SlideShare a Scribd company logo
NADEEM S. SYED
15107 Newport Bridge Court
Sugar land, TX 77978
Home: (281) 725-4330
Email nadeemsyed@netzero.com
_____________________________________________________________________________________
OBJECTIVE To obtain a test and reliability or manufacturing and operational engineering position
that utilizes my experience to develop a new test system or improvement in present
manufacturing, testing and quality control process.
SUMMARY 27 years of extensive experience in design, develop and sustain of test systems;
includes 14 years of operation and maintenance of manufacturing organizations.
• 13 years specialization in validation, sustain, quality control, test and reliability.
• Proven strengths in leadership, communication, teamwork, development, planning
and scheduling.
• Excellent presentation and business focus skills.
SKILLS / KNOWLEDGE
Broad-based responsibilities in the following areas:
• Operation
• Quality Assurance
• Vendor & Customer Negotiation
• Manufacturing
• Research & Development
• Board Design
• Cable Design
• Product Allocation
• Team Building
• Field Support
• New Business Development
• Test & Reliability
SOFTWARE SKILLS
Extensive experience and knowledge of implementing automated test procedures
and writing test software applications by using:
• Microsoft OS (Operating Systems)
• Linux OS (Operating Systems)
• Microsoft Visual Studio 2013 (Ultimate)
• Or-Cad (Schematic Design)
• ATE Script writing
• Micro Code studio (Micro-Controller Programming Language)
• Corelis Test System (CPLD & FPGA Boundary Scan JTAG Programming)
PROFESSIONAL HIGHLIGHTS
• Provide support on daily operations and validation of the product and test
equipments.
• Provided competitive focus to daily business decisions, with emphasis on cost of
product and asset allocation.
• Facilitate cross-functional teams for analysis and resolution of complex problems
affecting systems/process efficiency, quality, and reliability.
• Develop custom Automated Test Equipment (ATE) systems and Ethernet network
architecture.
EMPLOYMENT HISTORY
INOVA Geophysical. Stafford, TX (Sep 2012 – Present)
Senior Manufacturing and Operational Engineer
• Implement production and testing projects with technical work instruction to reduce
manufacturing rework cost, reduce project lead times, reduce warranty costs, improve
processes, and improve product quality and manufacturability.
• Evaluated work assignments and developed a master schedule for multiple projects to
facilitate proper usage of limited labor resources.
• Worked as part of a multi-national team to develop, document and implement standards for
engineering design and practices.
• Setup manufacturing and testing lines in Xian China for SN11 recording system, based on
a wireless platform without radio infrastructure.
• In Xian China managed a group of 20+ associates including performance, daily
supervision, mentoring and training.
• Provided expert contribution to qualify equipment built in Xian China
• Implemented and enforced ISO 9001 manufacturing procedures.
• Developed and administered engineering concept, preliminary and final design review
processes.
• Specified and approved the purchase or lease of test equipment from suppliers.
• Designed and implemented custom electronic circuits for signal conditioning, data
acquisition and control functions.
• Analyzed testing requirements of various products including Vib Pro – II, enhanced with
Patented Harmonic Distortion Reduction Technology (HDR™ Technology). Proposed and
implemented methods and equipment that would detect defects introduced during the
production process. Develop a unique test system based on boundary JTAG system which
is capable to test 1200+ nets in less than 2 seconds.
• Optimized and streamlined existing manufacturing and testing processes and
reduced cost by 15%.
Microwave Networks. Stafford, TX (Feb 2005 – Sep 2012)
Senior Test Engineer
• Identify and drive process technology improvements within the area of expertise.
• Provide leadership for test engineering activities across the asset.
• Provide daily technology support to test, quality and production team.
• Direct critical activities requiring test knowledge and expertise.
• Assist in planning and execution of turnaround functional test activities.
• Provide technical input in determining priority and scope of equipment repairs and
calibration.
• Lead root cause failure investigations for test equipment related issues.
• Review engineering projects and improvements to insure compliance with customer
standards and good engineering practices.
• Complete engineering design, documentation and implementation for ATE improvement
and modification projects.
• Design, develop and manage test fixture projects including scope definition, economic
analysis, mechanical design, and field execution.
• Produce new test methods which increase the production throughput.
• Provided expert resolution of the most troublesome of electrical interference issues.
Control and maintenance of the calibration lab. Accountable for the distribution,
calibration and repair of test equipment.
• Developed and administered engineering concept, preliminary and final design review
processes for Ethernet Hybrid Transport Radio (EHTR™ Technology) also known as
Proteus MX Radio.
• Setup a full manufacturing and testing line for Proteus MX Radio in REMEC
Manufacturing Services, Laguna, Philippines.
Suntron Corporation. Sugar Land, TX (Sep 1997 – Dec 2004)
Senior Test Engineer
• During 7 years of service, I designed and developed a total of 1,600 test fixtures and 2,000
test procedures which covered the validation, test and reliability of over 5,000 final and
sub-assemblies in phase one (cables) and phase two (final integration) area.
• Managed research and development lab for Suntron Corporation.
• Perform Failure Mode and Effect Analysis (FMEA), develop and implement corrective
action plan.
• Collaboratively prepared and reviewed many responses to Test Plans and Manufacturing
Engineering Issues to ensure accuracy, completeness, and timely submission.
• Recommend design or test methods and statistical process control procedures for achieving
required level of product reliability.
• Design review, improvement proposition/coordination, interface with customer
engineering, maintenance, production and contractors.
• Consulted with client to identify key requirements, defined project scope, developed
project plans and ensured milestones were met according to schedule.
• Conducted resources planning and budgeting; tracked costs to ensure adherence to
budgetary limitations.
• Prepared and presented timely status reports to clients and internal senior management.
• Performed market researches, developed documentations, and delivered presentations to
the upper management.
Western Atlas Logging Services Houston, TX (July 1994 – Sep 1997)
Test and Reliability Engineer
• During 3 years of service, I worked with a system called Standard of Performance (SOP)
which reduced the rework cost of defective parts and improved the quality and reliability
of electrical and electromechanical assemblies produced, designed or purchased by
Western Atlas. This system assisted in generation of bill of materials and engineering
change requests.
• Interpret and implement Customer Engineering Change Orders for semi-conductor sub
modules including control racks, power supplies, and transducers.
• Resolve discrepant Material Review Board issues on components such as power supplies,
circuit boards, and cable assemblies.
• Review customer drawings and specification to resolve assembly related issues.
• Implement detailed assembly instructions.
• Perform equipment/system reliability testing, condition monitoring, and data interpretation
utilizing various test technologies.
• Interface with customer to resolve design and obsolete assembly and component issues.
• Develop multilevel product structures and validate customer Bill of Material with Material
Requirements Planning.
Siemens Karachi, PK (Jan 1988 – Feb 1994)
Quality Control / Test Engineer
• Documented, designed and developed test plans for functionality testing of Electronic
Industrial devices and control units.
• Lead testing initiative to automate Customer Satisfaction Index process in order to evaluate
online performance and value added improvements.
• Instructed Industrial Electronics and Materials design courses for harnesses and printed
circuit board, with emphasis on Quality Control and Quality Assurance
• Provided support and maintenance including customizing of hardware installation and
upgrades on site.
• Act as interface between Customer Engineering Team and Siemens Manufacturing to
resolve Engineering issues.
• Analyzed policies with regard to customer service and efficiency, recommended policy
changes and process improvements as needed.
EDUCATION
Bachelor of Science in Electrical Engineering, Graduated Dec 1987
N.E.D University of Engineering Karachi
Average GPA 3.8 Honor Role Student
REFERANCES
Available upon request

More Related Content

What's hot

Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_ResumeJason Harvey
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resumeSteve Majors
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Henry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality ProfessionalHenry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality Professional
HENRY JR AGSAULLO
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Richard Metzner
 
Osric L Prowell - Resume - August 2016
Osric L Prowell - Resume -  August 2016Osric L Prowell - Resume -  August 2016
Osric L Prowell - Resume - August 2016Osric Prowell
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
Ken Probst
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
Cobra143
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock
 
Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015walid Saliba
 
Jps16
Jps16Jps16
JOSEPH LIPPS RESUME
JOSEPH LIPPS RESUMEJOSEPH LIPPS RESUME
JOSEPH LIPPS RESUMEJoseph Lipps
 

What's hot (19)

Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Henry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality ProfessionalHenry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality Professional
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016
 
Osric L Prowell - Resume - August 2016
Osric L Prowell - Resume -  August 2016Osric L Prowell - Resume -  August 2016
Osric L Prowell - Resume - August 2016
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
CV
CVCV
CV
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
 
Resume
ResumeResume
Resume
 
ROOP(1)
ROOP(1)ROOP(1)
ROOP(1)
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
amol thakare -
amol thakare -amol thakare -
amol thakare -
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015
 
Jps16
Jps16Jps16
Jps16
 
JOSEPH LIPPS RESUME
JOSEPH LIPPS RESUMEJOSEPH LIPPS RESUME
JOSEPH LIPPS RESUME
 

Viewers also liked

La mente entrepreneur en la empresa familiar
La mente entrepreneur en la empresa familiarLa mente entrepreneur en la empresa familiar
La mente entrepreneur en la empresa familiar
Club Argentino de Negocios de Familia
 
Ft cc-001. acidet (1)
Ft cc-001. acidet (1)Ft cc-001. acidet (1)
Ft cc-001. acidet (1)
Esmeralda Gallego Parra
 
Alejandra te amo
Alejandra te amoAlejandra te amo
Alejandra te amo
brayan010101
 
JaredWalsh.doc (1)
JaredWalsh.doc (1)JaredWalsh.doc (1)
JaredWalsh.doc (1)Jared Walsh
 
Love love dogs everything about pet dog
Love love dogs   everything about pet dogLove love dogs   everything about pet dog
Love love dogs everything about pet dog
lovelovedogs
 
Tarea sistema de gestion de la seguridad y salud en el trabajo
Tarea sistema de gestion de la seguridad y salud en el trabajoTarea sistema de gestion de la seguridad y salud en el trabajo
Tarea sistema de gestion de la seguridad y salud en el trabajo
Faustino Arce Gomez
 
Resume- Rosy Acharya(NEW BANKING)
Resume- Rosy Acharya(NEW BANKING)Resume- Rosy Acharya(NEW BANKING)
Resume- Rosy Acharya(NEW BANKING)Rosy Acharya
 
Presentación proyecto implementaciòn Sistema de gestiòn del riesgo
Presentación proyecto implementaciòn Sistema de gestiòn del riesgoPresentación proyecto implementaciòn Sistema de gestiòn del riesgo
Presentación proyecto implementaciòn Sistema de gestiòn del riesgo
Ericka Vanessa pejendino perea
 
Diapositivas sesión 1 gestión de seguridad minera e industrial
Diapositivas sesión 1 gestión de seguridad minera e industrialDiapositivas sesión 1 gestión de seguridad minera e industrial
Diapositivas sesión 1 gestión de seguridad minera e industrial
Luis Mamani
 
Sistema nacional de evaluación de impacto ambiental
Sistema nacional de evaluación de impacto ambientalSistema nacional de evaluación de impacto ambiental
Sistema nacional de evaluación de impacto ambiental
oskar110122
 

Viewers also liked (12)

La mente entrepreneur en la empresa familiar
La mente entrepreneur en la empresa familiarLa mente entrepreneur en la empresa familiar
La mente entrepreneur en la empresa familiar
 
Ft cc-001. acidet (1)
Ft cc-001. acidet (1)Ft cc-001. acidet (1)
Ft cc-001. acidet (1)
 
Alejandra te amo
Alejandra te amoAlejandra te amo
Alejandra te amo
 
JaredWalsh.doc (1)
JaredWalsh.doc (1)JaredWalsh.doc (1)
JaredWalsh.doc (1)
 
9 teo 3 minerales
9 teo 3 minerales9 teo 3 minerales
9 teo 3 minerales
 
Love love dogs everything about pet dog
Love love dogs   everything about pet dogLove love dogs   everything about pet dog
Love love dogs everything about pet dog
 
Tarea sistema de gestion de la seguridad y salud en el trabajo
Tarea sistema de gestion de la seguridad y salud en el trabajoTarea sistema de gestion de la seguridad y salud en el trabajo
Tarea sistema de gestion de la seguridad y salud en el trabajo
 
Solomon Adu Atefoe
Solomon Adu AtefoeSolomon Adu Atefoe
Solomon Adu Atefoe
 
Resume- Rosy Acharya(NEW BANKING)
Resume- Rosy Acharya(NEW BANKING)Resume- Rosy Acharya(NEW BANKING)
Resume- Rosy Acharya(NEW BANKING)
 
Presentación proyecto implementaciòn Sistema de gestiòn del riesgo
Presentación proyecto implementaciòn Sistema de gestiòn del riesgoPresentación proyecto implementaciòn Sistema de gestiòn del riesgo
Presentación proyecto implementaciòn Sistema de gestiòn del riesgo
 
Diapositivas sesión 1 gestión de seguridad minera e industrial
Diapositivas sesión 1 gestión de seguridad minera e industrialDiapositivas sesión 1 gestión de seguridad minera e industrial
Diapositivas sesión 1 gestión de seguridad minera e industrial
 
Sistema nacional de evaluación de impacto ambiental
Sistema nacional de evaluación de impacto ambientalSistema nacional de evaluación de impacto ambiental
Sistema nacional de evaluación de impacto ambiental
 

Similar to Resume

Pattra Long Resume
Pattra Long ResumePattra Long Resume
Pattra Long Resume
Jang (Pattra) Long
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
Stephen Perkins
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
Faruk Syed
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResumeDale Hobbs
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResumeDale Hobbs
 
Andy's Resume
Andy's ResumeAndy's Resume
Andy's ResumeAndy Lim
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennantbrennan
 

Similar to Resume (20)

Pattra Long Resume
Pattra Long ResumePattra Long Resume
Pattra Long Resume
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Resume 06212015
Resume 06212015Resume 06212015
Resume 06212015
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Projects DWDobbs 2016a
Projects DWDobbs 2016aProjects DWDobbs 2016a
Projects DWDobbs 2016a
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
 
MJP Resume
MJP ResumeMJP Resume
MJP Resume
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Andy's Resume
Andy's ResumeAndy's Resume
Andy's Resume
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennan
 
Larry W Shackelford V1
Larry W Shackelford V1Larry W Shackelford V1
Larry W Shackelford V1
 
resume2016.doc1
resume2016.doc1resume2016.doc1
resume2016.doc1
 

Resume

  • 1. NADEEM S. SYED 15107 Newport Bridge Court Sugar land, TX 77978 Home: (281) 725-4330 Email nadeemsyed@netzero.com _____________________________________________________________________________________ OBJECTIVE To obtain a test and reliability or manufacturing and operational engineering position that utilizes my experience to develop a new test system or improvement in present manufacturing, testing and quality control process. SUMMARY 27 years of extensive experience in design, develop and sustain of test systems; includes 14 years of operation and maintenance of manufacturing organizations. • 13 years specialization in validation, sustain, quality control, test and reliability. • Proven strengths in leadership, communication, teamwork, development, planning and scheduling. • Excellent presentation and business focus skills. SKILLS / KNOWLEDGE Broad-based responsibilities in the following areas: • Operation • Quality Assurance • Vendor & Customer Negotiation • Manufacturing • Research & Development • Board Design • Cable Design • Product Allocation • Team Building • Field Support • New Business Development • Test & Reliability SOFTWARE SKILLS Extensive experience and knowledge of implementing automated test procedures and writing test software applications by using: • Microsoft OS (Operating Systems) • Linux OS (Operating Systems) • Microsoft Visual Studio 2013 (Ultimate) • Or-Cad (Schematic Design) • ATE Script writing • Micro Code studio (Micro-Controller Programming Language) • Corelis Test System (CPLD & FPGA Boundary Scan JTAG Programming) PROFESSIONAL HIGHLIGHTS • Provide support on daily operations and validation of the product and test equipments. • Provided competitive focus to daily business decisions, with emphasis on cost of product and asset allocation. • Facilitate cross-functional teams for analysis and resolution of complex problems affecting systems/process efficiency, quality, and reliability. • Develop custom Automated Test Equipment (ATE) systems and Ethernet network architecture.
  • 2. EMPLOYMENT HISTORY INOVA Geophysical. Stafford, TX (Sep 2012 – Present) Senior Manufacturing and Operational Engineer • Implement production and testing projects with technical work instruction to reduce manufacturing rework cost, reduce project lead times, reduce warranty costs, improve processes, and improve product quality and manufacturability. • Evaluated work assignments and developed a master schedule for multiple projects to facilitate proper usage of limited labor resources. • Worked as part of a multi-national team to develop, document and implement standards for engineering design and practices. • Setup manufacturing and testing lines in Xian China for SN11 recording system, based on a wireless platform without radio infrastructure. • In Xian China managed a group of 20+ associates including performance, daily supervision, mentoring and training. • Provided expert contribution to qualify equipment built in Xian China • Implemented and enforced ISO 9001 manufacturing procedures. • Developed and administered engineering concept, preliminary and final design review processes. • Specified and approved the purchase or lease of test equipment from suppliers. • Designed and implemented custom electronic circuits for signal conditioning, data acquisition and control functions. • Analyzed testing requirements of various products including Vib Pro – II, enhanced with Patented Harmonic Distortion Reduction Technology (HDR™ Technology). Proposed and implemented methods and equipment that would detect defects introduced during the production process. Develop a unique test system based on boundary JTAG system which is capable to test 1200+ nets in less than 2 seconds. • Optimized and streamlined existing manufacturing and testing processes and reduced cost by 15%. Microwave Networks. Stafford, TX (Feb 2005 – Sep 2012) Senior Test Engineer • Identify and drive process technology improvements within the area of expertise. • Provide leadership for test engineering activities across the asset. • Provide daily technology support to test, quality and production team. • Direct critical activities requiring test knowledge and expertise. • Assist in planning and execution of turnaround functional test activities. • Provide technical input in determining priority and scope of equipment repairs and calibration. • Lead root cause failure investigations for test equipment related issues. • Review engineering projects and improvements to insure compliance with customer standards and good engineering practices. • Complete engineering design, documentation and implementation for ATE improvement and modification projects. • Design, develop and manage test fixture projects including scope definition, economic analysis, mechanical design, and field execution.
  • 3. • Produce new test methods which increase the production throughput. • Provided expert resolution of the most troublesome of electrical interference issues. Control and maintenance of the calibration lab. Accountable for the distribution, calibration and repair of test equipment. • Developed and administered engineering concept, preliminary and final design review processes for Ethernet Hybrid Transport Radio (EHTR™ Technology) also known as Proteus MX Radio. • Setup a full manufacturing and testing line for Proteus MX Radio in REMEC Manufacturing Services, Laguna, Philippines. Suntron Corporation. Sugar Land, TX (Sep 1997 – Dec 2004) Senior Test Engineer • During 7 years of service, I designed and developed a total of 1,600 test fixtures and 2,000 test procedures which covered the validation, test and reliability of over 5,000 final and sub-assemblies in phase one (cables) and phase two (final integration) area. • Managed research and development lab for Suntron Corporation. • Perform Failure Mode and Effect Analysis (FMEA), develop and implement corrective action plan. • Collaboratively prepared and reviewed many responses to Test Plans and Manufacturing Engineering Issues to ensure accuracy, completeness, and timely submission. • Recommend design or test methods and statistical process control procedures for achieving required level of product reliability. • Design review, improvement proposition/coordination, interface with customer engineering, maintenance, production and contractors. • Consulted with client to identify key requirements, defined project scope, developed project plans and ensured milestones were met according to schedule. • Conducted resources planning and budgeting; tracked costs to ensure adherence to budgetary limitations. • Prepared and presented timely status reports to clients and internal senior management. • Performed market researches, developed documentations, and delivered presentations to the upper management. Western Atlas Logging Services Houston, TX (July 1994 – Sep 1997) Test and Reliability Engineer • During 3 years of service, I worked with a system called Standard of Performance (SOP) which reduced the rework cost of defective parts and improved the quality and reliability of electrical and electromechanical assemblies produced, designed or purchased by Western Atlas. This system assisted in generation of bill of materials and engineering change requests. • Interpret and implement Customer Engineering Change Orders for semi-conductor sub modules including control racks, power supplies, and transducers. • Resolve discrepant Material Review Board issues on components such as power supplies, circuit boards, and cable assemblies. • Review customer drawings and specification to resolve assembly related issues. • Implement detailed assembly instructions. • Perform equipment/system reliability testing, condition monitoring, and data interpretation utilizing various test technologies. • Interface with customer to resolve design and obsolete assembly and component issues.
  • 4. • Develop multilevel product structures and validate customer Bill of Material with Material Requirements Planning. Siemens Karachi, PK (Jan 1988 – Feb 1994) Quality Control / Test Engineer • Documented, designed and developed test plans for functionality testing of Electronic Industrial devices and control units. • Lead testing initiative to automate Customer Satisfaction Index process in order to evaluate online performance and value added improvements. • Instructed Industrial Electronics and Materials design courses for harnesses and printed circuit board, with emphasis on Quality Control and Quality Assurance • Provided support and maintenance including customizing of hardware installation and upgrades on site. • Act as interface between Customer Engineering Team and Siemens Manufacturing to resolve Engineering issues. • Analyzed policies with regard to customer service and efficiency, recommended policy changes and process improvements as needed. EDUCATION Bachelor of Science in Electrical Engineering, Graduated Dec 1987 N.E.D University of Engineering Karachi Average GPA 3.8 Honor Role Student REFERANCES Available upon request