JOSEPH P. SLOGAR
Email: j4slogar@charter.net
5705 Hidden River Court
Weston, WI 54476
(715) 212-2842
Summary: I am a high performing self-starter with several years of engineering experience in multiple manufacturing
environments. My background includes project management, product and cost improvement, new product design and
introduction, process improvement, Lean Manufacturing, and quality improvement. I have successfully led and
implemented several major projects resulting in significantly reduced operating and product costs by improving design and
manufacturing methods (DFM).
2014-Present Caterpillar, Forest Products, Manufacturing Engineer:
• Implement high level ME projects for Forest Products Division resulting in significant cost savings
and quality improvements on all Caterpillar Work Tools.
• As the exclusive Work Tools ME, omplied with Caterpillar Lean Manufacturing Systems
2010-2014: Alamo Group, Ag Division, Gibson City, IL, Manufacturing Engineer:
• Designed/implement high level tooling projects for Ag Division resulting in significant cost savings
and quality improvements, with an emphasis on, but not limited to robotic welding..
• Acted as sole manufacturing/design engineering liaison to concurrently develop tooling/process
concepts for Ag Division NPI’s resulting in record corporate achievements.
• Led Ag Div. Continuous Improvement initiatives, resulting in major QA, & EBIT improvements.
• Developed product cells/shop flow to significantly improve plant efficiency and safety.
• Coordinated new process start-up and re-tooling for plant consolidations resulting in smooth and
timely transitions for OEM products.
• Led outside sources in assisting with tooling projects, resulting in reduced project implementation
cost and improved schedule attainment.
2009 Present: J4 Services, Weston, WI, Principal – Owner Consultant:
• Consulted with numerous Ag Manufacturers to improve engineering/manufacturing processes.
• Acted as a liaison to influence engineering and manufacturing groups in new product development
(NPI), existing product design maintenance, DFM improvements, and process improvements.
• Utilizing extensive “Big Picture” experiences provided significant operational cost improvements.
2007-2008: Utility Tool and Trailer, Clintonville, WI, Director of Engineering:
• Managed engineering staff in fast pace multi-task environment.
• Led engineering group in new product development (NPI), and existing product design maintenance.
• Developed process flow and implemented ISO certification into the engineering department.
• Key participant on US Military contract solicitations.
• Managed multiple engineering projects resulting in successful customer deliveries.
• Improved engineering accuracy in design and drawings.
2002-2007: Woods Equipment Company, Schofield, WI, QA/Product Engineer, Shredders:
• Initiated and implemented major changes in product design, resulting in improved customer
satisfaction, increased sales and profit, and product reliability.
• Led engineering changes to improve product quality/significantly reduce production operating costs.
• Developed, designed, and implemented new products by actively leading NPI Teams.
• Identified and implemented corrective action to numerous internal manufacturing and external field
quality problems resulting in improved product performance.
• Prepared Capital Projects resulting in productivity improvements.
• Managed, prepared, and improved facility environmental requirements.
1997 -2002: Greenheck Fan Corporation, Schofield, WI, Manufacturing Engineer:
• Facilitated cross functional quality team resulting in the closure of over 500 complex manufacturing,
design, and quality shop floor problems, within a twelve month period.
• As project manager, provided development recommendations and conceptual guidance for the
design, fabrication, and implementation of production machinery and fixtures.
• Facilitated new product development into manufacturing by resolving key production problems.
• Developed and authorized manufacturing procedures which standardized, formalized, and
streamlined existing processes.
• Planned, managed, and implemented manufacturing facility relocation move, resulting in a low
impact to production and achievement of schedule and budget.
JOSEPH P. SLOGAR (Page 2)
1994 -1996: ELKHART PRODUCTS CORPORATION, Elkhart, IN, Manufacturing Engineer:
Manufacturing Engineer, Product Line and Machine Development:
• Implemented corrective actions to production problems, resulting in increased efficiency and
consistent achievement of SPC criteria, design specification, and industry standards.
• Streamlined production by authorizing and implementing ECN’s to tooling design, tooling material
selection, process, and plant machinery design, resulting in improved manufacturing.
• As a product line manager, teamed with QC, R&D, Production, and Design Departments,
implemented “releases to production” of new products from development stages, resulting in smooth
and timely transitions to full production runs.
• Justified and purchased $ 500,000 of new plant CNC machining centers for machining department
reorganization by authorizing funding request analysis (AR’s) and demonstrating 2 year return on
investments, resulting in increased plant CNC capacity and decreased CNC work backlog.
1985 - 1994: GENERAL ELECTRIC COMPANY, Lynn, MA
Service Engineer, Program Manager, Fleet Leader Program:
• Without impacting customer, developed and implemented program to identify turbo machinery
problems, monitor quality, prevent product failures, resulting in increased product reliability.
• Coordinated and facilitated engineering analytical inspection teams resulting in identification of
turbo machinery problems, and implementation of corrective actions prior to average age impact.
• Initiated proactive turbo machinery service evaluations which provided critical information to
customers of hardware and material characteristics, enabling timely fix implementation and
increased spare parts sales.
Product Support Program Manager, Turbo Machinery:
• Reported significant field events to customer support, quality, and engineering management,
resulting in improved cross-functional organization communication.
• Successfully developed customer event data base, providing ability to statistically plot product quality
and failure trends and initiate engineering improvements.
Evaluation Engineer, Turbo Machinery:
• Facilitated engine test, calibration, and analytical tear down, providing engineering with critical
information on development hardware durability, reliability, safety, and material compatibility.
• Conducted analytical failure investigations and reported results to corporate engineering, resulting in
expedient product improvement and less customer impact.
• Provided on site customer training, resulting in increased production efficiency.
EDUCATION: Bachelor of Science, Purdue University, West Lafayette, IN
• Major: Aviation Technology
• Minor: Mechanical Engineering Technology
CONTINUING EDUCATION: Motoman Robotic Training (Dayton), Alamo Corporate Management Training,
ISO Implementation, Quality System Improvement, Lean Manufacturing, Solid Works & IDEAS 3-D Solid
Modeling, Auto CAD, Laser Safety, Allen Bradley PLC, Set Up Reduction, Cellular Manufacturing, Supervision,
FMEA, Hydraulics System Design, Motion Control, Problem Solving, Microsoft Project, Effective Listening,
Effective Presentation, Applied Engine Performance Analysis, Negotiation Skills Workshop, Influence Workshop,
Maintenance Management, Team Building, Microsoft Office, Apprentice Program Graduate, Aluminum Weld
Training, Brake Press Efficiency Training, Foundry Experience
LICENSES, AWARDS, COMMUNITY SERVICE:
• FAA Private Pilot License, FAA Airframe and Power plant License
• Clearance: Secret
• Real-estate Sales License
• Achievement Awards for outstanding commitment and key contribution.
• Junior Achievement Instructor
• Youth football, baseball, and soccer coach

Jps16

  • 1.
    JOSEPH P. SLOGAR Email:j4slogar@charter.net 5705 Hidden River Court Weston, WI 54476 (715) 212-2842 Summary: I am a high performing self-starter with several years of engineering experience in multiple manufacturing environments. My background includes project management, product and cost improvement, new product design and introduction, process improvement, Lean Manufacturing, and quality improvement. I have successfully led and implemented several major projects resulting in significantly reduced operating and product costs by improving design and manufacturing methods (DFM). 2014-Present Caterpillar, Forest Products, Manufacturing Engineer: • Implement high level ME projects for Forest Products Division resulting in significant cost savings and quality improvements on all Caterpillar Work Tools. • As the exclusive Work Tools ME, omplied with Caterpillar Lean Manufacturing Systems 2010-2014: Alamo Group, Ag Division, Gibson City, IL, Manufacturing Engineer: • Designed/implement high level tooling projects for Ag Division resulting in significant cost savings and quality improvements, with an emphasis on, but not limited to robotic welding.. • Acted as sole manufacturing/design engineering liaison to concurrently develop tooling/process concepts for Ag Division NPI’s resulting in record corporate achievements. • Led Ag Div. Continuous Improvement initiatives, resulting in major QA, & EBIT improvements. • Developed product cells/shop flow to significantly improve plant efficiency and safety. • Coordinated new process start-up and re-tooling for plant consolidations resulting in smooth and timely transitions for OEM products. • Led outside sources in assisting with tooling projects, resulting in reduced project implementation cost and improved schedule attainment. 2009 Present: J4 Services, Weston, WI, Principal – Owner Consultant: • Consulted with numerous Ag Manufacturers to improve engineering/manufacturing processes. • Acted as a liaison to influence engineering and manufacturing groups in new product development (NPI), existing product design maintenance, DFM improvements, and process improvements. • Utilizing extensive “Big Picture” experiences provided significant operational cost improvements. 2007-2008: Utility Tool and Trailer, Clintonville, WI, Director of Engineering: • Managed engineering staff in fast pace multi-task environment. • Led engineering group in new product development (NPI), and existing product design maintenance. • Developed process flow and implemented ISO certification into the engineering department. • Key participant on US Military contract solicitations. • Managed multiple engineering projects resulting in successful customer deliveries. • Improved engineering accuracy in design and drawings. 2002-2007: Woods Equipment Company, Schofield, WI, QA/Product Engineer, Shredders: • Initiated and implemented major changes in product design, resulting in improved customer satisfaction, increased sales and profit, and product reliability. • Led engineering changes to improve product quality/significantly reduce production operating costs. • Developed, designed, and implemented new products by actively leading NPI Teams. • Identified and implemented corrective action to numerous internal manufacturing and external field quality problems resulting in improved product performance. • Prepared Capital Projects resulting in productivity improvements. • Managed, prepared, and improved facility environmental requirements. 1997 -2002: Greenheck Fan Corporation, Schofield, WI, Manufacturing Engineer: • Facilitated cross functional quality team resulting in the closure of over 500 complex manufacturing, design, and quality shop floor problems, within a twelve month period. • As project manager, provided development recommendations and conceptual guidance for the design, fabrication, and implementation of production machinery and fixtures. • Facilitated new product development into manufacturing by resolving key production problems. • Developed and authorized manufacturing procedures which standardized, formalized, and streamlined existing processes. • Planned, managed, and implemented manufacturing facility relocation move, resulting in a low impact to production and achievement of schedule and budget. JOSEPH P. SLOGAR (Page 2)
  • 2.
    1994 -1996: ELKHARTPRODUCTS CORPORATION, Elkhart, IN, Manufacturing Engineer: Manufacturing Engineer, Product Line and Machine Development: • Implemented corrective actions to production problems, resulting in increased efficiency and consistent achievement of SPC criteria, design specification, and industry standards. • Streamlined production by authorizing and implementing ECN’s to tooling design, tooling material selection, process, and plant machinery design, resulting in improved manufacturing. • As a product line manager, teamed with QC, R&D, Production, and Design Departments, implemented “releases to production” of new products from development stages, resulting in smooth and timely transitions to full production runs. • Justified and purchased $ 500,000 of new plant CNC machining centers for machining department reorganization by authorizing funding request analysis (AR’s) and demonstrating 2 year return on investments, resulting in increased plant CNC capacity and decreased CNC work backlog. 1985 - 1994: GENERAL ELECTRIC COMPANY, Lynn, MA Service Engineer, Program Manager, Fleet Leader Program: • Without impacting customer, developed and implemented program to identify turbo machinery problems, monitor quality, prevent product failures, resulting in increased product reliability. • Coordinated and facilitated engineering analytical inspection teams resulting in identification of turbo machinery problems, and implementation of corrective actions prior to average age impact. • Initiated proactive turbo machinery service evaluations which provided critical information to customers of hardware and material characteristics, enabling timely fix implementation and increased spare parts sales. Product Support Program Manager, Turbo Machinery: • Reported significant field events to customer support, quality, and engineering management, resulting in improved cross-functional organization communication. • Successfully developed customer event data base, providing ability to statistically plot product quality and failure trends and initiate engineering improvements. Evaluation Engineer, Turbo Machinery: • Facilitated engine test, calibration, and analytical tear down, providing engineering with critical information on development hardware durability, reliability, safety, and material compatibility. • Conducted analytical failure investigations and reported results to corporate engineering, resulting in expedient product improvement and less customer impact. • Provided on site customer training, resulting in increased production efficiency. EDUCATION: Bachelor of Science, Purdue University, West Lafayette, IN • Major: Aviation Technology • Minor: Mechanical Engineering Technology CONTINUING EDUCATION: Motoman Robotic Training (Dayton), Alamo Corporate Management Training, ISO Implementation, Quality System Improvement, Lean Manufacturing, Solid Works & IDEAS 3-D Solid Modeling, Auto CAD, Laser Safety, Allen Bradley PLC, Set Up Reduction, Cellular Manufacturing, Supervision, FMEA, Hydraulics System Design, Motion Control, Problem Solving, Microsoft Project, Effective Listening, Effective Presentation, Applied Engine Performance Analysis, Negotiation Skills Workshop, Influence Workshop, Maintenance Management, Team Building, Microsoft Office, Apprentice Program Graduate, Aluminum Weld Training, Brake Press Efficiency Training, Foundry Experience LICENSES, AWARDS, COMMUNITY SERVICE: • FAA Private Pilot License, FAA Airframe and Power plant License • Clearance: Secret • Real-estate Sales License • Achievement Awards for outstanding commitment and key contribution. • Junior Achievement Instructor • Youth football, baseball, and soccer coach