CURRICULUM VITAE
SABEER YADAV
E Mail: yadavsavir@yahoo.co.in
yadavsavir@gmail.com
Contact: +91-9582077282
Career Objective
To pursue a challenging career with a progressive organization where I can use my energy and ethics and enhance my
skills by gaining comprehensive understanding of aims and objectives. I like the idea of working on things that are new
and innovative.
Academic Credentials
 MBA (Prod. & Operation) from MDU Rohtak (Hr.) in 2011 with FIRST DIVISION.
 B.E. (Mechanical) from Govt. University College of Engineering Kota in 2008 with FIRST DIVISION.
 10+2 from RBSE with FIRST DIVISION.
 10th
from RBSE with FRIST DIVISION.
Professional Synopsis
7.5 Years experience in automobile & auto ancillary (Sheet metal auto parts manufacturer) industries in press shop
production, tool trial and line setup.
Organizational Experience
 Currently working as (Asst. Manager – Press Shop) with M/s Bellsonica Auto Components from Sep. 2010.
BELLSONICA AUTO COMPONENT INDIA LTD. IMT Manesar (Hr.). A joint venture of MARUTI SUZUKI LTD. Reputed
supplier of sheet metal parts to Suzuki from last 55 years in Japan & same set up in India also for future Maruti Suzuki
car models. It is a leading group in sheet metal components assembly & manufacturing body and chassis parts for
passenger vehicle like Frt. MBR, Rear MBR, Frt. Bumper, Frt. and Rear door hinge & brake pedal, clutch, suspension arm
and accelerator assembly. Use of small tandem press shop - 80T-160T (make ISGEC &CHING FONG -15 No’s), Heavy
press tandem line - 300T-1000T (make ISGEC – 13 No’s), Two blanking & progressive press -300T (make KOMATSU).
1600 T & 2500 T Transfer press (make KOMATSU). EOT cranes (6 No’s) Robotic weld shop (arc, spot)
Job Responsibilities
• Overall responsibility of press shop-like- Production planning, manpower management, safety, quality, 5 S.
• Managerial capability to manage shop floor ( more than 250 m/p or 10 Engineer)
• Analysis of production target v/s actual (SPH).
• Ensuring stock inventory and try to reduce the level of inventory.
• Analysis & taking countermeasure against quality defects, rejection, rework.
• Training to subordinates regarding safety, quality & productivity.
• Conducting quality circle meetings for improvements.
• Ensure all check sheet filled properly or not.
• Responsible for achieving daily and monthly production targets.
• Responsible for defect free operations.
• Responsible of improving productivity and reduction in down time.
• Co-ordination with other departments like weld shop, machine maintenance, quality and PPC.
• To handle the problem on customer end and take corrective & preventive action by doing why-why analysis.
Achievements
 Yield improvement in raw material to reduce the cost of product.
 Automation in die, combined dies operation and saving manpower.
 Process improvement by doing kaizen and also cost saving by increasing productivity.
 Reduced die change time from 20 min to 9 min on tandem line and 30 min to 15 min on progressive line.
 Many kaizen to improve productivity, safety, quality and cost saving.
 Work with engineering for installation of transfer press and tool trial for new model.
 Reduced rejection, rework.
 Sep. 2008 to Sep. 2010 with Satyam auto component ltd. Manesar (GGN) as a Production Engineer Press Shop.
SATYAM AUTO COMPONENT LTD. IMT MANESAR, (A Hero Group Company).Turnover is 600 cr. Accredited with ISO/TS
16949. Engaged in manufacturing of sheet metal components & tubular frame making, use of heavy tandem press shop
– 350 T to 500 T ( Make Fonyu and Aida – 06 No’s). Weld shop, CNC pipe bending and light press shop (mechanical &
hydraulic, range from 30T to 250T, 18 No’s), fuel tank assembly line.
Job Responsibilities
 Responsibility of PRESS SHOP like –Production planning, production, quality, tool trial, production posting, dispatch,
manpower planning.
 Achieving targets of press shop, tube section, die maintenance.
 Motivating, educating and imparting comprehensive training to the workman for creating awareness for quality, 5S,
productivity, industrial safety & rejection.
Achievements
 Established 4 no’s new line of TECUMSEH compressor housing.
 Reduced rejection, rework, die down time.
 Reduce die change time from 16 min>9 min.
 Increase production from 2000 to 3500 per shift on TECUMSEH line.
Area of Expertise
Production Management:
 Productivity improvement and eliminating non–value added activities by focusing on kaizen activities.
 To find out press operation defects & takes appropriate counter measures.
 Managing overall operations with a view to ensure timely accomplishment of production targets within the time and
cost parameters.
Man Management:
 Managing and guiding a team of supervisors and workmen to address and resolve performance bottlenecks along
with imparting in house training.
 Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of
subordinates to enhance skills and productivity.
 Planning man power as per production schedule.
 Solve IR issues of subordinate.
Planning & Control:
 Monthly and daily Production Planning on basis of resources as per customer schedule.
 Daily machine loading planning to achieve production targets.
 Daily follow-ups with customer for critical components to avoid line stoppage.
Product Development:
 Playing a role of member in development of existing / new product, new tool trials, process improvements.
Process Improvement:
 Identifying scope for Planning, implementing & monitoring of technological changes to enhance productivity.
 Modifications in equipments, process flow, working practices, consumables, etc for controlling & reducing cost.
 Implementing various techniques for cycle time reduction, entailing identification of opportunities, analysis of data,
conduction of tests, cost benefit analysis.
 Executing cost saving techniques / measures and modifications to achieve cost reduction targets and work within the
budget.
Value Analysis and Value Engineering:
 Member of VA and VE activity running in the organization.
 Leader of single minute exchange of die (SMED) for reducing the changeover time during machine set up.
 Reduction of unnecessary manpower from the work station.
 Optimum utilization of 4M (man, material, machine, method)
 Variance analysis at each stage of production in terms of quality, cost and delivery and taking corrective actions.
Training Undergone
 6 Week training in RICO AUTO INDIA LTD. Dharuhera (Hr.)
 5 Week training in JAY BHARAT MARUTI LTD. PLANT –II GURGAON (Hr.)
 One day training at MSIL GURGAON on SMED.
 Company level training on safety, quality, and productivity, moral.
Computer Proficiency
 MS-Word, MS-Excel, Power Point Presentation, Outlook Express.
 Business software ERP.
Strengths
 Consistent, dedicated and determined to work efficiently.
 Positive attitude, innovative and self- motivated.
 Ready to take up challenging jobs with high adaptability and willpower.
Personal Profile
Father’s Name : Sh. Virender Singh
Date of birth : 18th
Jan 1984.
Martial status : Married.
Language Known : Hindi & English.
PAN No. : AEZPY0508C
Expected salary : Negotiable.
Hobbies : Gardening
Permanent Address : Village: Bhamdaka
Post: Gotoli (Tijara)
Distt: Alwar (Raj.)
(SABEER
YADAV)

Sabeer yadav

  • 1.
    CURRICULUM VITAE SABEER YADAV EMail: yadavsavir@yahoo.co.in yadavsavir@gmail.com Contact: +91-9582077282 Career Objective To pursue a challenging career with a progressive organization where I can use my energy and ethics and enhance my skills by gaining comprehensive understanding of aims and objectives. I like the idea of working on things that are new and innovative. Academic Credentials  MBA (Prod. & Operation) from MDU Rohtak (Hr.) in 2011 with FIRST DIVISION.  B.E. (Mechanical) from Govt. University College of Engineering Kota in 2008 with FIRST DIVISION.  10+2 from RBSE with FIRST DIVISION.  10th from RBSE with FRIST DIVISION. Professional Synopsis 7.5 Years experience in automobile & auto ancillary (Sheet metal auto parts manufacturer) industries in press shop production, tool trial and line setup. Organizational Experience  Currently working as (Asst. Manager – Press Shop) with M/s Bellsonica Auto Components from Sep. 2010. BELLSONICA AUTO COMPONENT INDIA LTD. IMT Manesar (Hr.). A joint venture of MARUTI SUZUKI LTD. Reputed supplier of sheet metal parts to Suzuki from last 55 years in Japan & same set up in India also for future Maruti Suzuki car models. It is a leading group in sheet metal components assembly & manufacturing body and chassis parts for passenger vehicle like Frt. MBR, Rear MBR, Frt. Bumper, Frt. and Rear door hinge & brake pedal, clutch, suspension arm and accelerator assembly. Use of small tandem press shop - 80T-160T (make ISGEC &CHING FONG -15 No’s), Heavy press tandem line - 300T-1000T (make ISGEC – 13 No’s), Two blanking & progressive press -300T (make KOMATSU). 1600 T & 2500 T Transfer press (make KOMATSU). EOT cranes (6 No’s) Robotic weld shop (arc, spot) Job Responsibilities • Overall responsibility of press shop-like- Production planning, manpower management, safety, quality, 5 S. • Managerial capability to manage shop floor ( more than 250 m/p or 10 Engineer) • Analysis of production target v/s actual (SPH). • Ensuring stock inventory and try to reduce the level of inventory. • Analysis & taking countermeasure against quality defects, rejection, rework. • Training to subordinates regarding safety, quality & productivity. • Conducting quality circle meetings for improvements. • Ensure all check sheet filled properly or not.
  • 2.
    • Responsible forachieving daily and monthly production targets. • Responsible for defect free operations. • Responsible of improving productivity and reduction in down time. • Co-ordination with other departments like weld shop, machine maintenance, quality and PPC. • To handle the problem on customer end and take corrective & preventive action by doing why-why analysis. Achievements  Yield improvement in raw material to reduce the cost of product.  Automation in die, combined dies operation and saving manpower.  Process improvement by doing kaizen and also cost saving by increasing productivity.  Reduced die change time from 20 min to 9 min on tandem line and 30 min to 15 min on progressive line.  Many kaizen to improve productivity, safety, quality and cost saving.  Work with engineering for installation of transfer press and tool trial for new model.  Reduced rejection, rework.  Sep. 2008 to Sep. 2010 with Satyam auto component ltd. Manesar (GGN) as a Production Engineer Press Shop. SATYAM AUTO COMPONENT LTD. IMT MANESAR, (A Hero Group Company).Turnover is 600 cr. Accredited with ISO/TS 16949. Engaged in manufacturing of sheet metal components & tubular frame making, use of heavy tandem press shop – 350 T to 500 T ( Make Fonyu and Aida – 06 No’s). Weld shop, CNC pipe bending and light press shop (mechanical & hydraulic, range from 30T to 250T, 18 No’s), fuel tank assembly line. Job Responsibilities  Responsibility of PRESS SHOP like –Production planning, production, quality, tool trial, production posting, dispatch, manpower planning.  Achieving targets of press shop, tube section, die maintenance.  Motivating, educating and imparting comprehensive training to the workman for creating awareness for quality, 5S, productivity, industrial safety & rejection. Achievements  Established 4 no’s new line of TECUMSEH compressor housing.  Reduced rejection, rework, die down time.  Reduce die change time from 16 min>9 min.  Increase production from 2000 to 3500 per shift on TECUMSEH line. Area of Expertise
  • 3.
    Production Management:  Productivityimprovement and eliminating non–value added activities by focusing on kaizen activities.  To find out press operation defects & takes appropriate counter measures.  Managing overall operations with a view to ensure timely accomplishment of production targets within the time and cost parameters. Man Management:  Managing and guiding a team of supervisors and workmen to address and resolve performance bottlenecks along with imparting in house training.  Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of subordinates to enhance skills and productivity.  Planning man power as per production schedule.  Solve IR issues of subordinate. Planning & Control:  Monthly and daily Production Planning on basis of resources as per customer schedule.  Daily machine loading planning to achieve production targets.  Daily follow-ups with customer for critical components to avoid line stoppage. Product Development:  Playing a role of member in development of existing / new product, new tool trials, process improvements. Process Improvement:  Identifying scope for Planning, implementing & monitoring of technological changes to enhance productivity.  Modifications in equipments, process flow, working practices, consumables, etc for controlling & reducing cost.  Implementing various techniques for cycle time reduction, entailing identification of opportunities, analysis of data, conduction of tests, cost benefit analysis.  Executing cost saving techniques / measures and modifications to achieve cost reduction targets and work within the budget. Value Analysis and Value Engineering:  Member of VA and VE activity running in the organization.  Leader of single minute exchange of die (SMED) for reducing the changeover time during machine set up.  Reduction of unnecessary manpower from the work station.  Optimum utilization of 4M (man, material, machine, method)  Variance analysis at each stage of production in terms of quality, cost and delivery and taking corrective actions. Training Undergone  6 Week training in RICO AUTO INDIA LTD. Dharuhera (Hr.)  5 Week training in JAY BHARAT MARUTI LTD. PLANT –II GURGAON (Hr.)  One day training at MSIL GURGAON on SMED.  Company level training on safety, quality, and productivity, moral. Computer Proficiency  MS-Word, MS-Excel, Power Point Presentation, Outlook Express.  Business software ERP. Strengths
  • 4.
     Consistent, dedicatedand determined to work efficiently.  Positive attitude, innovative and self- motivated.  Ready to take up challenging jobs with high adaptability and willpower. Personal Profile Father’s Name : Sh. Virender Singh Date of birth : 18th Jan 1984. Martial status : Married. Language Known : Hindi & English. PAN No. : AEZPY0508C Expected salary : Negotiable. Hobbies : Gardening Permanent Address : Village: Bhamdaka Post: Gotoli (Tijara) Distt: Alwar (Raj.) (SABEER YADAV)