SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
PRADEEP KUMAR SHRIVASTAVA
Flat No-34, Roopnagar
Kota Road, Jhalawar Rajsthan
Mob.No:09413351761, 09413390615
pksh0405@yahoo.co.in, pksh0405@gmail.com
SCHOLASTICS
 B.E. (Electrical Engg.) from Bhopal Universityin 1983 with 72.56%.
OBJECTIVE
 To emerge as a hardcore and contributing in the growth and development of the organization by
achieving the set goals.
~ PPPrrrooojjjeeecccttt /// CCCooonnnssstttrrruuuccctttiiiooonnn MMMaaannnaaagggeeemmmeeennnttt~
 A result-oriented professional with morethan29yearsofexperience&expertisein:
- Project Management - Quality Management - Installation and
Commissioning
- Operations & Maintenance - Resource management
 Currentlyassociated with JAIPUR VIDYUT VITRAN NIGAM LIMITED,JHALAWAR, RAJASTHAN
 Adept in planning, executing construction projects involving contract administration, resource planning in
compliance to qualitystandards.
 Deft in swiftly rampingupprojectsincloseco-ordinationwithclients,contractors& consultantsandensuring
on time deliverables.
 Deft at planning, monitoring and consulting all site activities including man power planning, resource
planningandfinalizationof responsibilitymatrix for site Manager, team building, monitoring progress of the
project.
 Proven success in executing various projects such as R- APDRP, Rural electrification, work of Feeder
Renovation Program, EHT, HT & LT lines.
 Possess excellentcommunication, analytical, problem solving and leadership skills with abilities in liaising
with government bodies for obtaining necessarysanctions.
COMPETENCYFORTE
Project Management
 Responsible for planning for project activities and managing erection work including site measurements,
reviewing drawings, ensuring compliance with qualitystandards.
 Participating in project review meetings for evaluating project progress & de-bottlenecking.
 Liaising with clients on determining technical specifications / requirements and commissioning.
 Listing down the resource needs for projects, after considering the budgetaryparameters set.
 Monitoring project status during the course of periodic project review meetings.
 Updating management on progress and status of project.
Site / Construction Management
 Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and
effective resource utilization to maximise the output.
 Preparing and reviewing of method statements and work specific qualitycontrol plans.
 Ensuring machinery/ equipment/materials received are in accordance with the quantity& quality.
 Coordinatingallconstruction activities including providing technical inputs for methodologies of construction &
coordination with site management activities.
 Installing and commissioning of equipments, followed by meeting targeted performance / quality & quantity
parameters and thereafter handing over of the project.
Team Management:
 Coordinating manpower planning for implementation of new projects.
 Responsible for team building and providing effective leadership to realize the potential of everymember of the
team for delivering quantifiable results.
Contract Administration
 Preparing technical specifications & scope and deliverables, estimates and BOQ based on requirements
generated during detailed engineering of the project.
 Coordinating procurement activities like tendering & bid management, estimations, techno-commercial
evaluations, contract negotiations, etc.
 Handling vendor value worth analysis and selection based on technical and financial competencies.
CAREER HIGHLIGHTS
Work exposure in the state of Rajasthan, Uttar Pradesh, Uttaranchal leading a term of four executive, ten Junior
Engineer.
SinceMARCH2006 to till datewith JVVNL, JAIPUR
Projects:
A- RAPDRP Project in R.Mandi, B.Mandi & Jhalawar Town in RAJASTHAN worth Rs.216 Crs and responsible for
planning, execution & completion of project with various agencies as NODAL OFFICER.
 Construction of new 11KV O/H lines with ACSR DOG Conductor
 Construction of new 11/22KV O/H lines with AB Cable 70/95 mm2
 Laying of 11 KV U/G XLPE Cable300/185 mm2
 Installation & commissioning of 11 KVRMUs & sectionalizes.
 Installation & commissioning of 11/22KV distribution transformers and releasing of service connections.
B- Associated in material management for Supply of Power to Rural consumers through FRP programs in Bundi
district in year 2006-2009.
 Construction of new 11 KV& LT O/H lines with AB Cables and insulated rabbit conductors.
 Installation & commissioning of 11KVdistribution transformers.
 Reconductering of damaged 33& 11KVlines
C-Developed mechanism to control public grievances and solution.
D- Implementation of integrated IT approach relating MBC (Metering, Billing and Collection)
E- Successfully handled sub divisions and developed a MIS system for ATC. Handled rural, urban and Industrial
consumers by implementing Augmentation of transformation capacity in existing power substations, extension of
bays in existing 33/11KVsubstations and reconductoring of damaged 33KV& 11 KVlines.
FEB 2004 TO MARCH2006
Rural Electrification Corporation Feb 04 to March06
Key Responsibilities as a Nodal Manager
 Processed, apprised 75 nos. of schemes of RGGVY (Rajiv Gandhi Gramin Vidhyutikaran Yojana) of UP and
Uttaranchal state.
 Monitoring of Projects/Schemes
 Processed and appraised 13 nos. APDRP schemes for Techno-Financial assistance.
 Formulated, Processed and appraised 16 nos. P: SI (EHV) schemes of UP and Uttaranchal state.
JAN2001 TO FEB2004
Projects:
Completesitemanagementincludesplanning,execution,measurement,billingsandinstallationofelectrical
equipments,layingof cables,attendingof faults andrealization of consumerbillingsatvarious citiesof JVVNL,
Jaipur.
DECEMBER 93 TO DECEMBER 2000
Projects:
Completesitemanagementincludesplanning,execution,measurement,billingsandinstallationofelectrical
equipments,layingof cables,attendingof faults andrealization of consumerbillingsatvarious citiesof Rajsthan
State in RSEB.
MAY 91 to DECEMBER 93
Projects:
 Executed work of erection & commissioning of new 220/132KV, 132/33KV GSS along with all equipment’s at
Jhalawar and Bhilwara
 Augmentation of transformation capacity in existing power substations, extension of bays in existing 132/33KV
substations Bhilwara and Kota circles of RSEB.
 Operation of 132 EHVSUB STATION at Jhalawar.
APRIL 85to DEC 91
Projects:
Village Electrificationworkconstruction of 33/11KVsub-stations of various capacity, layining of new 11KV, LT lines
in Hindoli, Talera, Nainwa, K.Patan Blocks of District Bundi, Rajsthan
ACADEMICEXPERIENCE
Facultyof Engineering studies Dhamangaon Education Society July84 to March85
MAJOR ACHIEVMENTS
 Appreciated by Zonal Chief Engineer for highest revenue remittance during the year 1990-91
 Awarded at Zonal level for Best Services for best revenue recovery & maintaining good power
supply in the area during the year 1999-2000.
 Reduced T&D losses from 39% to 24% by utilizing available limited resources of JVVNL in turn
saved approx. 65Crs of JVVNL due to this in between 2006-2013.
 Since 1993 achieved nearly 100% realisation target and in 1990-91, 1999-2000, 2007-2008 target
achieved was more than 100%.
PERSONAL DETAILS
Name Pradeep Kumar Shrivastava
Date of Birth 25th Dec 1960
Gender Male
PresentAddress P. K. Shrivastava
JVVNL,Chhabra Road
Atru,BARAN (Rajasthan)
Cell no. 9413351761
Permanent Address P.K.Shrivastava
S/o Shri N.P.Shrivastava
32, Durga Nagar Vidisha (M.P.)
Tel. No. 07592-232230
Email address pksh0405@yahoo.co.in
Marital Status Married
Language Proficiency Hindi: Read, Write & Speak English: Read & Write
Extra Curricular Activities NCC “A”,”B” and “C” certificate course.
Participated in a Advance Leader Ship Course at Mount- Abu organized byNCC.
Place:Baran (PRADEEP SHRIVASTAVA)
Date: 29.08.2014

More Related Content

What's hot (20)

CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copy
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
My Resume
My ResumeMy Resume
My Resume
 
AS_CV
AS_CVAS_CV
AS_CV
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
Resume- updated
Resume- updatedResume- updated
Resume- updated
 
latest_CV_Mar_2016
latest_CV_Mar_2016latest_CV_Mar_2016
latest_CV_Mar_2016
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Resume (engineer)
Resume (engineer)Resume (engineer)
Resume (engineer)
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Barkley3102010
Barkley3102010Barkley3102010
Barkley3102010
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 

Viewers also liked

Lanaturalezadiapositivas 100607160914-phpapp01
Lanaturalezadiapositivas 100607160914-phpapp01Lanaturalezadiapositivas 100607160914-phpapp01
Lanaturalezadiapositivas 100607160914-phpapp01Allison Guaan
 
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blog
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blogBáo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blog
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blogtruongquocvuong84
 
FG- WCR Presentation
FG- WCR PresentationFG- WCR Presentation
FG- WCR Presentationthomgirl80
 
Pinellas Industrial Revolution Middle School
Pinellas Industrial Revolution Middle SchoolPinellas Industrial Revolution Middle School
Pinellas Industrial Revolution Middle SchoolYumonomics
 
Нові підходи до відходів
Нові підходи до відходівНові підходи до відходів
Нові підходи до відходівAnna Kalinichenko
 
Doing Pronunciation: A Visible & Physical Approach
Doing Pronunciation: A Visible & Physical ApproachDoing Pronunciation: A Visible & Physical Approach
Doing Pronunciation: A Visible & Physical ApproachPhung Huy
 
"How content strategy helps to drive customer experience."
"How content strategy helps to drive customer experience.""How content strategy helps to drive customer experience."
"How content strategy helps to drive customer experience."Matty Soccio
 
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,Dans l'esprit du Pagerank: regards croisés sur les algorithmes,
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,Fabien Gandon
 
Health & Safety Mm
Health & Safety MmHealth & Safety Mm
Health & Safety MmMarcus9000
 
design of sampling filter
design of sampling filter design of sampling filter
design of sampling filter Anuj Arora
 

Viewers also liked (19)

Lanaturalezadiapositivas 100607160914-phpapp01
Lanaturalezadiapositivas 100607160914-phpapp01Lanaturalezadiapositivas 100607160914-phpapp01
Lanaturalezadiapositivas 100607160914-phpapp01
 
15
1515
15
 
Workshop EspañOlviaje
Workshop EspañOlviajeWorkshop EspañOlviaje
Workshop EspañOlviaje
 
سبعة محددات للديمقراطية تؤكد تراجع وضع مصر في تطبيقها
 سبعة محددات للديمقراطية تؤكد تراجع وضع مصر في تطبيقها سبعة محددات للديمقراطية تؤكد تراجع وضع مصر في تطبيقها
سبعة محددات للديمقراطية تؤكد تراجع وضع مصر في تطبيقها
 
Multiservicios LINS
Multiservicios LINSMultiservicios LINS
Multiservicios LINS
 
Vinoteca Teka RV 26 E
Vinoteca Teka RV 26 E Vinoteca Teka RV 26 E
Vinoteca Teka RV 26 E
 
¿QUÉ ES LA ECOLOGÍA?
¿QUÉ ES LA ECOLOGÍA?¿QUÉ ES LA ECOLOGÍA?
¿QUÉ ES LA ECOLOGÍA?
 
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blog
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blogBáo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blog
Báo giá v t li u 3 d panel – thi t k , thi công nhà 3d panel « ktsdavy's blog
 
FG- WCR Presentation
FG- WCR PresentationFG- WCR Presentation
FG- WCR Presentation
 
Pinellas Industrial Revolution Middle School
Pinellas Industrial Revolution Middle SchoolPinellas Industrial Revolution Middle School
Pinellas Industrial Revolution Middle School
 
Нові підходи до відходів
Нові підходи до відходівНові підходи до відходів
Нові підходи до відходів
 
Doing Pronunciation: A Visible & Physical Approach
Doing Pronunciation: A Visible & Physical ApproachDoing Pronunciation: A Visible & Physical Approach
Doing Pronunciation: A Visible & Physical Approach
 
"How content strategy helps to drive customer experience."
"How content strategy helps to drive customer experience.""How content strategy helps to drive customer experience."
"How content strategy helps to drive customer experience."
 
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,Dans l'esprit du Pagerank: regards croisés sur les algorithmes,
Dans l'esprit du Pagerank: regards croisés sur les algorithmes,
 
Health & Safety Mm
Health & Safety MmHealth & Safety Mm
Health & Safety Mm
 
Start with me
Start with me Start with me
Start with me
 
design of sampling filter
design of sampling filter design of sampling filter
design of sampling filter
 
Deisy timaná actividad1_2mapac
Deisy timaná actividad1_2mapacDeisy timaná actividad1_2mapac
Deisy timaná actividad1_2mapac
 
PSICOLOGIA SOCIAL
PSICOLOGIA SOCIALPSICOLOGIA SOCIAL
PSICOLOGIA SOCIAL
 

Similar to C V_PKS (Autosaved)

Similar to C V_PKS (Autosaved) (20)

Resume (1)
Resume (1)Resume (1)
Resume (1)
 
KRT Resume 29th July 2015
KRT Resume 29th July 2015KRT Resume 29th July 2015
KRT Resume 29th July 2015
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume
ResumeResume
Resume
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
CVHomesh
CVHomeshCVHomesh
CVHomesh
 
SOUMEN-RESUME
SOUMEN-RESUMESOUMEN-RESUME
SOUMEN-RESUME
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Manish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experience
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
Resume (Nishit Kumar Gupta)
Resume (Nishit Kumar Gupta)Resume (Nishit Kumar Gupta)
Resume (Nishit Kumar Gupta)
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
 
nitintripathi
nitintripathinitintripathi
nitintripathi
 

C V_PKS (Autosaved)

  • 1. CURRICULUM VITAE PRADEEP KUMAR SHRIVASTAVA Flat No-34, Roopnagar Kota Road, Jhalawar Rajsthan Mob.No:09413351761, 09413390615 pksh0405@yahoo.co.in, pksh0405@gmail.com SCHOLASTICS  B.E. (Electrical Engg.) from Bhopal Universityin 1983 with 72.56%. OBJECTIVE  To emerge as a hardcore and contributing in the growth and development of the organization by achieving the set goals. ~ PPPrrrooojjjeeecccttt /// CCCooonnnssstttrrruuuccctttiiiooonnn MMMaaannnaaagggeeemmmeeennnttt~  A result-oriented professional with morethan29yearsofexperience&expertisein: - Project Management - Quality Management - Installation and Commissioning - Operations & Maintenance - Resource management  Currentlyassociated with JAIPUR VIDYUT VITRAN NIGAM LIMITED,JHALAWAR, RAJASTHAN  Adept in planning, executing construction projects involving contract administration, resource planning in compliance to qualitystandards.  Deft in swiftly rampingupprojectsincloseco-ordinationwithclients,contractors& consultantsandensuring on time deliverables.  Deft at planning, monitoring and consulting all site activities including man power planning, resource planningandfinalizationof responsibilitymatrix for site Manager, team building, monitoring progress of the project.  Proven success in executing various projects such as R- APDRP, Rural electrification, work of Feeder Renovation Program, EHT, HT & LT lines.  Possess excellentcommunication, analytical, problem solving and leadership skills with abilities in liaising with government bodies for obtaining necessarysanctions. COMPETENCYFORTE Project Management  Responsible for planning for project activities and managing erection work including site measurements, reviewing drawings, ensuring compliance with qualitystandards.  Participating in project review meetings for evaluating project progress & de-bottlenecking.  Liaising with clients on determining technical specifications / requirements and commissioning.  Listing down the resource needs for projects, after considering the budgetaryparameters set.  Monitoring project status during the course of periodic project review meetings.  Updating management on progress and status of project.
  • 2. Site / Construction Management  Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximise the output.  Preparing and reviewing of method statements and work specific qualitycontrol plans.  Ensuring machinery/ equipment/materials received are in accordance with the quantity& quality.  Coordinatingallconstruction activities including providing technical inputs for methodologies of construction & coordination with site management activities.  Installing and commissioning of equipments, followed by meeting targeted performance / quality & quantity parameters and thereafter handing over of the project. Team Management:  Coordinating manpower planning for implementation of new projects.  Responsible for team building and providing effective leadership to realize the potential of everymember of the team for delivering quantifiable results. Contract Administration  Preparing technical specifications & scope and deliverables, estimates and BOQ based on requirements generated during detailed engineering of the project.  Coordinating procurement activities like tendering & bid management, estimations, techno-commercial evaluations, contract negotiations, etc.  Handling vendor value worth analysis and selection based on technical and financial competencies. CAREER HIGHLIGHTS Work exposure in the state of Rajasthan, Uttar Pradesh, Uttaranchal leading a term of four executive, ten Junior Engineer. SinceMARCH2006 to till datewith JVVNL, JAIPUR Projects: A- RAPDRP Project in R.Mandi, B.Mandi & Jhalawar Town in RAJASTHAN worth Rs.216 Crs and responsible for planning, execution & completion of project with various agencies as NODAL OFFICER.  Construction of new 11KV O/H lines with ACSR DOG Conductor  Construction of new 11/22KV O/H lines with AB Cable 70/95 mm2  Laying of 11 KV U/G XLPE Cable300/185 mm2  Installation & commissioning of 11 KVRMUs & sectionalizes.  Installation & commissioning of 11/22KV distribution transformers and releasing of service connections. B- Associated in material management for Supply of Power to Rural consumers through FRP programs in Bundi district in year 2006-2009.  Construction of new 11 KV& LT O/H lines with AB Cables and insulated rabbit conductors.  Installation & commissioning of 11KVdistribution transformers.  Reconductering of damaged 33& 11KVlines C-Developed mechanism to control public grievances and solution. D- Implementation of integrated IT approach relating MBC (Metering, Billing and Collection) E- Successfully handled sub divisions and developed a MIS system for ATC. Handled rural, urban and Industrial consumers by implementing Augmentation of transformation capacity in existing power substations, extension of bays in existing 33/11KVsubstations and reconductoring of damaged 33KV& 11 KVlines.
  • 3. FEB 2004 TO MARCH2006 Rural Electrification Corporation Feb 04 to March06 Key Responsibilities as a Nodal Manager  Processed, apprised 75 nos. of schemes of RGGVY (Rajiv Gandhi Gramin Vidhyutikaran Yojana) of UP and Uttaranchal state.  Monitoring of Projects/Schemes  Processed and appraised 13 nos. APDRP schemes for Techno-Financial assistance.  Formulated, Processed and appraised 16 nos. P: SI (EHV) schemes of UP and Uttaranchal state. JAN2001 TO FEB2004 Projects: Completesitemanagementincludesplanning,execution,measurement,billingsandinstallationofelectrical equipments,layingof cables,attendingof faults andrealization of consumerbillingsatvarious citiesof JVVNL, Jaipur. DECEMBER 93 TO DECEMBER 2000 Projects: Completesitemanagementincludesplanning,execution,measurement,billingsandinstallationofelectrical equipments,layingof cables,attendingof faults andrealization of consumerbillingsatvarious citiesof Rajsthan State in RSEB. MAY 91 to DECEMBER 93 Projects:  Executed work of erection & commissioning of new 220/132KV, 132/33KV GSS along with all equipment’s at Jhalawar and Bhilwara  Augmentation of transformation capacity in existing power substations, extension of bays in existing 132/33KV substations Bhilwara and Kota circles of RSEB.  Operation of 132 EHVSUB STATION at Jhalawar. APRIL 85to DEC 91 Projects: Village Electrificationworkconstruction of 33/11KVsub-stations of various capacity, layining of new 11KV, LT lines in Hindoli, Talera, Nainwa, K.Patan Blocks of District Bundi, Rajsthan ACADEMICEXPERIENCE Facultyof Engineering studies Dhamangaon Education Society July84 to March85 MAJOR ACHIEVMENTS  Appreciated by Zonal Chief Engineer for highest revenue remittance during the year 1990-91  Awarded at Zonal level for Best Services for best revenue recovery & maintaining good power supply in the area during the year 1999-2000.  Reduced T&D losses from 39% to 24% by utilizing available limited resources of JVVNL in turn saved approx. 65Crs of JVVNL due to this in between 2006-2013.  Since 1993 achieved nearly 100% realisation target and in 1990-91, 1999-2000, 2007-2008 target achieved was more than 100%.
  • 4. PERSONAL DETAILS Name Pradeep Kumar Shrivastava Date of Birth 25th Dec 1960 Gender Male PresentAddress P. K. Shrivastava JVVNL,Chhabra Road Atru,BARAN (Rajasthan) Cell no. 9413351761 Permanent Address P.K.Shrivastava S/o Shri N.P.Shrivastava 32, Durga Nagar Vidisha (M.P.) Tel. No. 07592-232230 Email address pksh0405@yahoo.co.in Marital Status Married Language Proficiency Hindi: Read, Write & Speak English: Read & Write Extra Curricular Activities NCC “A”,”B” and “C” certificate course. Participated in a Advance Leader Ship Course at Mount- Abu organized byNCC. Place:Baran (PRADEEP SHRIVASTAVA) Date: 29.08.2014