SlideShare a Scribd company logo
1 of 3
Beatriz Barba
Manufacturing Supervisor and Manufacturing/Product Engineer
2555 Caminito Avellano, San Diego, CA 92154
bbarba31@gmail.com
619-550-8421, mobile
619-391-7373, home
SUMMARY OF QUALIFICATIONS
Manufacturing Supervisor, Manufacturing Engineer/Product Engineer with 20 years of experience in U.S., and Mexico world class manufacturing
environments dealing with people from diverse cultures and nationalities. Highly motivated professional with strong background in all tasks related with
manufacturing, product engineering and industrial engineering.
PROFESSIONAL EXPERIENCE
Leviton de Mexico … Tijuana, B. C. Dec/12-Date
Manufacturing Engineering Supervisor
Responsibilities
Supervise and coordinate the activities of four Manufacturing Engineers who manage diverse projects related to the improvement of the processes and
products. When applicable, suggest design changes to improve product manufacturability. Design assembly process and production lines following lean
manufacturing principles. Design fixtures and buy new assembly equipment suitable for existing and new products. Review and approve new molds and
dies. Review cost structure of BOMs and routings to assure cost of products meet preliminary estimates.
Main Accomplishments
• Changed the material in the stop pad used in the “Decora” product family. This change involved the design of molded plastic parts, fixtures
and assembly processes generating savings of $50,000 in material, labor and overhead.
• Used lean manufacturing tools to redesign the assembly process of a high-runner PCBA (for sensors), the change included the addition of flip-
over fixtures, wave solder pallets and the modification of the electrical test process. These changes yielded a cost saving of $60,000
approximately.
• Improved the Dymax PCB coating operation by implementing a continuous process flow, the change generated a saving of $15,000.
• Modified the design of the Toggle Dimmer to remove one part (CAP) and save $25,000 approximately
• Identified an alternate source for the EVSE LED membrane label generating a yearly saving of $12,000
• Participated in the selection and purchasing of a RoHS wave solder machine. This equipment improved the soldering process and the
reduction of solder scrap.
Leviton de Mexico … Tijuana, B. C. Mar/08-Dec/12
Manufacturing Supervisor
Responsibilities
Production supervisor who drives success and directs high-producing teams while developing employee loyalty. Experienced in using Lean
manufacturing to reduce costs and streamline production processes. Focused on facilitating the creation of quality products to meet customers’
expectations and achieve company goals.
Main Accomplishments
• Being in charge of transferring the EVSE (electrical vehicle supply equipment) line from sister plant at El Paso, TX.
• Used Lean manufacturing tools to find efficiencies in the final assembly area, PCB area (thru-hole/SMT), molding and stamping department;
saving more than $200,000 over a four-year period.
• Improved the productivity of the Printed Circuit Board (PCB) area from 56% to 80%
• Improved the productivity of the “Commercial and Industrial” final assembly area from 65% to 85%
• Managed team of more than 70 direct employees in the PCB area and 40 employees in the final assembly area
Leviton de Mexico … Tijuana, B. C. Jun/03-Mar/08
Product Engineer
Responsibilities
Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design
assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product.
Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot runs. Design assembly processes and create
visual aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot
runs.
Main Accomplishments
• Coordinated the assembly of all the samples needed to replace the power components for all the Dimmer product line.
• Coordinated the assembly of the new TVSS strip line samples for UL testing (five different catalogs)
• Participated in the TVSS cost reduction team, finding and implementing changes to the products and the processes with a total savings of
$50,000 per year.
• Being in charge of transferring 8 new PCBs from sister plant at Portland, OR. into our SMT area/process.
• Participated of transferring all ACENTI receptacle products from El Paso plant.
Levimex de Baja California … Tijuana, B. C. Sep/01-Jun/03
Product Engineer
Responsibilities
Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design
assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product.
Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot runs. Design assembly processes and create
visual aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot
runs.
Main Accomplishments
• Released to production the first microprocessor based TVSS panel from Leviton.
• Being in charge of transferring part of the theatrical Dimmer line from Levimex’s sister plant at Portland.
• Worked together with the R&D department in San Diego to have re-designed successfully 5 TVSS products, in order to improve their
performance and manufacturability.
• Participated in the MTM task team to perform time study analysis on 50 operations.
Levical S.A de C.V. … Tecate, B. C. Sep/93-Sep/01
Product Engineer (Jun/99 - Sep/01)
Responsibilities
Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design
assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product.
Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot run. Design assembly processes and create visual
aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot runs.
Main Accomplishments
• Released to production the first TVSS product line designed for the South American market.
• Participated in the process of selection, purchasing and set-up of a UV curing system (DIMAX) for PCBs; with this new conformal coating
process of PCBs the assembly process time was decreased by 23 hrs. The savings in material and labor were $130,000 per year.
• Released to production the new TVSS receptacle line which included a total of more than 100 different variations between them.
• Participated in the TVSS cost reduction team, finding and implementing changes to the products and the processes with a total savings of more
than $200,000 per year.
Cost Engineer (Mar/97 – Jun/99)
Responsibilities
Analyze cost variations between budget and real costs in material, labor and overhead. Review with the product engineers the BOM and routing of new
products prior to release them to production. Update the system with BOM changes, routing changes and keep records of them. Coordinate the team in
charge to implement the engineering changes in the production floor.
Main Accomplishments
• Being part of the team to implement the Oracle system.
• Transferred in system the Dimmer substrate line from Levical’s sister plant at Brooklyn, NY.
• Standardized operations in the Dimmer PCB line.
Industrial Engineer (Sep/93 - Mar/97)
Responsibilities
Support the production floor by designing and redesigning assembly lines and assembly fixtures. Review line balance and performance (efficiency,
utilization, etc.) and take actions to improve them, utilizing tools as SPC. Review, submittal and follow up of internal ECOs to improve the product
performance and cost. Perform ISO9000 internal audits.
Main Accomplishments
• Being involved in the introduction of the first two products with SMT, designed by Leviton.
• Participated in the re-engineering group to modify all the TVSS area, involving floor space saving and improving efficiency and utilization.
• Participated in the creation of all documentation needed for the ISO9000 certification.
• Standardization of all US and Canadian versions of the touch dimmer line, involving a material and labor cost saving of $80,000 per year.
EDUCATION
UABC BS in Industrial Engineering
TRAINING
-Cost Engineering UABC-Tecate
-SolidWorks UABC-Tecate
-Manufactura de Clase
Mundial y Reingeniería Richard J. Schonberger/Tijuana
-Manufactura Celular Formación Integral en Manufactura/Tecate
-ISO 9000:2000 Levimex-Tijuana
-Management processes
And leadership skills Leviton-San Diego
-MS Project UABC-Tecate
-ISO9000 auditor Levical-Tecate
-5 S’s Levical-Tecate
-MTM Levical-Tecate
-Seminario de Balanceo
De Líneas (Line balancing) Levical-Tecate
-Fundamentos Básicos
de Moldeo (plastic molding) Levical-Tecate
-JIT-KANBAN Leviton-Tijuana
-Administración de
Proyectos (Project
administation Leviton-Tijuana
-Lectura de Planos
(How to read engineering
Drawings) Leviton-Tijuana
-Fundamentos de
Six Sigma Leviton-Tijuana
COMPUTER SOFTWARE KNOWLEDGE
Windows, MS Office, Oracle, Visio.
REFERENCES:
Fernando Arredondo, Design Engineer, (619)205-8716, (619)608-8332
Ignacio López Aguado, Industrial Engineer, 1(858)864-2526
Juan Manuel Flores Corona, Industrial Engineer, +52(644)969-4900 ext. 3217 (Tijuana)

More Related Content

What's hot

Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric Reneker
 
Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andy Feinberg
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukrimilind phadke
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resumeBrent Strahan
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Richard Metzner
 
Hieber, Bruce Resume
Hieber, Bruce ResumeHieber, Bruce Resume
Hieber, Bruce ResumeBruceHieber
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Nitin sardana Resume
Nitin sardana ResumeNitin sardana Resume
Nitin sardana Resumenitincrsce
 
RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016Randall Tointon
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeCobra143
 

What's hot (19)

Resume Robert Pointer
Resume Robert PointerResume Robert Pointer
Resume Robert Pointer
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015
 
RESUME BP 04-25-2016
RESUME BP 04-25-2016RESUME BP 04-25-2016
RESUME BP 04-25-2016
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
Rhett's Resume 1
Rhett's Resume 1Rhett's Resume 1
Rhett's Resume 1
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016
 
Hieber, Bruce Resume
Hieber, Bruce ResumeHieber, Bruce Resume
Hieber, Bruce Resume
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
M Rearick Resume
M Rearick ResumeM Rearick Resume
M Rearick Resume
 
Nitin sardana Resume
Nitin sardana ResumeNitin sardana Resume
Nitin sardana Resume
 
RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
 
vikas goel
vikas goelvikas goel
vikas goel
 

Viewers also liked

Empieza el año estrenando CASA
Empieza el año estrenando CASAEmpieza el año estrenando CASA
Empieza el año estrenando CASACOLRAICES
 
Class 2_group 2_JP Morgan chase co.
Class 2_group 2_JP Morgan chase co.Class 2_group 2_JP Morgan chase co.
Class 2_group 2_JP Morgan chase co.tranaimy94
 
Mirador de los ocobos armenia
Mirador de los ocobos armeniaMirador de los ocobos armenia
Mirador de los ocobos armeniaCOLRAICES
 
Want media? Think like an entrepreneur
Want media? Think like an entrepreneurWant media? Think like an entrepreneur
Want media? Think like an entrepreneurKarenUnland
 
Upstill_Thesis_Revised_17Aug05
Upstill_Thesis_Revised_17Aug05Upstill_Thesis_Revised_17Aug05
Upstill_Thesis_Revised_17Aug05Trystan Upstill
 
esquizofrenia
esquizofreniaesquizofrenia
esquizofrenianando3018
 
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...IAEME Publication
 
Respuesta inmunitaria celular
Respuesta inmunitaria celularRespuesta inmunitaria celular
Respuesta inmunitaria celularLeonel Lopez
 
Drug addiction education schematic
Drug addiction  education schematicDrug addiction  education schematic
Drug addiction education schematicCedonnie Curtis
 
Nocardia y Bacterias Relacionadas
Nocardia y Bacterias RelacionadasNocardia y Bacterias Relacionadas
Nocardia y Bacterias RelacionadasLeonel Lopez
 
Internacionalización como estrategia de crecimiento (David Carnicer)
Internacionalización como estrategia de crecimiento (David Carnicer)Internacionalización como estrategia de crecimiento (David Carnicer)
Internacionalización como estrategia de crecimiento (David Carnicer)One Vision
 
LAURA MATHIAS WORD RESUME 4-9-15
LAURA MATHIAS WORD RESUME 4-9-15LAURA MATHIAS WORD RESUME 4-9-15
LAURA MATHIAS WORD RESUME 4-9-15Laura Mathias
 
Joseph Eastman - Resume
Joseph Eastman - ResumeJoseph Eastman - Resume
Joseph Eastman - ResumeJoseph Eastman
 

Viewers also liked (17)

Empieza el año estrenando CASA
Empieza el año estrenando CASAEmpieza el año estrenando CASA
Empieza el año estrenando CASA
 
Class 2_group 2_JP Morgan chase co.
Class 2_group 2_JP Morgan chase co.Class 2_group 2_JP Morgan chase co.
Class 2_group 2_JP Morgan chase co.
 
Mirador de los ocobos armenia
Mirador de los ocobos armeniaMirador de los ocobos armenia
Mirador de los ocobos armenia
 
Want media? Think like an entrepreneur
Want media? Think like an entrepreneurWant media? Think like an entrepreneur
Want media? Think like an entrepreneur
 
TURISMO POBLANO
TURISMO POBLANOTURISMO POBLANO
TURISMO POBLANO
 
Upstill_Thesis_Revised_17Aug05
Upstill_Thesis_Revised_17Aug05Upstill_Thesis_Revised_17Aug05
Upstill_Thesis_Revised_17Aug05
 
esquizofrenia
esquizofreniaesquizofrenia
esquizofrenia
 
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...
PERFORMANCE EVALUATION OF A DIESEL ENGINE RUNNING IN DUAL FUEL MODE WITH KARA...
 
Respuesta inmunitaria celular
Respuesta inmunitaria celularRespuesta inmunitaria celular
Respuesta inmunitaria celular
 
2 & 3 bhk flats in noida extension @ 9873516559
2 & 3 bhk flats in noida extension @ 98735165592 & 3 bhk flats in noida extension @ 9873516559
2 & 3 bhk flats in noida extension @ 9873516559
 
Drug addiction education schematic
Drug addiction  education schematicDrug addiction  education schematic
Drug addiction education schematic
 
Nocardia y Bacterias Relacionadas
Nocardia y Bacterias RelacionadasNocardia y Bacterias Relacionadas
Nocardia y Bacterias Relacionadas
 
Sde. Sjögren
Sde. SjögrenSde. Sjögren
Sde. Sjögren
 
Internacionalización como estrategia de crecimiento (David Carnicer)
Internacionalización como estrategia de crecimiento (David Carnicer)Internacionalización como estrategia de crecimiento (David Carnicer)
Internacionalización como estrategia de crecimiento (David Carnicer)
 
Résumé
RésuméRésumé
Résumé
 
LAURA MATHIAS WORD RESUME 4-9-15
LAURA MATHIAS WORD RESUME 4-9-15LAURA MATHIAS WORD RESUME 4-9-15
LAURA MATHIAS WORD RESUME 4-9-15
 
Joseph Eastman - Resume
Joseph Eastman - ResumeJoseph Eastman - Resume
Joseph Eastman - Resume
 

Similar to resume_Beatriz_Barba

Similar to resume_Beatriz_Barba (20)

Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Civitano_resume_2017
Civitano_resume_2017Civitano_resume_2017
Civitano_resume_2017
 
W White Resume
W White ResumeW White Resume
W White Resume
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell ResumeA2
Rod Cornell ResumeA2
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Resume
ResumeResume
Resume
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennan
 
David Baker - CV
David Baker - CVDavid Baker - CV
David Baker - CV
 

resume_Beatriz_Barba

  • 1. Beatriz Barba Manufacturing Supervisor and Manufacturing/Product Engineer 2555 Caminito Avellano, San Diego, CA 92154 bbarba31@gmail.com 619-550-8421, mobile 619-391-7373, home SUMMARY OF QUALIFICATIONS Manufacturing Supervisor, Manufacturing Engineer/Product Engineer with 20 years of experience in U.S., and Mexico world class manufacturing environments dealing with people from diverse cultures and nationalities. Highly motivated professional with strong background in all tasks related with manufacturing, product engineering and industrial engineering. PROFESSIONAL EXPERIENCE Leviton de Mexico … Tijuana, B. C. Dec/12-Date Manufacturing Engineering Supervisor Responsibilities Supervise and coordinate the activities of four Manufacturing Engineers who manage diverse projects related to the improvement of the processes and products. When applicable, suggest design changes to improve product manufacturability. Design assembly process and production lines following lean manufacturing principles. Design fixtures and buy new assembly equipment suitable for existing and new products. Review and approve new molds and dies. Review cost structure of BOMs and routings to assure cost of products meet preliminary estimates. Main Accomplishments • Changed the material in the stop pad used in the “Decora” product family. This change involved the design of molded plastic parts, fixtures and assembly processes generating savings of $50,000 in material, labor and overhead. • Used lean manufacturing tools to redesign the assembly process of a high-runner PCBA (for sensors), the change included the addition of flip- over fixtures, wave solder pallets and the modification of the electrical test process. These changes yielded a cost saving of $60,000 approximately. • Improved the Dymax PCB coating operation by implementing a continuous process flow, the change generated a saving of $15,000. • Modified the design of the Toggle Dimmer to remove one part (CAP) and save $25,000 approximately • Identified an alternate source for the EVSE LED membrane label generating a yearly saving of $12,000 • Participated in the selection and purchasing of a RoHS wave solder machine. This equipment improved the soldering process and the reduction of solder scrap. Leviton de Mexico … Tijuana, B. C. Mar/08-Dec/12 Manufacturing Supervisor Responsibilities Production supervisor who drives success and directs high-producing teams while developing employee loyalty. Experienced in using Lean manufacturing to reduce costs and streamline production processes. Focused on facilitating the creation of quality products to meet customers’ expectations and achieve company goals. Main Accomplishments • Being in charge of transferring the EVSE (electrical vehicle supply equipment) line from sister plant at El Paso, TX. • Used Lean manufacturing tools to find efficiencies in the final assembly area, PCB area (thru-hole/SMT), molding and stamping department; saving more than $200,000 over a four-year period. • Improved the productivity of the Printed Circuit Board (PCB) area from 56% to 80% • Improved the productivity of the “Commercial and Industrial” final assembly area from 65% to 85% • Managed team of more than 70 direct employees in the PCB area and 40 employees in the final assembly area Leviton de Mexico … Tijuana, B. C. Jun/03-Mar/08 Product Engineer Responsibilities Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product. Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot runs. Design assembly processes and create visual aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot runs. Main Accomplishments • Coordinated the assembly of all the samples needed to replace the power components for all the Dimmer product line. • Coordinated the assembly of the new TVSS strip line samples for UL testing (five different catalogs) • Participated in the TVSS cost reduction team, finding and implementing changes to the products and the processes with a total savings of $50,000 per year. • Being in charge of transferring 8 new PCBs from sister plant at Portland, OR. into our SMT area/process. • Participated of transferring all ACENTI receptacle products from El Paso plant.
  • 2. Levimex de Baja California … Tijuana, B. C. Sep/01-Jun/03 Product Engineer Responsibilities Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product. Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot runs. Design assembly processes and create visual aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot runs. Main Accomplishments • Released to production the first microprocessor based TVSS panel from Leviton. • Being in charge of transferring part of the theatrical Dimmer line from Levimex’s sister plant at Portland. • Worked together with the R&D department in San Diego to have re-designed successfully 5 TVSS products, in order to improve their performance and manufacturability. • Participated in the MTM task team to perform time study analysis on 50 operations. Levical S.A de C.V. … Tecate, B. C. Sep/93-Sep/01 Product Engineer (Jun/99 - Sep/01) Responsibilities Review and analyze engineering documentation for new products. When applicable, suggest design changes to improve manufacturability. Design assembly process and production lines suitable for the new product. Design fixtures and buy new assembly equipment suitable for the new product. Review and approve new molds and dies. Follow-up on parts availability for the engineering and pilot run. Design assembly processes and create visual aids for the operator. Validate test equipment and test procedure. Perform, analyze and supervise all aspects related to engineering and pilot runs. Main Accomplishments • Released to production the first TVSS product line designed for the South American market. • Participated in the process of selection, purchasing and set-up of a UV curing system (DIMAX) for PCBs; with this new conformal coating process of PCBs the assembly process time was decreased by 23 hrs. The savings in material and labor were $130,000 per year. • Released to production the new TVSS receptacle line which included a total of more than 100 different variations between them. • Participated in the TVSS cost reduction team, finding and implementing changes to the products and the processes with a total savings of more than $200,000 per year. Cost Engineer (Mar/97 – Jun/99) Responsibilities Analyze cost variations between budget and real costs in material, labor and overhead. Review with the product engineers the BOM and routing of new products prior to release them to production. Update the system with BOM changes, routing changes and keep records of them. Coordinate the team in charge to implement the engineering changes in the production floor. Main Accomplishments • Being part of the team to implement the Oracle system. • Transferred in system the Dimmer substrate line from Levical’s sister plant at Brooklyn, NY. • Standardized operations in the Dimmer PCB line. Industrial Engineer (Sep/93 - Mar/97) Responsibilities Support the production floor by designing and redesigning assembly lines and assembly fixtures. Review line balance and performance (efficiency, utilization, etc.) and take actions to improve them, utilizing tools as SPC. Review, submittal and follow up of internal ECOs to improve the product performance and cost. Perform ISO9000 internal audits. Main Accomplishments • Being involved in the introduction of the first two products with SMT, designed by Leviton. • Participated in the re-engineering group to modify all the TVSS area, involving floor space saving and improving efficiency and utilization. • Participated in the creation of all documentation needed for the ISO9000 certification. • Standardization of all US and Canadian versions of the touch dimmer line, involving a material and labor cost saving of $80,000 per year. EDUCATION UABC BS in Industrial Engineering TRAINING -Cost Engineering UABC-Tecate -SolidWorks UABC-Tecate -Manufactura de Clase Mundial y Reingeniería Richard J. Schonberger/Tijuana -Manufactura Celular Formación Integral en Manufactura/Tecate -ISO 9000:2000 Levimex-Tijuana -Management processes And leadership skills Leviton-San Diego -MS Project UABC-Tecate -ISO9000 auditor Levical-Tecate -5 S’s Levical-Tecate -MTM Levical-Tecate
  • 3. -Seminario de Balanceo De Líneas (Line balancing) Levical-Tecate -Fundamentos Básicos de Moldeo (plastic molding) Levical-Tecate -JIT-KANBAN Leviton-Tijuana -Administración de Proyectos (Project administation Leviton-Tijuana -Lectura de Planos (How to read engineering Drawings) Leviton-Tijuana -Fundamentos de Six Sigma Leviton-Tijuana COMPUTER SOFTWARE KNOWLEDGE Windows, MS Office, Oracle, Visio. REFERENCES: Fernando Arredondo, Design Engineer, (619)205-8716, (619)608-8332 Ignacio López Aguado, Industrial Engineer, 1(858)864-2526 Juan Manuel Flores Corona, Industrial Engineer, +52(644)969-4900 ext. 3217 (Tijuana)