risk managment is
   often considered
  boring because it
smells of grey suits
    and playing safe
but think of it this
                way :
  what worries you
about your project?
risk assessment as
  the chance to put
down everyting that
  worries you; what
     could go wrong
• obvious things but also
                   • nagging things
  • stuff that’s actually not under
                       your control
                     • assumptions
• stuff that shouldn’t happen but
                              could
• stuff that keeps you up at night
• allows you to recognise
     and deal with problems
                          early
• transfers responsibility to
                  right people
      • jisc prefers openness,
  acceptance and solutions
•Acceptance
   Accept the possibility and develop contingency
   (For lower risk scores)
• Avoidance
   Adding to or changing plan so risk no longer a
   possibility
• Reduction
   Reducing the probability or impact of the risk
• Transfer
    Moving the impact (and ownership) of the risk
to a third party (outside project or instituion)
Once a risk , it should be
        assessed, monitored,
updated at regular intervals
    (e.g. project meetings) –
 useful to circualte to senior
managment, esp when there
               are risk scores
What now?

• Work on risks within the project plan
• Less bothered (at the moment) about rating
them
• Write down obvious and less obvious risks
• Discuss with your group (20 mins)

•General discussion at end (10 mins)


More info on Risk Management at JISC InfoNet
http://www.flickr.com/photos/bng/25164905/ - Risk (game)
http://www.flickr.com/photos/loop_oh/3230700469/ - Risk
(grave)

Risk Management

  • 3.
    risk managment is often considered boring because it smells of grey suits and playing safe
  • 4.
    but think ofit this way : what worries you about your project?
  • 5.
    risk assessment as the chance to put down everyting that worries you; what could go wrong
  • 6.
    • obvious thingsbut also • nagging things • stuff that’s actually not under your control • assumptions • stuff that shouldn’t happen but could • stuff that keeps you up at night
  • 7.
    • allows youto recognise and deal with problems early • transfers responsibility to right people • jisc prefers openness, acceptance and solutions
  • 9.
    •Acceptance Accept the possibility and develop contingency (For lower risk scores) • Avoidance Adding to or changing plan so risk no longer a possibility • Reduction Reducing the probability or impact of the risk • Transfer Moving the impact (and ownership) of the risk to a third party (outside project or instituion)
  • 10.
    Once a risk, it should be assessed, monitored, updated at regular intervals (e.g. project meetings) – useful to circualte to senior managment, esp when there are risk scores
  • 11.
    What now? • Workon risks within the project plan • Less bothered (at the moment) about rating them • Write down obvious and less obvious risks • Discuss with your group (20 mins) •General discussion at end (10 mins) More info on Risk Management at JISC InfoNet
  • 12.
    http://www.flickr.com/photos/bng/25164905/ - Risk(game) http://www.flickr.com/photos/loop_oh/3230700469/ - Risk (grave)