CJ** are mainly Project Definition and WBS related,
CN** are mainly Network and activity related and the
OP** are mainly PS Configuration / Customization related.
There are other codes which are not on the list, but this is a good platform to start and build up
your own list of PS transactions as per your requirements:
CJ01 Create Work Breakdown Structure
CJ02 Change Work Breakdown Structure
CJ03 Display Work Breakdown Structure
CJ06 Create Project Definition
CJ07 Change Project Definition
CJ08 Display Project Definition
CJ11 Create WBS Element
CJ12 Change WBS Element
CJ13 Display WBS Element
CJ14 Display WBS Element (From DMS)
CJ20 Structure planning
CJ20N Project Builder
CJ21 Change Basic Dates
CJ22 Display Basic Dates
CJ23 Change Forecast Dates
CJ24 Display Forecast Dates
CJ25 Change Actual Dates
CJ26 Display Actual Dates
CJ27 Project planning board
CJ29 Update WBS (Forecast)
CJ2A Display structure planning
CJ2B Change project planning board
CJ2C Display project planning board
CJ2D Structure planning
CJ30 Change Project Original Budget
CJ31 Display Project Original Budget
CJ32 Change Project Release
CJ33 Display Project Release
CJ34 Project Budget Transfer
CJ35 Budget Return from Project
CJ36 Budget Supplement to Project
CJ37 Budget Supplement in Project
CJ38 Budget Return in Project
CJ3A Change Budget Document
CJ3B Display Budget Document
CJ40 Change Project Plan
CJ41 Display Project Plan
CJ42 Change Project Revenues
CJ43 Display Project Revenues
CJ44 Act. overhd: Projects, ind. process.
CJ45 Act. ovhd: Projects, coll. process.
CJ46 Plnd ovrhd: Projects, ind. process.
CJ47 Pld Overhead: Projects, Coll.Procssg
CJ48 Change Payment Planning: Init.Screen
CJ49 Display Payment Planning: Init.Scrn
CJ70 Maintain Project Settlement LIs
CJ72 Project: Act. amt. line item settlmt
CJ74 Project Actual Cost Line Items
CJ76 Project Commitment Line Items
CJ7E Plan Data Transfer: Projects
CJ7G Plan Data Transfer: Projects
CJ7M Project Plan Cost Line Items
CJ7N Maint. DRG inv.projects for retmt.
CJ80 Availability Control – Overview
CJ81 Update Report List
CJ88 Settle Projects and Networks
CJ8A Act.-setlmt: Proj. retirmt. from IM
CJ8G Actual Settlement: Projects/Networks
CJ8V Period Close for Project Selection
CJ91 Create Standard WBS
CJ92 Change Standard WBS
CJ93 Display Standard WBS
CJ9B Copy WBS Plan to Plan (Collective)
CJ9B_OLD
Copy Project Cost Planning (old)
CJ9BS Copy WBS Plan to Plan (Indiv.)
CJ9C Copy WBS Actual to Plan (Collective)
CJ9C_OLD
Copy Project Revenue Planning (old)
CJ9CS Copy WBS Actual to Plan (Indiv.)
CJ9D Copy Plan Versions
CJ9E Plan Settlement: Projects
CJ9ECP Project System: Easy Cost Planning
CJ9F Copy Project Costing (Collective)
CJ9FS Copy Project Costing (Indiv.)
CJ9G Plan Settlement: Projects
CJ9K Network Costing
CJ9L Forecast Costs: Individual Projects
CJ9M Forecast Costs: Coll.Project Proc.
CJ9Q Integrated Planning for Ntwks(Coll.)
CJ9QS Integrated Planning for Ntwks (Ind.)
CJA1 Proj.Rel.Order Receipts: Coll.Proc.
CJA2 Proj.Rel. Order Receipts: Ind.Proc.
CJAL Send project
CJB1 Generate Settmt Rule: Coll.Proc.
CJB2 Generate Settmt Rule: Indiv.Proc.
CJBBS1 Planning Board Report Assignment
CJBBS2 Structure Overview Report Asst
CJBN Reconstruct Availability Control
CJBV Activate Project Availabilty Control
CJBW Deactivate Project Availabilty Cntrl
CJC1 Maintenance Dialog for Stat.by Per.
CJC2 Maintain Planned Status Changes
CJCD Change documents: WBS
CJCF Carry Forward Project Commitments
CJCO Carry Forward Project Budget
CJCS Standard WBS
CJE0 Run Hierarchy Report
CJE1 Create Hierarchy Report
CJE2 Change Hierarchy Report
CJE3 Display Hierarchy Report
CJE4 Create Project Report Layout
CJE5 Change Project Report Layout
CJE6 Display Project Report Layout
CJEA Call Hierarchy Report
CJEB Background Processing, Hier.Reports
CJEC Maintain Project Crcy Trans.Type
CJEK Copy Interfaces/Reports
CJEM Project Reports: Test Monitor
CJEN Reconstruct: Summarized Proj.Data
CJEO Transport Reports
CJEP Transport Forms
CJEQ Import Reports from Client
CJET Translation Tool – Drilldown
CJEV Maintain Global Variable
CJEX Reorganize Drilldown Reports
CJEY Reorganize Report Data
CJEZ Reorganize Forms
CJF1 Create Transfer Price Agreement
CJF2 Change Transfer Price Agreement
CJF3 Display Transfer Price Agreement
CJF4 Transfer Price Agreement List
CJFA Analysis of Data Trans. into PS Cash
CJFN CBM Payment Converter
CJG1 Enter Transfer Price Allocation
CJG3 Display Transfer Price Allocation
CJG4 Enter Trsfr Price Allocation: List
CJG5 Cancel Transfer Price Allocation
CJH1 Reconstruct Project Inheritance
CJH2 Project Inheritance Log
CJI1
CJI2
CJI3
CJI4
CJI5
CJI8
CJI9
CJIA
CJIB
CJIC
CJID
CJIE
CJIF
CJIG
CJJ2
CJJ3
CJK2
CJK3
CJL2
CJN1
CJN2
CJNO
CJO8
CJO9
CJP1
CJP2
CJP3
CJP4
CJPN
CJPU
CJR2
CJR3
CJR4
CJR5
CJR6
CJR7
CJR8
CJR9
CJS2
CJS3
CJS4
CJS5
CJSA
CJSB
CJSG
CJSN

Project Budget Line Items
Budget Line Items: Document Chain
Project Actual Cost Line Items
Project Plan Cost Line Items
Project Commitment Line Items
Project Budget Line Items
Project Struct.Pld Costs Line Items
Project Actual and Commt Paymt LIs
Project Plan Payment Line Items
Maintain Project Settlement LIs
Display Project Settlement Line Itms
Projects: Retirement LI Settlement
Projects: Profitability Analysis LI
Display PS Cash Documents
Change Statistical Key Figures
Display Statistical Key Figures
Change Statistical Key Figures
Display Statistical Key Figures
Collective Agreement
Reval. ACT: Projects Ind.Pro.
Reval. ACT: Projects Col.Pro.
Number range maintenance: FMCJ_BELNR
Overhead COMM: Projects Ind.Pro.
Overhead COMM: Projects Col.Pro.
Create Project Plan Adjustment
Change Project Plan Adjustment
Display Project Plan Adjustment
Delete Project Plan Adjustment
Number Range Maintenance: Proj.Items
Execute Project Plan Adjustment
PS: Change plan CElem/Activ. input
PS: Display plan CElem/Activ. input
PS: Change plan primary cost element
PS: Display plan primary cost elem.
PS: Change activity input planning
PS: Display activity input planning
PS: Change revenue type planning
PS: Display Revenue Element Planning
PS: Change stat. key figure planning
PS: Display stat. key fig. planning
PS: Change stat. key figure planning
PS: Display stat. key fig. planning
Data Transfer to SAP-EIS
Select Key Figure and Characteristic
Generate WBS Element Group
Number Range Maintenance: Projects
CJT2
CJV1
CJV2
CJV3
CJV4
CJV5
CJV6
CJV7
CJVC
CJW1
CJZ1
CJZ2
CJZ3
CJZ5
CJZ6
CJZ7
CJZ8
CJZ9

Project Actual Payment Line Items
Create project version (simulation)
Change project version (simulation)
Display project version (simulation)
Transfer project
Delete simulation version
Maintenance: Version administration
Display transfer log
Value Category Checking Program
EURO: Adjust Project Budget
Act. Int Calc.: Projects Coll. Proc.
Actual Int.Calc.: Project Indiv.Prc.
Plan Int.Calc.: Project Indiv.Prc.
Plan Int.Calc.: Project Coll.Prc.
Actual Int.Calc.: Indiv.CO Order Prc
Planned Int.Calc: Indiv.CO Ord.Proc.
Actual Int.Calc.: Coll.CO Order Prc.
Plan Int.Calc.: Coll.CO Order Prc.

Network and activity related transaction codes:
CN01 Create Standard Network
CN02 Change Standard Network
CN03 Display Standard Network
CN04 Edit PS Text Catalog
CN05 Display PS Text Catalog
CN06 MPX Download: Standard Network
CN07 MPX Upload: Standard Network
CN08 Allocate material -> stand. network
CN09 Allocate material -> stand. network
CN11 Create standard milestone
CN12 Change standard milestone
CN13 Display standard milestone
CN19 Display Activity (From DMS)
CN20 Dsply network/act.bsc data init.scrn
CN21 Create Network
CN22 Change Network
CN23 Display Network
CN24 Overall Network Scheduling
CN24N Overall Network Scheduling
CN25 Confirm Completions in Network
CN26 Display Mat.Comp/Init: Ntwk,Acty,Itm
CN26N Display Mat. Components (From DMS)
CN27 Collective confirm.
CN28 Display Network Confirmations
CN29 Cancel Network Confirmation
CN2X Confirm Completions in Network
CN30 Processing PDC error records
CN33 PDM-PS interface
CN34 Maintain release table TCNRL
CN35 Control stock / account assignment
CN36 BOM Transfer Profile
CN37 BOM Allocation Field Selection
CN38 Maintain Flexible Reference Point
CN40 Project Overview
CN41 Structure Overview
CN42 Overview: Project Definitions
CN42N Overview: Project Definitions
CN43 Overview: WBS Elements
CN43N Overview: WBS Elements
CN44 Overview: Planned Orders
CN44N Overview: Planned Orders
CN45 Overview: Orders
CN45N Overview: Orders
CN46 Overview: Networks
CN46N Overview: Networks
CN47 Overview: Activities/Elements
CN47N Overview: Activities/Elements
CN48 Overview: Confirmations
CN48N Overview: Confirmations
CN49 Overview: Relationships
CN49N Overview: Relationships
CN50 Overview: Capacity Requirements
CN50N Overview: Capacity Requirements
CN51 Overview: PRTs
CN51N Overview: PRTs
CN52 Overview: Components
CN52N Overview: Components
CN53 Overview: Milestones
CN53N Overview: Milestones
CN54N Overview: Sales Document
CN55N Overview: Sales and Dist. Doc. Items
CN60 Change Documents for Projects/Netw.
CN61 Standard network
CN65 Change documents order /network
CN70 Overview: Batch variants
CN71 Create versions
CN72 Create Project Version
CN80 Archiving project structures
CN81 PS: Archiving project – preliminary
CN82 PS: Archiving project structures
CN83 PS: Archiving project – Info System
CN84 PS: Archiving project – admin.
CN85 PS: Delete operative structures
CN98 Delete Standard Networks
CN99 Archiving Standard Networks
CNB1 Purchase requisitions for project
CNB2 Purchase orders for project
CNC4 Consistency checks for WBS
CNC5 Consistency checks sales order/proj.
CNE1 Project Progress (Individual Proc.)
CNE2 Project Progress (Collective Proc.)
CNE5 Progress Analysis
CNG1 Netw./Hier.: Maintain frame types
CNG2 Netw./Hier.: Maintain form def.
CNG3 Netw./hier.: maintain color definit.
CNG4 Netw./Hier.: Maintain graph. profile
CNG5 Netw./Hier: Maintain options profile
CNG6 Netw./hier.: Maintain node type
CNG7 Netw./Hier.: Maintain link types
CNG8 Netw./Hier.: Maintain field def.
CNG9 Graph. Cust. Netw./Hierarchy Graph.
CNL1 Create delivery information
CNL2 Change delivery information
CNL3 Display delivery information
CNMASS Mass Changes in Project System
CNMASSPROT
Display log f. mass changes PS
CNMM Project-Oriented Procurement
CNMT Milestone Trend Analysis
CNN0 Number Range for Library Network
CNN1 Number range maint.: ROUTING_0
CNPAR Partner Overview
CNPRG Network Progress
CNR1 Create Work Center
CNR2 Change Work Center
CNR3 Display Work Center
CNS0 Create deleivry from project
CNS40 Project Overview
CNS41 Structure Overview
CNS42 Overview: Project Definitions
CNS43 Overview: WBS Elements
CNS44 Overview: Planned Orders
CNS45 Overview: Orders
CNS46 Overview: Networks
CNS47 Overview: Activities/Elements
CNS48 Overview: Confirmations
CNS49 Overview: Relationships
CNS50 Overview: Capacity Requirements
CNS51
CNS52
CNS53
CNS54
CNS55
CNS60
CNS71
CNS83
CNSE5
CNVL
CNW1
CNW4

Overview: PRTs
Overview: Components
Overview: Milestones
Overview: Sales Document
Overview: Sales and Dist. Doc. Items
Change Documents for Projects/Netw.
Create versions
PS: Archiving project – Info System
Progress Analysis
Variable Overviews
WWW: Confirmation
Project Documents

PS Configuration / Customization related Transactions codes:
OP00
OP01
OP03
OP04
OP07
OP08
OP09
OP10
OP11
OP12
OP13
OP14
OP15
OP16
OP17
OP18
OP19
OP20
OP21
OP22
OP23
OP24
OP26
OP28
OP30
OP31
OP32
OP34
OP35
OP36
OP37

Maintain Operation Control Key
Customizing Routing/Work Center
Factory Calendar C
Word Processing
Standard Text
Standard Text
Maintain Alternative Activity Desc.
Maintain Person Responsible
Maintain Period Pattern Key
Maintain Location
Maintain Screen Sequence
Maintain Type of Std. Value Determin
Production User Profile
Maintain Period Pattern
Formula Parameters
Maintain Setup Group/Setup Group Cat
Standard Value Key
Maintain Setup Type Key
Define Formula
Maintain Wage Groups
Maintain Location
Maintain period dependent oper. val.
Maintain suitability
Maintain Perf. Efficiency Rate Key
Maintain Move Time Matrix
Maintain Time Segment (Per. Pattern)
Maintain Capacity Category
Maintain Work Center Planner Group
Maintain Perf. Efficiency Rate Key
Maintain Capacity Default Values
Maintain Available Capacity Version
OP38
OP39
OP40
OP41
OP42
OP43
OP44
OP45
OP46
OP47
OP48
OP49
OP4A
OP4B
OP4C
OP4D
OP4E
OP4F
OP4G
OP4H
OP4I
OP50
OP51
OP52
OP53
OP54
OP55
OP56
OP57
OP58
OP59
OP5A
OP5B
OP5C
OP5D
OP5E
OP5F
OP5H
OP61
OP62
OP63
OP64
OP65
OP66
OP67
OP68

Maintain Setup Type Key
Maintain Graphics Profile
Maintain Work Center Category
Matchcode for work center
Default work center
Maintain Setup Group Categories
Maintain Task List Usage
Maintain Usage
Maintain Task List Status
Maintain PRT Usage
Maintain Planner Group
Matchcode for Routings/Ref. Op. Sets
Maintain Shift Sequences
Overview variant: Routing
Overview variant: Ref. oper. set
Overview variant: Rate routing
Overview variant: Ref. rate routing
Overview var.:Scheduling of routings
Overview var.:Scheduling ref.op.set
Overview var.:Scheduling of rate rtg
Overview var.:Scheduling RefRateRtgs
Assign Material Types
Formula Parameters
Formula Parameters
Formula Parameters
Define Formula
Define Formula
Define Formula
Define Formula
Maintain Default Value Profiles
Formula Parameters
Field Selection: Task List Overview
Field Selection: Task List Header
Field Selection: Task List Sequence
Field Selection: Task List Details
Field selection task list overview
Field selection std network -> PRT
Field sel. insp.plan characteristics
Number range maintenance: ROUTING_3
Number ranges for routings
Number Ranges for Ref.Operation Sets
Maintain Setup Group Key
Formula Parameters
Maintain Location Group
Maintain Operation Control Key
Maintain Move Time Matrix
OP69
OP70
OP71
OP72
OP73
OP74
OP76
OP77
OP78
OP7A
OP7B
OP80
OP82
OP84
OP85
OP87
OP88
OP8A
OP8B
OP8C
OP8D
OP8E
OP8F
OP8H
OP91
OP95
OP96
OP97
OP98
OPA0
OPA1
OPA2
OPA3
OPA4
OPA5
OPA6
OPA7
OPA9
OPB1
OPB2
OPB3
OPB4
OPB5
OPC0
OPC1
OPC2

Maintain wage type
Maintain PRT Control Key
Maintain Wage Group
PRT Control Key
PRT Authorization Group
Maintain PRT Group Key
Define suitability
Engineering Workbench for Task Lists
Maintain Type of Std. Value Determin
Customizing matchcode for PRTs
Define Parameters
Maintain PRT Status
Define Formula
Profiles: Default Values for Rtgs.
Profiles: Default Values for QM
Maintain Routing/Ref.Op.Set Usage
Maintain Assignmt. of Task List Type
Maintain operation value description
Maintain standard value texts
Record layout for background (APL)
Data transfer APL
Command file task lists Rel. 2.2A
Maintain production scheduler
Profiles: Default Values for Rtgs.
Maintain Object Overview Version
Assign Work Center Cat. to Applicatn
Maintain Work Center Category
Maintain Performance Efficiency Rate
Maintain Validity of Perf.Effic.Rate
Status selection profiles
Maintain combination definitions
Define selection profile
Define option profile
Define list profile
Define graphics profile
Define overall profile
Define columns
Maintain selection profiles
Define list versions
Define distribution function
Specify distribution functions
Specify distribution strategies
Specify distribution key
Axis representation selection
Maintain axis representation
Curve representation selection
OPC3
OPC5
OPCD
OPCE
OPCF
OPCG
OPCH
OPCI
OPCL
OPCM
OPCN
OPCQ
OPCR
OPCS
OPCT
OPCU
OPCW
OPCX
OPCY
OPD0
OPD1
OPD2
OPD3
OPD4
OPD5
OPD6
OPD7
OPD8
OPD9
OPDA
OPDB
OPDD
OPDE
OPDF
OPDH
OPDJ
OPDK
OPDL
OPDM
OPDQ
OPDR
OPDT
OPDU
OPDV
OPDW
OPE0

Maintain curve representation
Max. no. of data records
Capacity category
Capacity planner
Time units
Maintain Operation Control Key
Maintain production scheduler
Setup group key/category
Scheduling type
Standard value key
Maintain move time matrix
Efficiency rate
Formula parameters
Define formula
Strategies
Strategy levels
Planned order parameters
Formula parameters
Define formula
Resource planning overall profile
Resource planning selection profile
Capacity leveling – time profile
Resource planning evaluation profile
Resource planning period profile
Flow control definition
Flow control control table
Flow control statuses
Flow Control Actions
Flow Control Messages
Transition matrix (setup matrix)
Capacity Leveling Strategy Profile
Factory calendar
Resource planning control profile
Define requirements grouping
Capacity leveling – list profile
Define layout
Define standard overview
Cap. plan. detailed cap.list maint.
Define detail list (leveling)
Profile for planning table (tab.)
Define layout key
Define detail list
Maintain perf. efficiency rate key
Com-file (Rel-Info/OLPK) KOP. Set´s
Com-file (Rel-Info/OLPK) KOP. Set´s
Maintain Sort String
OPE1 Maintain Value Type
OPE2 Maintain Machine Type
OPE3 Maintain Planner Group
OPE4 Maintain Control Parameters
OPE5 Maintain rounding categories
OPE6 Maintain Rounding Category
OPE7 Maintain overhead key
OPE8 Maint. Roundg. and Add.Val.Key (Def)
OPE9 Maintain User Profile
OPEA User selection
OPEB Automatic selection
OPEC PP user fields
OPENPS Download Activities to Palm Pilot
OPF0 Maintain User
OPF1 Authorizations for CAPP
OPFA Field selection: Work center
OPFP Configuring the Fixed Price Version
OPFR01 RPUCORF0PBS : IMG Link
OPG0 Profile for planning table
OPG1 Chart sequence – selection
OPG2 Line representation
OPG3 Scale time axis
OPG4 Time scale profile
OPG5 Graphic obj.type sel./repr.profile
OPG6 Transition matrix setup fam.key
OPG7 Line display selection
OPG9 Graphical object type/obj.represent.
OPGD Ref. Oper. Set-All Task Lists (PP)
OPGE Ref. Oper. Set – Rate Routings (PP)
OPGF Work Center – All Task Lists (PP)
OPGG Work Center – Rate Routings (PP)
OPGH Document PRT – All Task Lists
OPGI Equipment PRT – All Task Lists
OPGJ Material PRT – All Task Lists
OPGK Misc. PRT – All Task Lists
OPGL Resource – Master Recipes (PI)
OPGM Process Instr. Cat. – Master Recipe
OPGN Document PRT – Maintenance Task List
OPGO Equipment PRT-Maintenance Task Lists
OPGP Material PRT – Maintenance Task List
OPGQ Misc. PRT – Maintenance Task Lists
OPGR Work Center – Standard Network (PS)
OPGS Document PRT – Standard Network (PS)
OPGT Equipment PRT – Standard Network(PS)
OPGU Material PRT – Standard Network (PS)
OPGV Misc. PRT – Standard Network (PS)
OPH1
OPH2
OPH3
OPH4
OPH5
OPH6
OPH7
OPI1
OPI2
OPI3
OPI4
OPI5
OPI6
OPI8
OPIA
OPIB
OPIC
OPID
OPIE
OPIF
OPIG
OPIH
OPIN
OPJ2
OPJ4
OPJ6
OPJ7
OPJ8
OPJ9
OPJA
OPJB
OPJC
OPJD
OPJE
OPJF
OPJG
OPJH
OPJI
OPJJ
OPJK
OPJL
OPJM
OPJN
OPJO
OPJP
OPJQ

CO Cash Bgt Mgmt: Delete Actual Data
PS Cash Management: Delete Plan Data
CO Cash Bgt Mgmt: Delete Master Data
CO Cash Bgt Mgmt: MM Data Transfer
CO CBM: Successive FI Data Transfer
CO CBM: Take Over FI Completely
CO-CBM: Take Over All Data
Maintain Value Categories
Value Categories for Cost Elements
Update Control: File RPSCO
Commitment Item Value Categories
Value Categories for Stag.Key Figs
Activate CO Cash Budget Management
Display Value Category
Interest Profile for Projects
Maintain Interest Profile
Intrst Relevance: Cost Els/Cmmt Itms
Proj.Int Calc: Account Determination
Interest Indicator
View Maintenance:Compound Int.Cont.
View Maint.: Compound Int. Periods
Interest Scale, General Conditions
Number range maintnce: VHU_PINST
Production order stock determination
Schedule batch function request
Maintain Status Profiles
Maintain Routing Usage
Maintain Operation Control Key
Maintain prod. scheduler group
Maintain setup group/group category
Specify system messages
Maintain Wage Groups
Item Categories
User Selection
Automatic Selection
Maintain Default Values
Order types production order
BOM Usage Priorities
Maintain Scope of Check
Maintain Control
Maintain Checking Rule
Application-Specific Criteria
Maintain Scheduling Type
C MM-BD units of measurement
Maint. acct.assgnm.types for orders
Standard Value Key
OPJR Maintain move time matrix
OPJS PP: Maintain reduction strategies
OPJT Maintain Strategy Levels
OPJU Production order control parameters
OPJV Maintain Capacity Category
OPJW Maintain Capa.Planr.Grp for WrkCentr
OPJX Factory Calendar C
OPJY Maintain perf. efficiency rate key
OPJZ Maintain Release Periods
OPK0 Confirmation Parameters PP
OPK0T Confirmation Parameters
OPK1 Confirmation Parameters PP-PI
OPK1T Confirmation Parameters
OPK2 Formula Parameters
OPK3 Define Formula
OPK4 Confirmation Parameters
OPK5 Maintain variances
OPK6 List Layout
OPK7 Accessing Customizing PDC transfer
OPK8 Maintain print control prod. orders
OPK9 Maintain Goods Receipt Valuation
OPKA Maintain Movement Types
OPKB Control parallel confirmation
OPKC Control confirmation process chain
OPKD Control confirmation process chain
OPKE Screen Sequence for Components
OPKF Control parallel confirmation
OPKG Maintain Messages
OPKH Maintain Breakpoints
OPKI Maintain Collective Confirmation
OPKJ Maintain PRT Control Key
OPKK Standard Text
OPKL Formula Parameters
OPKM Define Formula
OPKN Overview variant production control
OPKO Command File for Production Orders
OPKP Shop floor control profile
OPKQ Customizing: Matchcode for Proc.Ord.
OPKR Print flag
OPKS Maintain Origins for CO Object
OPKT Initial Screen: Settlement Structure
OPKU Maintain Collective Confirmation
OPKV Print Flag
OPKW Print shop papers
OPKX Deletion Flag/Indicator
OPKZ Customizing Matchcode for ProdOrder
OPL1
OPL2
OPL3
OPL4
OPL5
OPL6
OPL7
OPL8
OPL9
OPLA
OPLB
OPLC
OPLD
OPLE
OPLF
OPLG
OPLH
OPLI
OPLJ
OPLK
OPLL
OPLM
OPLO
OPLP
OPLQ
OPLR
OPLS
OPLT
OPLV
OPLW
OPLX
OPLY
OPLZ
OPM0
OPM1
OPM2
OPM3
OPMF
OPMI
OPMJ
OPN0
OPN1
OPN2
OPN3
OPN5
OPN6

Costing Variants: PP Prod. Order
Maintain trigger point group
Trigger point usage
Profile for missing parts list
Order type LIS parameters
Profile for documented goods mvmts
Order change management profile
Order type parameters: Overview
Parameters for order change mgmt
Conditions: V_T682F for H CO
CondTab: Create (batch, prod.)
CondTab: Change (batchs, prod.)
CondTab: Display (batches, prod.)
Strategy types: Batch determ. (prod)
Access: Maintain batch determ.(prod)
Batch determ.: Procedure for prod.
Overview variant – production orders
Background job for goods movements
Job “Fast entry confirmation”
Overall profile for order prog. rep.
Order progress: Displayed fields
Order progress: Displayed fields
maintain selection profile
Job “Convert planned order”
maintain filter for control keys
Maintain filter for capacity version
Parallel processing control
Target System for Data Transfer
Maintain Filter for Task List Usage
Maintain Filter for Task List Status
Maintain Filter for BOM Usage
Maintain Filter for BOM Status
Maintain POI Planned Order Selection
Maintain profile – field selection
Costing Variants – Production Order
Maintain Detail Screen Control Oper.
Maintain Detail Scrn Control Header
Field Selection – BOM Transfer
Import models activities
Determine progress values
Master Recipe Profile
Maintain Profiles for Master Recipes
Valuation Variants – Prod. Order
Overv.Var.: Master Recipe Scheduling
Field Seln: Std Network Overview
Field Selection Standard Network Hdr
OPN7 Field Sel.:Std Ntwk Activity Detail
OPN8 Field Sel.:Std.Ntwk Comp.Overview
OPN9 Field Sel. Std Ntwk Comp.Detail
OPO1 Create Cost Element Planning Layout
OPO2 Change Cost Element Planning Layout
OPO3 Display Cost Element Planning Layout
OPO4 Create Stat. KF Planning Layout
OPO5 Change Stat. KF Planning Layout
OPO6 Display Stat. KF Planning Layout
OPO7 View Maintenance V_TCJ41_7
OPO8 View Maintenance V_TCJ41_8
OPO9 View Maintenance V_TCJ41_9
OPOA View Maintenance V_T003O_N0
OPOB View Maintenance V_T003O_N1
OPOC View Maintenance V_T399X_N0
OPOD View Maintenance V_T399X_N1
OPOE View Maintenance T_T399X_N2
OPP1 Customizing MRP
OPP2 MPS
OPP3 Customizing Repetitive Manufacturing
OPP5 List Profile Component List
OPPA PP/MRP Customizing Explosion
OPPB Direct Procurement
OPPC Period Grouping
OPPD Customizing Planning Time Fence
OPPE Conversion Plnnd Order -> Prod.Order
OPPE01 General iPPE Customizing
OPPE02 Define iPPE Node Type
OPPE03 Define iPPE Variant Types
OPPE04 Define iPPE Alternative Types
OPPE05 Define iPPE Relationship Types
OPPE06 Customer-Spec. Model Assgts (iPPE)
OPPE07 Time Analysis: Partner Products iPPE
OPPE11 Profiles: iPPE WB Professional
OPPE12 Tabs: iPPE Workbench Professional
OPPE13 User Assgmt: iPPE WB Professional
OPPE14 Define Reports for iPPE WB Prof.
OPPE15 Define Interface for iPPE Workbench
OPPE20 Profile Maintenance iPPE PS
OPPEACT01
Define Std Val. Determin. Type
OPPEACT02
Object Dependency in Process Struct.
OPPECHK01
Customizing: Consistency Check
OPPEDOK Documentation
OPPELUI01
Profile Definition: iPPE WB Express
OPPELUI02
User Assignment: iPPE WB Express
OPPERES01
Customizing for Production Resources
OPPESCMPV
Object Dependent Status Management
OPPESTATUS
Cross-Application Status Management
OPPF Customizing for Order Report
OPPH Customizing Purchase Req. Conversion
OPPI Available Stock
OPPJ MRP Checking Rule
OPPK Hierarchy Element
OPPL MRP
OPPM Evaluation Profiles
OPPN Layout
OPPO Hierarchy Element
OPPP Customizing Direct Procurement
OPPQ C M MRP Plant Parameters for MRP
OPPR C M MRP MRP Group
OPPS Strategy
OPPT Strategy Group
OPPU Strategy Group for MRP Group
OPPZ MRP Group
OPR1 Area of Responsibility <-> Message
OPR3 Definition of Breakpoints
OPR4_ACT
Multilevel Actual Settlement
OPR4_CK Material Cost Estimate
OPR4_CKMC
Mass Costing – Sales Documents
OPR4_CKML
Closing and Calc. of Periodic Price
OPR4_CKPF
Price Update
OPR4_FCO
Collective Processing: Variances
OPR4_KKA
WIP Calculation
OPR4_KKP
Repetitive Mfg and Process Mfg
OPR4_KKS
Collective Processing: Variances
OPR4_KKS1
Individual Processing: Variances
OPR4_PPCO
Production Order: Cost Calculation
OPR5 Definition of Error Mgmt IDs (SAP)
OPR6 Definition of Object IDs (SAP)
OPR7 Def. of Areas of Responsibility
OPR8 Def. of Minimum Message Types (SAP)
OPR9 Def. of Reference Objects (SAP)
OPRCMFE User-Defined Messages
OPRF Maintain Quotation Prefixes
OPS Customizing for Project System
OPS0 Maintain print control for networks
OPS1 Maintain User Fields
OPS2 Maintain Relationship Texts
OPS3 Maintain PS Text Types
OPS4 maintain simulation profile
OPS5 Maintain Standard Network Profile
OPS6 Maintain Project Manager
OPS7 Maintain Applicant
OPS8 Materialflow network
OPS9 Budget Management Profile
OPSA Maintain Project Profile
OPSB Cost Planning Profile
OPSC Create network types
OPSCAS Command File Payments (PS)
OPSCOS Command File Costs (PS)
OPSD Maintain Profile for Report Lines
OPSE Maintain Report Groups
OPSF Maintain Report Variations
OPSG Order change management profile
OPSH Maintain ctrl. key for activity (PS)
OPSI Edit PS validation rules
OPSINS Command File Info System (PS-F)
OPSJ Maintain Project Coding
OPSK Maintain Special Characters
OPSL Project Info System Overview Maint.
OPSM Maintain Overall Profile PS InfoSys
OPSN Edit PS substitution rules
OPSO Maintain Project Types
OPSP Capacity availability check
OPSPAR1 Maintain Partner Functions
OPSPAR2 Define Lang.-Dep.Partner Functions
OPSPAR3 WBS Partner Profile
OPSQ Intervals for Cost/Revenue Types
OPSR Maintain milestones
OPSREV Command File Revenues (PS)
OPSS Maintain milestones
OPST Network Confirmation Parameters
OPSU Maintain Activity Control Key
OPSV Cost object ind.
OPSW Info System Profile
OPSX PS: Reset “Budgeted” Status
OPT1 Maintain PS Transaction Types
OPT2 Matchcode for project definition
OPT3 Matchcode for WBS elements
OPT4 Matchcode for standard network
OPT5 Customizing matchcode for network
OPT6 Maintain std. milestone group
OPT7 Project planning board profile
OPT8 Maintain hierarchy graphic / dates
OPT9 Network parameters for PS-SD
OPTA Command file for PS -> FI area
OPTB Command file for WBS
OPTC Command file for network
OPTD
OPTE
OPTF
OPTG
OPTH
OPTI
OPTJ
OPTK
OPTL
OPTM
OPTN
OPTO
OPTP
OPTQ
OPTR
OPTS
OPTT
OPTU
OPTV
OPTW
OPTX
OPTY
OPTZ
OPU0
OPU3
OPU4
OPU5
OPU6
OPU7
OPU8
OPU9
OPUA
OPUB
OPUC
OPUD
OPUH
OPUI
OPUJ
OPUK
OPUL
OPUM
OPUN
OPUO
OPUP
OPUQ
OPUR

Command file for standard network
Command file for PS info system
Command file for PS graphic
Maintain PS Info Summztn Criteria
PS info system maintenance
Maintain Progrss Analysis Overview
Maintain PS Info Unit Conversion
Exclude Cost Elems from Avlbty Cntrl
Maintain PS Info Comparison Criteria
Fincl Budgeting Profile for Projects
Maintain priorities
Change costing variants
Sub-network parameters
Maintain WBS scheduling parameters
Strategies for settlement rules
Maintain project version profile
Maint. acct.assgnm.types for orders
Maint. PS Info System field settings
Maint. PS Info System sort criteria
Maint.PS Info System group. criteria
Maint. PS Info System database set.
Capacity leveling – Time profile/PS
Matchcode for standard WBS elements
Matchcode for standard project def.
Production order control parameters
Maintain Capacity Planning (SOP)
Parameter long term planning PlndOrd
Production order control parameters
Control parameters plant maintenance
Overview Var.: Header Line Info Sys.
Overview Variant: Item Line
Field selection: Network: Header
Field selection: Network: Overview
Field selection: Network: Details
Field selection:Network confirmation
Field sel: Std. project definition
Field selection: Std. WBS elements
Field selection: Project definition
Field selection: WBS element
PS: Maintain reduction strategies
Maintain Subprojects
Capacity overviews
Project schedule overviews
Subnetwork schedule overview
Overall network scheduling overview
Info System: Structure overview
OPUS
OPUT
OPUU
OPUV
OPUW
OPUX
OPUY
OPUZ
OPVC
OPVP

Maintain Version Number Entry Mask
Maintain overview variants
Maintain Network Profile
Network Type Parameters
Standard Network Status
Maintain overview variants std netwk
Overview var.:Std.ntwrk scheduling
Control parameters plant maintenance
Convert Avlability Cntrl Tol.Limits
Collective availibility checkProfile

Sap ps transaction codes

  • 1.
    Transaction Codes -SAP PS CJ** are mainly Project Definition and WBS related, CN** are mainly Network and activity related and the OP** are mainly PS Configuration / Customization related. There are other codes which are not on the list, but this is a good platform to start and build up your own list of PS transactions as per your requirements: CJ01 Create Work Breakdown Structure CJ02 Change Work Breakdown Structure CJ03 Display Work Breakdown Structure CJ06 Create Project Definition CJ07 Change Project Definition CJ08 Display Project Definition CJ11 Create WBS Element CJ12 Change WBS Element CJ13 Display WBS Element CJ14 Display WBS Element (From DMS) CJ20 Structure planning CJ20N Project Builder CJ21 Change Basic Dates CJ22 Display Basic Dates CJ23 Change Forecast Dates CJ24 Display Forecast Dates CJ25 Change Actual Dates CJ26 Display Actual Dates CJ27 Project planning board CJ29 Update WBS (Forecast) CJ2A Display structure planning CJ2B Change project planning board CJ2C Display project planning board CJ2D Structure planning CJ30 Change Project Original Budget CJ31 Display Project Original Budget CJ32 Change Project Release CJ33 Display Project Release CJ34 Project Budget Transfer CJ35 Budget Return from Project CJ36 Budget Supplement to Project CJ37 Budget Supplement in Project CJ38 Budget Return in Project CJ3A Change Budget Document CJ3B Display Budget Document CJ40 Change Project Plan
  • 2.
    CJ41 Display ProjectPlan CJ42 Change Project Revenues CJ43 Display Project Revenues CJ44 Act. overhd: Projects, ind. process. CJ45 Act. ovhd: Projects, coll. process. CJ46 Plnd ovrhd: Projects, ind. process. CJ47 Pld Overhead: Projects, Coll.Procssg CJ48 Change Payment Planning: Init.Screen CJ49 Display Payment Planning: Init.Scrn CJ70 Maintain Project Settlement LIs CJ72 Project: Act. amt. line item settlmt CJ74 Project Actual Cost Line Items CJ76 Project Commitment Line Items CJ7E Plan Data Transfer: Projects CJ7G Plan Data Transfer: Projects CJ7M Project Plan Cost Line Items CJ7N Maint. DRG inv.projects for retmt. CJ80 Availability Control – Overview CJ81 Update Report List CJ88 Settle Projects and Networks CJ8A Act.-setlmt: Proj. retirmt. from IM CJ8G Actual Settlement: Projects/Networks CJ8V Period Close for Project Selection CJ91 Create Standard WBS CJ92 Change Standard WBS CJ93 Display Standard WBS CJ9B Copy WBS Plan to Plan (Collective) CJ9B_OLD Copy Project Cost Planning (old) CJ9BS Copy WBS Plan to Plan (Indiv.) CJ9C Copy WBS Actual to Plan (Collective) CJ9C_OLD Copy Project Revenue Planning (old) CJ9CS Copy WBS Actual to Plan (Indiv.) CJ9D Copy Plan Versions CJ9E Plan Settlement: Projects CJ9ECP Project System: Easy Cost Planning CJ9F Copy Project Costing (Collective) CJ9FS Copy Project Costing (Indiv.) CJ9G Plan Settlement: Projects CJ9K Network Costing CJ9L Forecast Costs: Individual Projects CJ9M Forecast Costs: Coll.Project Proc. CJ9Q Integrated Planning for Ntwks(Coll.) CJ9QS Integrated Planning for Ntwks (Ind.) CJA1 Proj.Rel.Order Receipts: Coll.Proc. CJA2 Proj.Rel. Order Receipts: Ind.Proc. CJAL Send project
  • 3.
    CJB1 Generate SettmtRule: Coll.Proc. CJB2 Generate Settmt Rule: Indiv.Proc. CJBBS1 Planning Board Report Assignment CJBBS2 Structure Overview Report Asst CJBN Reconstruct Availability Control CJBV Activate Project Availabilty Control CJBW Deactivate Project Availabilty Cntrl CJC1 Maintenance Dialog for Stat.by Per. CJC2 Maintain Planned Status Changes CJCD Change documents: WBS CJCF Carry Forward Project Commitments CJCO Carry Forward Project Budget CJCS Standard WBS CJE0 Run Hierarchy Report CJE1 Create Hierarchy Report CJE2 Change Hierarchy Report CJE3 Display Hierarchy Report CJE4 Create Project Report Layout CJE5 Change Project Report Layout CJE6 Display Project Report Layout CJEA Call Hierarchy Report CJEB Background Processing, Hier.Reports CJEC Maintain Project Crcy Trans.Type CJEK Copy Interfaces/Reports CJEM Project Reports: Test Monitor CJEN Reconstruct: Summarized Proj.Data CJEO Transport Reports CJEP Transport Forms CJEQ Import Reports from Client CJET Translation Tool – Drilldown CJEV Maintain Global Variable CJEX Reorganize Drilldown Reports CJEY Reorganize Report Data CJEZ Reorganize Forms CJF1 Create Transfer Price Agreement CJF2 Change Transfer Price Agreement CJF3 Display Transfer Price Agreement CJF4 Transfer Price Agreement List CJFA Analysis of Data Trans. into PS Cash CJFN CBM Payment Converter CJG1 Enter Transfer Price Allocation CJG3 Display Transfer Price Allocation CJG4 Enter Trsfr Price Allocation: List CJG5 Cancel Transfer Price Allocation CJH1 Reconstruct Project Inheritance CJH2 Project Inheritance Log
  • 4.
    CJI1 CJI2 CJI3 CJI4 CJI5 CJI8 CJI9 CJIA CJIB CJIC CJID CJIE CJIF CJIG CJJ2 CJJ3 CJK2 CJK3 CJL2 CJN1 CJN2 CJNO CJO8 CJO9 CJP1 CJP2 CJP3 CJP4 CJPN CJPU CJR2 CJR3 CJR4 CJR5 CJR6 CJR7 CJR8 CJR9 CJS2 CJS3 CJS4 CJS5 CJSA CJSB CJSG CJSN Project Budget LineItems Budget Line Items: Document Chain Project Actual Cost Line Items Project Plan Cost Line Items Project Commitment Line Items Project Budget Line Items Project Struct.Pld Costs Line Items Project Actual and Commt Paymt LIs Project Plan Payment Line Items Maintain Project Settlement LIs Display Project Settlement Line Itms Projects: Retirement LI Settlement Projects: Profitability Analysis LI Display PS Cash Documents Change Statistical Key Figures Display Statistical Key Figures Change Statistical Key Figures Display Statistical Key Figures Collective Agreement Reval. ACT: Projects Ind.Pro. Reval. ACT: Projects Col.Pro. Number range maintenance: FMCJ_BELNR Overhead COMM: Projects Ind.Pro. Overhead COMM: Projects Col.Pro. Create Project Plan Adjustment Change Project Plan Adjustment Display Project Plan Adjustment Delete Project Plan Adjustment Number Range Maintenance: Proj.Items Execute Project Plan Adjustment PS: Change plan CElem/Activ. input PS: Display plan CElem/Activ. input PS: Change plan primary cost element PS: Display plan primary cost elem. PS: Change activity input planning PS: Display activity input planning PS: Change revenue type planning PS: Display Revenue Element Planning PS: Change stat. key figure planning PS: Display stat. key fig. planning PS: Change stat. key figure planning PS: Display stat. key fig. planning Data Transfer to SAP-EIS Select Key Figure and Characteristic Generate WBS Element Group Number Range Maintenance: Projects
  • 5.
    CJT2 CJV1 CJV2 CJV3 CJV4 CJV5 CJV6 CJV7 CJVC CJW1 CJZ1 CJZ2 CJZ3 CJZ5 CJZ6 CJZ7 CJZ8 CJZ9 Project Actual PaymentLine Items Create project version (simulation) Change project version (simulation) Display project version (simulation) Transfer project Delete simulation version Maintenance: Version administration Display transfer log Value Category Checking Program EURO: Adjust Project Budget Act. Int Calc.: Projects Coll. Proc. Actual Int.Calc.: Project Indiv.Prc. Plan Int.Calc.: Project Indiv.Prc. Plan Int.Calc.: Project Coll.Prc. Actual Int.Calc.: Indiv.CO Order Prc Planned Int.Calc: Indiv.CO Ord.Proc. Actual Int.Calc.: Coll.CO Order Prc. Plan Int.Calc.: Coll.CO Order Prc. Network and activity related transaction codes: CN01 Create Standard Network CN02 Change Standard Network CN03 Display Standard Network CN04 Edit PS Text Catalog CN05 Display PS Text Catalog CN06 MPX Download: Standard Network CN07 MPX Upload: Standard Network CN08 Allocate material -> stand. network CN09 Allocate material -> stand. network CN11 Create standard milestone CN12 Change standard milestone CN13 Display standard milestone CN19 Display Activity (From DMS) CN20 Dsply network/act.bsc data init.scrn CN21 Create Network CN22 Change Network CN23 Display Network CN24 Overall Network Scheduling CN24N Overall Network Scheduling CN25 Confirm Completions in Network CN26 Display Mat.Comp/Init: Ntwk,Acty,Itm CN26N Display Mat. Components (From DMS) CN27 Collective confirm. CN28 Display Network Confirmations CN29 Cancel Network Confirmation
  • 6.
    CN2X Confirm Completionsin Network CN30 Processing PDC error records CN33 PDM-PS interface CN34 Maintain release table TCNRL CN35 Control stock / account assignment CN36 BOM Transfer Profile CN37 BOM Allocation Field Selection CN38 Maintain Flexible Reference Point CN40 Project Overview CN41 Structure Overview CN42 Overview: Project Definitions CN42N Overview: Project Definitions CN43 Overview: WBS Elements CN43N Overview: WBS Elements CN44 Overview: Planned Orders CN44N Overview: Planned Orders CN45 Overview: Orders CN45N Overview: Orders CN46 Overview: Networks CN46N Overview: Networks CN47 Overview: Activities/Elements CN47N Overview: Activities/Elements CN48 Overview: Confirmations CN48N Overview: Confirmations CN49 Overview: Relationships CN49N Overview: Relationships CN50 Overview: Capacity Requirements CN50N Overview: Capacity Requirements CN51 Overview: PRTs CN51N Overview: PRTs CN52 Overview: Components CN52N Overview: Components CN53 Overview: Milestones CN53N Overview: Milestones CN54N Overview: Sales Document CN55N Overview: Sales and Dist. Doc. Items CN60 Change Documents for Projects/Netw. CN61 Standard network CN65 Change documents order /network CN70 Overview: Batch variants CN71 Create versions CN72 Create Project Version CN80 Archiving project structures CN81 PS: Archiving project – preliminary CN82 PS: Archiving project structures CN83 PS: Archiving project – Info System
  • 7.
    CN84 PS: Archivingproject – admin. CN85 PS: Delete operative structures CN98 Delete Standard Networks CN99 Archiving Standard Networks CNB1 Purchase requisitions for project CNB2 Purchase orders for project CNC4 Consistency checks for WBS CNC5 Consistency checks sales order/proj. CNE1 Project Progress (Individual Proc.) CNE2 Project Progress (Collective Proc.) CNE5 Progress Analysis CNG1 Netw./Hier.: Maintain frame types CNG2 Netw./Hier.: Maintain form def. CNG3 Netw./hier.: maintain color definit. CNG4 Netw./Hier.: Maintain graph. profile CNG5 Netw./Hier: Maintain options profile CNG6 Netw./hier.: Maintain node type CNG7 Netw./Hier.: Maintain link types CNG8 Netw./Hier.: Maintain field def. CNG9 Graph. Cust. Netw./Hierarchy Graph. CNL1 Create delivery information CNL2 Change delivery information CNL3 Display delivery information CNMASS Mass Changes in Project System CNMASSPROT Display log f. mass changes PS CNMM Project-Oriented Procurement CNMT Milestone Trend Analysis CNN0 Number Range for Library Network CNN1 Number range maint.: ROUTING_0 CNPAR Partner Overview CNPRG Network Progress CNR1 Create Work Center CNR2 Change Work Center CNR3 Display Work Center CNS0 Create deleivry from project CNS40 Project Overview CNS41 Structure Overview CNS42 Overview: Project Definitions CNS43 Overview: WBS Elements CNS44 Overview: Planned Orders CNS45 Overview: Orders CNS46 Overview: Networks CNS47 Overview: Activities/Elements CNS48 Overview: Confirmations CNS49 Overview: Relationships CNS50 Overview: Capacity Requirements
  • 8.
    CNS51 CNS52 CNS53 CNS54 CNS55 CNS60 CNS71 CNS83 CNSE5 CNVL CNW1 CNW4 Overview: PRTs Overview: Components Overview:Milestones Overview: Sales Document Overview: Sales and Dist. Doc. Items Change Documents for Projects/Netw. Create versions PS: Archiving project – Info System Progress Analysis Variable Overviews WWW: Confirmation Project Documents PS Configuration / Customization related Transactions codes: OP00 OP01 OP03 OP04 OP07 OP08 OP09 OP10 OP11 OP12 OP13 OP14 OP15 OP16 OP17 OP18 OP19 OP20 OP21 OP22 OP23 OP24 OP26 OP28 OP30 OP31 OP32 OP34 OP35 OP36 OP37 Maintain Operation Control Key Customizing Routing/Work Center Factory Calendar C Word Processing Standard Text Standard Text Maintain Alternative Activity Desc. Maintain Person Responsible Maintain Period Pattern Key Maintain Location Maintain Screen Sequence Maintain Type of Std. Value Determin Production User Profile Maintain Period Pattern Formula Parameters Maintain Setup Group/Setup Group Cat Standard Value Key Maintain Setup Type Key Define Formula Maintain Wage Groups Maintain Location Maintain period dependent oper. val. Maintain suitability Maintain Perf. Efficiency Rate Key Maintain Move Time Matrix Maintain Time Segment (Per. Pattern) Maintain Capacity Category Maintain Work Center Planner Group Maintain Perf. Efficiency Rate Key Maintain Capacity Default Values Maintain Available Capacity Version
  • 9.
    OP38 OP39 OP40 OP41 OP42 OP43 OP44 OP45 OP46 OP47 OP48 OP49 OP4A OP4B OP4C OP4D OP4E OP4F OP4G OP4H OP4I OP50 OP51 OP52 OP53 OP54 OP55 OP56 OP57 OP58 OP59 OP5A OP5B OP5C OP5D OP5E OP5F OP5H OP61 OP62 OP63 OP64 OP65 OP66 OP67 OP68 Maintain Setup TypeKey Maintain Graphics Profile Maintain Work Center Category Matchcode for work center Default work center Maintain Setup Group Categories Maintain Task List Usage Maintain Usage Maintain Task List Status Maintain PRT Usage Maintain Planner Group Matchcode for Routings/Ref. Op. Sets Maintain Shift Sequences Overview variant: Routing Overview variant: Ref. oper. set Overview variant: Rate routing Overview variant: Ref. rate routing Overview var.:Scheduling of routings Overview var.:Scheduling ref.op.set Overview var.:Scheduling of rate rtg Overview var.:Scheduling RefRateRtgs Assign Material Types Formula Parameters Formula Parameters Formula Parameters Define Formula Define Formula Define Formula Define Formula Maintain Default Value Profiles Formula Parameters Field Selection: Task List Overview Field Selection: Task List Header Field Selection: Task List Sequence Field Selection: Task List Details Field selection task list overview Field selection std network -> PRT Field sel. insp.plan characteristics Number range maintenance: ROUTING_3 Number ranges for routings Number Ranges for Ref.Operation Sets Maintain Setup Group Key Formula Parameters Maintain Location Group Maintain Operation Control Key Maintain Move Time Matrix
  • 10.
    OP69 OP70 OP71 OP72 OP73 OP74 OP76 OP77 OP78 OP7A OP7B OP80 OP82 OP84 OP85 OP87 OP88 OP8A OP8B OP8C OP8D OP8E OP8F OP8H OP91 OP95 OP96 OP97 OP98 OPA0 OPA1 OPA2 OPA3 OPA4 OPA5 OPA6 OPA7 OPA9 OPB1 OPB2 OPB3 OPB4 OPB5 OPC0 OPC1 OPC2 Maintain wage type MaintainPRT Control Key Maintain Wage Group PRT Control Key PRT Authorization Group Maintain PRT Group Key Define suitability Engineering Workbench for Task Lists Maintain Type of Std. Value Determin Customizing matchcode for PRTs Define Parameters Maintain PRT Status Define Formula Profiles: Default Values for Rtgs. Profiles: Default Values for QM Maintain Routing/Ref.Op.Set Usage Maintain Assignmt. of Task List Type Maintain operation value description Maintain standard value texts Record layout for background (APL) Data transfer APL Command file task lists Rel. 2.2A Maintain production scheduler Profiles: Default Values for Rtgs. Maintain Object Overview Version Assign Work Center Cat. to Applicatn Maintain Work Center Category Maintain Performance Efficiency Rate Maintain Validity of Perf.Effic.Rate Status selection profiles Maintain combination definitions Define selection profile Define option profile Define list profile Define graphics profile Define overall profile Define columns Maintain selection profiles Define list versions Define distribution function Specify distribution functions Specify distribution strategies Specify distribution key Axis representation selection Maintain axis representation Curve representation selection
  • 11.
    OPC3 OPC5 OPCD OPCE OPCF OPCG OPCH OPCI OPCL OPCM OPCN OPCQ OPCR OPCS OPCT OPCU OPCW OPCX OPCY OPD0 OPD1 OPD2 OPD3 OPD4 OPD5 OPD6 OPD7 OPD8 OPD9 OPDA OPDB OPDD OPDE OPDF OPDH OPDJ OPDK OPDL OPDM OPDQ OPDR OPDT OPDU OPDV OPDW OPE0 Maintain curve representation Max.no. of data records Capacity category Capacity planner Time units Maintain Operation Control Key Maintain production scheduler Setup group key/category Scheduling type Standard value key Maintain move time matrix Efficiency rate Formula parameters Define formula Strategies Strategy levels Planned order parameters Formula parameters Define formula Resource planning overall profile Resource planning selection profile Capacity leveling – time profile Resource planning evaluation profile Resource planning period profile Flow control definition Flow control control table Flow control statuses Flow Control Actions Flow Control Messages Transition matrix (setup matrix) Capacity Leveling Strategy Profile Factory calendar Resource planning control profile Define requirements grouping Capacity leveling – list profile Define layout Define standard overview Cap. plan. detailed cap.list maint. Define detail list (leveling) Profile for planning table (tab.) Define layout key Define detail list Maintain perf. efficiency rate key Com-file (Rel-Info/OLPK) KOP. Set´s Com-file (Rel-Info/OLPK) KOP. Set´s Maintain Sort String
  • 12.
    OPE1 Maintain ValueType OPE2 Maintain Machine Type OPE3 Maintain Planner Group OPE4 Maintain Control Parameters OPE5 Maintain rounding categories OPE6 Maintain Rounding Category OPE7 Maintain overhead key OPE8 Maint. Roundg. and Add.Val.Key (Def) OPE9 Maintain User Profile OPEA User selection OPEB Automatic selection OPEC PP user fields OPENPS Download Activities to Palm Pilot OPF0 Maintain User OPF1 Authorizations for CAPP OPFA Field selection: Work center OPFP Configuring the Fixed Price Version OPFR01 RPUCORF0PBS : IMG Link OPG0 Profile for planning table OPG1 Chart sequence – selection OPG2 Line representation OPG3 Scale time axis OPG4 Time scale profile OPG5 Graphic obj.type sel./repr.profile OPG6 Transition matrix setup fam.key OPG7 Line display selection OPG9 Graphical object type/obj.represent. OPGD Ref. Oper. Set-All Task Lists (PP) OPGE Ref. Oper. Set – Rate Routings (PP) OPGF Work Center – All Task Lists (PP) OPGG Work Center – Rate Routings (PP) OPGH Document PRT – All Task Lists OPGI Equipment PRT – All Task Lists OPGJ Material PRT – All Task Lists OPGK Misc. PRT – All Task Lists OPGL Resource – Master Recipes (PI) OPGM Process Instr. Cat. – Master Recipe OPGN Document PRT – Maintenance Task List OPGO Equipment PRT-Maintenance Task Lists OPGP Material PRT – Maintenance Task List OPGQ Misc. PRT – Maintenance Task Lists OPGR Work Center – Standard Network (PS) OPGS Document PRT – Standard Network (PS) OPGT Equipment PRT – Standard Network(PS) OPGU Material PRT – Standard Network (PS) OPGV Misc. PRT – Standard Network (PS)
  • 13.
    OPH1 OPH2 OPH3 OPH4 OPH5 OPH6 OPH7 OPI1 OPI2 OPI3 OPI4 OPI5 OPI6 OPI8 OPIA OPIB OPIC OPID OPIE OPIF OPIG OPIH OPIN OPJ2 OPJ4 OPJ6 OPJ7 OPJ8 OPJ9 OPJA OPJB OPJC OPJD OPJE OPJF OPJG OPJH OPJI OPJJ OPJK OPJL OPJM OPJN OPJO OPJP OPJQ CO Cash BgtMgmt: Delete Actual Data PS Cash Management: Delete Plan Data CO Cash Bgt Mgmt: Delete Master Data CO Cash Bgt Mgmt: MM Data Transfer CO CBM: Successive FI Data Transfer CO CBM: Take Over FI Completely CO-CBM: Take Over All Data Maintain Value Categories Value Categories for Cost Elements Update Control: File RPSCO Commitment Item Value Categories Value Categories for Stag.Key Figs Activate CO Cash Budget Management Display Value Category Interest Profile for Projects Maintain Interest Profile Intrst Relevance: Cost Els/Cmmt Itms Proj.Int Calc: Account Determination Interest Indicator View Maintenance:Compound Int.Cont. View Maint.: Compound Int. Periods Interest Scale, General Conditions Number range maintnce: VHU_PINST Production order stock determination Schedule batch function request Maintain Status Profiles Maintain Routing Usage Maintain Operation Control Key Maintain prod. scheduler group Maintain setup group/group category Specify system messages Maintain Wage Groups Item Categories User Selection Automatic Selection Maintain Default Values Order types production order BOM Usage Priorities Maintain Scope of Check Maintain Control Maintain Checking Rule Application-Specific Criteria Maintain Scheduling Type C MM-BD units of measurement Maint. acct.assgnm.types for orders Standard Value Key
  • 14.
    OPJR Maintain movetime matrix OPJS PP: Maintain reduction strategies OPJT Maintain Strategy Levels OPJU Production order control parameters OPJV Maintain Capacity Category OPJW Maintain Capa.Planr.Grp for WrkCentr OPJX Factory Calendar C OPJY Maintain perf. efficiency rate key OPJZ Maintain Release Periods OPK0 Confirmation Parameters PP OPK0T Confirmation Parameters OPK1 Confirmation Parameters PP-PI OPK1T Confirmation Parameters OPK2 Formula Parameters OPK3 Define Formula OPK4 Confirmation Parameters OPK5 Maintain variances OPK6 List Layout OPK7 Accessing Customizing PDC transfer OPK8 Maintain print control prod. orders OPK9 Maintain Goods Receipt Valuation OPKA Maintain Movement Types OPKB Control parallel confirmation OPKC Control confirmation process chain OPKD Control confirmation process chain OPKE Screen Sequence for Components OPKF Control parallel confirmation OPKG Maintain Messages OPKH Maintain Breakpoints OPKI Maintain Collective Confirmation OPKJ Maintain PRT Control Key OPKK Standard Text OPKL Formula Parameters OPKM Define Formula OPKN Overview variant production control OPKO Command File for Production Orders OPKP Shop floor control profile OPKQ Customizing: Matchcode for Proc.Ord. OPKR Print flag OPKS Maintain Origins for CO Object OPKT Initial Screen: Settlement Structure OPKU Maintain Collective Confirmation OPKV Print Flag OPKW Print shop papers OPKX Deletion Flag/Indicator OPKZ Customizing Matchcode for ProdOrder
  • 15.
    OPL1 OPL2 OPL3 OPL4 OPL5 OPL6 OPL7 OPL8 OPL9 OPLA OPLB OPLC OPLD OPLE OPLF OPLG OPLH OPLI OPLJ OPLK OPLL OPLM OPLO OPLP OPLQ OPLR OPLS OPLT OPLV OPLW OPLX OPLY OPLZ OPM0 OPM1 OPM2 OPM3 OPMF OPMI OPMJ OPN0 OPN1 OPN2 OPN3 OPN5 OPN6 Costing Variants: PPProd. Order Maintain trigger point group Trigger point usage Profile for missing parts list Order type LIS parameters Profile for documented goods mvmts Order change management profile Order type parameters: Overview Parameters for order change mgmt Conditions: V_T682F for H CO CondTab: Create (batch, prod.) CondTab: Change (batchs, prod.) CondTab: Display (batches, prod.) Strategy types: Batch determ. (prod) Access: Maintain batch determ.(prod) Batch determ.: Procedure for prod. Overview variant – production orders Background job for goods movements Job “Fast entry confirmation” Overall profile for order prog. rep. Order progress: Displayed fields Order progress: Displayed fields maintain selection profile Job “Convert planned order” maintain filter for control keys Maintain filter for capacity version Parallel processing control Target System for Data Transfer Maintain Filter for Task List Usage Maintain Filter for Task List Status Maintain Filter for BOM Usage Maintain Filter for BOM Status Maintain POI Planned Order Selection Maintain profile – field selection Costing Variants – Production Order Maintain Detail Screen Control Oper. Maintain Detail Scrn Control Header Field Selection – BOM Transfer Import models activities Determine progress values Master Recipe Profile Maintain Profiles for Master Recipes Valuation Variants – Prod. Order Overv.Var.: Master Recipe Scheduling Field Seln: Std Network Overview Field Selection Standard Network Hdr
  • 16.
    OPN7 Field Sel.:StdNtwk Activity Detail OPN8 Field Sel.:Std.Ntwk Comp.Overview OPN9 Field Sel. Std Ntwk Comp.Detail OPO1 Create Cost Element Planning Layout OPO2 Change Cost Element Planning Layout OPO3 Display Cost Element Planning Layout OPO4 Create Stat. KF Planning Layout OPO5 Change Stat. KF Planning Layout OPO6 Display Stat. KF Planning Layout OPO7 View Maintenance V_TCJ41_7 OPO8 View Maintenance V_TCJ41_8 OPO9 View Maintenance V_TCJ41_9 OPOA View Maintenance V_T003O_N0 OPOB View Maintenance V_T003O_N1 OPOC View Maintenance V_T399X_N0 OPOD View Maintenance V_T399X_N1 OPOE View Maintenance T_T399X_N2 OPP1 Customizing MRP OPP2 MPS OPP3 Customizing Repetitive Manufacturing OPP5 List Profile Component List OPPA PP/MRP Customizing Explosion OPPB Direct Procurement OPPC Period Grouping OPPD Customizing Planning Time Fence OPPE Conversion Plnnd Order -> Prod.Order OPPE01 General iPPE Customizing OPPE02 Define iPPE Node Type OPPE03 Define iPPE Variant Types OPPE04 Define iPPE Alternative Types OPPE05 Define iPPE Relationship Types OPPE06 Customer-Spec. Model Assgts (iPPE) OPPE07 Time Analysis: Partner Products iPPE OPPE11 Profiles: iPPE WB Professional OPPE12 Tabs: iPPE Workbench Professional OPPE13 User Assgmt: iPPE WB Professional OPPE14 Define Reports for iPPE WB Prof. OPPE15 Define Interface for iPPE Workbench OPPE20 Profile Maintenance iPPE PS OPPEACT01 Define Std Val. Determin. Type OPPEACT02 Object Dependency in Process Struct. OPPECHK01 Customizing: Consistency Check OPPEDOK Documentation OPPELUI01 Profile Definition: iPPE WB Express OPPELUI02 User Assignment: iPPE WB Express OPPERES01 Customizing for Production Resources
  • 17.
    OPPESCMPV Object Dependent StatusManagement OPPESTATUS Cross-Application Status Management OPPF Customizing for Order Report OPPH Customizing Purchase Req. Conversion OPPI Available Stock OPPJ MRP Checking Rule OPPK Hierarchy Element OPPL MRP OPPM Evaluation Profiles OPPN Layout OPPO Hierarchy Element OPPP Customizing Direct Procurement OPPQ C M MRP Plant Parameters for MRP OPPR C M MRP MRP Group OPPS Strategy OPPT Strategy Group OPPU Strategy Group for MRP Group OPPZ MRP Group OPR1 Area of Responsibility <-> Message OPR3 Definition of Breakpoints OPR4_ACT Multilevel Actual Settlement OPR4_CK Material Cost Estimate OPR4_CKMC Mass Costing – Sales Documents OPR4_CKML Closing and Calc. of Periodic Price OPR4_CKPF Price Update OPR4_FCO Collective Processing: Variances OPR4_KKA WIP Calculation OPR4_KKP Repetitive Mfg and Process Mfg OPR4_KKS Collective Processing: Variances OPR4_KKS1 Individual Processing: Variances OPR4_PPCO Production Order: Cost Calculation OPR5 Definition of Error Mgmt IDs (SAP) OPR6 Definition of Object IDs (SAP) OPR7 Def. of Areas of Responsibility OPR8 Def. of Minimum Message Types (SAP) OPR9 Def. of Reference Objects (SAP) OPRCMFE User-Defined Messages OPRF Maintain Quotation Prefixes OPS Customizing for Project System OPS0 Maintain print control for networks OPS1 Maintain User Fields OPS2 Maintain Relationship Texts OPS3 Maintain PS Text Types OPS4 maintain simulation profile OPS5 Maintain Standard Network Profile OPS6 Maintain Project Manager
  • 18.
    OPS7 Maintain Applicant OPS8Materialflow network OPS9 Budget Management Profile OPSA Maintain Project Profile OPSB Cost Planning Profile OPSC Create network types OPSCAS Command File Payments (PS) OPSCOS Command File Costs (PS) OPSD Maintain Profile for Report Lines OPSE Maintain Report Groups OPSF Maintain Report Variations OPSG Order change management profile OPSH Maintain ctrl. key for activity (PS) OPSI Edit PS validation rules OPSINS Command File Info System (PS-F) OPSJ Maintain Project Coding OPSK Maintain Special Characters OPSL Project Info System Overview Maint. OPSM Maintain Overall Profile PS InfoSys OPSN Edit PS substitution rules OPSO Maintain Project Types OPSP Capacity availability check OPSPAR1 Maintain Partner Functions OPSPAR2 Define Lang.-Dep.Partner Functions OPSPAR3 WBS Partner Profile OPSQ Intervals for Cost/Revenue Types OPSR Maintain milestones OPSREV Command File Revenues (PS) OPSS Maintain milestones OPST Network Confirmation Parameters OPSU Maintain Activity Control Key OPSV Cost object ind. OPSW Info System Profile OPSX PS: Reset “Budgeted” Status OPT1 Maintain PS Transaction Types OPT2 Matchcode for project definition OPT3 Matchcode for WBS elements OPT4 Matchcode for standard network OPT5 Customizing matchcode for network OPT6 Maintain std. milestone group OPT7 Project planning board profile OPT8 Maintain hierarchy graphic / dates OPT9 Network parameters for PS-SD OPTA Command file for PS -> FI area OPTB Command file for WBS OPTC Command file for network
  • 19.
    OPTD OPTE OPTF OPTG OPTH OPTI OPTJ OPTK OPTL OPTM OPTN OPTO OPTP OPTQ OPTR OPTS OPTT OPTU OPTV OPTW OPTX OPTY OPTZ OPU0 OPU3 OPU4 OPU5 OPU6 OPU7 OPU8 OPU9 OPUA OPUB OPUC OPUD OPUH OPUI OPUJ OPUK OPUL OPUM OPUN OPUO OPUP OPUQ OPUR Command file forstandard network Command file for PS info system Command file for PS graphic Maintain PS Info Summztn Criteria PS info system maintenance Maintain Progrss Analysis Overview Maintain PS Info Unit Conversion Exclude Cost Elems from Avlbty Cntrl Maintain PS Info Comparison Criteria Fincl Budgeting Profile for Projects Maintain priorities Change costing variants Sub-network parameters Maintain WBS scheduling parameters Strategies for settlement rules Maintain project version profile Maint. acct.assgnm.types for orders Maint. PS Info System field settings Maint. PS Info System sort criteria Maint.PS Info System group. criteria Maint. PS Info System database set. Capacity leveling – Time profile/PS Matchcode for standard WBS elements Matchcode for standard project def. Production order control parameters Maintain Capacity Planning (SOP) Parameter long term planning PlndOrd Production order control parameters Control parameters plant maintenance Overview Var.: Header Line Info Sys. Overview Variant: Item Line Field selection: Network: Header Field selection: Network: Overview Field selection: Network: Details Field selection:Network confirmation Field sel: Std. project definition Field selection: Std. WBS elements Field selection: Project definition Field selection: WBS element PS: Maintain reduction strategies Maintain Subprojects Capacity overviews Project schedule overviews Subnetwork schedule overview Overall network scheduling overview Info System: Structure overview
  • 20.
    OPUS OPUT OPUU OPUV OPUW OPUX OPUY OPUZ OPVC OPVP Maintain Version NumberEntry Mask Maintain overview variants Maintain Network Profile Network Type Parameters Standard Network Status Maintain overview variants std netwk Overview var.:Std.ntwrk scheduling Control parameters plant maintenance Convert Avlability Cntrl Tol.Limits Collective availibility checkProfile