Advancing Engineering with AI
Through the Next Generation of Strategic Project Portfolio Management
with OnePlan
Trends The current state of project and portfolio management (PPM) for engineering is continually evolving,
driven by advancements in technology, changing project demands, and a growing emphasis on
efficiency and sustainability. Here are some key trends and aspects of PPM in engineering:
Digital Transformation
Integrated Systems
Agile and Iterative Approaches
Data-Driven Decision Making
Risk Management
Remote Collaboration
Sustainability
• There's a move towards integrated PPM systems that bring together project planning, scheduling, resource
management, and financials into a unified platform. Integration improves visibility, decision-making, and efficiency.
• Agile methodologies are increasingly used in engineering projects, allowing for more flexibility, faster iterations,
and better responsiveness to changing requirements.
• PPM in engineering is becoming more data-centric. Advanced analytics and AI are used to analyze project
data, predict outcomes, and optimize resource allocation.
• With the complexity of engineering projects, risk management is a critical focus. PPM tools now often
include robust risk assessment and mitigation features.
• The ability to collaborate remotely has become vital, especially after the experiences of the COVID-19 pandemic.
PPM tools now emphasize remote access, real-time updates, and virtual collaboration features.
• Many engineering projects now have a strong focus on sustainability. PPM includes considerations for
environmental impact assessments, carbon footprint tracking, and green project management practices.
• Like many industries, engineering is undergoing a digital transformation. This includes the adoption of digital
tools for project management, such as cloud-based platforms, AI-driven analytics, and collaborative software.
Major Challenges of Modern Engineering Projects
Complexity
• Interdisciplinary nature
• Technical complexity
• Globalization
Budget/Cost Mgmt
• Costoverruns
• Resourceallocation
Schedule and Time Constraints
• Schedule overruns
• Tight Deadlines
Risk Mgmt
• Uncertainty
• Risk Identification
Sustainability/Environmental Impact
• Regulatory compliance
• Carbon footprint
Technology Integration
• Rapid technological advancements
• Legacy systems
Stakeholder Management
• Diversestakeholders
• Communication
Quality Control
• Meeting standards
• Defects and rework
Supply Chain Disruptions
• Global supply chains
• Material shortages
Human Resources
• Skills gap and shortages
• Workforcediversity and inclusion
Health and Safety
• Workplacesafety
• Pandemic preparedness
Regulatory Compliance
• Changing regulations
• Permitting and approvals
Data Management
• Big data
• Cybersecurity
Ethical Considerations
• Ethical design
• Sustainability ethics
Common Components of Engineering Projects
Scope Definition
• Project Objectives
• Requirements
• Constraints
• Deliverables
Project Planning
• WBS & Scheduling
• Resource Planning
• Risk Management
• Quality Planning
Design/Development
• Conceptual Design
• Detailed Design
• Prototype & Testing
• Iterative Refinement
Procurement/Logistics
• Supplier selection
• Procurement Planning
• Logistics Management
Construction or Mfg.
• Construction Mgmt
• Quality Assurance
• Safety & Compliance
• Progress monitoring
Testing/Commissioning
• Functional Testing
• Performance Testing
• Commissioning
Documentation
• Technical documents
• As-Built drawings
• Certificates &
Compliance
Project Management
• Communication
• Change mgmt.
• Budget/Cost control
• Stakeholder mgmt.
Post-Project Support
• Maintenance
• Warranty support
• Performance monitoring
Handover & Closeout
• Client acceptance
• Training
• Documentation handover
• Lessons learned
Product Portfolio Management
• Product portfolio management is all about
developing and implementing a
comprehensive and profitable business
strategy for your company’s entire product
line. Making a product portfolio as strong as it
can be is the goal of good product portfolio
management.
• Product portfolio management goes way
beyond singular product management and
day-to-day project management.
Understanding the goals and benefits of product
portfolio management can not only boost your
company’s bottom line but also transform the
company from top to bottom.
Benefits Of Product Portfolio Management
• Evaluate product performance.
• Increase efficiency. By looking at which products
meet company goals, businesses can prioritize
stronger products and launch new products more
quickly.
• Improve competitive ranking. By tracking market
trends, businesses are better able to pinpoint
customer needs and adapt to changing market
trends.
• Centralize data. This enables teams and
departments to better communicate with each other.
• Determine and prepare for risks.
• Research from Manufacturers Alliance shows that 61
percent of product managers rate product life cycle
and portfolio management as “very or extremely
important”to their role. Why? Because product
portfolio management helps businesses make
decisions in line with the reality of their products’
successes.
Common Features of Portfolio Management Software
• Data analytics
• Product roadmap tools
• Risk management features
• Budget tracking and resource allocation
• Scheduling
• Time tracking
• Portfolio ranking tools
Different Methodologies
Agile
Waterfall
Hybrid
• Agile is growing
• Waterfall is still widely used
• Agile variants
• Hybrid methodologies
• Personalized, cherry-picked versions
• Associate and align
• Aggregate and rollup
• Different methodologies
• Variety of tools
• Translate to common
metrics for leadership
Consolidating and Translating
Hybrid
Corporate Strategy
Key Results
Product Lines
Products
Release Release Release Release Release Release
Methodology
Tools
Teams
Leadership
Corporate Goals
Portfolios
Strategic Themes
Programs
Initiative Initiative Initiative Initiative Initiative Initiative
Methodology
Tools
• Associate and align
• Aggregate and rollup
• Different methodologies
• Variety of tools
• Translate to common
metrics for leadership
Teams
Leadership
• Burn Down
• Burn Up
• Velocity
• Cumulative
Flow Diagram
• WSJF
• Bug Trends
Consolidating and Translating
All Agile Teams
• NPV
• IRR
• ROI
• Earned Value
• Utilization
• Milestones
• CPI
• SPI
• Cost Variance
Leadershiprequires SPM to support enterprise-wide strategy-to-execution
alignment and adaptation.
Definition of key business strategies and desired business outcomes,
and mapping key portfolio elements, such as business capabilities,
investments, programs, digital and physical products,
applications, and projects.
Capture, define and prioritize business strategies; manage the
execution of initiatives, programsand projects that drive the
achievementof these strategies; and provide full visibilityand
managementof core functional assets.
Strategic Portfolio Management (SPM)
Supports three key stakeholders from Leadership who sets direction,
IT/Functionalmanagement who owns the critical assets in infrastructure and
Execution teams that plan and deliver projects and products in the pursuitof
reachingthe business goals.
Strategic Portfolio Management as a set of business capabilities, processes and supporting portfolio
management technology.
Shift Toward SPM to Enable Organizational Agility
The increasing pace of change and environmental turbulence creates
unsustainable strain for organizations. The need for agility will drive
strategic portfolio leaders to increase adoption of strategic portfolio
management and change supporting tooling and metrics.
Key Findings
• Only 16% of organizations are highly effective at all three key
attributes of strategic portfolio management (SPM) — portfolio
alignment, ongoing portfolio flexibility and value-driven decision
making.
• A fragmented approach to designing the future of work can lead to
excessive costs due to conflicting priorities, redundant
processes and misaligned goals.
• In a distributed delivery environment, business leaders overemphasize
local customer needs while making decisions and unintentionally pull
the enterprise away from its strategic objectives.
OnePlan Provides the Path to Strategic Portfolio Management
A complete solution for the Enterprise
BUSINESS LEADERS
Solutions that define business goals and strategies,
as well as track progress at the levels of portfolios,
business capabilities, products and strategic
initiatives.
OKRs | VALUE STREAMS
FUNCTIONAL LEADERS
Solutions that can present the interrelated
perspectives, views and considerations needed to
make strategic decisions across the business.
ENTERPRISE ARCHITECTURE MANAGEMENT
APPLICATION PORTFOLIO MANAGEMENT
PRODUCT PORTFOLIO MANAGEMENT
EXECUTION LEADERS
Solutions that support the selection, planning and
execution of a variety of different Initiatives across
the organization
ADAPTIVE | PSA | AGILE | PRODUCT
Portfolio Managers
Resource Planning
Financial Planning
Work Plan
Visualizations
Dashboards
Status Reports
Plan Managers
Agile Plan
Ideation / Requests
Artificial Intelligence – Sofia GPT
Strategy
Timesheets
My Work
Stakeholders
Team Members
Executives
Portfolio Planning
Planning
Do the right work Do the work right
Resource Negotiation
Resource Managers
Enterprise Architecture
Execution Analysis
What-if Scenario Modeling
• Products
• Services
• Applications
Capacity Planning
Issues Risks Changes
• BusinessValue
• Benefits
Realization
OKRs
Say Hello to OnePlan’s ‘Sofia GPT’
A Game-Changer for StrategicPortfolio Management
Data Integration:
Accesses data from both OpenAI's extensive network and
OnePlan's own resources.
AI-Driven Collaboration
Sofia GPT, an advanced Azure OpenAI module, is tailored to
transform strategic portfolio and work management.
Intuitive Interaction:
Understands natural language and provides real-time responses,
enhancing strategic planning and decision-making efficiency.
Automation Powerhouse:
Simplifies tasks like data entry, information retrieval,
communication, estimation, anomaly detection, and more.
Sofia GPT Always Available in OnePlan
AI Evolution in Portfolio Management
Step 01
Step 02
Step 03
Step 04
Step 05
APIs
Scripts
Predictive Analytics
In-built AI Assistant
Fully Auto Mode
Integration
Automation
AI Based
Suggestive for SPM
AI Based
Assistantfor SPM
AI Based
Autonomousfor SPM
Previously Now Future
nePlan AI
Incorporate GenAI Into Overall SPM Practices
Sample Use Cases for AI in Strategic Portfolio Management
OnePlan's Sofia GPT helps
organizations make data-
driven decisions and
forecast outcomes.
Strategic
Planning
Work
Management
OnePlan's Sofia GPT helps
organizations balance
their portfolio of projects
to maximize value.
Resource
Allocation
OnePlan's Sofia GPT helps
organizations manage
resources, tasks, and
timelines more efficiently.
Investment
Forecasting
OnePlan's Sofia GPT helps
organizations identify and
mitigate potential risks to
their projects and
portfolios.
Risk
Assessment
OnePlan's Sofia GPT helps
organizations optimize
resource allocation across
projects and teams.
Portfolio
Optimization
OnePlan's Sofia GPT helps
organizations manage
project costs, budgets,
and forecasts.
Business Case Definition – Technology Product Engineering
Provide a list of viable OKRs for Technology Product Engineering
Demonstration
AI-Driven Strategic Planning with OnePlan
➢ Increased Productivity: Sofia GPT's AI-based strategic planningtoolscan help to increase
productivityby streamliningthe OKR developmentprocess, reducing manual input, and
automatingroutine tasks.
➢ Improved Alignment: Sofia GPT can help to align organizational objectiveswith individual
and team OKRs. By analyzingbusiness performance metrics and identifyingareas for
improvement, Sofia GPT can inform the developmentof OKRs and ensure alignment with
overallorganizational objectives.
➢ Data-Driven Decision Making: Sofia GPT can analyze OKRs and related data to identify
patterns, opportunities,and potentialrisks. It can use predictive analyticsto forecast OKR
outcomes and identify potentialroadblocks.Thiscan help stakeholdersmake data-driven
decisionsto achieve their strategic goals.
➢ Optimization: Sofia GPT can analyze OKRs and providerecommendationsto optimize
outcomes. By recommending adjustmentsto OKRs, resource allocations,and other
factors, Sofia GPT can maximize OKR success and improve business outcomes.
Analyze data to identify patterns, opportunities, and potential risks
AI-enabled Work Management with OnePlan
➢ Work plan creation: OnePlan's Sofia GPT can help create and manage work templates for
common types of work, such as project planning, marketing campaigns, or software
development. These templates can be customized based on the specific needs of a
project, and they can be used to standardize workflows, reduce errors, and improve
efficiency.
➢ Schedule risk assessment: OnePlan's Sofia GPT can help teams assess the risk associated
with individual tasks and projects by analyzing data related to past performance, resource
availability, and other factors that can impact project success. By identifying and
mitigating risks early on, teams can improve the likelihood of project success and avoid
potential delays or failures.
➢ Schedule optimization: OnePlan's Sofia GPT can help teams optimize project schedules by
analyzing data related to resource availability, task dependencies, and project goals. By
identifying the most efficient and effective schedule, teams can reduce delays and
improve overall project outcomes.
Plan Creation – Digital Transformation Program
AI-enabled Portfolio Optimization with OnePlan
➢ Data analysis: OnePlan'sSofia GPT can analyze data related to a company'sproject
portfolio, includingproject goals, resources, timelines, budgets, and risks. This analysiscan
help identify patterns and trends that can inform decision-makingaroundproject selection
and prioritization.
➢ Prediction and forecasting:By analyzingOnePlan data, OnePlan's Sofia GPT can make
predictions and forecasts about the likely outcomes of different project scenarios. This can
help decision-makers anticipatepotentialproblemsor opportunities and make more
informed decisions about project prioritization.
➢ Risk assessment:OnePlan's Sofia GPT can help assess the risk associated with different
projects in a portfolio, includingthe likelihoodof project delays, cost overruns, and other
potentialissues. This informationcan help inform project prioritization andresource
allocation decisions.
➢ PortfolioOptimization:OnePlan's Sofia GPT can use optimizationalgorithmsto identify
the best combinationof projects to include in a portfolio based on various criteria, such as
business goals, resource availability,and risk tolerance.
Provide a summary of the portfolio data
Budget and Plan Optimization - Intake Lead – Select Projects based on criteria
AI-enabled Risk Identification & Mitigation with OnePlan
➢ Identifying and categorizing risks: Sofia GPT can analyze large volumes of data and
identify potential risks that may affect an organization. It can also categorize the risks
based on severity, likelihood of occurrence, and potential impact on the organization.
➢ Predicting future risks: Sofia GPT can analyze historical data and use machine learning
algorithms to predict future risks that may arise. This can help organizations take
preventive measures and prepare for potential risks.
➢ Recommending mitigation strategies: Based on the identified risks, Sofia GPT can
recommend mitigation strategies that can help organizations reduce the likelihood or
impact of the risks. These strategies can be customized based on the specific needs and
characteristics of the organization.
Identify potential risks and how to mitigate them
AI-enabled Resource Capacity Planning with OnePlan
➢ ResourceAllocation: Sofia GPT can help organizationsoptimize resource allocation by
analyzingthe current resource usage patternsand predicting future demand. This can help
organizationsto allocateresources more efficiently and avoidover/underutilization of
resources.
➢ Capacity Planning: Sofia GPT can help organizationsto plan for future capacity requirements
by analyzinghistoricalusage data and predicting future demand. Thiscan help organizations
to make informed decisions about when to add or remove resources to meet changing
business needs.
➢ ResourceOptimization: Sofia GPT can be used to optimize resource utilizationby identifying
opportunitiesto reduce waste, improve efficiency, and increase productivity.This can help
organizationsto reduce costs and improve their overallperformance.
➢ Predictive Talent Acquisition: Sofia GPT can analyze OnePlan data to predict future hiring
needs based on trends and patterns. This can help businesses plan their talent acquisition
strategy and identify the right candidatesfor their organization
Provide a sample Resource Plan by hours and month for this plan
AI-powered Investment Forecasting and Predictive Analytics
➢ Predicting and forecasting costs: Sofia GPT can analyze OnePlan financial data, identify
patterns, and predict future costs. This can help businesses plan their budgets more
accurately and avoid unexpected expenses.
➢ Optimizing spending: Sofia GPT can analyze spending patterns and identify areas where
costs can be reduced or optimized. This can help businesses make more informed
decisions about where to allocate their resources.
➢ Providing real-time insights: Sofia GPT can provide real-time insights into financial data,
allowing businesses to make more informed decisions quickly. This can help businesses
respond to changes in the market or in their own financial situation more effectively.
What are the key insights and trends that can be inferred from the financial data?
Help me write a project summary email to my manager
Augmented Data Entry – Project Manager Status Report Narrative
Summary and Next Steps
• Engineering has its own unique challenges for success in the
organization
• Better alignment with strategy and business architecture is
needed for successful outcomes
• Strategic Portfolio Management (SPM) has become
important in today’s business environment
• Increased complexity, and the fast pace of change requires
enhanced methods and approaches
• Introduction of Gen AI is adding to the degree of change
impacting the Engineering and Product Portfolios
• OnePlan provides end-to-end Strategic Portfolio
Management in the Microsoft Cloud
• OnePlan meets you where you are, and enables a crawl,
walk, run approach to attain the full benefits of SPM
• The use of AI provides valuable assistance and insights to
our SPM efforts, and Sofia GPT provides AI-enabled
capabilities in OnePlan
Summary
- Global PPM Leader for 5 Consecutive Years
Consistently Recognized as a Market Leader
OnePlan cited as a top vendor in
“Determine the Future of Microsoft
Project in Your Organization”
Strategy and Innovation
2023 Peer Insights
“Voice of the Customer”
Strategic Portfolio Management
Our Next Webinars
https://oneplan.ai/webinars/
• Frequent webinars on a variety of topics
• Register for new webinars
• Library of recorded, on-demand webinars
www.appsource.com
Get Started Today! - Free Trials
Assistanceavailable from OnePlan
https://oneplan.ai/solutions/
For more information:
contact@oneplan.ai
Free Offers and Next Steps
• FREE - OnePlan Trial
• FREE – Roadmap Workshop
• FREE – Personalized 1:1 Demo
www.oneplan.ai
Contact Us
contact@oneplan.ai
www.oneplan.ai
Jim Patterson
jpatterson@oneplan.ai
Thank You!!
The Power of One

Advancing Engineering with AI through the Next Generation of Strategic Project Portfolio Management with OnePlan

  • 1.
    In partnership with AdvancingEngineering with AI Through the Next Generation of Strategic Project Portfolio Management with OnePlan
  • 2.
    Trends The currentstate of project and portfolio management (PPM) for engineering is continually evolving, driven by advancements in technology, changing project demands, and a growing emphasis on efficiency and sustainability. Here are some key trends and aspects of PPM in engineering: Digital Transformation Integrated Systems Agile and Iterative Approaches Data-Driven Decision Making Risk Management Remote Collaboration Sustainability • There's a move towards integrated PPM systems that bring together project planning, scheduling, resource management, and financials into a unified platform. Integration improves visibility, decision-making, and efficiency. • Agile methodologies are increasingly used in engineering projects, allowing for more flexibility, faster iterations, and better responsiveness to changing requirements. • PPM in engineering is becoming more data-centric. Advanced analytics and AI are used to analyze project data, predict outcomes, and optimize resource allocation. • With the complexity of engineering projects, risk management is a critical focus. PPM tools now often include robust risk assessment and mitigation features. • The ability to collaborate remotely has become vital, especially after the experiences of the COVID-19 pandemic. PPM tools now emphasize remote access, real-time updates, and virtual collaboration features. • Many engineering projects now have a strong focus on sustainability. PPM includes considerations for environmental impact assessments, carbon footprint tracking, and green project management practices. • Like many industries, engineering is undergoing a digital transformation. This includes the adoption of digital tools for project management, such as cloud-based platforms, AI-driven analytics, and collaborative software.
  • 3.
    Major Challenges ofModern Engineering Projects Complexity • Interdisciplinary nature • Technical complexity • Globalization Budget/Cost Mgmt • Costoverruns • Resourceallocation Schedule and Time Constraints • Schedule overruns • Tight Deadlines Risk Mgmt • Uncertainty • Risk Identification Sustainability/Environmental Impact • Regulatory compliance • Carbon footprint Technology Integration • Rapid technological advancements • Legacy systems Stakeholder Management • Diversestakeholders • Communication Quality Control • Meeting standards • Defects and rework Supply Chain Disruptions • Global supply chains • Material shortages Human Resources • Skills gap and shortages • Workforcediversity and inclusion Health and Safety • Workplacesafety • Pandemic preparedness Regulatory Compliance • Changing regulations • Permitting and approvals Data Management • Big data • Cybersecurity Ethical Considerations • Ethical design • Sustainability ethics
  • 4.
    Common Components ofEngineering Projects Scope Definition • Project Objectives • Requirements • Constraints • Deliverables Project Planning • WBS & Scheduling • Resource Planning • Risk Management • Quality Planning Design/Development • Conceptual Design • Detailed Design • Prototype & Testing • Iterative Refinement Procurement/Logistics • Supplier selection • Procurement Planning • Logistics Management Construction or Mfg. • Construction Mgmt • Quality Assurance • Safety & Compliance • Progress monitoring Testing/Commissioning • Functional Testing • Performance Testing • Commissioning Documentation • Technical documents • As-Built drawings • Certificates & Compliance Project Management • Communication • Change mgmt. • Budget/Cost control • Stakeholder mgmt. Post-Project Support • Maintenance • Warranty support • Performance monitoring Handover & Closeout • Client acceptance • Training • Documentation handover • Lessons learned
  • 5.
    Product Portfolio Management •Product portfolio management is all about developing and implementing a comprehensive and profitable business strategy for your company’s entire product line. Making a product portfolio as strong as it can be is the goal of good product portfolio management. • Product portfolio management goes way beyond singular product management and day-to-day project management. Understanding the goals and benefits of product portfolio management can not only boost your company’s bottom line but also transform the company from top to bottom.
  • 6.
    Benefits Of ProductPortfolio Management • Evaluate product performance. • Increase efficiency. By looking at which products meet company goals, businesses can prioritize stronger products and launch new products more quickly. • Improve competitive ranking. By tracking market trends, businesses are better able to pinpoint customer needs and adapt to changing market trends. • Centralize data. This enables teams and departments to better communicate with each other. • Determine and prepare for risks. • Research from Manufacturers Alliance shows that 61 percent of product managers rate product life cycle and portfolio management as “very or extremely important”to their role. Why? Because product portfolio management helps businesses make decisions in line with the reality of their products’ successes.
  • 7.
    Common Features ofPortfolio Management Software • Data analytics • Product roadmap tools • Risk management features • Budget tracking and resource allocation • Scheduling • Time tracking • Portfolio ranking tools
  • 8.
    Different Methodologies Agile Waterfall Hybrid • Agileis growing • Waterfall is still widely used • Agile variants • Hybrid methodologies • Personalized, cherry-picked versions
  • 9.
    • Associate andalign • Aggregate and rollup • Different methodologies • Variety of tools • Translate to common metrics for leadership Consolidating and Translating Hybrid Corporate Strategy Key Results Product Lines Products Release Release Release Release Release Release Methodology Tools Teams Leadership
  • 10.
    Corporate Goals Portfolios Strategic Themes Programs InitiativeInitiative Initiative Initiative Initiative Initiative Methodology Tools • Associate and align • Aggregate and rollup • Different methodologies • Variety of tools • Translate to common metrics for leadership Teams Leadership • Burn Down • Burn Up • Velocity • Cumulative Flow Diagram • WSJF • Bug Trends Consolidating and Translating All Agile Teams • NPV • IRR • ROI • Earned Value • Utilization • Milestones • CPI • SPI • Cost Variance
  • 11.
    Leadershiprequires SPM tosupport enterprise-wide strategy-to-execution alignment and adaptation. Definition of key business strategies and desired business outcomes, and mapping key portfolio elements, such as business capabilities, investments, programs, digital and physical products, applications, and projects. Capture, define and prioritize business strategies; manage the execution of initiatives, programsand projects that drive the achievementof these strategies; and provide full visibilityand managementof core functional assets. Strategic Portfolio Management (SPM) Supports three key stakeholders from Leadership who sets direction, IT/Functionalmanagement who owns the critical assets in infrastructure and Execution teams that plan and deliver projects and products in the pursuitof reachingthe business goals. Strategic Portfolio Management as a set of business capabilities, processes and supporting portfolio management technology.
  • 12.
    Shift Toward SPMto Enable Organizational Agility The increasing pace of change and environmental turbulence creates unsustainable strain for organizations. The need for agility will drive strategic portfolio leaders to increase adoption of strategic portfolio management and change supporting tooling and metrics. Key Findings • Only 16% of organizations are highly effective at all three key attributes of strategic portfolio management (SPM) — portfolio alignment, ongoing portfolio flexibility and value-driven decision making. • A fragmented approach to designing the future of work can lead to excessive costs due to conflicting priorities, redundant processes and misaligned goals. • In a distributed delivery environment, business leaders overemphasize local customer needs while making decisions and unintentionally pull the enterprise away from its strategic objectives.
  • 13.
    OnePlan Provides thePath to Strategic Portfolio Management A complete solution for the Enterprise BUSINESS LEADERS Solutions that define business goals and strategies, as well as track progress at the levels of portfolios, business capabilities, products and strategic initiatives. OKRs | VALUE STREAMS FUNCTIONAL LEADERS Solutions that can present the interrelated perspectives, views and considerations needed to make strategic decisions across the business. ENTERPRISE ARCHITECTURE MANAGEMENT APPLICATION PORTFOLIO MANAGEMENT PRODUCT PORTFOLIO MANAGEMENT EXECUTION LEADERS Solutions that support the selection, planning and execution of a variety of different Initiatives across the organization ADAPTIVE | PSA | AGILE | PRODUCT
  • 14.
    Portfolio Managers Resource Planning FinancialPlanning Work Plan Visualizations Dashboards Status Reports Plan Managers Agile Plan Ideation / Requests Artificial Intelligence – Sofia GPT Strategy Timesheets My Work Stakeholders Team Members Executives Portfolio Planning Planning Do the right work Do the work right Resource Negotiation Resource Managers Enterprise Architecture Execution Analysis What-if Scenario Modeling • Products • Services • Applications Capacity Planning Issues Risks Changes • BusinessValue • Benefits Realization OKRs
  • 15.
    Say Hello toOnePlan’s ‘Sofia GPT’ A Game-Changer for StrategicPortfolio Management Data Integration: Accesses data from both OpenAI's extensive network and OnePlan's own resources. AI-Driven Collaboration Sofia GPT, an advanced Azure OpenAI module, is tailored to transform strategic portfolio and work management. Intuitive Interaction: Understands natural language and provides real-time responses, enhancing strategic planning and decision-making efficiency. Automation Powerhouse: Simplifies tasks like data entry, information retrieval, communication, estimation, anomaly detection, and more.
  • 16.
    Sofia GPT AlwaysAvailable in OnePlan
  • 17.
    AI Evolution inPortfolio Management Step 01 Step 02 Step 03 Step 04 Step 05 APIs Scripts Predictive Analytics In-built AI Assistant Fully Auto Mode Integration Automation AI Based Suggestive for SPM AI Based Assistantfor SPM AI Based Autonomousfor SPM Previously Now Future nePlan AI
  • 18.
    Incorporate GenAI IntoOverall SPM Practices
  • 19.
    Sample Use Casesfor AI in Strategic Portfolio Management OnePlan's Sofia GPT helps organizations make data- driven decisions and forecast outcomes. Strategic Planning Work Management OnePlan's Sofia GPT helps organizations balance their portfolio of projects to maximize value. Resource Allocation OnePlan's Sofia GPT helps organizations manage resources, tasks, and timelines more efficiently. Investment Forecasting OnePlan's Sofia GPT helps organizations identify and mitigate potential risks to their projects and portfolios. Risk Assessment OnePlan's Sofia GPT helps organizations optimize resource allocation across projects and teams. Portfolio Optimization OnePlan's Sofia GPT helps organizations manage project costs, budgets, and forecasts.
  • 20.
    Business Case Definition– Technology Product Engineering
  • 21.
    Provide a listof viable OKRs for Technology Product Engineering
  • 22.
  • 23.
    AI-Driven Strategic Planningwith OnePlan ➢ Increased Productivity: Sofia GPT's AI-based strategic planningtoolscan help to increase productivityby streamliningthe OKR developmentprocess, reducing manual input, and automatingroutine tasks. ➢ Improved Alignment: Sofia GPT can help to align organizational objectiveswith individual and team OKRs. By analyzingbusiness performance metrics and identifyingareas for improvement, Sofia GPT can inform the developmentof OKRs and ensure alignment with overallorganizational objectives. ➢ Data-Driven Decision Making: Sofia GPT can analyze OKRs and related data to identify patterns, opportunities,and potentialrisks. It can use predictive analyticsto forecast OKR outcomes and identify potentialroadblocks.Thiscan help stakeholdersmake data-driven decisionsto achieve their strategic goals. ➢ Optimization: Sofia GPT can analyze OKRs and providerecommendationsto optimize outcomes. By recommending adjustmentsto OKRs, resource allocations,and other factors, Sofia GPT can maximize OKR success and improve business outcomes.
  • 24.
    Analyze data toidentify patterns, opportunities, and potential risks
  • 25.
    AI-enabled Work Managementwith OnePlan ➢ Work plan creation: OnePlan's Sofia GPT can help create and manage work templates for common types of work, such as project planning, marketing campaigns, or software development. These templates can be customized based on the specific needs of a project, and they can be used to standardize workflows, reduce errors, and improve efficiency. ➢ Schedule risk assessment: OnePlan's Sofia GPT can help teams assess the risk associated with individual tasks and projects by analyzing data related to past performance, resource availability, and other factors that can impact project success. By identifying and mitigating risks early on, teams can improve the likelihood of project success and avoid potential delays or failures. ➢ Schedule optimization: OnePlan's Sofia GPT can help teams optimize project schedules by analyzing data related to resource availability, task dependencies, and project goals. By identifying the most efficient and effective schedule, teams can reduce delays and improve overall project outcomes.
  • 26.
    Plan Creation –Digital Transformation Program
  • 27.
    AI-enabled Portfolio Optimizationwith OnePlan ➢ Data analysis: OnePlan'sSofia GPT can analyze data related to a company'sproject portfolio, includingproject goals, resources, timelines, budgets, and risks. This analysiscan help identify patterns and trends that can inform decision-makingaroundproject selection and prioritization. ➢ Prediction and forecasting:By analyzingOnePlan data, OnePlan's Sofia GPT can make predictions and forecasts about the likely outcomes of different project scenarios. This can help decision-makers anticipatepotentialproblemsor opportunities and make more informed decisions about project prioritization. ➢ Risk assessment:OnePlan's Sofia GPT can help assess the risk associated with different projects in a portfolio, includingthe likelihoodof project delays, cost overruns, and other potentialissues. This informationcan help inform project prioritization andresource allocation decisions. ➢ PortfolioOptimization:OnePlan's Sofia GPT can use optimizationalgorithmsto identify the best combinationof projects to include in a portfolio based on various criteria, such as business goals, resource availability,and risk tolerance.
  • 28.
    Provide a summaryof the portfolio data
  • 29.
    Budget and PlanOptimization - Intake Lead – Select Projects based on criteria
  • 30.
    AI-enabled Risk Identification& Mitigation with OnePlan ➢ Identifying and categorizing risks: Sofia GPT can analyze large volumes of data and identify potential risks that may affect an organization. It can also categorize the risks based on severity, likelihood of occurrence, and potential impact on the organization. ➢ Predicting future risks: Sofia GPT can analyze historical data and use machine learning algorithms to predict future risks that may arise. This can help organizations take preventive measures and prepare for potential risks. ➢ Recommending mitigation strategies: Based on the identified risks, Sofia GPT can recommend mitigation strategies that can help organizations reduce the likelihood or impact of the risks. These strategies can be customized based on the specific needs and characteristics of the organization.
  • 31.
    Identify potential risksand how to mitigate them
  • 32.
    AI-enabled Resource CapacityPlanning with OnePlan ➢ ResourceAllocation: Sofia GPT can help organizationsoptimize resource allocation by analyzingthe current resource usage patternsand predicting future demand. This can help organizationsto allocateresources more efficiently and avoidover/underutilization of resources. ➢ Capacity Planning: Sofia GPT can help organizationsto plan for future capacity requirements by analyzinghistoricalusage data and predicting future demand. Thiscan help organizations to make informed decisions about when to add or remove resources to meet changing business needs. ➢ ResourceOptimization: Sofia GPT can be used to optimize resource utilizationby identifying opportunitiesto reduce waste, improve efficiency, and increase productivity.This can help organizationsto reduce costs and improve their overallperformance. ➢ Predictive Talent Acquisition: Sofia GPT can analyze OnePlan data to predict future hiring needs based on trends and patterns. This can help businesses plan their talent acquisition strategy and identify the right candidatesfor their organization
  • 33.
    Provide a sampleResource Plan by hours and month for this plan
  • 34.
    AI-powered Investment Forecastingand Predictive Analytics ➢ Predicting and forecasting costs: Sofia GPT can analyze OnePlan financial data, identify patterns, and predict future costs. This can help businesses plan their budgets more accurately and avoid unexpected expenses. ➢ Optimizing spending: Sofia GPT can analyze spending patterns and identify areas where costs can be reduced or optimized. This can help businesses make more informed decisions about where to allocate their resources. ➢ Providing real-time insights: Sofia GPT can provide real-time insights into financial data, allowing businesses to make more informed decisions quickly. This can help businesses respond to changes in the market or in their own financial situation more effectively.
  • 35.
    What are thekey insights and trends that can be inferred from the financial data?
  • 36.
    Help me writea project summary email to my manager
  • 37.
    Augmented Data Entry– Project Manager Status Report Narrative
  • 38.
  • 39.
    • Engineering hasits own unique challenges for success in the organization • Better alignment with strategy and business architecture is needed for successful outcomes • Strategic Portfolio Management (SPM) has become important in today’s business environment • Increased complexity, and the fast pace of change requires enhanced methods and approaches • Introduction of Gen AI is adding to the degree of change impacting the Engineering and Product Portfolios • OnePlan provides end-to-end Strategic Portfolio Management in the Microsoft Cloud • OnePlan meets you where you are, and enables a crawl, walk, run approach to attain the full benefits of SPM • The use of AI provides valuable assistance and insights to our SPM efforts, and Sofia GPT provides AI-enabled capabilities in OnePlan Summary
  • 40.
    - Global PPMLeader for 5 Consecutive Years Consistently Recognized as a Market Leader OnePlan cited as a top vendor in “Determine the Future of Microsoft Project in Your Organization” Strategy and Innovation 2023 Peer Insights “Voice of the Customer” Strategic Portfolio Management
  • 41.
    Our Next Webinars https://oneplan.ai/webinars/ •Frequent webinars on a variety of topics • Register for new webinars • Library of recorded, on-demand webinars
  • 42.
    www.appsource.com Get Started Today!- Free Trials Assistanceavailable from OnePlan https://oneplan.ai/solutions/
  • 43.
    For more information: contact@oneplan.ai FreeOffers and Next Steps • FREE - OnePlan Trial • FREE – Roadmap Workshop • FREE – Personalized 1:1 Demo www.oneplan.ai