1. YajuvendraBamrara
E-Mail: yaju_bamrara@yahoo.com
Contact No.: +91-9760061400/+91-8859500798
To attainprofessional enrichment in the area of Production/ Technological Development with a growth oriented organization.
PROFESSIONAL SYNOPSIS
A dynamic professional with nearly 12 years of rich experience in the field of Production & Planning Cum
SCM Execution of order, Production/Assembly and having package 7.25 Lacs per Annum + Perks.
Presently working with ABB Limited. Haridwar (U.K)as an EngineerProduction & Planning Cum SCM
since January, 2010 for LP-WA (Electrical Wiring Accessories) Business unit.
Expertise in managing planning activities, streamlining processes / procedures to facilitate smooth
production process & enhance productivity.
Expertise in production & Planning operations. Skills in conceptualizing and effecting process initiatives
to enhance efficiency and productivity.
Strong ability to create/read/interpret engineering drawings executes new products in conformance to pre-
defined technical specifications.
Deft in managing the wide spectrum of tasks including achieve target against plan and process control
acrossthe production and production planning & execute the order in close co- ordination with all concern
department ensuring on time deliverables.
An effective communicator with excellent relationship management skills and strong analytical, problem
solving & organizational abilities. Possess a flexible & detail oriented attitude.
CORE COMPETENCIES (PPC)
Achieved customer satisfaction goals, including six days between ordering and shipping and delivery of
90% of orders on the first committed date to the customer.
Analyzed backlog, detected problems, and raised alerts to the organization for procurement, supply
planning, factory, order management, products engineering
Improved on-time sales order shipments from 80% to 99%.
Reduced production floor shortages by 95% with scheduling and coordination with purchasing.
Supported the transition from a work order process to a Lean back flushing process.
Audited the reconciliation of cost variances on work orders.
Managed the planning of new product introductions into manufacturing.
Coordinated the implementation of Engineering Change Notices (ECN's) in manufacturing.
Entered inventory and shop floor control transactions
Active team member in monthly S&OP meeting, and represented product supply as the direct contact to
Sales & Marketing.
Acquired materials and scheduled production to support customer demand.
Implemented full MRP system.
Lead cultural changes for all personnel and software to transform the facility from a manual planning
system to MRP based supply system.
Reduced the lead time for finished goods replacement from 90 to 22 days.
Controlled material flow through operations, expediting functions as necessary to maintain schedules
2. Sourcing / Procurement and Supply Chain Management
Assessing performance of Suppliers based on various criterions such as percentage for rejections, quality
improvement rate, timely delivery etc.
Steering strategic sourcing through identification of cost effective vendors/suppliers for procurement with
an aim of reducing cost while improving quality & reliability.
Introducing potential low cost global suppliers and coordinates to develop the parts as per requirement.
Introducing advanced machining methods in key result areas in mass production to get bulk supply from
vendors.
Adopt atplanning, implementing and controlling the operations of the supply chain. Derive and implement
Standard Operating Procedure. Ensure a smoother operation for the supply chain.
Identifying areas of quality failures in components and taking steps to rectify the system wide preventive
and corrective actions to avoid the reoccurrences.
Supply Chain Strategy.
My Supply Chain Management Strategy is to develop and manage a potentialsupply base that enhancesthe success of
our customersand the long term competitivenessof ABB.
Roles & Responsibilities
Material Planning for local & Imports
Sourcing (Localization)
Supplier OTD & FPY.
Procurement of raw material local, Imports, & consumables.
Logistics
Vendor Selection, Registration, Evaluation & payment.
Responsible for developing potential Suppliers & ensuring adherence to ABB selection processes.
Handing New projects for LPWA -Complete Manufacturing Line setup for LPWA.
Sourcing & Supply chain establishment for above products by developing Press tools (Sheet Metal parts),
Injection Moulds (Plastic parts) & Machined parts.
Estimation and costing of mechanical parts and negotiate best material price at the time of development
from suppliers and ensuring relevant data in SAP.
Responsible for Supply Chain Optimization, Vendor Evaluation, Vendor Analysis, Supplier Delivery and
Quality Improvements.
Achievements:
Successfully localized BOM of IPS (20 parts) in 6 months period.
Proficiently reduced the BOM cost by 15% mainly by consolidation of suppliers.
Sustainability of on time delivery (OTD) by 90%
Components handled:
Metal components of copper, brass, & G.I.
Springs in stainless steel
Moulded parts of nylon, & 243R.
Packaging boxes.
Fasteners & Rivets
Contact tips / silver contacts.
Electronic Kits
3. Occupational Contour
INDO ASIAN Ltd as an Engineer in production from Aug, 2006 to Oct,2009
Previously worked with INDO ASIAN Ltd as an Engineer in production from Aug, 2006 to Oct, 2009 in
Haridwar SIDCUL.
Indo Asian Fuse gear Ltd. was the first Indian manufacturer of electrical safety equipment, to be awarded ISO
9001 certification under the upgraded 1994 guidelines. Indo Asian has grown into a multi-product, group of
companies, manufacturing and marketing a wide range of electrical control and protection equipment. They are
popular under the brand names: Indo Kopp MCBs, Stop shock, MCBs, Indo Asian HRC Fuselinks, Indo Asian
Industrial Plugs & Sockets, and Contactors & Relays. Standard Rewirables.
Responsibilities:
Managed production activities in manufacturing of MCCB, MCB.
Planning & Co-ordinating with other departments to achieve the daily production target.
SUBROS Ltd. as an Astt. Engineer in production from Jan, 2004 to Aug, 2006
Prior to Indo Asian worked with SUBROS Ltd as an Astt. Engineer in production from Jan, 2004 to Aug, 2006
in Phase -2 Noida.
SUBROS LTD is joint venture DENSO.CO.JAPAN& SUZUKI Motors as a leading manufacturer of auto
air conditioning system. It is an OEM Supplier and TS Certified Company with RS 1000crors annually turn
over.
Responsibilities:
Holding a shift independently.
To inspect all line parameters and always keep an eye on quality.
ISO/QS/TS related activities.
Process Flow Charts for Different assembly line processes and Control Plans.
Implementation of 5S Activities.
Implementation of Kaizen Activities to improve Productivity & Safety of workers
Trainings Undergone
Seven QC Tools
5S
TPM, S.P.C.
4Q.
CREDDENTIALS
Basic Knowledge of AUTOCAD-2D.
Familiar with operating systems Windows 2007, 2000, XP, DOS.
Excellent support skills in Microsoft products Office suite involving Word, Excel, Visio, PowerPoint,
linux and Newton.
Presently working on SAP.
Academic Credentials
Three years Diploma in Engineering (Mechanical) from Govt. Polytechnic Srinagar (Uttarakhand) in
2003.
BSc from HNBGU Srinagar Garhwal (A Central University ) in 2000.
10+2 from UP Board Allahabad in 1997.
10th from UP Board Allahabad in 1995.
4. Personal Credentials
Date of birth: 15th October 1979
Father’s Name: Mr Sridhar Prasad Bamrara
Mother’s Name: Mrs. Savitri Bamrara
Marital Status: Married
Address: Vedvani Niwas, Laxmipuram, Miyanwala, Dehradun. 248001
Designation : Sr. Engineer Production & Planning Cum SCM
Package drawn: 7.25 LAC Per Annum+ Perks Package Expected:Negotiable.
Notice Period: 90 days.
Declaration: I hereby declare that all the above-furnished details are true to the best of my knowledge.
Date: Yajuvendra Bamrara