l  Build accurate cost estimate
l  Provide clear visibility of project costs, revenues, margins and cash position
l  Accurate forecasting of Cost, Revenues and Margin
l  Measurement and Reporting of Project Progress
l  Management of project variations, customer escalations, and their seamless integration with
project cost forecasting, budgeting and revenue planning
l  Procurement planning & execution
l  Integration of subcontractors into project execution, monitoring of work performed and the
incorporation of this work into progress reporting.
l  Accurate customer billing
SAP centric requirements
Engineering & Design
Construction Package
Structural Engineering
Drafting
Sub-contracted services
Construction worker
Construction project
Current
Budget
Original
Estimate
Contract
Value
Costs To
Complete
Actual
Costs
Estimate At
Completion
l  SAP system to be the central place for integrated project
management
l  SAP Projects to update and manage key financial and progress
attributes
l  Manage project procurement of materials, sub-contracted
services and labour directly in SAP
l  SAP to be the single source to report project key financial valuesMaterials
Why Noveco ?
l  Estimation or Cost Planning is cumbersome and contradictory. Most SAP PS customers use:
•  Controlling type transactions (e.g. CJR2, CJ40) to plan cost on WBS
•  Network Planning, inherited in PS from PP (production planning) on network activities
l  Cost forecasting or financial re-planning is not functional
l  No project variation management solution
l  No single central place to manage your project (you must run dozen of transactions to monitor
and report)
l  No comprehensive project reports out of the box
Why do you need Noveco ePM for project Management in SAP?
SAP Project Systems (PS) functional gaps:
Noveco  ePM  is  a  family  of  seamlessly  integrated  software  components  designed  to  
complement  and  enhance  SAP's  standard  Project  System  (PS)  functionality,  with  a  
focus  on  easy  project  planning,  forecasting,  variation  management  and  reporting  
directly  in  SAP  ECC  
  
Noveco  ePM  enables  management  of  your  project  lifecycle  directly inside  your  ERP  
system  (no  other  tools  needed)  
Why  Noveco  ePM  
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
MonitoringForecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  PS  (Project  System)  is  one  of  
the  most  integrated  modules  
in  SAP  ERP    
  
•  Noveco  ePM  enhances  SAP  
Project  System  enabling  
integrated  project  
management  directly  in  SAP  
ECC  
•  You  will  not  need  any  other  
tools  like  excel,  BI,  BO  etc.  to  
manage  your  project  
lifecycle  in  SAP.  
Business  Challenges  
SAP  PS    
+    
Noveco  ePM  
Accounting  
(FI)  and  
Controlling  
(CO)  
Materials    
Management  
and  
Procurement  
(MM)  
Production  
Planning  
(PP)  Plant  
Maintenance,  
Customer  
Service  
(PM/CS)  
Sales  
and  customer  
billing  
(SD)  
Human  
Resources    
(HR)  
Capacity    
and  Resource  
Planning  
Time  Sheets  
(CATS)  
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Project Management Lifecycle
•  Create Project Stricture
•  Cost and Revenue Planning
•  Dates Scheduling
•  Budget approval
•  Cost Distribution
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
Monitoring
Forecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Create
Projects
Project Structures: WBS hierarchy only (no networks)
Option 1: WBS (no networks)
WBS represent project
organizational structure:
•  Phases
•  Types
•  Project Activity
Example:
•  Design, Land Acquisition,
•  Construction packages,
•  Testing and Commissioning
WBS used for:
•  Grouping project activities for
planning and reporting
•  Form (sub)packages within
structure
•  Cost planning (see next slides)
•  Budget allocation
•  Dates Scheduling
•  Cost Collection (e.g. labour,
materials, equipment, services)
•  Cost Forecasting
•  Reporting
Construction Project
Construction
Building A1
Equipment Installation
Cost Plan on WBS elements
Capital Project
Construction
Sub-Station
Manual Cost Planning on WBS elements:
•  Labour rates (different types)
•  Materials
•  Sub-Contracted Services
•  Plants & Equipment
•  Overheads
Labour
Materials
Subcontract
Plant
Overheads
In this scenario WBS elements are used for
•  Cost Planning
•  Cost Forecasting
•  Dates scheduling
•  Cost collection (engineering, project management etc.)
For manual cost planning we recommend using Easy Cost Planning on WBS elements
Project: WBS elements only (option 1)
•  Create project structure in SAP PS using Project Builder
•  WBS structure (example) can be multi-level and represent
your specific coding rules
•  WBS represents packages and sub-packages of your
construction project
Project Structures: WBS and Network Activities
Construction
Building A1
Option 2: WBS & Networks
Network Activities Represent
Project tasks
Example: engineering drawings,
earth moving, equipment installation
etc.
WBS used for:
•  Grouping project activities for
reporting
•  Cost planning (see next slides)
•  Budget allocation
Networks used for:
•  Detailed Cost Planning
•  Dates scheduling
•  Cost Collection (e.g. labour,
materials, equipment,
services)
•  Resource planning
•  Cost Forecasting
Construction ProjectWBS represent project
organizational structure:
•  Phases
•  Types
•  Project Activity
Project: WBS elements and Network Activities (option 2)
•  WBS structure represents project organizational
structure and its phases
•  Network activities represent project tasks, linked
with relationships
Project Management Lifecycle
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
Monitoring
Forecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  Create Project Stricture
•  Cost and Revenue Planning
•  Dates Scheduling
•  Budget approval
•  Cost Distribution
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Cost
Planning
Project Builder (SAP standard transaction CJ20N)
Easy Cost Planning
•  Here is an example on how Project Cost plan can be
formed by using Easy Cost Planning functionality (SAP
Standard)
•  Easy Cost Plan can be automatically generated from
external estimating system
Project Builder (SAP standard transaction CJ20N)
Select Costing Version
•  Cost Estimation is saved in costing versions
•  Multiple Costing versions can be created.
•  In this example version N01 is used to keep the Original Budget
Easy Cost Planning in details
Easy Cost Planning allows you to plan multiple resources on one WBS
( or Network Activity):
•  Internal labour types
•  external services
•  Material
•  plant etc.
Easy Cost Planning using Planning Forms
•  You can use pre-defined planning forms to
estimate costs using input parameters
•  Costing lines (below) are generated
automatically
Easy Cost Planning using Services as BOQ
Plan sub-contracted package on WBS element using services
These lines (bill of quantities) will be included in purchase order
Plan Revenue using Sales and Project Integration
Engineering & Design
Construction
Structural Engineering
Drafting
Sub-contracted services
Construction worker
Materials / Equipment
Construction project
Sales
Order
•  In this example revenue plan created from Sales Order
billing plan
•  The billing plan can be created from project milestones
Cost and Revenue Planning options
l  In our example we planned costs using Easy Cost Planning and Planned Revenue using Sales
Order – Project System integration
l  You can Plan Costs in PS using other functions:
•  Network planning (if you use networks)
•  Cost Element Planning (CJ42, CJR2)
•  Revenue Planning (CJ40)
•  New planning functions based on WebDynpro available in enhp6
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Scheduling
Schedule Project Dates using PS Planning Board or MSP
OpenPS for
Microsoft Project
(SAP standard
interface between
PS and MSP)
•  Use SAP Project Planning Board to schedule project dates
•  Detailed schedule can also be created in MS Project and synchronized with SAP PS
using standard (free) interface OPENPS4MSP
New Gantt Chart is
available as of ECC 6.0
enhp6
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Cost
Distribution
Project Manager Workbench: KPI view
Cost and Revenue Plan by period
Current Budget = Estimate + Variations + Adjustments + Contingency
Project Manager Workbench: KPI view
Estimated At Completion = Actual Costs + Commitments + Cost To Complete
Project Manager Workbench: KPI view
•  Plan Revenue = Original Revenue + Revenue Variations
•  Current Profit = Plan Revenue – Estimated At Completion
Project Manager Workbench: KPI view
Cost information is broken by WBS, Value Category and Resource Types
Project Manager Workbench: KPI view
You can choose to view costs aggregated and grouped by Value Category
and Resource Types for selected WBS element
Noveco Project Manager Workbench can “turn off” cost elements from the view. This feature enables cost element free forecasting, which can
be important for companies that created too many cost elements for the same type of work. Noveco will make sure that all lines from different
cost elements that belong to the same Value Category and Resource are presented as one line with summarized costing information
Project Manager Workbench: Value Category view
Cost grouped by Value Categories and Resources and broken down by period
Project Manager Workbench: Value Category by Period
Project Manager Workbench: Plan by Period
Distribute LABOUR cost
Project Manager Workbench: Plan by Period
Distribute MATERIAL cost
Noveco manual distribution
function allows you distribute
different type of cost
independently from each other
Project Manager Workbench: Plan by Period
Distribute SUBCONTRACT cost
In this WBS you expect Purchase
Order to be raised
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Post Actual
Costs
and
Purchasing
Commitments
Project Management Lifecycle
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
MonitoringForecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  Procurement
•  Time Sheets
•  Forecast update and KPI Monitoring
•  Progress assessment
•  Variations and issues
Project Actual Costs flow
Time sheets
Expenses
&
other costs
Material
Consumption
from stock
Sub-
Contracted
Services
Equipment &
Materials
Direct
Project
Construction
Building A1
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Recalculate
Forecasts
Project Management Lifecycle
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
MonitoringForecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  Procurement
•  Time Sheets
•  Forecast update and KPI Monitoring
•  Progress assessment
•  Variations and issues
Project Manager Workbench: Auto-Recalculate Forecast
•  We posted Actual Costs and raised Purchasing Commitments
•  System automatically reduced remaining Costs To Complete
•  Estimated Cost At Completion did not change = Actuals + Commitments + CTC
Project Manager Workbench: Recalculate Forecast automatically
•  Review costing details
•  Review Purchase Order
Project Manager Workbench: Recalculate Forecast automatically
Actual Cost of Labour posted in February, Cost
To Complete reduced accordingly
Project Manager Workbench: automatic Commitment distribution
•  Purchase Order Commitments
reduced Cost To Complete (in this
scenario to “zero”)
•  Commitments were automatically
distributed using the same
pattern as previously distributed
Cost To Complete
•  You can change it if you like
Project Manager Workbench: Purchasing Commitments
•  View PO commitment value per
WBS
•  View Purchase Order List
•  You can drill down to PO from
that screen
Project Manager Workbench: Purchasing Commitments
•  Switch to Change mode
•  Change Cost and Work To Complete or
Estimated At Completion
•  System recalculates Estimated Cost At
Completion (EAC) and Budget Deficit
Project Manager Workbench: Purchasing Commitments
•  Budget Deficit = Current Budget – Estimated
at Completion
•  Exceptions highlight WBS elements where
Budget differs from EAC
•  You can define tolerance limits for “green”
and “red” icons
Project Manager Workbench: Review KPIs
Since EAC has changed, the “Current Profit” has
changed as well
Project Manager Workbench: S-Curves
Project Management Lifecycle
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
MonitoringForecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  Procurement
•  Time Sheets
•  Forecast update and KPI Monitoring
•  Progress assessment
•  Variations and issues
Review Project Progress
•  You can review Plan and Actual POC as
well Earned Values (BCWS and BCWP)
Project Actual Progress
•  You can change Actual Progress
•  System will keep Calculated and Actual
Progress separately
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Create
Project
Variation
Project Management Lifecycle
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
MonitoringForecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
•  Procurement
•  Time Sheets
•  Forecast update and KPI Monitoring
•  Progress assessment
•  Variations and issues
Project Variation
Revenue item
Costing items
Variation affect on project
Project Review: KPIs including Variation
Current Budget = Original Estimate + Cost Variations
Plan Revenue = Original Revenue + Revenue Variations
Project Variation in details
•  Variation List
•  Variation history
* Project Variation ManagementProcurement, Time Sheets
Invoicing, Billing
Project Dates SchedulingCost & Revenue PlanningProject Builder
Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis)
Planning
and
Execution
Monitoring
Forecasting
Progress Tracking
Reporting
and
Analysis
*  Project  Manager  Workbench  
*  Noveco  Applications  Integrated  Project  Management  in  SAP  
Project
Reporting
Project Management Lifecycle
•  Project Reporting
•  Portfolio and Program Reporting
•  Analysis
•  Long Term planning and forecasting
.	
  .	
  
.	
  .	
  
Efficient
Project
Management
Execution
Monitoring
Forecasting
l  Reporting
l  Analysis
l  Settlement
l  Estimating
l  Planning
l  Budgeting
Classic SAP Hierarchy Report
•  All Financial and Progress data is saved in SAP ECC
•  No interfaces and no custom tables are used by Noveco
Project Manager Portal
Project Manager Portal
Project Manager Portal
•  Project Financial history is recorded
•  You review project Budget, Forecast, Profit in each month
since proejct was approved
Project Manager Portal
•  All this information can be extracted to BI/BW for further
reporting
•  SAP standard extractors will be used (no programming is
required)
Project Manager Portal
•  Multiple projects can be reported via Portal
•  Project Manager can select projects that he is responsible for
and monitor their progress
Noveco System Architecture
¤  No middleware (BI, BO etc.)
¤  No interfaces
¤  No custom tables
¤  Always real-time
¤  Rich functionality
¤  Automatic forecasting
¤  Simple and intuitive interface
¤  Minimum training
¤  Quick implementation
Execution
Transactional System
Noveco
Monitoring,
Forecasting,
Variations,
Progress
●  Project Manager Workbench
●  Automatic Forecasting
●  Manual adjustment of CTC or Work TC
●  Progress Analysis
●  Exception and drill down reporting
●  Integrated variations into cost forecast
●  Forecast history
Analysis,
Resourcing
Reports
Business
Intelligence
Strategic
Planning
System Landscape including Noveco
Program Portfolio
Planning
Company Strategy
Planning
Result Analysis
PS Information
System
Resource
Planning
Estimation
Budget values
Time Sheets, Invoices
Actual Costs
Sales Orders
Revenue
Purchase Orders,
Commitments
Variations
●  Project Manager Workbench provides one central place to review KPIs, update
forecasts, track and update progress, execute analytical and drill down reports
●  Complete Cost and Work To Complete management: Automatic reduction and
Manual adjustment
●  Instant Integration with ECC transactions: PO, time sheets, invoices etc.
●  Forecasting results are immediately available for Result Analysis, Progress Analysis,
PS Reports and BI (no custom interfaces needed to native SAP reports)
●  Period Sensitive Forecasts: designed for month end forecasts in live transactional
system
●  Saves project forecast history w/o need to perform version copy by the user
●  Project Costs Forecasts integrated with PM/CS and PP orders
●  Integrates Project Variations into cost forecasting and budgeting
●  No modifications to SAP standard core applications. No “z-tables” to keep forecasts
costs, all data read/written from/to SAP standard database.
ePM Project Cost Forecasting, Progress and Variation Management
●  Connects upstream (estimating, procurement, timesheets) and downstream (monitoring,
resource allocation, analytical reports) activities of project management lifecycle
●  Closes the loop between execution and analysis processes providing 360 degree flow of
information
●  Replaces spreadsheets and other third party tools with centralized SAP database
●  Reduces amount of effort required to produce project forecasts and analytical reports
●  Reduces number of interdependent systems and interfaces needed; reduce costs of
maintenance and support of systems other then SAP
●  Decreases potential for errors of data entry and manipulation
●  Improves quality, transparency and accuracy of data
●  Allows potential savings and process efficiency by relieving Project Managers from performing
routine transactional and administrative activities.
●  Integrates Resource (personnel) Planning into project planning and forecasting
●  Determine realistic project progress
●  Unleashes the true power of integrated SAP system
Business Value of Integrated Project Forecasting in SAP
SAP Customers running Noveco ePM
Rawson Group
–  rawsonhomes.net.au
–  Industry: Residential construction
Powercor/CityPower
–  powercor.com.au
–  Industry: Utility, Construction
Sedgman
–  sedgman.com
–  Industry: Mining Construction
TRILITY
–  trility.com.au
–  Industry: Utility, Construction
Hydro Tasmania
–  www.hydro.com.au
–  Industry: Utility, Construction
Costs
Forecasting
Project
Manager
Workbench
Integrated Project
Management in SAP
PS FI
HR
COSD
PM
MM
Integrated Project Management
Progress
Analysis
Variation
Management
For more information visit Noveco Systems on
www.novecosystems.com

More Related Content

What's hot

Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manualJaideep Kulkarni
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project ManagementKumar M.
 
Ps user manual
Ps user manualPs user manual
Ps user manualSoumya De
 
Ps training mannual power users
Ps training mannual   power usersPs training mannual   power users
Ps training mannual power usersSoumya De
 
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...John Jordan
 
PS Module Overview
PS Module OverviewPS Module Overview
PS Module Overviewitplant
 
Sap ps training material
Sap ps training materialSap ps training material
Sap ps training materialSoumya De
 
Project Systems: Materials
Project Systems: MaterialsProject Systems: Materials
Project Systems: Materialsvnhardik
 
Sap ps cost planning
Sap ps cost planningSap ps cost planning
Sap ps cost planningSoumya De
 
Budget upload process in SAP PS
Budget upload process in SAP PSBudget upload process in SAP PS
Budget upload process in SAP PSgovil79
 
Funds management configuration sap ag
Funds management configuration sap agFunds management configuration sap ag
Funds management configuration sap agLluckyy
 
Ps project manager 2013
Ps project manager 2013Ps project manager 2013
Ps project manager 2013Subhash reddy1
 
S4 HANA Finance Contents
S4 HANA Finance Contents S4 HANA Finance Contents
S4 HANA Finance Contents Pradeep Hota
 

What's hot (20)

Balco ps configuration manual
Balco ps configuration manualBalco ps configuration manual
Balco ps configuration manual
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project Management
 
Ps user manual
Ps user manualPs user manual
Ps user manual
 
Ps training mannual power users
Ps training mannual   power usersPs training mannual   power users
Ps training mannual power users
 
Cutover activities
Cutover activitiesCutover activities
Cutover activities
 
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
 
PS Module Overview
PS Module OverviewPS Module Overview
PS Module Overview
 
SAP PPM 6.0 powered by HANA
SAP PPM 6.0 powered by HANASAP PPM 6.0 powered by HANA
SAP PPM 6.0 powered by HANA
 
Sap ps training material
Sap ps training materialSap ps training material
Sap ps training material
 
Project Systems: Materials
Project Systems: MaterialsProject Systems: Materials
Project Systems: Materials
 
Sap ps cost planning
Sap ps cost planningSap ps cost planning
Sap ps cost planning
 
Balco ps user manual
Balco ps user manualBalco ps user manual
Balco ps user manual
 
Budget upload process in SAP PS
Budget upload process in SAP PSBudget upload process in SAP PS
Budget upload process in SAP PS
 
SAP FI
SAP FI SAP FI
SAP FI
 
Sap funds management training
Sap funds management trainingSap funds management training
Sap funds management training
 
Funds management configuration sap ag
Funds management configuration sap agFunds management configuration sap ag
Funds management configuration sap ag
 
Ps project manager 2013
Ps project manager 2013Ps project manager 2013
Ps project manager 2013
 
SAP S/4HANA Cloud
SAP S/4HANA CloudSAP S/4HANA Cloud
SAP S/4HANA Cloud
 
S4 HANA Finance Contents
S4 HANA Finance Contents S4 HANA Finance Contents
S4 HANA Finance Contents
 
SAP Project Systems with Success Factors
SAP Project Systems with Success FactorsSAP Project Systems with Success Factors
SAP Project Systems with Success Factors
 

Similar to Sap solutions presentation

Project Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxProject Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxNCHKRISHNATEJA
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxNCHKRISHNATEJA
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7Pragmatic Techsoft
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementpragmatic123
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction EstimatingIan McGaw
 
Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptp6academy
 
4- Project Cost Management.ppt
4- Project Cost Management.ppt4- Project Cost Management.ppt
4- Project Cost Management.pptMohamadAGhareb
 
00 project control tools
00 project control tools00 project control tools
00 project control toolsshrn4u
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint university(kust)
 
ch-2 Project Planning.pptx
ch-2 Project Planning.pptxch-2 Project Planning.pptx
ch-2 Project Planning.pptxJigneshKadia
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14p6academy
 
Odoo OpenERP 7 Consulting Management
Odoo OpenERP 7 Consulting Management  Odoo OpenERP 7 Consulting Management
Odoo OpenERP 7 Consulting Management pragmatic123
 
vdocument.in_sap-ps-presentation.pdf
vdocument.in_sap-ps-presentation.pdfvdocument.in_sap-ps-presentation.pdf
vdocument.in_sap-ps-presentation.pdfNethajiSathpatheNeth
 

Similar to Sap solutions presentation (20)

SAP cProjects
SAP cProjectsSAP cProjects
SAP cProjects
 
Project Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxProject Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptx
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptx
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction management
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
Construction module version 7
Construction module version 7Construction module version 7
Construction module version 7
 
00 project control tools
00 project control tools00 project control tools
00 project control tools
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
 
Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems ppt
 
4- Project Cost Management.ppt
4- Project Cost Management.ppt4- Project Cost Management.ppt
4- Project Cost Management.ppt
 
OpenERP Construction
OpenERP ConstructionOpenERP Construction
OpenERP Construction
 
00 project control tools
00 project control tools00 project control tools
00 project control tools
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
ch-2 Project Planning.pptx
ch-2 Project Planning.pptxch-2 Project Planning.pptx
ch-2 Project Planning.pptx
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
 
5d in BIM
5d in BIM5d in BIM
5d in BIM
 
Odoo OpenERP 7 Consulting Management
Odoo OpenERP 7 Consulting Management  Odoo OpenERP 7 Consulting Management
Odoo OpenERP 7 Consulting Management
 
vdocument.in_sap-ps-presentation.pdf
vdocument.in_sap-ps-presentation.pdfvdocument.in_sap-ps-presentation.pdf
vdocument.in_sap-ps-presentation.pdf
 

More from Kumar M.

Cost Code Presention
Cost Code PresentionCost Code Presention
Cost Code PresentionKumar M.
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)Kumar M.
 
07 data bank
07 data bank07 data bank
07 data bankKumar M.
 
06 production and produtivty reporting
06 production and produtivty reporting06 production and produtivty reporting
06 production and produtivty reportingKumar M.
 
05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast costKumar M.
 
04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost controlKumar M.
 
03 cost report preparation
03 cost report preparation03 cost report preparation
03 cost report preparationKumar M.
 
02 budget preparation and procedures
02 budget preparation and procedures02 budget preparation and procedures
02 budget preparation and proceduresKumar M.
 
01 introduction to the project monitoring system
01 introduction to the project monitoring system01 introduction to the project monitoring system
01 introduction to the project monitoring systemKumar M.
 
Sap - Initiation Manual
Sap - Initiation ManualSap - Initiation Manual
Sap - Initiation ManualKumar M.
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor EntriesKumar M.
 
SAP - General Ledger Account
SAP - General Ledger AccountSAP - General Ledger Account
SAP - General Ledger AccountKumar M.
 
Doha Metro Track
Doha Metro TrackDoha Metro Track
Doha Metro TrackKumar M.
 
Depots presentation
Depots presentationDepots presentation
Depots presentationKumar M.
 
Track work presentation
Track work presentationTrack work presentation
Track work presentationKumar M.
 

More from Kumar M. (15)

Cost Code Presention
Cost Code PresentionCost Code Presention
Cost Code Presention
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
 
07 data bank
07 data bank07 data bank
07 data bank
 
06 production and produtivty reporting
06 production and produtivty reporting06 production and produtivty reporting
06 production and produtivty reporting
 
05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost
 
04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control
 
03 cost report preparation
03 cost report preparation03 cost report preparation
03 cost report preparation
 
02 budget preparation and procedures
02 budget preparation and procedures02 budget preparation and procedures
02 budget preparation and procedures
 
01 introduction to the project monitoring system
01 introduction to the project monitoring system01 introduction to the project monitoring system
01 introduction to the project monitoring system
 
Sap - Initiation Manual
Sap - Initiation ManualSap - Initiation Manual
Sap - Initiation Manual
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor Entries
 
SAP - General Ledger Account
SAP - General Ledger AccountSAP - General Ledger Account
SAP - General Ledger Account
 
Doha Metro Track
Doha Metro TrackDoha Metro Track
Doha Metro Track
 
Depots presentation
Depots presentationDepots presentation
Depots presentation
 
Track work presentation
Track work presentationTrack work presentation
Track work presentation
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Sap solutions presentation

  • 1. Project  Management  Solutions   for  Engineering  and   Construction  projects  in  SAP  PS   enhanced  by  Noveco  ePM  
  • 2. Key Requirements l  Build accurate cost estimate l  Provide clear visibility of project costs, revenues, margins and cash position l  Accurate forecasting of Cost, Revenues and Margin l  Measurement and Reporting of Project Progress l  Management of project variations, customer escalations, and their seamless integration with project cost forecasting, budgeting and revenue planning l  Procurement planning & execution l  Integration of subcontractors into project execution, monitoring of work performed and the incorporation of this work into progress reporting. l  Accurate customer billing
  • 3. SAP centric requirements Engineering & Design Construction Package Structural Engineering Drafting Sub-contracted services Construction worker Construction project Current Budget Original Estimate Contract Value Costs To Complete Actual Costs Estimate At Completion l  SAP system to be the central place for integrated project management l  SAP Projects to update and manage key financial and progress attributes l  Manage project procurement of materials, sub-contracted services and labour directly in SAP l  SAP to be the single source to report project key financial valuesMaterials
  • 4. Why Noveco ? l  Estimation or Cost Planning is cumbersome and contradictory. Most SAP PS customers use: •  Controlling type transactions (e.g. CJR2, CJ40) to plan cost on WBS •  Network Planning, inherited in PS from PP (production planning) on network activities l  Cost forecasting or financial re-planning is not functional l  No project variation management solution l  No single central place to manage your project (you must run dozen of transactions to monitor and report) l  No comprehensive project reports out of the box Why do you need Noveco ePM for project Management in SAP? SAP Project Systems (PS) functional gaps:
  • 5. Noveco  ePM  is  a  family  of  seamlessly  integrated  software  components  designed  to   complement  and  enhance  SAP's  standard  Project  System  (PS)  functionality,  with  a   focus  on  easy  project  planning,  forecasting,  variation  management  and  reporting   directly  in  SAP  ECC     Noveco  ePM  enables  management  of  your  project  lifecycle  directly inside  your  ERP   system  (no  other  tools  needed)   Why  Noveco  ePM   .  .   .  .   Efficient Project Management Execution MonitoringForecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting
  • 6. •  PS  (Project  System)  is  one  of   the  most  integrated  modules   in  SAP  ERP       •  Noveco  ePM  enhances  SAP   Project  System  enabling   integrated  project   management  directly  in  SAP   ECC   •  You  will  not  need  any  other   tools  like  excel,  BI,  BO  etc.  to   manage  your  project   lifecycle  in  SAP.   Business  Challenges   SAP  PS     +     Noveco  ePM   Accounting   (FI)  and   Controlling   (CO)   Materials     Management   and   Procurement   (MM)   Production   Planning   (PP)  Plant   Maintenance,   Customer   Service   (PM/CS)   Sales   and  customer   billing   (SD)   Human   Resources     (HR)   Capacity     and  Resource   Planning   Time  Sheets   (CATS)  
  • 7. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP  
  • 8. Project Management Lifecycle •  Create Project Stricture •  Cost and Revenue Planning •  Dates Scheduling •  Budget approval •  Cost Distribution .  .   .  .   Efficient Project Management Execution Monitoring Forecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting
  • 9. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Create Projects
  • 10. Project Structures: WBS hierarchy only (no networks) Option 1: WBS (no networks) WBS represent project organizational structure: •  Phases •  Types •  Project Activity Example: •  Design, Land Acquisition, •  Construction packages, •  Testing and Commissioning WBS used for: •  Grouping project activities for planning and reporting •  Form (sub)packages within structure •  Cost planning (see next slides) •  Budget allocation •  Dates Scheduling •  Cost Collection (e.g. labour, materials, equipment, services) •  Cost Forecasting •  Reporting Construction Project Construction Building A1 Equipment Installation
  • 11. Cost Plan on WBS elements Capital Project Construction Sub-Station Manual Cost Planning on WBS elements: •  Labour rates (different types) •  Materials •  Sub-Contracted Services •  Plants & Equipment •  Overheads Labour Materials Subcontract Plant Overheads In this scenario WBS elements are used for •  Cost Planning •  Cost Forecasting •  Dates scheduling •  Cost collection (engineering, project management etc.) For manual cost planning we recommend using Easy Cost Planning on WBS elements
  • 12. Project: WBS elements only (option 1) •  Create project structure in SAP PS using Project Builder •  WBS structure (example) can be multi-level and represent your specific coding rules •  WBS represents packages and sub-packages of your construction project
  • 13. Project Structures: WBS and Network Activities Construction Building A1 Option 2: WBS & Networks Network Activities Represent Project tasks Example: engineering drawings, earth moving, equipment installation etc. WBS used for: •  Grouping project activities for reporting •  Cost planning (see next slides) •  Budget allocation Networks used for: •  Detailed Cost Planning •  Dates scheduling •  Cost Collection (e.g. labour, materials, equipment, services) •  Resource planning •  Cost Forecasting Construction ProjectWBS represent project organizational structure: •  Phases •  Types •  Project Activity
  • 14. Project: WBS elements and Network Activities (option 2) •  WBS structure represents project organizational structure and its phases •  Network activities represent project tasks, linked with relationships
  • 15. Project Management Lifecycle .  .   .  .   Efficient Project Management Execution Monitoring Forecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting •  Create Project Stricture •  Cost and Revenue Planning •  Dates Scheduling •  Budget approval •  Cost Distribution
  • 16. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Cost Planning
  • 17. Project Builder (SAP standard transaction CJ20N) Easy Cost Planning •  Here is an example on how Project Cost plan can be formed by using Easy Cost Planning functionality (SAP Standard) •  Easy Cost Plan can be automatically generated from external estimating system
  • 18. Project Builder (SAP standard transaction CJ20N) Select Costing Version •  Cost Estimation is saved in costing versions •  Multiple Costing versions can be created. •  In this example version N01 is used to keep the Original Budget
  • 19. Easy Cost Planning in details Easy Cost Planning allows you to plan multiple resources on one WBS ( or Network Activity): •  Internal labour types •  external services •  Material •  plant etc.
  • 20. Easy Cost Planning using Planning Forms •  You can use pre-defined planning forms to estimate costs using input parameters •  Costing lines (below) are generated automatically
  • 21. Easy Cost Planning using Services as BOQ Plan sub-contracted package on WBS element using services These lines (bill of quantities) will be included in purchase order
  • 22. Plan Revenue using Sales and Project Integration Engineering & Design Construction Structural Engineering Drafting Sub-contracted services Construction worker Materials / Equipment Construction project Sales Order •  In this example revenue plan created from Sales Order billing plan •  The billing plan can be created from project milestones
  • 23. Cost and Revenue Planning options l  In our example we planned costs using Easy Cost Planning and Planned Revenue using Sales Order – Project System integration l  You can Plan Costs in PS using other functions: •  Network planning (if you use networks) •  Cost Element Planning (CJ42, CJR2) •  Revenue Planning (CJ40) •  New planning functions based on WebDynpro available in enhp6
  • 24. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Scheduling
  • 25. Schedule Project Dates using PS Planning Board or MSP OpenPS for Microsoft Project (SAP standard interface between PS and MSP) •  Use SAP Project Planning Board to schedule project dates •  Detailed schedule can also be created in MS Project and synchronized with SAP PS using standard (free) interface OPENPS4MSP New Gantt Chart is available as of ECC 6.0 enhp6
  • 26. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Cost Distribution
  • 27. Project Manager Workbench: KPI view Cost and Revenue Plan by period Current Budget = Estimate + Variations + Adjustments + Contingency
  • 28. Project Manager Workbench: KPI view Estimated At Completion = Actual Costs + Commitments + Cost To Complete
  • 29. Project Manager Workbench: KPI view •  Plan Revenue = Original Revenue + Revenue Variations •  Current Profit = Plan Revenue – Estimated At Completion
  • 30. Project Manager Workbench: KPI view Cost information is broken by WBS, Value Category and Resource Types
  • 31. Project Manager Workbench: KPI view You can choose to view costs aggregated and grouped by Value Category and Resource Types for selected WBS element Noveco Project Manager Workbench can “turn off” cost elements from the view. This feature enables cost element free forecasting, which can be important for companies that created too many cost elements for the same type of work. Noveco will make sure that all lines from different cost elements that belong to the same Value Category and Resource are presented as one line with summarized costing information
  • 32. Project Manager Workbench: Value Category view Cost grouped by Value Categories and Resources and broken down by period
  • 33. Project Manager Workbench: Value Category by Period
  • 34. Project Manager Workbench: Plan by Period Distribute LABOUR cost
  • 35. Project Manager Workbench: Plan by Period Distribute MATERIAL cost Noveco manual distribution function allows you distribute different type of cost independently from each other
  • 36. Project Manager Workbench: Plan by Period Distribute SUBCONTRACT cost In this WBS you expect Purchase Order to be raised
  • 37. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Post Actual Costs and Purchasing Commitments
  • 38. Project Management Lifecycle .  .   .  .   Efficient Project Management Execution MonitoringForecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting •  Procurement •  Time Sheets •  Forecast update and KPI Monitoring •  Progress assessment •  Variations and issues
  • 39. Project Actual Costs flow Time sheets Expenses & other costs Material Consumption from stock Sub- Contracted Services Equipment & Materials Direct Project Construction Building A1
  • 40. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Recalculate Forecasts
  • 41. Project Management Lifecycle .  .   .  .   Efficient Project Management Execution MonitoringForecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting •  Procurement •  Time Sheets •  Forecast update and KPI Monitoring •  Progress assessment •  Variations and issues
  • 42. Project Manager Workbench: Auto-Recalculate Forecast •  We posted Actual Costs and raised Purchasing Commitments •  System automatically reduced remaining Costs To Complete •  Estimated Cost At Completion did not change = Actuals + Commitments + CTC
  • 43. Project Manager Workbench: Recalculate Forecast automatically •  Review costing details •  Review Purchase Order
  • 44. Project Manager Workbench: Recalculate Forecast automatically Actual Cost of Labour posted in February, Cost To Complete reduced accordingly
  • 45. Project Manager Workbench: automatic Commitment distribution •  Purchase Order Commitments reduced Cost To Complete (in this scenario to “zero”) •  Commitments were automatically distributed using the same pattern as previously distributed Cost To Complete •  You can change it if you like
  • 46. Project Manager Workbench: Purchasing Commitments •  View PO commitment value per WBS •  View Purchase Order List •  You can drill down to PO from that screen
  • 47. Project Manager Workbench: Purchasing Commitments •  Switch to Change mode •  Change Cost and Work To Complete or Estimated At Completion •  System recalculates Estimated Cost At Completion (EAC) and Budget Deficit
  • 48. Project Manager Workbench: Purchasing Commitments •  Budget Deficit = Current Budget – Estimated at Completion •  Exceptions highlight WBS elements where Budget differs from EAC •  You can define tolerance limits for “green” and “red” icons
  • 49. Project Manager Workbench: Review KPIs Since EAC has changed, the “Current Profit” has changed as well
  • 51. Project Management Lifecycle .  .   .  .   Efficient Project Management Execution MonitoringForecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting •  Procurement •  Time Sheets •  Forecast update and KPI Monitoring •  Progress assessment •  Variations and issues
  • 52. Review Project Progress •  You can review Plan and Actual POC as well Earned Values (BCWS and BCWP)
  • 53. Project Actual Progress •  You can change Actual Progress •  System will keep Calculated and Actual Progress separately
  • 54. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Create Project Variation
  • 55. Project Management Lifecycle .  .   .  .   Efficient Project Management Execution MonitoringForecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting •  Procurement •  Time Sheets •  Forecast update and KPI Monitoring •  Progress assessment •  Variations and issues
  • 56. Project Variation Revenue item Costing items Variation affect on project
  • 57. Project Review: KPIs including Variation Current Budget = Original Estimate + Cost Variations Plan Revenue = Original Revenue + Revenue Variations
  • 58. Project Variation in details •  Variation List •  Variation history
  • 59. * Project Variation ManagementProcurement, Time Sheets Invoicing, Billing Project Dates SchedulingCost & Revenue PlanningProject Builder Portfolio PlanningDashboard reporting* Project Reporting Profit Take (Result Analysis) Planning and Execution Monitoring Forecasting Progress Tracking Reporting and Analysis *  Project  Manager  Workbench   *  Noveco  Applications  Integrated  Project  Management  in  SAP   Project Reporting
  • 60. Project Management Lifecycle •  Project Reporting •  Portfolio and Program Reporting •  Analysis •  Long Term planning and forecasting .  .   .  .   Efficient Project Management Execution Monitoring Forecasting l  Reporting l  Analysis l  Settlement l  Estimating l  Planning l  Budgeting
  • 61. Classic SAP Hierarchy Report •  All Financial and Progress data is saved in SAP ECC •  No interfaces and no custom tables are used by Noveco
  • 64. Project Manager Portal •  Project Financial history is recorded •  You review project Budget, Forecast, Profit in each month since proejct was approved
  • 65. Project Manager Portal •  All this information can be extracted to BI/BW for further reporting •  SAP standard extractors will be used (no programming is required)
  • 66. Project Manager Portal •  Multiple projects can be reported via Portal •  Project Manager can select projects that he is responsible for and monitor their progress
  • 67. Noveco System Architecture ¤  No middleware (BI, BO etc.) ¤  No interfaces ¤  No custom tables ¤  Always real-time ¤  Rich functionality ¤  Automatic forecasting ¤  Simple and intuitive interface ¤  Minimum training ¤  Quick implementation
  • 68. Execution Transactional System Noveco Monitoring, Forecasting, Variations, Progress ●  Project Manager Workbench ●  Automatic Forecasting ●  Manual adjustment of CTC or Work TC ●  Progress Analysis ●  Exception and drill down reporting ●  Integrated variations into cost forecast ●  Forecast history Analysis, Resourcing Reports Business Intelligence Strategic Planning System Landscape including Noveco Program Portfolio Planning Company Strategy Planning Result Analysis PS Information System Resource Planning Estimation Budget values Time Sheets, Invoices Actual Costs Sales Orders Revenue Purchase Orders, Commitments Variations
  • 69. ●  Project Manager Workbench provides one central place to review KPIs, update forecasts, track and update progress, execute analytical and drill down reports ●  Complete Cost and Work To Complete management: Automatic reduction and Manual adjustment ●  Instant Integration with ECC transactions: PO, time sheets, invoices etc. ●  Forecasting results are immediately available for Result Analysis, Progress Analysis, PS Reports and BI (no custom interfaces needed to native SAP reports) ●  Period Sensitive Forecasts: designed for month end forecasts in live transactional system ●  Saves project forecast history w/o need to perform version copy by the user ●  Project Costs Forecasts integrated with PM/CS and PP orders ●  Integrates Project Variations into cost forecasting and budgeting ●  No modifications to SAP standard core applications. No “z-tables” to keep forecasts costs, all data read/written from/to SAP standard database. ePM Project Cost Forecasting, Progress and Variation Management
  • 70. ●  Connects upstream (estimating, procurement, timesheets) and downstream (monitoring, resource allocation, analytical reports) activities of project management lifecycle ●  Closes the loop between execution and analysis processes providing 360 degree flow of information ●  Replaces spreadsheets and other third party tools with centralized SAP database ●  Reduces amount of effort required to produce project forecasts and analytical reports ●  Reduces number of interdependent systems and interfaces needed; reduce costs of maintenance and support of systems other then SAP ●  Decreases potential for errors of data entry and manipulation ●  Improves quality, transparency and accuracy of data ●  Allows potential savings and process efficiency by relieving Project Managers from performing routine transactional and administrative activities. ●  Integrates Resource (personnel) Planning into project planning and forecasting ●  Determine realistic project progress ●  Unleashes the true power of integrated SAP system Business Value of Integrated Project Forecasting in SAP
  • 71. SAP Customers running Noveco ePM Rawson Group –  rawsonhomes.net.au –  Industry: Residential construction Powercor/CityPower –  powercor.com.au –  Industry: Utility, Construction Sedgman –  sedgman.com –  Industry: Mining Construction TRILITY –  trility.com.au –  Industry: Utility, Construction Hydro Tasmania –  www.hydro.com.au –  Industry: Utility, Construction
  • 72. Costs Forecasting Project Manager Workbench Integrated Project Management in SAP PS FI HR COSD PM MM Integrated Project Management Progress Analysis Variation Management
  • 73. For more information visit Noveco Systems on www.novecosystems.com