· How should the risks be prioritized?
· Who should do the prioritization of the project risks?
· How should project risks be monitored and controlled?
· Who should develop risk responses and contingency plans?
· Who should own these responses and plans?
Introduction
This week, we will explore risk management. Risk management
is one of those areas in project management that separates good
project managers from great project managers. A good project
manager makes risk management an integral part of every phase
of project work. Risks are identified, prioritized, and
understood. There are clear responsibilities within the team as
to whose is responsible for implementing a risk response to
reduce the impact should it occur. So let's get started.
What is Risk?
*Risk: An uncertain event or condition that, if it occurs, has a
positive or negative effect on one or more project objectives.
Risks can be positive, meaning beneficial to the project, or they
can be negative, meaning detrimental to the project.
Many students have a difficult time visualizing positive risks. A
positive risk is an opportunity that may increase the probability
of success, the return on investment, or the benefits of the
project. They may also be ways to reduce project costs or ways
to complete the project early. There may even be methods to
improve project quality or overall performance. These are all
examples of positive risks.
A negative risk can be easier to understand. It is the possibility
that something will go wrong, a threat to the success of the
project. It is important to remember that a risk is a possibility,
not a fact. It is a potential problem. At GettaByte Software,
there is the potential that a power outage would occur during
data transfer. The potential exists that a key resource could
become unavailable due to some unforeseen circumstance, like
illness. Those are threats to the success of the project.
When buying a house to renovate, there are potential risks with
respect to plumbing, wiring, the foundation, and so on.
A project manager needs to consider trying to make positive
risks happen while trying to prevent negative ones from
occurring. To do this, a project manager can take a proactive
approach to risk management. This means he or she plans a risk
response should it look as though the risk will become a reality.
In this way, everyone knows exactly how to prepare and
respond to the risk once it does become an issue.
The Risk Management Process
A project has both good and bad risks, which are referred to as
positive and negative risks or opportunities and threats. For
positive risks or opportunities, the project manager can choose
from a range of risk responses. For threats, a project manager
has a similar range of choices. The following, as described in
the PMBOK® Guide, are the risk management processes.
Plan Risk Management:
· Risk Strategy
· Defines the general approach to managing risk on the project
· Methodology
· Defines the specific, tools, approaches, organizational
considerations, data, and measurements that will be used to
perform risk management
· Roles and Responsibilities
· Identifies potential risk owners and defines risk owner
responsibilities
· Budget (Funding)
· Allocates specific funds for risk management
· Schedule (Timing)
· Defines when and how often risk management processes will
be performed during the project so risk management activities
become part of the project schedule
· Risk Categories
· Defines the general categories of risks that could occur during
this project into a hierarchical representation of potential
sources of risk—a risk breakdown structure (RBS)
· Stakeholder Risk Tolerance
· Defines and measures risk thresholds for each project
objective, determining the acceptable level of overall project
risk exposure
· Definitions of Risk Probability and Impact
· Define levels of risk probability and impact to create
consistency in qualitative risk analysis
Identify Risks
· Data Gathering
· Identify risks using brainstorming, checklists, interviews, or
review of similar projects. Identifying risks is an iterative
process throughout the life of the project. Time for risk
identification should be part of every status meeting or update.
· Data Analysis
· Use tools such as SWOT analysis, root cause analysis, and
others to identify additional risks.
· Risk Register
· Create a categorized risk register, including the list of
identified risks, potential risk owners, and risk responses. The
register is updated throughout the course of the project. Here is
a look at the risk register you will be using for your project.
Perform Qualitative Risk Analysis
During this process, each risk is evaluated for impact and
probability. Impacts and probabilities are listed on a scale of
either one to three (low, medium, high), or one to five (very
low, low, medium, high, very high). Shown below is a 5 by 5
impact probability matrix used to visualize risk. It is an
example of a very high to very low scale matrix. Each risk is
rated based on its impact and probability and given a color
code. Therefore, looking at the impact (very low to very
high) and comparing it on the matrix to the risk's probability
(very low to very high) provides a color risk ranking for a given
risk. Red risks usually require a proactive response, yellow
risks monitoring and a possible contingency plan, and green
risks are placed on a watchlist because they are too low in
impact or probability to require an action plan. It is important to
realize that risks can change in impact and probability
throughout the course of the project
Perform Quantative Risk Analysis
This is the process of analyzing the cumulative effect of
identified risks and other sources of uncertainty on project
objectives. It quantifies overall project risk exposure and
informs strategic decision making regarding the project. It is
not required for every project. Accurate data is required so that
simulations, sensitivity analyses, and decision tree analyses can
be perfored.
Plan Risk Response
Once the project risks are analyzed, consider risk response
strategies and plans. There are a range of potential types of
responses to both opportunities and threats.Positive Risk or
Opportunity Responses:
· Exploit
· Exploitation involves making sure that the positive risk
become a reality. Tasks are added to the WBS to cause the risk
outcome.
· Enhance
· Enhance means just that: enhance the probability of the risk
occurring or its impact should it occur.
· Share
· Partner with another party to help ensure that the risk occurs.
The benefits of the opportunity are then shared.
· Acceptance
· Acceptance can be passive or active. Active acceptance means
that although no proactive action is taken to increase the
likelihood that the risk will occur, a contingency plan is
created. If the risk becomes a reality, the project team will be
ready to take advantage of it. Passive acceptance means that
nothing proactive or reactive is done concerning this risk,
usually applied to green risks on the risk register.Negative Risk
or Threat Responses:
· Avoid: Avoiding a negative risk means preventing it from
happening in the first place. It can be accomplished by
evaluating the work or tasks that lead to the risk occurring and
taking specific action to make the risk impossible.
· Mitigate: Mitigating a risk or threat means reducing the
impact or the probability of the risk. When practicing risk
management in the real world, stakeholders often discuss
mitigation as if it were the only method to address project risk.
It's important to help them realize that it is only one type of
response.
· Transfer: Transferring a risk means to shift the responsibility
for that risk to a third party. It is accomplished by buying
insurance or hiring contractors to do the work.
· Acceptance: Acceptance can be passive or active. Active
acceptance means that although no proactive action is taken to
increase the likelihood that the risk will occur, a contingency
plan is created. If the risk become a reality, the project team
will be ready to take advantage of it. Passive acceptance means
that nothing proactive or reactive is done concerning this risk,
usually applied to green risks on the risk register.
Implement Risk Responses
This process involves the execution of the planned risk
responses to risks that have occurred. Reviewing what was
planned for the risks and what was carried out to handle the
risks allows the project team to determine how well the project
risks were planned and provides information that will help in
future project risk responses
Monitor Risks
In this final process, the project manager monitors risks to make
sure that the team has a clear plan when a risk becomes an
issue. Further, the project manager continues to the maintenance
of the risk register throughout the work of the project. Risk
management must be a integral part of all status meetings as
well as communications with stakeholders.Contingency
Reserves
According to the PMBOK® Guide - Sixth edition, a contingency
fund or reserve is time or money allocated in the schedule or
budget for known risks with active response strategies. The
management reserve is a fund allocated to cover unknown and
unforeseen events that require additional work to accomplish
the project scope. Although in many organizations, contingency
reserves are calculated as a fixed percentage of the project
budget, it is best practice to evaluate overall project risk and
fund it accordingly.Getta Byte Software Risk Management
The team at Getta Byte has to create a risk management plan for
the Getta Bill project. Let's visit with them and see how it is
going.
Transcript:
Getta Byte Software
Risk Management
We need a risk management plan for our project.
We are meeting to brainstorm what the risks could be.
I don't like talking about risks. It makes them come true.
No, it doesn't. It helps us decide what to do if something goes
wrong.
Network capacity could be a problem during data transfer.
Great start! Let me get it into the risk register.
Let's think about a possible response to avoid, mitigate,
transfer, or accept these risks.
We still need to do qualitative analysis to decide probability
and impact.
Not today, my brain hurts.
The endRisk Management in an Agile Project
In a traditional project, risk management is conducted
throughout the life of the project. New risks may emerge at any
time. The impact and probability of risks can change. Therefore,
the project manager has to be vigilant through every phase of
the project.
In agile projects, risk management is very similar; however, it
is more emergent. Beginning from the product backlog and as
iterations are planned, risks are identified. Risk responses are
the same and the requirement for a risk owner is the same as
well. However, the gap between risk identification and the need
for a response is much shorter as risks emerge during iterations.
Risks are highlighted during daily stand-ups, retrospectives,
reviews, and demos. Rapid and decisive action is
required.Practitioner's Corner
As a project/program/portfolio manager and a risk management
professional, I have encountered a great deal of resistance to
discussing and managing risk in the field. Stakeholders are
willing to spend a little bit of time identifying risk, less time in
prioritizing them and even less time in selecting a risk response
strategy. It's as though leadership and team members believe
that discussing risks too much will make them come true. In
fact, the opposite is true, when I have been able to persuade my
stakeholders to participate in active risk management, some
risks are completely avoided and the impact of others is
substantially reduced. I have found that it is always true that
without talking about risk, there are more costly issues that
arise later in the project.
"Missed schedules and creeping requirements are not things that
just happen to you once and then go away, never to appear
again. Rather, they are part of the territory.
We all know that. What's odd is that we don't plan our
projects as if we knew it. Instead, we plan as if our past
problems are locked in the past and will never rear their ugly
heads again. Of course, you know that isn't a reasonable
expectation." (Tom DeMarco, Waltzing with Bears: Managing
Risk on Software Projects)
· How should the risks be prioritized· Who should do the priori.docx

More Related Content

Similar to · How should the risks be prioritized· Who should do the priori.docx

Similar to · How should the risks be prioritized· Who should do the priori.docx (20)

11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
Managing Risk as Opportunity
Managing Risk as OpportunityManaging Risk as Opportunity
Managing Risk as Opportunity
 
Managing risk as Opportunity
Managing risk as OpportunityManaging risk as Opportunity
Managing risk as Opportunity
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk based thinking
Risk based thinkingRisk based thinking
Risk based thinking
 
The Project Risk Management Process
The Project Risk Management ProcessThe Project Risk Management Process
The Project Risk Management Process
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategies
 
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Pmi 19 26
Pmi 19 26Pmi 19 26
Pmi 19 26
 
Risk response planning.pptx
Risk response planning.pptxRisk response planning.pptx
Risk response planning.pptx
 
Implementing Ways to Limit Risk (Risk Mitigation)
Implementing Ways to Limit Risk (Risk Mitigation)Implementing Ways to Limit Risk (Risk Mitigation)
Implementing Ways to Limit Risk (Risk Mitigation)
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Management
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship
 
Control only.pdf
Control only.pdfControl only.pdf
Control only.pdf
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project risk management
Project risk managementProject risk management
Project risk management
 

More from alinainglis

· Previous professional experiences that have had a profound.docx
· Previous professional experiences that have had a profound.docx· Previous professional experiences that have had a profound.docx
· Previous professional experiences that have had a profound.docx
alinainglis
 
· Please select ONE of the following questions and write a 200-wor.docx
· Please select ONE of the following questions and write a 200-wor.docx· Please select ONE of the following questions and write a 200-wor.docx
· Please select ONE of the following questions and write a 200-wor.docx
alinainglis
 
· If we accept the fact that we may need to focus more on teaching.docx
· If we accept the fact that we may need to focus more on teaching.docx· If we accept the fact that we may need to focus more on teaching.docx
· If we accept the fact that we may need to focus more on teaching.docx
alinainglis
 
· How many employees are working for youtotal of 5 employees .docx
· How many employees are working for youtotal of 5 employees  .docx· How many employees are working for youtotal of 5 employees  .docx
· How many employees are working for youtotal of 5 employees .docx
alinainglis
 
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
alinainglis
 
· Global O365 Tenant Settings relevant to SPO, and recommended.docx
· Global O365 Tenant Settings relevant to SPO, and recommended.docx· Global O365 Tenant Settings relevant to SPO, and recommended.docx
· Global O365 Tenant Settings relevant to SPO, and recommended.docx
alinainglis
 
· Focus on the identified client within your chosen case.· Analy.docx
· Focus on the identified client within your chosen case.· Analy.docx· Focus on the identified client within your chosen case.· Analy.docx
· Focus on the identified client within your chosen case.· Analy.docx
alinainglis
 
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
alinainglis
 
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
alinainglis
 
· Expectations for Power Point Presentations in Units IV and V I.docx
· Expectations for Power Point Presentations in Units IV and V I.docx· Expectations for Power Point Presentations in Units IV and V I.docx
· Expectations for Power Point Presentations in Units IV and V I.docx
alinainglis
 
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
alinainglis
 
· Drawing the EyeThis assignments provide a deeper understanding.docx
· Drawing the EyeThis assignments provide a deeper understanding.docx· Drawing the EyeThis assignments provide a deeper understanding.docx
· Drawing the EyeThis assignments provide a deeper understanding.docx
alinainglis
 

More from alinainglis (20)

· Present a discussion of what team is. What type(s) of team do .docx
· Present a discussion of what team is. What type(s) of team do .docx· Present a discussion of what team is. What type(s) of team do .docx
· Present a discussion of what team is. What type(s) of team do .docx
 
· Presentation of your project. Prepare a PowerPoint with 8 slid.docx
· Presentation of your project. Prepare a PowerPoint with 8 slid.docx· Presentation of your project. Prepare a PowerPoint with 8 slid.docx
· Presentation of your project. Prepare a PowerPoint with 8 slid.docx
 
· Prepare a research proposal, mentioning a specific researchabl.docx
· Prepare a research proposal, mentioning a specific researchabl.docx· Prepare a research proposal, mentioning a specific researchabl.docx
· Prepare a research proposal, mentioning a specific researchabl.docx
 
· Previous professional experiences that have had a profound.docx
· Previous professional experiences that have had a profound.docx· Previous professional experiences that have had a profound.docx
· Previous professional experiences that have had a profound.docx
 
· Please select ONE of the following questions and write a 200-wor.docx
· Please select ONE of the following questions and write a 200-wor.docx· Please select ONE of the following questions and write a 200-wor.docx
· Please select ONE of the following questions and write a 200-wor.docx
 
· Please use Firefox for access to cronometer.com16 ye.docx
· Please use Firefox for access to cronometer.com16 ye.docx· Please use Firefox for access to cronometer.com16 ye.docx
· Please use Firefox for access to cronometer.com16 ye.docx
 
· Please share theoretical explanations based on social, cultural an.docx
· Please share theoretical explanations based on social, cultural an.docx· Please share theoretical explanations based on social, cultural an.docx
· Please share theoretical explanations based on social, cultural an.docx
 
· If we accept the fact that we may need to focus more on teaching.docx
· If we accept the fact that we may need to focus more on teaching.docx· If we accept the fact that we may need to focus more on teaching.docx
· If we accept the fact that we may need to focus more on teaching.docx
 
· How many employees are working for youtotal of 5 employees .docx
· How many employees are working for youtotal of 5 employees  .docx· How many employees are working for youtotal of 5 employees  .docx
· How many employees are working for youtotal of 5 employees .docx
 
· How does the distribution mechanism control the issues address.docx
· How does the distribution mechanism control the issues address.docx· How does the distribution mechanism control the issues address.docx
· How does the distribution mechanism control the issues address.docx
 
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
· Helen Petrakis Identifying Data Helen Petrakis is a 5.docx
 
· Global O365 Tenant Settings relevant to SPO, and recommended.docx
· Global O365 Tenant Settings relevant to SPO, and recommended.docx· Global O365 Tenant Settings relevant to SPO, and recommended.docx
· Global O365 Tenant Settings relevant to SPO, and recommended.docx
 
· Focus on the identified client within your chosen case.· Analy.docx
· Focus on the identified client within your chosen case.· Analy.docx· Focus on the identified client within your chosen case.· Analy.docx
· Focus on the identified client within your chosen case.· Analy.docx
 
· Find current events regarding any issues in public health .docx
· Find current events regarding any issues in public health .docx· Find current events regarding any issues in public health .docx
· Find current events regarding any issues in public health .docx
 
· Explore and assess different remote access solutions.Assig.docx
· Explore and assess different remote access solutions.Assig.docx· Explore and assess different remote access solutions.Assig.docx
· Explore and assess different remote access solutions.Assig.docx
 
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
· FASB ASC & GARS Login credentials LinkUser ID AAA51628Pas.docx
 
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
· Due Sat. Sep. · Format Typed, double-spaced, sub.docx
 
· Expectations for Power Point Presentations in Units IV and V I.docx
· Expectations for Power Point Presentations in Units IV and V I.docx· Expectations for Power Point Presentations in Units IV and V I.docx
· Expectations for Power Point Presentations in Units IV and V I.docx
 
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
· Due Friday by 1159pmResearch Paper--IssueTopic Ce.docx
 
· Drawing the EyeThis assignments provide a deeper understanding.docx
· Drawing the EyeThis assignments provide a deeper understanding.docx· Drawing the EyeThis assignments provide a deeper understanding.docx
· Drawing the EyeThis assignments provide a deeper understanding.docx
 

Recently uploaded

Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
YibeltalNibretu
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 

Recently uploaded (20)

NLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptxNLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptx
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Forest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDFForest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDF
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 

· How should the risks be prioritized· Who should do the priori.docx

  • 1. · How should the risks be prioritized? · Who should do the prioritization of the project risks? · How should project risks be monitored and controlled? · Who should develop risk responses and contingency plans? · Who should own these responses and plans? Introduction This week, we will explore risk management. Risk management is one of those areas in project management that separates good project managers from great project managers. A good project manager makes risk management an integral part of every phase of project work. Risks are identified, prioritized, and understood. There are clear responsibilities within the team as to whose is responsible for implementing a risk response to reduce the impact should it occur. So let's get started. What is Risk? *Risk: An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives. Risks can be positive, meaning beneficial to the project, or they can be negative, meaning detrimental to the project. Many students have a difficult time visualizing positive risks. A positive risk is an opportunity that may increase the probability of success, the return on investment, or the benefits of the project. They may also be ways to reduce project costs or ways to complete the project early. There may even be methods to improve project quality or overall performance. These are all examples of positive risks. A negative risk can be easier to understand. It is the possibility that something will go wrong, a threat to the success of the project. It is important to remember that a risk is a possibility, not a fact. It is a potential problem. At GettaByte Software, there is the potential that a power outage would occur during data transfer. The potential exists that a key resource could
  • 2. become unavailable due to some unforeseen circumstance, like illness. Those are threats to the success of the project. When buying a house to renovate, there are potential risks with respect to plumbing, wiring, the foundation, and so on. A project manager needs to consider trying to make positive risks happen while trying to prevent negative ones from occurring. To do this, a project manager can take a proactive approach to risk management. This means he or she plans a risk response should it look as though the risk will become a reality. In this way, everyone knows exactly how to prepare and respond to the risk once it does become an issue. The Risk Management Process A project has both good and bad risks, which are referred to as positive and negative risks or opportunities and threats. For positive risks or opportunities, the project manager can choose from a range of risk responses. For threats, a project manager has a similar range of choices. The following, as described in the PMBOK® Guide, are the risk management processes. Plan Risk Management: · Risk Strategy · Defines the general approach to managing risk on the project · Methodology · Defines the specific, tools, approaches, organizational considerations, data, and measurements that will be used to perform risk management · Roles and Responsibilities · Identifies potential risk owners and defines risk owner responsibilities · Budget (Funding) · Allocates specific funds for risk management · Schedule (Timing) · Defines when and how often risk management processes will be performed during the project so risk management activities become part of the project schedule · Risk Categories · Defines the general categories of risks that could occur during
  • 3. this project into a hierarchical representation of potential sources of risk—a risk breakdown structure (RBS) · Stakeholder Risk Tolerance · Defines and measures risk thresholds for each project objective, determining the acceptable level of overall project risk exposure · Definitions of Risk Probability and Impact · Define levels of risk probability and impact to create consistency in qualitative risk analysis Identify Risks · Data Gathering · Identify risks using brainstorming, checklists, interviews, or review of similar projects. Identifying risks is an iterative process throughout the life of the project. Time for risk identification should be part of every status meeting or update. · Data Analysis · Use tools such as SWOT analysis, root cause analysis, and others to identify additional risks. · Risk Register · Create a categorized risk register, including the list of identified risks, potential risk owners, and risk responses. The register is updated throughout the course of the project. Here is a look at the risk register you will be using for your project. Perform Qualitative Risk Analysis During this process, each risk is evaluated for impact and probability. Impacts and probabilities are listed on a scale of either one to three (low, medium, high), or one to five (very low, low, medium, high, very high). Shown below is a 5 by 5 impact probability matrix used to visualize risk. It is an example of a very high to very low scale matrix. Each risk is rated based on its impact and probability and given a color code. Therefore, looking at the impact (very low to very
  • 4. high) and comparing it on the matrix to the risk's probability (very low to very high) provides a color risk ranking for a given risk. Red risks usually require a proactive response, yellow risks monitoring and a possible contingency plan, and green risks are placed on a watchlist because they are too low in impact or probability to require an action plan. It is important to realize that risks can change in impact and probability throughout the course of the project Perform Quantative Risk Analysis This is the process of analyzing the cumulative effect of identified risks and other sources of uncertainty on project objectives. It quantifies overall project risk exposure and informs strategic decision making regarding the project. It is not required for every project. Accurate data is required so that simulations, sensitivity analyses, and decision tree analyses can be perfored. Plan Risk Response Once the project risks are analyzed, consider risk response strategies and plans. There are a range of potential types of responses to both opportunities and threats.Positive Risk or Opportunity Responses: · Exploit · Exploitation involves making sure that the positive risk become a reality. Tasks are added to the WBS to cause the risk outcome. · Enhance · Enhance means just that: enhance the probability of the risk occurring or its impact should it occur. · Share · Partner with another party to help ensure that the risk occurs. The benefits of the opportunity are then shared. · Acceptance · Acceptance can be passive or active. Active acceptance means
  • 5. that although no proactive action is taken to increase the likelihood that the risk will occur, a contingency plan is created. If the risk becomes a reality, the project team will be ready to take advantage of it. Passive acceptance means that nothing proactive or reactive is done concerning this risk, usually applied to green risks on the risk register.Negative Risk or Threat Responses: · Avoid: Avoiding a negative risk means preventing it from happening in the first place. It can be accomplished by evaluating the work or tasks that lead to the risk occurring and taking specific action to make the risk impossible. · Mitigate: Mitigating a risk or threat means reducing the impact or the probability of the risk. When practicing risk management in the real world, stakeholders often discuss mitigation as if it were the only method to address project risk. It's important to help them realize that it is only one type of response. · Transfer: Transferring a risk means to shift the responsibility for that risk to a third party. It is accomplished by buying insurance or hiring contractors to do the work. · Acceptance: Acceptance can be passive or active. Active acceptance means that although no proactive action is taken to increase the likelihood that the risk will occur, a contingency plan is created. If the risk become a reality, the project team will be ready to take advantage of it. Passive acceptance means that nothing proactive or reactive is done concerning this risk, usually applied to green risks on the risk register. Implement Risk Responses This process involves the execution of the planned risk responses to risks that have occurred. Reviewing what was planned for the risks and what was carried out to handle the risks allows the project team to determine how well the project risks were planned and provides information that will help in future project risk responses Monitor Risks In this final process, the project manager monitors risks to make
  • 6. sure that the team has a clear plan when a risk becomes an issue. Further, the project manager continues to the maintenance of the risk register throughout the work of the project. Risk management must be a integral part of all status meetings as well as communications with stakeholders.Contingency Reserves According to the PMBOK® Guide - Sixth edition, a contingency fund or reserve is time or money allocated in the schedule or budget for known risks with active response strategies. The management reserve is a fund allocated to cover unknown and unforeseen events that require additional work to accomplish the project scope. Although in many organizations, contingency reserves are calculated as a fixed percentage of the project budget, it is best practice to evaluate overall project risk and fund it accordingly.Getta Byte Software Risk Management The team at Getta Byte has to create a risk management plan for the Getta Bill project. Let's visit with them and see how it is going. Transcript: Getta Byte Software Risk Management We need a risk management plan for our project. We are meeting to brainstorm what the risks could be. I don't like talking about risks. It makes them come true. No, it doesn't. It helps us decide what to do if something goes wrong. Network capacity could be a problem during data transfer. Great start! Let me get it into the risk register. Let's think about a possible response to avoid, mitigate, transfer, or accept these risks. We still need to do qualitative analysis to decide probability and impact. Not today, my brain hurts. The endRisk Management in an Agile Project In a traditional project, risk management is conducted throughout the life of the project. New risks may emerge at any
  • 7. time. The impact and probability of risks can change. Therefore, the project manager has to be vigilant through every phase of the project. In agile projects, risk management is very similar; however, it is more emergent. Beginning from the product backlog and as iterations are planned, risks are identified. Risk responses are the same and the requirement for a risk owner is the same as well. However, the gap between risk identification and the need for a response is much shorter as risks emerge during iterations. Risks are highlighted during daily stand-ups, retrospectives, reviews, and demos. Rapid and decisive action is required.Practitioner's Corner As a project/program/portfolio manager and a risk management professional, I have encountered a great deal of resistance to discussing and managing risk in the field. Stakeholders are willing to spend a little bit of time identifying risk, less time in prioritizing them and even less time in selecting a risk response strategy. It's as though leadership and team members believe that discussing risks too much will make them come true. In fact, the opposite is true, when I have been able to persuade my stakeholders to participate in active risk management, some risks are completely avoided and the impact of others is substantially reduced. I have found that it is always true that without talking about risk, there are more costly issues that arise later in the project. "Missed schedules and creeping requirements are not things that just happen to you once and then go away, never to appear again. Rather, they are part of the territory. We all know that. What's odd is that we don't plan our projects as if we knew it. Instead, we plan as if our past problems are locked in the past and will never rear their ugly heads again. Of course, you know that isn't a reasonable expectation." (Tom DeMarco, Waltzing with Bears: Managing Risk on Software Projects)