1. CURRICULUM VITAE
Page 1 of 4
UMA MAHESWARARAO ROUTHU
Email:routhuumamahesh@gmail.com
Mobile: 09985808028
Pass PortNo: M4839184
Career Objective
To sustain an excellent and challenging career in the field of Instrumentation by exposing to the cutting edge
technologies in a systematic manner and work dynamically towards thegoals of the organization.
Professional Experience
3.10 years of working experience in the Power sector as an Erection & Commissioning engineer in which gained
rich knowledge in Instrumentation Engineering principles and expertisein various operations.
Current Employer:-
Organization : Wonder Cement Ltd.
Designation : Sr. Engineer (INSTRUMENTATION)
Project : CPP (1x40MW)
Location : Nimbahera,Chittorgarh (Rajasthan)
Currently involve in 1X40MW Power Plant maintenance and carried out following activities for the CPP project
includingB.H.E.L Make Steam Turbine, Thermax 1 X 160 TPH CFBC Boiler,WTP&ETP,BOP
1x 40 MW Steam Turbine erection and commissioning
The Steam turbine master control device of Governing console board erection and commissioning it is a Steam
Turbine speed,pressure,load controller by using Electronic Governer,Electrohydraulic Converter(1800) and Con-
trol Valve Actuator(1910)
Turbine supervisory instruments like: vibration probes, Magnetic pickup units(MPU),Speed probes, Axial dis-
placement Probes, Key pharos Probes Installation and commissioning work for The Turbine safety and reliable
runningof the Steam Turbine
Erection & commissioning of Air Cooled condenser including Field instruments, Profibus PA devices e.g. Transmit-
ters, Control valves,Cabletrays,Junction boxes, Cablelying.
1 x 160 TPH CFBC Boiler instruments erection , commissioningand maintenance
Involved in erection & commissioning of 5 nos. of PLC Siemens SIMATIC S71200 for Water treatment plant, Efflu-
ent treatment plant& Sewage treatment plant.
Erection and commissioning of WTP, ETP & STP field instruments, analyzers, totalizers, cable trays, junction boxes,
PLC panels.
Emerson makes Forbes marshal make PH analyzers and conductivity & ORP and Turbidity analyzers Erection
Commissioning & calibration and maintains.
Steam and Water Analysis system Erection and commissioning and Maintains Including With PH and Conductivity
analyzers calibration
ABB ACS800 up to 1250 KW VFD Erection,commissioning and Troubleshooting
Siemens G120 VFD up to 7.5 KW Erection,commissioning maintenanceand Trouble shooting
Coal and Lime handlingplantinstruments erection,commissioningand maintenance
Job Profile
Erection & commissioningof field instruments.
Planning,schedulingof Projectprogramfor erection, Testing & commissioning.
Partof commissioningof TSI monitoringRack Bently Nevada
2. CURRICULUM VITAE
Page 2 of 4
Partof commissioningWoodward governor WWG-505
Steam Turbine Controller Valve actuator commissioning through WWG-505, Steam Turbine Controller Valve actu-
ator commissioningthrough I/H converter From Field and WWG 505
Commissioningof governing consoleBoard.
Temperature Transmitters installation atPRDS and Primary super heater, secondary super heater.
RTDs installation for turbine General bearings, Turbine front pedestal Non-Active, Active Bearings, Generator
Winding,Core, Tooth, HOT, COLD, Gear Box Rtds.
Proximity Sensors Like; Vibration, Speed, Magnetic Pick-Up(MPU), Axial displacement & Key Phaser installation at
Turbine front, Turbine rear,Genarator front,rear,Gear Box for Turbine Safety and Reliable and trouble free run-
ningrunning.
ABB ACS 800, Siemens G120 VFD drives Maintenance
Calibration, maintenance and checking of transmitters, gauges, switches, pneumatic control valves, MOVs, pneu-
matic power cylinders.
Troubleshootingof all the problems regardingerection and commissioningfrominstrumentation prospect.
Planningfor daily manpower engagement.
Level transmitter installation in dearator, hotwell and coolingtower, HP heater, LP Heater, Condensate tank.
Pressure transmitter installation in Lube Oil, Jacking Oil, HP heater, LP Heater, Main steam, PRDS, Turbine extrac-
tions,Dearator, Hotwel, Boiler flue has path, Boiler steam path, Plantinletsteam path.
Flow transmitter installation from boiler to high pressure header, hp header –turbine, feed water from dearator
to steam drum (orificeand venture tube).
Installation and commissioningof RTD (PT-100) in turbine and thermocouple (k-type) in boiler area.
SPM, SOX,NOX,O2 Analyzers erection,commissioning,and maintenance
Materials (Instruments with proper data, Equipment with proper specifications) selection to purchase and negoti-
ation with the material provider
Indent of materials and there certification
Maintain spareparts of all section of power plantinstruments.
Experienced in preparing documents, reports regarding maintenance, history cards and recording observations
over equipment performance
Monitor day-to-day work carried outby Contractors.
Ensure availability of material atrighttime to enable them to complete C&I erection jobs in time.
Project commissioningjob.
Store related work issuing the material,instrument code opening with full specification in ERP,PR generate, follow
up the material offered material technical specification checking & giving Clearance to purchase the material.
Maintenance, troubleshooting,faultanalyzing,rectification,interlock checkingof E&I system
Previous Employer:
Organization : INTEQ AUTOMATION SERVICES PVT LTD.
Designation : C&I Engineer
Project : 1. LANCO POWER PROJECT 2. MYHOME INDUSTRIES LIMITED
Location : Vijayawada,Kondapalli Kodhada,Mellachervu
Capacity : 2X371 MW Combined cycle CPP-2(1x60MW)
3. CURRICULUM VITAE
Page 3 of 4
Professional summary:
• Responsible for complete calibration, Cold loop and Hot loop checking, Installation & cabling of all field instru-
ments of Gas turbine, Fuel gas conditioning system, GT Exhaust system, and equipment cooling water system and
turbine control panel
• Calibration and servicing of process sensors, Transmitters (SMART), Electronic, Pneumatic instruments, MOV and
Pneumatic Control valves.
• Studying of P & I, Control loop, wiringDiagrams and Cablescheduling.
• Have knowledge in Hook up drawings.
• Knowledge on turbine, boiler commissioning,start-up and testingprocedures.
Handling Equipment’s of Instrumentation Kits:
Calibrator ( Nag man PPC-20,Dead Weight Tester,Nagman Digital Calibrator), HART 475 Field communicator, CTP,
Temperature Bath, Source Meter, Loop Calibrator, Fluke RMS Digital multimeter,Fluke 710 series RTD/Thermocouple
Calibrator,Megger,DC Voltage Regulator, Rheostat.
Educational Qualifications
• Bachelor of Technology in Electrical & electronics Engineering from SBCE,Khammam,JNTU with 65.38% in 2011
• Intermediate (MPC) from Board of Intermediate Education,Andhra Pradesh with 73.4% in 2007.
• Secondary School Certificate (SSC) from Secondary School Education,Andhra Pradesh with 77% in 2005
Technical SkillS:
Core knowledge : Power Systems, electrical machines
Operatingsystems : Windows XP,Windows 7
Packages : MS-Office 2007,2010,MicrosoftDynamic AX, ERP
Personal details:
Full Name : Umamaheswara Rao Routhu
Father Name : KrishnamNaidu
Date of Birth : 5th August, 1990
Nationality : Indian.
Marital status : Single.
Languages Known : Telugu, English,and Hindi.
Current CTC : 3.8 Lacks + Parks
Address : D.N0-1-32/1 kattula kaviti,Veeraghattam
Srikakulam(Dist.) Andhra Pradesh – 532 460
Present Address : Qtr.no: E1/14, R.K.Nagar, Wonder Cement LTD, Rasool Pura Nimbahera, chittorgarh
(Dist.), Rajasthan,Pin:312601
Place:Nimbahera, Rajasthan (Umamaheswara Rao Routhu)