Transform Supply Chain & Logistics into Demand Networks
Planning Matters:
Issues: Demand Plans are aggregated which leads to low forecast accuracy, increased stock transfer orders and increased inventory in the network. Also, Sales & Operations Planning processes are disconnected from the execution which leads to a delay of executing decisions and increased cost. And finally inventory targets for product-location combinations are kept static instead of dynamically adjusting them according to demand and supply volatility
Solution: introduce 3 dimensional planning: plan with financial and supply chain numbers, combine short- and long-term forecasting and connect tactical with operational planning with inventory & service level optimization
Be Accessible:
Issues: One of the biggest issues to introduce speed into the supply chain is the missing connectivity with supply chain and logistics partners. Communication is done via e-mail and spreadsheets, which leads to increased inventory (to cover the risk) and delays. Furthermore point-to-point connections are hindering to increase flexibility to make fast decisions
Strategy: Leverage Business Networks instead of costly point-to-point connections. Make it easy to connect, increase flexibility and take risk out of the supply chain
Fulfill to Please:
Issues: Same-day shipments become the norm, especially in end-consumer related industries. Cost in Logistics are raising and the complexity is ever increasing. Warehouse and Transportation processes need to interact more closely for fast delivery. Efficiency in Warehouse Management lags 10 years behind the efficiency in Manufacturing (according to Gartner) – more automation will be introduced (robotics, augmented realities, etc)
Strategy: Efficiency in transportation and distribution requires connectivity, end-to-end visibility and a strong focus on cost
Get Free Online SAP S4 Hana Logistic Demo and get Online videos,Documents,recordings,green field implementation by our real time SAP experts. so please register
https://webinarit324573860.wordpress.com/sap-s4-hana-finanance-training/
SAP Business One is one of the most famed ERP solutions if you want to manage every tit and bit of your sales & marketing, CRM, and finance operations without much of spending, best fit for medium to small, this SAP tool can help you expand your capabilities and perform par excellently.
SAP for Retail is an industry-specific application software from the software vendor SAP AG and is focused on the global retailing industry. SAP for Retail is a set of software solutions that supports demand management, merchandise management and planning, supply chain, store operations, and base financials and Human Resource Capital functions.
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...Rocket Consulting Ltd
Are you an existing SAP Warehouse Management (SAP WM) or Inventory Management user and considering using SAP Extended Warehouse Management (SAP EWM) but are unsure if this is right for your business?
Then help is at hand with this presentation provided courtesy of SAP Partner Rocket Consulting who have a successful track record of SAP EWM and SAP WM implementations as well as SAP Recognised Expertise in EWM And SCM.
In this presentation the following is covered.
- Look at the history and evolution of the SAP Warehouse Management System (WMS) offerings
- Review the high level functionality of each of SAP WM and SAP EWM
- Look at the key functional differences between SAP WM and SAP EWM
- Review how you can assess your warehouse platform selection
- Look at the wider implications and implementation considerations for each solution
- Review why businesses have selected their warehouse management solution
For more information and support visit www.rocket-consulting.com
Would you like a free SAP WM vs SAP EWM comparison against your specific requirements?
Then visit www.whichsapwms.com
Get Free Online SAP S4 Hana Logistic Demo and get Online videos,Documents,recordings,green field implementation by our real time SAP experts. so please register
https://webinarit324573860.wordpress.com/sap-s4-hana-finanance-training/
SAP Business One is one of the most famed ERP solutions if you want to manage every tit and bit of your sales & marketing, CRM, and finance operations without much of spending, best fit for medium to small, this SAP tool can help you expand your capabilities and perform par excellently.
SAP for Retail is an industry-specific application software from the software vendor SAP AG and is focused on the global retailing industry. SAP for Retail is a set of software solutions that supports demand management, merchandise management and planning, supply chain, store operations, and base financials and Human Resource Capital functions.
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...Rocket Consulting Ltd
Are you an existing SAP Warehouse Management (SAP WM) or Inventory Management user and considering using SAP Extended Warehouse Management (SAP EWM) but are unsure if this is right for your business?
Then help is at hand with this presentation provided courtesy of SAP Partner Rocket Consulting who have a successful track record of SAP EWM and SAP WM implementations as well as SAP Recognised Expertise in EWM And SCM.
In this presentation the following is covered.
- Look at the history and evolution of the SAP Warehouse Management System (WMS) offerings
- Review the high level functionality of each of SAP WM and SAP EWM
- Look at the key functional differences between SAP WM and SAP EWM
- Review how you can assess your warehouse platform selection
- Look at the wider implications and implementation considerations for each solution
- Review why businesses have selected their warehouse management solution
For more information and support visit www.rocket-consulting.com
Would you like a free SAP WM vs SAP EWM comparison against your specific requirements?
Then visit www.whichsapwms.com
SAP S4HANA : Learn From Our Implementation JourneyAnup Lakra
Are you looking to streamline data models, optimize daily business transactions, accelerate strategic decision making and simplify everything in between – whether you use it on the cloud or on premise. Know about how you can prepare and simplify the SAP S4HANA adoption journey through our successful implementation of SAP S4HANA
•Gain a deeper understanding of SAP S/4HANA and its benefits
•Understand how SAP S/4HANA is organized into core, products, and suite
•Learn the new capability planned for the October update
•Hear about the Gartner report on vendors in the SAP HANA solution space
•Learn about the infrastructure required to run SAP HANA
WebXpress WMS is a mobile enabled, web based tool to help customer gain real time visibility across their storage locations.It helps to manage all the activities from arrival to storage to location management and dispatch and can be integrated with ERP to provide a seamless solution.
WebXpress is an IT Solutions company offering services in the domain of Logistics. We have multiple number of IT solutions in our basket to cater the growing requirements of the Logistics sector:
1. Transportation Management System
2. Fleet Management System
3. Warehouse Management System
4. E-Commerce Solution
5. Business Intelligence
6. Mobile Solutions
7. Finance and Accounting System
WebXpress has a large customer base, to name a few, Linfox, Agility, Safexpress, ColdEX, Kelvin, Future Supply Chains, DTDC, Surat Goods Transport, Agarwal Packers and Movers and many more.
If you want to know more about our company please visit www.webxpress.in
This presentation talks about the SAP SCM Extended Warehouse Management (EWM) solution - its benefits, overview, key capabilities and so on. It would be great for someone who needs to understand the EWM solution & maybe, pursue a career in that area. Please view & provide your feedback. Thanks!
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In india USa UAE JAPAN DELHI Noida Indore Bihar North India
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Kolkata
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Odisha
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Chatishghar
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In MP
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Maharstra
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Karnatka
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In North East India
Leverage SAP Activate Methodology to implement S/4HANA for maximized benefits. Best deployment and configuration practices revealed. Read our PPT for in-depth knowledge.
Predavanje pod nazivom „Simplify your SCM“ održala je Olja Lapčević ispred SAP West Balkans. Predavanje se baziralo na prevazilaženju prepreka na koje nailaze lanci snabdevanja uz pomoć primene softvera za upravljanje lancem snabdevanja (SAPove Supply Chain Execution Platforme), povezivanju informacija i monitoringu u realnom vremenu.
The 2015 Guide to New SAP Solutions That Support End-to-End Logistics and Ord...SAPinsider Events
View this session from Logistics and Supply Chain Management 2015 in Las Vegas. Coming to Europe! www.SCM2015.com
The 2015 Guide to New SAP Solutions That Support
End-to-End Logistics and Order Fulfillment by Markus Rosemann, SAP SE
Attend this session to get a firsthand look at SAP's full portfolio of logistics and order fulfillment solutions and its latest vision for supply chain execution convergence. You will:
- Get an overview of new capabilities delivered in the latest transportation management and warehouse management solutions from SAP
- Grasp how SAP solutions for logistics networks extend the portfolio with comprehensive capabilities for increased visibility
Step through real-world examples of how your counterparts are leveraging functionality from SAP to drive overall business value through logistics excellence.
SAP S4HANA : Learn From Our Implementation JourneyAnup Lakra
Are you looking to streamline data models, optimize daily business transactions, accelerate strategic decision making and simplify everything in between – whether you use it on the cloud or on premise. Know about how you can prepare and simplify the SAP S4HANA adoption journey through our successful implementation of SAP S4HANA
•Gain a deeper understanding of SAP S/4HANA and its benefits
•Understand how SAP S/4HANA is organized into core, products, and suite
•Learn the new capability planned for the October update
•Hear about the Gartner report on vendors in the SAP HANA solution space
•Learn about the infrastructure required to run SAP HANA
WebXpress WMS is a mobile enabled, web based tool to help customer gain real time visibility across their storage locations.It helps to manage all the activities from arrival to storage to location management and dispatch and can be integrated with ERP to provide a seamless solution.
WebXpress is an IT Solutions company offering services in the domain of Logistics. We have multiple number of IT solutions in our basket to cater the growing requirements of the Logistics sector:
1. Transportation Management System
2. Fleet Management System
3. Warehouse Management System
4. E-Commerce Solution
5. Business Intelligence
6. Mobile Solutions
7. Finance and Accounting System
WebXpress has a large customer base, to name a few, Linfox, Agility, Safexpress, ColdEX, Kelvin, Future Supply Chains, DTDC, Surat Goods Transport, Agarwal Packers and Movers and many more.
If you want to know more about our company please visit www.webxpress.in
This presentation talks about the SAP SCM Extended Warehouse Management (EWM) solution - its benefits, overview, key capabilities and so on. It would be great for someone who needs to understand the EWM solution & maybe, pursue a career in that area. Please view & provide your feedback. Thanks!
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In india USa UAE JAPAN DELHI Noida Indore Bihar North India
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Kolkata
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Odisha
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Chatishghar
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In MP
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Maharstra
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In Karnatka
BEST SAP ERP IMPLEMENTATION AND SUpPORT Companies In North East India
Leverage SAP Activate Methodology to implement S/4HANA for maximized benefits. Best deployment and configuration practices revealed. Read our PPT for in-depth knowledge.
Predavanje pod nazivom „Simplify your SCM“ održala je Olja Lapčević ispred SAP West Balkans. Predavanje se baziralo na prevazilaženju prepreka na koje nailaze lanci snabdevanja uz pomoć primene softvera za upravljanje lancem snabdevanja (SAPove Supply Chain Execution Platforme), povezivanju informacija i monitoringu u realnom vremenu.
The 2015 Guide to New SAP Solutions That Support End-to-End Logistics and Ord...SAPinsider Events
View this session from Logistics and Supply Chain Management 2015 in Las Vegas. Coming to Europe! www.SCM2015.com
The 2015 Guide to New SAP Solutions That Support
End-to-End Logistics and Order Fulfillment by Markus Rosemann, SAP SE
Attend this session to get a firsthand look at SAP's full portfolio of logistics and order fulfillment solutions and its latest vision for supply chain execution convergence. You will:
- Get an overview of new capabilities delivered in the latest transportation management and warehouse management solutions from SAP
- Grasp how SAP solutions for logistics networks extend the portfolio with comprehensive capabilities for increased visibility
Step through real-world examples of how your counterparts are leveraging functionality from SAP to drive overall business value through logistics excellence.
How to Craft a World-Class Commerce Program with Your SuppliersSAP Ariba
Learn how to design a winning commerce program that maximizes value. In this session we cover the critical success factors, discuss how to engage your suppliers and your internal organization, and explain how you can leverage SAP Ariba solutions to facilitate a strong partnership and improved outcomes on both sides of the equation.
Digital Supply Chain Transformation in the Networked EconomySAP Ariba
Learn how companies are seeking to transform their supply chains in the new digital networked economy. This session will include a discussion about the major pillars for transformation that can act as a concrete framework for initiatives to realize new digital opportunities and business value. You will be introduced to SAP’s extended supply chain portfolio and learn how this can be used for collaborative business planning across the network to integrate supply chain with sourcing and purchasing, and to orchestrate internal and external operations across short-, medium- and long-term time horizons. SAP customer use cases and examples from various industries will be used.
Sourcing and Procurement Excellence in a Networked WorldSAP Ariba
"Procurement executives are continually challenged to maintain sustainable savings, overall operational efficiency, and risk mitigation in today’s highly volatile commodity markets and risk-prone global supply chains. Organizations today look up to procurement teams to deliver value beyond tactical savings. Procurement is increasingly seen as the driver of business value through cross-functional collaboration within the enterprise as well as outside. During this session, we’ll hear about two successful transformation stories:
• Murphy Oil, which was supported by Accenture in the implementation
• SAP Global Procurement organization, describing how SAP’s internal procurement uses SAP Ariba solutions
Learn how a truly integrated source-to-settle process in both companies offers a tremendous ROI, with spend analysis driving effective sourcing, well-managed suppliers, and contract-compliant purchases. We will share an overview of the journey, from the vision and business case through to deployment of technology, along with the necessary process change management."
Changing Dynamics: Driving Direct Materials Sourcing and Supplier CollaborationSAP Ariba
"No two categories are the same, and neither are sourcing and procurement strategies. Direct materials sourcing – considered the lifeblood of the supply chain – presents unique challenges and opportunities. Success requires the right blend of in-depth product expertise, close supplier collaboration, and tight integration across processes. In today’s global economy, greater reliance on trading partners has made supply chain collaboration a competitive mandate. As supply chains become more complex and dynamic, your ability to use direct materials sourcing and procurement to achieve the perfect order – receiving the right product, in the right place, at the right time, in the right quantity – depends on having the right tools and partners.
Join this session to learn how SAP Ariba solutions are helping customers with their direct material sourcing strategy; how to collaborate across multiple processes, systems, and geographies in real time; and how to quickly identify and respond to unplanned supply chain events."
SMART Modular’s Collaboration with Direct Materials Suppliers for Instant Sup...SAP Ariba
As manufacturers become more reliant on their direct materials suppliers, manufacturing and supply chain processes become more iterative and aligned with suppliers. Join this session to hear a leading manufacturer in a highly dynamic industry discuss how to incorporate supplier collaboration in manufacturing plans.
Read this Blue Harbors whitepaper to learn about using the SAP Express Ship Interface (XSI) to connect to shippers, freight forwarders, motor freight, LTL and Parcel Carriers.
Since 2001, Blue Harbors (blueharbors.com) has focused solely on developing innovative supply chain solutions and providing experienced logistics and warehouse management consulting services to businesses that use SAP. These solutions and services save our clients a significant amount of time and money every year.
You have an opportunity to streamline shipping processes through the implementation of the Blue Harbors Express Shipping Solution (blueharbors.com/xss). The Express Shipping Solution provides a comprehensive and flexible platform that automates shipping functions within SAP.
Ship with over 50 carriers worldwide directly from your SAP system:
(1) Eliminate need for carrier-specific processes, applications and packing stations;
(2) No new shipping application or technology to support — all activity is transacted directly within your existing SAP environment;
(3) Designed using native SAP tools to provide seamless communication with all the leading parcel carriers, so that you can better leverage the investment which has already been made in SAP and reduce your total cost of ownership;
(4) Easy maintenance with hosted solution: no rate tables to update, no data to sync across systems or label formatting;
(5) Real-time tracking information available directly in SAP sales orders, deliveries and shipments.
Contact us: info@blueharbors.com; http://blueharbors.com/xss
Ariba, SAP Procurement and Business Network Roadmap [New York City]SAP Ariba
What's next for SAP, Ariba, and Fieldglass solutions, and what should you consider leveraging in the future? You will learn relevant roadmap details regarding the SAP On Premise procurement portfolio, the Ariba On Demand procurement portfolio, Ariba Network, Fieldglass and SAP Cloud for Travel and Expense. We will also discuss the larger vision for the Ariba Network within SAP, broadening to supply chain and transportation - related collaborative processes. You won't want to miss this insight on our latest direction.
Ariba, SAP Procurement and Business Network Roadmap
Rob Jones, Sr. Director, Solutions Management – Business Network, SAP -- Ariba Commerce Summit New York City 2014
Software Engineering, Software Consulting, Tech Lead.
Spring Boot, Spring Cloud, Spring Core, Spring JDBC, Spring Security,
Spring Transaction, Spring MVC,
Log4j, REST/SOAP WEB-SERVICES.
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Crescat
Crescat is industry-trusted event management software, built by event professionals for event professionals. Founded in 2017, we have three key products tailored for the live event industry.
Crescat Event for concert promoters and event agencies. Crescat Venue for music venues, conference centers, wedding venues, concert halls and more. And Crescat Festival for festivals, conferences and complex events.
With a wide range of popular features such as event scheduling, shift management, volunteer and crew coordination, artist booking and much more, Crescat is designed for customisation and ease-of-use.
Over 125,000 events have been planned in Crescat and with hundreds of customers of all shapes and sizes, from boutique event agencies through to international concert promoters, Crescat is rigged for success. What's more, we highly value feedback from our users and we are constantly improving our software with updates, new features and improvements.
If you plan events, run a venue or produce festivals and you're looking for ways to make your life easier, then we have a solution for you. Try our software for free or schedule a no-obligation demo with one of our product specialists today at crescat.io
Enhancing Research Orchestration Capabilities at ORNL.pdfGlobus
Cross-facility research orchestration comes with ever-changing constraints regarding the availability and suitability of various compute and data resources. In short, a flexible data and processing fabric is needed to enable the dynamic redirection of data and compute tasks throughout the lifecycle of an experiment. In this talk, we illustrate how we easily leveraged Globus services to instrument the ACE research testbed at the Oak Ridge Leadership Computing Facility with flexible data and task orchestration capabilities.
May Marketo Masterclass, London MUG May 22 2024.pdfAdele Miller
Can't make Adobe Summit in Vegas? No sweat because the EMEA Marketo Engage Champions are coming to London to share their Summit sessions, insights and more!
This is a MUG with a twist you don't want to miss.
How Recreation Management Software Can Streamline Your Operations.pptxwottaspaceseo
Recreation management software streamlines operations by automating key tasks such as scheduling, registration, and payment processing, reducing manual workload and errors. It provides centralized management of facilities, classes, and events, ensuring efficient resource allocation and facility usage. The software offers user-friendly online portals for easy access to bookings and program information, enhancing customer experience. Real-time reporting and data analytics deliver insights into attendance and preferences, aiding in strategic decision-making. Additionally, effective communication tools keep participants and staff informed with timely updates. Overall, recreation management software enhances efficiency, improves service delivery, and boosts customer satisfaction.
First Steps with Globus Compute Multi-User EndpointsGlobus
In this presentation we will share our experiences around getting started with the Globus Compute multi-user endpoint. Working with the Pharmacology group at the University of Auckland, we have previously written an application using Globus Compute that can offload computationally expensive steps in the researcher's workflows, which they wish to manage from their familiar Windows environments, onto the NeSI (New Zealand eScience Infrastructure) cluster. Some of the challenges we have encountered were that each researcher had to set up and manage their own single-user globus compute endpoint and that the workloads had varying resource requirements (CPUs, memory and wall time) between different runs. We hope that the multi-user endpoint will help to address these challenges and share an update on our progress here.
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI AppGoogle
AI Fusion Buddy Review: Brand New, Groundbreaking Gemini-Powered AI App
👉👉 Click Here To Get More Info 👇👇
https://sumonreview.com/ai-fusion-buddy-review
AI Fusion Buddy Review: Key Features
✅Create Stunning AI App Suite Fully Powered By Google's Latest AI technology, Gemini
✅Use Gemini to Build high-converting Converting Sales Video Scripts, ad copies, Trending Articles, blogs, etc.100% unique!
✅Create Ultra-HD graphics with a single keyword or phrase that commands 10x eyeballs!
✅Fully automated AI articles bulk generation!
✅Auto-post or schedule stunning AI content across all your accounts at once—WordPress, Facebook, LinkedIn, Blogger, and more.
✅With one keyword or URL, generate complete websites, landing pages, and more…
✅Automatically create & sell AI content, graphics, websites, landing pages, & all that gets you paid non-stop 24*7.
✅Pre-built High-Converting 100+ website Templates and 2000+ graphic templates logos, banners, and thumbnail images in Trending Niches.
✅Say goodbye to wasting time logging into multiple Chat GPT & AI Apps once & for all!
✅Save over $5000 per year and kick out dependency on third parties completely!
✅Brand New App: Not available anywhere else!
✅ Beginner-friendly!
✅ZERO upfront cost or any extra expenses
✅Risk-Free: 30-Day Money-Back Guarantee!
✅Commercial License included!
See My Other Reviews Article:
(1) AI Genie Review: https://sumonreview.com/ai-genie-review
(2) SocioWave Review: https://sumonreview.com/sociowave-review
(3) AI Partner & Profit Review: https://sumonreview.com/ai-partner-profit-review
(4) AI Ebook Suite Review: https://sumonreview.com/ai-ebook-suite-review
#AIFusionBuddyReview,
#AIFusionBuddyFeatures,
#AIFusionBuddyPricing,
#AIFusionBuddyProsandCons,
#AIFusionBuddyTutorial,
#AIFusionBuddyUserExperience
#AIFusionBuddyforBeginners,
#AIFusionBuddyBenefits,
#AIFusionBuddyComparison,
#AIFusionBuddyInstallation,
#AIFusionBuddyRefundPolicy,
#AIFusionBuddyDemo,
#AIFusionBuddyMaintenanceFees,
#AIFusionBuddyNewbieFriendly,
#WhatIsAIFusionBuddy?,
#HowDoesAIFusionBuddyWorks
AI Pilot Review: The World’s First Virtual Assistant Marketing SuiteGoogle
AI Pilot Review: The World’s First Virtual Assistant Marketing Suite
👉👉 Click Here To Get More Info 👇👇
https://sumonreview.com/ai-pilot-review/
AI Pilot Review: Key Features
✅Deploy AI expert bots in Any Niche With Just A Click
✅With one keyword, generate complete funnels, websites, landing pages, and more.
✅More than 85 AI features are included in the AI pilot.
✅No setup or configuration; use your voice (like Siri) to do whatever you want.
✅You Can Use AI Pilot To Create your version of AI Pilot And Charge People For It…
✅ZERO Manual Work With AI Pilot. Never write, Design, Or Code Again.
✅ZERO Limits On Features Or Usages
✅Use Our AI-powered Traffic To Get Hundreds Of Customers
✅No Complicated Setup: Get Up And Running In 2 Minutes
✅99.99% Up-Time Guaranteed
✅30 Days Money-Back Guarantee
✅ZERO Upfront Cost
See My Other Reviews Article:
(1) TubeTrivia AI Review: https://sumonreview.com/tubetrivia-ai-review
(2) SocioWave Review: https://sumonreview.com/sociowave-review
(3) AI Partner & Profit Review: https://sumonreview.com/ai-partner-profit-review
(4) AI Ebook Suite Review: https://sumonreview.com/ai-ebook-suite-review
Software Engineering, Software Consulting, Tech Lead, Spring Boot, Spring Cloud, Spring Core, Spring JDBC, Spring Transaction, Spring MVC, OpenShift Cloud Platform, Kafka, REST, SOAP, LLD & HLD.
OpenMetadata Community Meeting - 5th June 2024OpenMetadata
The OpenMetadata Community Meeting was held on June 5th, 2024. In this meeting, we discussed about the data quality capabilities that are integrated with the Incident Manager, providing a complete solution to handle your data observability needs. Watch the end-to-end demo of the data quality features.
* How to run your own data quality framework
* What is the performance impact of running data quality frameworks
* How to run the test cases in your own ETL pipelines
* How the Incident Manager is integrated
* Get notified with alerts when test cases fail
Watch the meeting recording here - https://www.youtube.com/watch?v=UbNOje0kf6E
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus
As part of the DOE Integrated Research Infrastructure (IRI) program, NERSC at Lawrence Berkeley National Lab and ALCF at Argonne National Lab are working closely with General Atomics on accelerating the computing requirements of the DIII-D experiment. As part of the work the team is investigating ways to speedup the time to solution for many different parts of the DIII-D workflow including how they run jobs on HPC systems. One of these routes is looking at Globus Compute as a way to replace the current method for managing tasks and we describe a brief proof of concept showing how Globus Compute could help to schedule jobs and be a tool to connect compute at different facilities.
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptxrickgrimesss22
Discover the essential features to incorporate in your Winzo clone app to boost business growth, enhance user engagement, and drive revenue. Learn how to create a compelling gaming experience that stands out in the competitive market.
Essentials of Automations: The Art of Triggers and Actions in FMESafe Software
In this second installment of our Essentials of Automations webinar series, we’ll explore the landscape of triggers and actions, guiding you through the nuances of authoring and adapting workspaces for seamless automations. Gain an understanding of the full spectrum of triggers and actions available in FME, empowering you to enhance your workspaces for efficient automation.
We’ll kick things off by showcasing the most commonly used event-based triggers, introducing you to various automation workflows like manual triggers, schedules, directory watchers, and more. Plus, see how these elements play out in real scenarios.
Whether you’re tweaking your current setup or building from the ground up, this session will arm you with the tools and insights needed to transform your FME usage into a powerhouse of productivity. Join us to discover effective strategies that simplify complex processes, enhancing your productivity and transforming your data management practices with FME. Let’s turn complexity into clarity and make your workspaces work wonders!
Large Language Models and the End of ProgrammingMatt Welsh
Talk by Matt Welsh at Craft Conference 2024 on the impact that Large Language Models will have on the future of software development. In this talk, I discuss the ways in which LLMs will impact the software industry, from replacing human software developers with AI, to replacing conventional software with models that perform reasoning, computation, and problem-solving.
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Globus
The Earth System Grid Federation (ESGF) is a global network of data servers that archives and distributes the planet’s largest collection of Earth system model output for thousands of climate and environmental scientists worldwide. Many of these petabyte-scale data archives are located in proximity to large high-performance computing (HPC) or cloud computing resources, but the primary workflow for data users consists of transferring data, and applying computations on a different system. As a part of the ESGF 2.0 US project (funded by the United States Department of Energy Office of Science), we developed pre-defined data workflows, which can be run on-demand, capable of applying many data reduction and data analysis to the large ESGF data archives, transferring only the resultant analysis (ex. visualizations, smaller data files). In this talk, we will showcase a few of these workflows, highlighting how Globus Flows can be used for petabyte-scale climate analysis.
12. Strategies for Warehouse Management
Introduce optimization techniques
Slotting and constrained-based planning in the warehouse
Warehouse layout optimization
Increase warehouse efficiency through Internet of Things
Augmented reality for warehouse workers
Material flow system and warehouse automation
Simplify material flow
Seamless flow between Make and Deliver through production warehouse
Handle returns as volume business (up to 30% in e-commerce)
19. Strategies for Logistics Networks
Sense and respond to logistics insights
Alert stakeholders and adapt business processes
Real-time reporting, analysis for insight-into-action and risk mitigation
Manage freight strategically
Determine best mix of carriers to meet business goals
Monitor compliance with agreements for both sell and buy side
Connect logistics to the internet of everything for business
Increase utilization and goods throughput with real-time location services
Accelerate delivery times with reduced waiting times and automated monitoring