SEISMIC RETROFITTING OF
MANI MANDIR COMPLEX
AT MORBI,
GUJARAT, INDIA
Presented by
Ashlin T V
1
 100m×100m in plan
 Historic monument
 125 km from the epicenter of the 2001
Bhuj earthquake
 Morbi in the western state of Gujarat
 Western banks of the Macchu River
 Built in the 1930s by the ruler of Morbi
 Very ornate masonry building
INTRODUCTION
2
Contd.
 Built in yellow sandstone in the tradition of the Indo-Saracenic style of architecture.
 The Secretariat building has a large central courtyard housing the Mani Mandir
temple
 Total area of the Willingdon Secretariat is;
- 4900m2 on ground floor
- 4150m2 on first floor
- 255m2 a part of second floor
Fig. 1: Mani Mandir Complex
3
Principles that Governed The Seismic Retrofit Program
 Avoid intervention to maximum extent possible
 Introduce retrofitting measures in consonance with the heritage character and
principles of conservation
 New elements must be non-intrusive and compatible with existing materials
 New elements must not be a cause of further damage (such as corrosion).
 Retrofit measures must be easy to implement
4
DAMAGE DOCUMENTATION
Macro Survey
Identifying the areas of
severe, moderate and
minor damage
Areas that required
emergency
interventions
Detailed Survey
Floor-wise and Wing-
wise
To identify the types of
damage
Micro-Detailed Structural
Survey
Room-wise
Documenting all
damages including the
extent of corrosion, the
location of structural
members and their
sizes, and the length
and width of cracks.
5
 Two – storey complex
 Load bearing walls of soft,
- yellow sandstone above plinth
- black basalt stone below plinth
 Stone is dressed and exposed on external side
- coated with paint or lime wash internally
 Ashlar-type masonry
Fig. 2: Plan of Mani Mandir Complex
EXISTING STRUCTURE
6
 No physical bonds between stone blocks
 Stay in place by bearing friction
 Some stones locked by wooden keys – Chhatris ( ornamental canopies)
- Shikhars ( decorative towers)
 The stone blocks of pillars are socketed into each other by a small tongue and groove
detail
 Floors are built of stone slabs
750mm width and 200mm thick.
 Slabs wedged between flanges of steel joist
Fig. 3: Stone Slab Wedged between Steel Joists
7
 Joist rest on stone cornice
 Floor finish – 150mm thick
 Arches along external façade walls
and internally across passages
Fig. 4: Separation of Joist Flanges and Failure of
Stone Slab
8
Damage Prior of 2001
Earthquake
 Corrosion of steel joists
 Damage to cornice pieces at the
steel joist locations
 Weathering and flaking of
sandstone
 Roof leakage
 Peeling of internal paint
Damage in 1956
Earthquake
 Displacement of keystones of
portals, arches
 Movement of stones of walls
9
Damage in 2001 Earthquake
 Severe damage and collapse of a large number of elements
 Extensive damage at the roof level
 Moderate damage at the first storey
 Little damage on the ground storey
 Staircase cap slabs, parapets, shikhars, arches, portals and chhatris above the roof
were very badly damaged
 Bastions at the extreme corners of the structure sustained severe damage
10
Fig. 5: Damage above Roof Level: (a) Destruction of Arches in Elevational Elements,
(b) Partial Collapse of Bastions
11
Fig. 6: Floor Level Damage:
Fig. 7: Damage to Vertical Elements: (a) Openings of Joints in Arch;
(b) Diagonal Cracks in Walls
12
Previous Attempts of Retrofit
 Keystones of some arches and stone blocks of a few walls and portals were stapled
to adjacent stones
 Plastering the surface with cement mortar
 Arch pillars had been fully jacketed in concrete
13
Fig. 8: Earlier Interventions towards Restoration: (a) Fastening of Stones Using Mild Steel Staples;
(b) Repairing of Weathered Stone.
14
BEHAVIOUR ANALYSIS
 Poor Bonding Between Stones
 Lack of Rigid Diaphragm Action of Slab
 Lack of Rigid Diaphragm Action of Slab
 Reentrant Corners
 Arches
15
STRUCTURALANALYSIS
 Material Tests
 Modeling and Analysis of the Existing Structure
- Design Force Level for the Buildings
- Modeling
 Verification of the Analysis and Structural Adequacy
16
METHODOLOGIES FOR REPAIR,
RESTORATION AND RETROFITTING
 Elements to be Added/Enhanced for Improved Seismic Behaviour of Structure
- Introducing rigid diaphragm action of slab
- Enhancing Strength of the Structure
- End-pinning of Wall Corners
- Introducing Horizontal Reinforced Bands To Existing Masonry Walls
- Strengthening of Arches
- Cross-Pinning of Corridor Columns
- Stitching and Grouting of Cracks in Walls
17
Fig. 7: Location of Proposed Bracings and R.C. Skin Walls at First
Floor Level
18
Fig. 8: Sectional Details of Anchoring of Diagonal Floor Bracing in Walls
19
FIG. 9: Details of New R.C. Skin Wall (a) R.C. Skin Wall Nogged in to Masonry Wall;
(b) New R.C. Skin Wall Foundation
(a) (b)
20
Fig. 10: Intervention in Walls: (a) End Pining at Wall Corners;
(b) Seismic Reinforcement Bands
(a) (b)
21
Fig. 11: Detail of Interventions in Arches: (a) Strengthening of Arches Using Ties;
(b) Strengthening Of Arches by Pining And Reinforcement Band.
22
Fig. 12: Interventions in Vertical Elements: (a) Cross Pining of Corridor Columns
(b) Detail of Stitching Cracks in Walls
23
 Areas Requiring Demolition and Rebuild
- Roof Slab
- Bastions
- Elevation Features above Roof (Chhatris and Shikhars) and Decorative Balconies
- Roof Parapets
- Weather Sheds
24
Fig. 13: Plan of Bastion with New R.C. Skin Wall
25
Fig. 14 Pinning Details For Weather Shed
26
Conclusions
 The total area of new reinforced concrete skin walls introduced is less than 10% of
the area of the existing masonry walls
 The estimated cost of the proposed retrofit worked out to less than Rs. 4300/m2
 Reinforced concrete skin walls, diagonal bracing on the underside of the floor slabs
for diaphragm action, horizontal stainless steel reinforcement bands in existing
masonry walls have been proposed to improve lateral strength and behaviour
 Cross-pinning and end pinning have been recommended to improve the seismic
behaviour of walls, weather sheds and stone pillars
27
REFERENCES
 Alpa Sheth et. al., (2004), “Seismic Retrofitting of Mani Mandir Complex at
Morbi, Gujarat, India”, World Conference on Earthquake Engineering, 2430;1-6
28
Thank you
29

More Related Content

What's hot

Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
toshi gupta
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
Karthik Suresh
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
Abhishek Mewada
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
Shivangi Shankar
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
Rithika Ravishankar
 
Victoria memorial kolkata
Victoria memorial kolkataVictoria memorial kolkata
Victoria memorial kolkata
Moyukh Roy
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Earthquake resistance in buildings
Earthquake resistance in buildingsEarthquake resistance in buildings
Earthquake resistance in buildings
Rithika Ravishankar
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
Waseem Akbar
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
Krishnagnr
 
Laurie baker
Laurie bakerLaurie baker
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
Madan Mohan Jana
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.
Mayur Waghulde
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
ishant_kukreja
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
Palak Khandelwal
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
Muftah Aljoat
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
Onal Kothari
 
Case studies on heritage conservation
Case studies on heritage conservationCase studies on heritage conservation
Case studies on heritage conservation
Akshada Muley
 

What's hot (20)

Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
Petronas Towers
Petronas TowersPetronas Towers
Petronas Towers
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Victoria memorial kolkata
Victoria memorial kolkataVictoria memorial kolkata
Victoria memorial kolkata
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Earthquake resistance in buildings
Earthquake resistance in buildingsEarthquake resistance in buildings
Earthquake resistance in buildings
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
Laurie baker
Laurie bakerLaurie baker
Laurie baker
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
Case studies on heritage conservation
Case studies on heritage conservationCase studies on heritage conservation
Case studies on heritage conservation
 

Similar to Seismic retrofitting of heritage building- case study

Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015Silvia Rossi
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
ParamaAthmeka
 
Rehab of an existing mse(1)
Rehab of an existing mse(1)Rehab of an existing mse(1)
Rehab of an existing mse(1)
Dr. Ganesh Kame
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
Ananthakumar75
 
St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...
wesleyvillhard
 
Retrofitting of buildings
Retrofitting of buildingsRetrofitting of buildings
Retrofitting of buildings
Shehryar Abdullah
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Bala murali
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structures
Abdallah Shaheen
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
selvem
 
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
IRJET Journal
 
Earthquake Resistant Design Techniques
Earthquake Resistant Design TechniquesEarthquake Resistant Design Techniques
Earthquake Resistant Design Techniques
Sahil Kaundal
 
Seminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_StructureSeminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_Structure
Issar Kapadia
 
Yorkshire Heritage References_new
Yorkshire Heritage References_newYorkshire Heritage References_new
Yorkshire Heritage References_newSimon Nott
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
Sze Ting Kuek
 
Govindji Temple Conservation Project
Govindji Temple Conservation ProjectGovindji Temple Conservation Project
Govindji Temple Conservation Project
Nilanjan Bhowal
 
Module-5_sketch_Advanced Construction Technology
Module-5_sketch_Advanced Construction TechnologyModule-5_sketch_Advanced Construction Technology
Module-5_sketch_Advanced Construction Technology
A Makwana
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_aryaimaduddin91
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor CenterRay Rankin
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
Abdul Khader Shahadaf TH
 

Similar to Seismic retrofitting of heritage building- case study (20)

Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Rehab of an existing mse(1)
Rehab of an existing mse(1)Rehab of an existing mse(1)
Rehab of an existing mse(1)
 
16
1616
16
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
 
St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...
 
Retrofitting of buildings
Retrofitting of buildingsRetrofitting of buildings
Retrofitting of buildings
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structures
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
 
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
SEISMIC STRENGTHENING OF NON-ENGINEERED SCHOOL BUILDING IN STONE MASONRY IN T...
 
Earthquake Resistant Design Techniques
Earthquake Resistant Design TechniquesEarthquake Resistant Design Techniques
Earthquake Resistant Design Techniques
 
Seminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_StructureSeminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_Structure
 
Yorkshire Heritage References_new
Yorkshire Heritage References_newYorkshire Heritage References_new
Yorkshire Heritage References_new
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Govindji Temple Conservation Project
Govindji Temple Conservation ProjectGovindji Temple Conservation Project
Govindji Temple Conservation Project
 
Module-5_sketch_Advanced Construction Technology
Module-5_sketch_Advanced Construction TechnologyModule-5_sketch_Advanced Construction Technology
Module-5_sketch_Advanced Construction Technology
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
 

More from ashlinvilson

St. torcato church
St. torcato churchSt. torcato church
St. torcato church
ashlinvilson
 
Rana plaza
Rana plazaRana plaza
Rana plaza
ashlinvilson
 
Behaviour of concrete column reinforced with prefabricated cage
Behaviour of concrete column reinforced with prefabricated cageBehaviour of concrete column reinforced with prefabricated cage
Behaviour of concrete column reinforced with prefabricated cage
ashlinvilson
 
Buckling restrained braced frames
Buckling restrained braced framesBuckling restrained braced frames
Buckling restrained braced frames
ashlinvilson
 
Damping & types
Damping & typesDamping & types
Damping & types
ashlinvilson
 
Spillways
SpillwaysSpillways
Spillways
ashlinvilson
 
Mangrove forest
Mangrove forestMangrove forest
Mangrove forest
ashlinvilson
 
Layout & mechanics of research report
Layout & mechanics of research reportLayout & mechanics of research report
Layout & mechanics of research report
ashlinvilson
 
Bubble deck slab system
Bubble deck slab system Bubble deck slab system
Bubble deck slab system
ashlinvilson
 

More from ashlinvilson (9)

St. torcato church
St. torcato churchSt. torcato church
St. torcato church
 
Rana plaza
Rana plazaRana plaza
Rana plaza
 
Behaviour of concrete column reinforced with prefabricated cage
Behaviour of concrete column reinforced with prefabricated cageBehaviour of concrete column reinforced with prefabricated cage
Behaviour of concrete column reinforced with prefabricated cage
 
Buckling restrained braced frames
Buckling restrained braced framesBuckling restrained braced frames
Buckling restrained braced frames
 
Damping & types
Damping & typesDamping & types
Damping & types
 
Spillways
SpillwaysSpillways
Spillways
 
Mangrove forest
Mangrove forestMangrove forest
Mangrove forest
 
Layout & mechanics of research report
Layout & mechanics of research reportLayout & mechanics of research report
Layout & mechanics of research report
 
Bubble deck slab system
Bubble deck slab system Bubble deck slab system
Bubble deck slab system
 

Recently uploaded

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 

Recently uploaded (20)

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 

Seismic retrofitting of heritage building- case study

  • 1. SEISMIC RETROFITTING OF MANI MANDIR COMPLEX AT MORBI, GUJARAT, INDIA Presented by Ashlin T V 1
  • 2.  100m×100m in plan  Historic monument  125 km from the epicenter of the 2001 Bhuj earthquake  Morbi in the western state of Gujarat  Western banks of the Macchu River  Built in the 1930s by the ruler of Morbi  Very ornate masonry building INTRODUCTION 2
  • 3. Contd.  Built in yellow sandstone in the tradition of the Indo-Saracenic style of architecture.  The Secretariat building has a large central courtyard housing the Mani Mandir temple  Total area of the Willingdon Secretariat is; - 4900m2 on ground floor - 4150m2 on first floor - 255m2 a part of second floor Fig. 1: Mani Mandir Complex 3
  • 4. Principles that Governed The Seismic Retrofit Program  Avoid intervention to maximum extent possible  Introduce retrofitting measures in consonance with the heritage character and principles of conservation  New elements must be non-intrusive and compatible with existing materials  New elements must not be a cause of further damage (such as corrosion).  Retrofit measures must be easy to implement 4
  • 5. DAMAGE DOCUMENTATION Macro Survey Identifying the areas of severe, moderate and minor damage Areas that required emergency interventions Detailed Survey Floor-wise and Wing- wise To identify the types of damage Micro-Detailed Structural Survey Room-wise Documenting all damages including the extent of corrosion, the location of structural members and their sizes, and the length and width of cracks. 5
  • 6.  Two – storey complex  Load bearing walls of soft, - yellow sandstone above plinth - black basalt stone below plinth  Stone is dressed and exposed on external side - coated with paint or lime wash internally  Ashlar-type masonry Fig. 2: Plan of Mani Mandir Complex EXISTING STRUCTURE 6
  • 7.  No physical bonds between stone blocks  Stay in place by bearing friction  Some stones locked by wooden keys – Chhatris ( ornamental canopies) - Shikhars ( decorative towers)  The stone blocks of pillars are socketed into each other by a small tongue and groove detail  Floors are built of stone slabs 750mm width and 200mm thick.  Slabs wedged between flanges of steel joist Fig. 3: Stone Slab Wedged between Steel Joists 7
  • 8.  Joist rest on stone cornice  Floor finish – 150mm thick  Arches along external façade walls and internally across passages Fig. 4: Separation of Joist Flanges and Failure of Stone Slab 8
  • 9. Damage Prior of 2001 Earthquake  Corrosion of steel joists  Damage to cornice pieces at the steel joist locations  Weathering and flaking of sandstone  Roof leakage  Peeling of internal paint Damage in 1956 Earthquake  Displacement of keystones of portals, arches  Movement of stones of walls 9
  • 10. Damage in 2001 Earthquake  Severe damage and collapse of a large number of elements  Extensive damage at the roof level  Moderate damage at the first storey  Little damage on the ground storey  Staircase cap slabs, parapets, shikhars, arches, portals and chhatris above the roof were very badly damaged  Bastions at the extreme corners of the structure sustained severe damage 10
  • 11. Fig. 5: Damage above Roof Level: (a) Destruction of Arches in Elevational Elements, (b) Partial Collapse of Bastions 11
  • 12. Fig. 6: Floor Level Damage: Fig. 7: Damage to Vertical Elements: (a) Openings of Joints in Arch; (b) Diagonal Cracks in Walls 12
  • 13. Previous Attempts of Retrofit  Keystones of some arches and stone blocks of a few walls and portals were stapled to adjacent stones  Plastering the surface with cement mortar  Arch pillars had been fully jacketed in concrete 13
  • 14. Fig. 8: Earlier Interventions towards Restoration: (a) Fastening of Stones Using Mild Steel Staples; (b) Repairing of Weathered Stone. 14
  • 15. BEHAVIOUR ANALYSIS  Poor Bonding Between Stones  Lack of Rigid Diaphragm Action of Slab  Lack of Rigid Diaphragm Action of Slab  Reentrant Corners  Arches 15
  • 16. STRUCTURALANALYSIS  Material Tests  Modeling and Analysis of the Existing Structure - Design Force Level for the Buildings - Modeling  Verification of the Analysis and Structural Adequacy 16
  • 17. METHODOLOGIES FOR REPAIR, RESTORATION AND RETROFITTING  Elements to be Added/Enhanced for Improved Seismic Behaviour of Structure - Introducing rigid diaphragm action of slab - Enhancing Strength of the Structure - End-pinning of Wall Corners - Introducing Horizontal Reinforced Bands To Existing Masonry Walls - Strengthening of Arches - Cross-Pinning of Corridor Columns - Stitching and Grouting of Cracks in Walls 17
  • 18. Fig. 7: Location of Proposed Bracings and R.C. Skin Walls at First Floor Level 18
  • 19. Fig. 8: Sectional Details of Anchoring of Diagonal Floor Bracing in Walls 19
  • 20. FIG. 9: Details of New R.C. Skin Wall (a) R.C. Skin Wall Nogged in to Masonry Wall; (b) New R.C. Skin Wall Foundation (a) (b) 20
  • 21. Fig. 10: Intervention in Walls: (a) End Pining at Wall Corners; (b) Seismic Reinforcement Bands (a) (b) 21
  • 22. Fig. 11: Detail of Interventions in Arches: (a) Strengthening of Arches Using Ties; (b) Strengthening Of Arches by Pining And Reinforcement Band. 22
  • 23. Fig. 12: Interventions in Vertical Elements: (a) Cross Pining of Corridor Columns (b) Detail of Stitching Cracks in Walls 23
  • 24.  Areas Requiring Demolition and Rebuild - Roof Slab - Bastions - Elevation Features above Roof (Chhatris and Shikhars) and Decorative Balconies - Roof Parapets - Weather Sheds 24
  • 25. Fig. 13: Plan of Bastion with New R.C. Skin Wall 25
  • 26. Fig. 14 Pinning Details For Weather Shed 26
  • 27. Conclusions  The total area of new reinforced concrete skin walls introduced is less than 10% of the area of the existing masonry walls  The estimated cost of the proposed retrofit worked out to less than Rs. 4300/m2  Reinforced concrete skin walls, diagonal bracing on the underside of the floor slabs for diaphragm action, horizontal stainless steel reinforcement bands in existing masonry walls have been proposed to improve lateral strength and behaviour  Cross-pinning and end pinning have been recommended to improve the seismic behaviour of walls, weather sheds and stone pillars 27
  • 28. REFERENCES  Alpa Sheth et. al., (2004), “Seismic Retrofitting of Mani Mandir Complex at Morbi, Gujarat, India”, World Conference on Earthquake Engineering, 2430;1-6 28