28
H21-
03356
PrjctSvrCAL 2013 OLP NL Gov
UsrCAL
$
150.
34 25 $ 3,758.40
76P-
01511
SharePointSvr 2013 OLP NL
Gov
$
5,269.5
4 1 $ 5,269.54
76M-
01538
SharePointStdCAL 2013 OLP
NL Gov UsrCAL
$
83.
95 25 $ 2,098.80
76N-
03627
SharePointEntCAL 2013 OLP
NL Gov UsrCAL
$
73.
87 25 $ 1,846.80
Total $ 17,364.82
3. Potential Software: ComindWork
Type: Locally hosted or Web-based
Cost web-based: 16 USD/User
Cost Locally hosted: 5000 USD
1. Pros 1: light software
2. Pros 2: The In-house version is not that expensive, hence less risk involved
3. Pros 3: Good functionalities
4. Cons 1: Too much collaboration.
Suggestion: The locally hosted version costing only 5000 USD can be a choice.
4. Potential Software: Project Insight
Type: Web-Based
Cost: 5,500/year for 20 users
1. Pros 1: Reliable, as it is Microsoft partner
2. Pros 2: Good integration with MS office
3. Pros 3. Having a special application which enables synchronization between the software
and MS Word, and Excel.
4. Pros 4: Complete functionalities
5. Pros 5: Can be accessed through Smartphones
6. Cons 1: Not the lightest of the software but can easily be operated with current
internet speed
Suggestion: A leading candidate
5. Potential Software: MavenLink
Type: Web-based
Cost web-based: 5$/user/month Or 25$/user/month
1. Pros 1: light software
2. Pros 2: Works perfectly fine with the current internet speed
3. Pros 3: Good functionalities
4. Pros 4: The least risk involved when it comes to deployment, change, and price
5. Pros 5: The second fast of the available software
6. Pros 6: Great Customer support
7. Pros 7: Having Mobile app for iOS and Android
8. Cons 1: No risk and issue tracking features
Suggestion 1: Since it works fine with the current internet speed it can be an option.
6. Potential Software: ZilicusPm
Type: Web-based
Cost web-based: 15/user/month
1. Pros 1: light software
2. Pros 2: Works fine with the current internet speed
3. Pros 3: Excellent functionalities
4. Pros 4: The least risk involved when it comes to deployment, change, and price
5. Pros 5: The fastest of all the software
6. Cons 1: No mobile apps yet. But will be in two months
Suggestion 1: Since it works fine with the current internet speed it can be the best option.
Productivity VS Cost
1. OpenERP
• Productivity increase 20%
• Cost 25,000 one time
• Info confidence 70%
7. Microsoft
A. MS project
• Productivity by 15%
• Cost 10,000 one time
• Info confidence 90%
B. Project Server
• Productivity by 30%
• Cost 20,000 one time
• Info confidence 80%
C. Project online + Desktop
• Productivity by 25%
• Cost: 3250/year
• Confidence 70%
6. Mavenlink
• Productivity increase 20%
• Cost 5/user/month
• Info confidence 90%
2. TenRox
• Productivity increase 30%
• Cost 25,000 one time
• Info confidence 75%
4. Project Insight
• Productivity increase 30%
• Cost: 5,500/year
• Info confidence 80%
5. Comindwork
• Productivity increase 25%
• Cost 5000 one time
• Info confidence 80%
3. Zilicuspm
• Productivity increase 30%
• Cost 15/user/month
• Info confidence 90%
Notes
1. Coming up with the best solution is almost impossible as there are almost no local users of these
software
2. Making heavy initial investment can be too risky
3. It is very likely that after installing a In-house solution, there will be a need for an extra IT employee.
Therefore, a possibility can be an increase the internet speed and going for online version of the
software
4. Or go ahead with some of the web-based software that are working fine with the current internet
speed and encourage the staff to use Mobile versions of the software when internet is down
5. We may not need most of the functionalities offered by these software, so better to start with
something simple.
6. I recommend ZilicusPM, MavenLink, and ProjecInsight
7. We should not worry much about migrating from one Project Managmeent Software to another. As
moving from one software to another is just like moving from Office 2007 to Office 2013
Coming steps
1. After getting feedback from the management I will study two or three
software in details
2. After the software is finalized, the templates and working procedures will be
reviewed
3. Deployment of the software
4. The templates will be tweaked to facilitate better integration with the
software
5. A training will be developed and delivered
6. On job training for at least two weeks

More Related Content

What's hot

04 project integration management
04 project integration management04 project integration management
04 project integration management
Omer Alsayed PhD,MBA, PMP®
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
Essam Lotffy, PMP®, CCP®
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
Saad Merie
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
Dhamo daran
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
Inam Khosa
 
PMP / Framework 1 2-3
PMP / Framework 1 2-3PMP / Framework 1 2-3
PMP / Framework 1 2-3
Ahmed Elshaboury,PMP,LEED GA
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
Dhamo daran
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
Ahmed Elshaboury,PMP,LEED GA
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
Reetesh Gupta
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
Mohamed Loey
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
Anand Bobade
 
Project integration management
Project integration managementProject integration management
Project integration management
Saad Al Jabri
 
Project integration management
Project integration managementProject integration management
Project integration management
Ehsan Ullah
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
DavidMcLachlan1
 
Ed4 P4 Project Integration Management
Ed4 P4 Project Integration ManagementEd4 P4 Project Integration Management
Ed4 P4 Project Integration Management
jonash99
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
Venugopal Venkatachalapathy
 

What's hot (20)

04 project integration management
04 project integration management04 project integration management
04 project integration management
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
PMP / Framework 1 2-3
PMP / Framework 1 2-3PMP / Framework 1 2-3
PMP / Framework 1 2-3
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Project integration management
Project integration managementProject integration management
Project integration management
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
Ed4 P4 Project Integration Management
Ed4 P4 Project Integration ManagementEd4 P4 Project Integration Management
Ed4 P4 Project Integration Management
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 

Viewers also liked

Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
Anand Bobade
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE
 
PMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality ManagementPMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality Management
Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
Imran Jamil
 
Seven tools of quality for pmp exam
Seven tools of quality for pmp examSeven tools of quality for pmp exam
Seven tools of quality for pmp exam
Manish Purwar
 

Viewers also liked (8)

Project quality management
Project quality managementProject quality management
Project quality management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
 
PMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality ManagementPMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality Management
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Seven tools of quality for pmp exam
Seven tools of quality for pmp examSeven tools of quality for pmp exam
Seven tools of quality for pmp exam
 

Similar to Selecting the Right Project Management Software

Web Application Development Cost.pdf
Web Application Development Cost.pdfWeb Application Development Cost.pdf
Web Application Development Cost.pdf
Simform
 
Construction Software & Technology Applications: What fits your biz?
Construction Software & Technology Applications: What fits your biz?Construction Software & Technology Applications: What fits your biz?
Construction Software & Technology Applications: What fits your biz?
Bridgit
 
Near east university
Near east universityNear east university
Near east university
DerrickDusabe
 
Top 12 Software Development Methodologies.pdf
Top 12 Software Development Methodologies.pdfTop 12 Software Development Methodologies.pdf
Top 12 Software Development Methodologies.pdf
Satawaretechnologies1
 
Web Applications: Dominance and Drawbacks
Web Applications: Dominance and DrawbacksWeb Applications: Dominance and Drawbacks
Web Applications: Dominance and Drawbacks
iMOBDEV Technologies Pvt. Ltd.
 
Business Proposal for Project
Business Proposal for ProjectBusiness Proposal for Project
Business Proposal for Project
Aftab Mirza
 
web development.pdf
web development.pdfweb development.pdf
web development.pdf
suryamahathi1
 
Cloud cpr uncc cloud computing conference 2013
Cloud cpr   uncc cloud computing conference 2013Cloud cpr   uncc cloud computing conference 2013
Cloud cpr uncc cloud computing conference 2013C5_LUCK
 
Project Plan And Estimation
Project Plan And EstimationProject Plan And Estimation
Project Plan And Estimation
Rajan Srivastava
 
List of Software Development Model and Methods
List of Software Development Model and MethodsList of Software Development Model and Methods
List of Software Development Model and Methods
Riant Soft
 
How Much Does Hiring Remote React Native Developers Cost.pdf
How Much Does Hiring Remote React Native Developers Cost.pdfHow Much Does Hiring Remote React Native Developers Cost.pdf
How Much Does Hiring Remote React Native Developers Cost.pdf
Artistixe IT Solution LLP
 
Latest proposal project info zakat
Latest proposal project info zakatLatest proposal project info zakat
Latest proposal project info zakat
Ummi Zakiah
 
How Much Does Hiring Remote React Native Developers Cost.docx
How Much Does Hiring Remote React Native Developers Cost.docxHow Much Does Hiring Remote React Native Developers Cost.docx
How Much Does Hiring Remote React Native Developers Cost.docx
Artistixe IT Solution LLP
 
Green Digital Skills Presentation.pptx
Green Digital Skills Presentation.pptxGreen Digital Skills Presentation.pptx
Green Digital Skills Presentation.pptx
Lavinia856482
 
Reduce Time to Value: Focus First on Configuration Management Debt
Reduce Time to Value: Focus First on Configuration Management DebtReduce Time to Value: Focus First on Configuration Management Debt
Reduce Time to Value: Focus First on Configuration Management Debt
Chris Sterling
 
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
Steve Greenley
 
1. Project Stakeholders Managementa. Target Users · End-Use.docx
1. Project Stakeholders Managementa. Target  Users · End-Use.docx1. Project Stakeholders Managementa. Target  Users · End-Use.docx
1. Project Stakeholders Managementa. Target Users · End-Use.docx
ambersalomon88660
 
Web application development full & detailed guide for 2022
Web application development  full & detailed guide for 2022Web application development  full & detailed guide for 2022
Web application development full & detailed guide for 2022
Metricoid Technology
 
Software Engineering Basics.pdf
Software Engineering Basics.pdfSoftware Engineering Basics.pdf
Software Engineering Basics.pdf
Priyajit Sen
 

Similar to Selecting the Right Project Management Software (20)

Web Application Development Cost.pdf
Web Application Development Cost.pdfWeb Application Development Cost.pdf
Web Application Development Cost.pdf
 
Construction Software & Technology Applications: What fits your biz?
Construction Software & Technology Applications: What fits your biz?Construction Software & Technology Applications: What fits your biz?
Construction Software & Technology Applications: What fits your biz?
 
Near east university
Near east universityNear east university
Near east university
 
Top 12 Software Development Methodologies.pdf
Top 12 Software Development Methodologies.pdfTop 12 Software Development Methodologies.pdf
Top 12 Software Development Methodologies.pdf
 
Web Applications: Dominance and Drawbacks
Web Applications: Dominance and DrawbacksWeb Applications: Dominance and Drawbacks
Web Applications: Dominance and Drawbacks
 
Business Proposal for Project
Business Proposal for ProjectBusiness Proposal for Project
Business Proposal for Project
 
web development.pdf
web development.pdfweb development.pdf
web development.pdf
 
GSOC 2016 mifos
GSOC 2016 mifosGSOC 2016 mifos
GSOC 2016 mifos
 
Cloud cpr uncc cloud computing conference 2013
Cloud cpr   uncc cloud computing conference 2013Cloud cpr   uncc cloud computing conference 2013
Cloud cpr uncc cloud computing conference 2013
 
Project Plan And Estimation
Project Plan And EstimationProject Plan And Estimation
Project Plan And Estimation
 
List of Software Development Model and Methods
List of Software Development Model and MethodsList of Software Development Model and Methods
List of Software Development Model and Methods
 
How Much Does Hiring Remote React Native Developers Cost.pdf
How Much Does Hiring Remote React Native Developers Cost.pdfHow Much Does Hiring Remote React Native Developers Cost.pdf
How Much Does Hiring Remote React Native Developers Cost.pdf
 
Latest proposal project info zakat
Latest proposal project info zakatLatest proposal project info zakat
Latest proposal project info zakat
 
How Much Does Hiring Remote React Native Developers Cost.docx
How Much Does Hiring Remote React Native Developers Cost.docxHow Much Does Hiring Remote React Native Developers Cost.docx
How Much Does Hiring Remote React Native Developers Cost.docx
 
Green Digital Skills Presentation.pptx
Green Digital Skills Presentation.pptxGreen Digital Skills Presentation.pptx
Green Digital Skills Presentation.pptx
 
Reduce Time to Value: Focus First on Configuration Management Debt
Reduce Time to Value: Focus First on Configuration Management DebtReduce Time to Value: Focus First on Configuration Management Debt
Reduce Time to Value: Focus First on Configuration Management Debt
 
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
Steve Greenley July 2015 - Enterprise Architecture and True Agility - lessons...
 
1. Project Stakeholders Managementa. Target Users · End-Use.docx
1. Project Stakeholders Managementa. Target  Users · End-Use.docx1. Project Stakeholders Managementa. Target  Users · End-Use.docx
1. Project Stakeholders Managementa. Target Users · End-Use.docx
 
Web application development full & detailed guide for 2022
Web application development  full & detailed guide for 2022Web application development  full & detailed guide for 2022
Web application development full & detailed guide for 2022
 
Software Engineering Basics.pdf
Software Engineering Basics.pdfSoftware Engineering Basics.pdf
Software Engineering Basics.pdf
 

More from Mohammad Ashraf Khan, PMP

Project cost management
Project cost managementProject cost management
Project cost management
Mohammad Ashraf Khan, PMP
 
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Project time management 1 final
Project time management 1 finalProject time management 1 final
Project time management 1 final
Mohammad Ashraf Khan, PMP
 

More from Mohammad Ashraf Khan, PMP (6)

Project cost management
Project cost managementProject cost management
Project cost management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project time management 3 final
Project time management 3 finalProject time management 3 final
Project time management 3 final
 
Project time management 2 final
Project time management 2 finalProject time management 2 final
Project time management 2 final
 
Project time management 1 final
Project time management 1 finalProject time management 1 final
Project time management 1 final
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 

Recently uploaded

Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Crescat
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
Ortus Solutions, Corp
 
Enterprise Software Development with No Code Solutions.pptx
Enterprise Software Development with No Code Solutions.pptxEnterprise Software Development with No Code Solutions.pptx
Enterprise Software Development with No Code Solutions.pptx
QuickwayInfoSystems3
 
Enhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfEnhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdf
Globus
 
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI AppAI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
Google
 
AI Genie Review: World’s First Open AI WordPress Website Creator
AI Genie Review: World’s First Open AI WordPress Website CreatorAI Genie Review: World’s First Open AI WordPress Website Creator
AI Genie Review: World’s First Open AI WordPress Website Creator
Google
 
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Mind IT Systems
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Łukasz Chruściel
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Mobile App Development Company In Noida | Drona Infotech
Mobile App Development Company In Noida | Drona InfotechMobile App Development Company In Noida | Drona Infotech
Mobile App Development Company In Noida | Drona Infotech
Drona Infotech
 
Nidhi Software Price. Fact , Costs, Tips
Nidhi Software Price. Fact , Costs, TipsNidhi Software Price. Fact , Costs, Tips
Nidhi Software Price. Fact , Costs, Tips
vrstrong314
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
Juraj Vysvader
 
APIs for Browser Automation (MoT Meetup 2024)
APIs for Browser Automation (MoT Meetup 2024)APIs for Browser Automation (MoT Meetup 2024)
APIs for Browser Automation (MoT Meetup 2024)
Boni García
 
Quarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden ExtensionsQuarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden Extensions
Max Andersen
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of Programming
Matt Welsh
 
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptxText-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
ShamsuddeenMuhammadA
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Neo4j
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
abdulrafaychaudhry
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
Deuglo Infosystem Pvt Ltd
 

Recently uploaded (20)

Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
 
Enterprise Software Development with No Code Solutions.pptx
Enterprise Software Development with No Code Solutions.pptxEnterprise Software Development with No Code Solutions.pptx
Enterprise Software Development with No Code Solutions.pptx
 
Enhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfEnhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdf
 
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI AppAI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
 
AI Genie Review: World’s First Open AI WordPress Website Creator
AI Genie Review: World’s First Open AI WordPress Website CreatorAI Genie Review: World’s First Open AI WordPress Website Creator
AI Genie Review: World’s First Open AI WordPress Website Creator
 
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Mobile App Development Company In Noida | Drona Infotech
Mobile App Development Company In Noida | Drona InfotechMobile App Development Company In Noida | Drona Infotech
Mobile App Development Company In Noida | Drona Infotech
 
Nidhi Software Price. Fact , Costs, Tips
Nidhi Software Price. Fact , Costs, TipsNidhi Software Price. Fact , Costs, Tips
Nidhi Software Price. Fact , Costs, Tips
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
 
APIs for Browser Automation (MoT Meetup 2024)
APIs for Browser Automation (MoT Meetup 2024)APIs for Browser Automation (MoT Meetup 2024)
APIs for Browser Automation (MoT Meetup 2024)
 
Quarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden ExtensionsQuarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden Extensions
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of Programming
 
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptxText-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
Text-Summarization-of-Breaking-News-Using-Fine-tuning-BART-Model.pptx
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
 

Selecting the Right Project Management Software

  • 1. Selection and Deployment of Project Management Software By Mohammad Ashraf Khan On March 2014
  • 2. Objective To select and implement a software which will help in automating the work at XX org and result in higher productivity of the organization
  • 3. The Challenge • The availability of too many software to choose from • Lack of local representatives for the software companies • The time and weekend difference between Afghanistan and the software provider companies • Lack of clear requirements on behalf of XX Org • Unrealistic expectations of the employees from the software
  • 4. The progress • Review of templates used by the project management unit • General understanding of employees’ expectation from the software, including M&E and, finance, and Communication departments • Review and trial use of more than 15 web-based project management software • Participating in 5 online demo sessions • Review of various solutions provided by Microsoft
  • 5. The Solutions available The solutions available can be broadly grouped into four categories 1. Web-Based Solutions 2. Stand alone or desktop software 3. Intranet based solutions 4. Stand alone + web-based
  • 6. The Solutions available: Web-based 1. Price: Based on functionalities the software can cost from 5 $/user/month to 30 $/user/month 2. Total average price: 12x15x20= 3600 USD per year 3. Common functionalities: Planning, tracking, collaboration, report generation 4. Pros 1: Simple to use and no IT infrastructure to setup 5. Pros 2: No need for heavy initial investment, No maintenance costs 6. Cons 1: Needs dedicated internet
  • 7. The Solutions available: Stand alone or Desktop 1. Price: Based on functionalities the a software can cost from 400 USD to 1200 USD per license 2. Common Functionalities: planning, report generation, tracking 3. Total price minimum: 400x15 = 6000 USD one time 4. Pros: One time investment, no need for extra IT equipment or skills 5. Cons: No collaboration or and little ability to track project by higher management Suggestion: Can be a solution. Can be a good first step. Will greatly help in planning and reporting, and to some part tracking the project. But no collaboration available without Sharepoint or Project Server
  • 8. The Solutions available: Intranet Based Solutions 1. Price: Can cost between 5,000 USD to 30,000 USD for 2. Functionalities: project management functionalities plus collaboration 3. Pros 1: No need for high speed internet 4. Cons 1: Heavy initial investment 5. Cons 2: Need for constant maintenance and IT skills Suggestions 1: Can be a solution. Suggestion 2: there is one particular company which is ready to install its software through intranet but charge base on per user per month. Can be a good start. Suggestion 3: We may start with stand alone MS project and migrate to Intranet based later on.
  • 9. The Solutions available: Stand Alone + Web-Based 1. Price: Can cost between 25 USD/User/month to 60/user/month based on functionalities 2. Functionalities: Planning, reporting, tracking, and less or more collaboration 3. Pros 1: No need for high speed internet 4. Pros 2: No heavy initial investment 5. Pros 3: No need for maintenance and IT skills 6. Cons 1: Higher functionalities are expensive 7. Cons 2: Only option is Microsoft 8. Cons 3: The online version must be heavy for our current internet speed 9. Cons 4: Hard to get full information because the solution is currently sold for Afghanistan Suggestions 1: Can be the ideal solution provided we get full information
  • 10. 1. Potential Software: Open ERP Software Name: OpenERP Type: Locally hosted (Intranet based) Cost: 35,000 to 45,000 USD one time investment 1. Pros 1: local company is ready to install the software 2. Pros 2: locally used 3. Cons 1: Fundamentally not a project management software 4. Cons 2: has less functionalities than other available software 5. Cons 3: heavy investment Suggestion: Can be an option
  • 11. 2. Possible Software: MS Project Type: Locally hosted or can be desktop + web-based Cost web-based: 25 USD/User to 60 USD/user Cost Locally hosted: 15,000 to 25,000 USD 1. Pros 1: Various versions to choose from 2. Pros 2: Less risk for web based version 3. Pros 3: Can be web-based and desktop based 4. Pros 4: Good functionalities 5. Cons 1: High functionalities can be expensive 6. Cons 2: The collaboration features may need us to be online 100% of time Suggestion: The Desktop + Web-based version can be the ideal option. But we still do not exactly know how it works. Part No Description Unit Price QTY Total Price H22- 02491 PrjctSvr 2013 OLP NL Gov $ 4,391.2 8 1 $ 4,391.28 H21- 03356 PrjctSvrCAL 2013 OLP NL Gov UsrCAL $ 150. 34 25 $ 3,758.40 76P- 01511 SharePointSvr 2013 OLP NL Gov $ 5,269.5 4 1 $ 5,269.54 76M- 01538 SharePointStdCAL 2013 OLP NL Gov UsrCAL $ 83. 95 25 $ 2,098.80 76N- 03627 SharePointEntCAL 2013 OLP NL Gov UsrCAL $ 73. 87 25 $ 1,846.80 Total $ 17,364.82
  • 12. 3. Potential Software: ComindWork Type: Locally hosted or Web-based Cost web-based: 16 USD/User Cost Locally hosted: 5000 USD 1. Pros 1: light software 2. Pros 2: The In-house version is not that expensive, hence less risk involved 3. Pros 3: Good functionalities 4. Cons 1: Too much collaboration. Suggestion: The locally hosted version costing only 5000 USD can be a choice.
  • 13. 4. Potential Software: Project Insight Type: Web-Based Cost: 5,500/year for 20 users 1. Pros 1: Reliable, as it is Microsoft partner 2. Pros 2: Good integration with MS office 3. Pros 3. Having a special application which enables synchronization between the software and MS Word, and Excel. 4. Pros 4: Complete functionalities 5. Pros 5: Can be accessed through Smartphones 6. Cons 1: Not the lightest of the software but can easily be operated with current internet speed Suggestion: A leading candidate
  • 14. 5. Potential Software: MavenLink Type: Web-based Cost web-based: 5$/user/month Or 25$/user/month 1. Pros 1: light software 2. Pros 2: Works perfectly fine with the current internet speed 3. Pros 3: Good functionalities 4. Pros 4: The least risk involved when it comes to deployment, change, and price 5. Pros 5: The second fast of the available software 6. Pros 6: Great Customer support 7. Pros 7: Having Mobile app for iOS and Android 8. Cons 1: No risk and issue tracking features Suggestion 1: Since it works fine with the current internet speed it can be an option.
  • 15. 6. Potential Software: ZilicusPm Type: Web-based Cost web-based: 15/user/month 1. Pros 1: light software 2. Pros 2: Works fine with the current internet speed 3. Pros 3: Excellent functionalities 4. Pros 4: The least risk involved when it comes to deployment, change, and price 5. Pros 5: The fastest of all the software 6. Cons 1: No mobile apps yet. But will be in two months Suggestion 1: Since it works fine with the current internet speed it can be the best option.
  • 16. Productivity VS Cost 1. OpenERP • Productivity increase 20% • Cost 25,000 one time • Info confidence 70% 7. Microsoft A. MS project • Productivity by 15% • Cost 10,000 one time • Info confidence 90% B. Project Server • Productivity by 30% • Cost 20,000 one time • Info confidence 80% C. Project online + Desktop • Productivity by 25% • Cost: 3250/year • Confidence 70% 6. Mavenlink • Productivity increase 20% • Cost 5/user/month • Info confidence 90% 2. TenRox • Productivity increase 30% • Cost 25,000 one time • Info confidence 75% 4. Project Insight • Productivity increase 30% • Cost: 5,500/year • Info confidence 80% 5. Comindwork • Productivity increase 25% • Cost 5000 one time • Info confidence 80% 3. Zilicuspm • Productivity increase 30% • Cost 15/user/month • Info confidence 90%
  • 17. Notes 1. Coming up with the best solution is almost impossible as there are almost no local users of these software 2. Making heavy initial investment can be too risky 3. It is very likely that after installing a In-house solution, there will be a need for an extra IT employee. Therefore, a possibility can be an increase the internet speed and going for online version of the software 4. Or go ahead with some of the web-based software that are working fine with the current internet speed and encourage the staff to use Mobile versions of the software when internet is down 5. We may not need most of the functionalities offered by these software, so better to start with something simple. 6. I recommend ZilicusPM, MavenLink, and ProjecInsight 7. We should not worry much about migrating from one Project Managmeent Software to another. As moving from one software to another is just like moving from Office 2007 to Office 2013
  • 18. Coming steps 1. After getting feedback from the management I will study two or three software in details 2. After the software is finalized, the templates and working procedures will be reviewed 3. Deployment of the software 4. The templates will be tweaked to facilitate better integration with the software 5. A training will be developed and delivered 6. On job training for at least two weeks