SlideShare a Scribd company logo
Scope Management
Martin Sillaots
2019
# 3
www.projektor.ee/pm/#scope
Scope Definition
• Project Scope - The work that needs to be
accomplished to deliver a product, service, or result
with the specified features and functions
• Product Scope - The features and functions that
characterize a product, service, or result
www.projektor.ee/pm/#scope
Project Scope Management
• Scope planning
• Scope definition
• WBS
• Scope verification
• Scope control
www.projektor.ee/pm/#scope
Project Phases and Processes
Initiation
Planning
Execution Control
Closing
www.projektor.ee/pm/#scope
Scope in the Project Plan
Scope
definition
Quality
planning
Activity
definition
Activity
sequencing
Duration
estimation
Schedule
development
Organization
planning
Resource
planning
Communica-
tion planning
Procurement
planning
Plan
contracting
Select
sellers
Seller
responses
Risk
management
Risk
identification
Qualitative
analysis
Quantitative
analysis
Response
planning
Budgeting
Project
plan
Initiation
Execution
WBS
www.projektor.ee/pm/#scope
Inputs:
- Org process assets
- Project charter*
- Preliminary project
scope statement
- Project scope
management plan
- Approved change
requests
Methods:
- SMART
- Decomposition
(WBS)
Outputs
- Scope statement
- WBS
- WBS dictionary
- Request changes
- Project scope
management plan
updates
Scope Planning
www.projektor.ee/pm/#scope
Inputs
Scope Planning
www.projektor.ee/pm/#scope
Project Charter*
• Project manager name
• Organization (team)
• Requirements and Business needs
• Description of the end result
• Main deliverables
• Stakeholders influence
• Business case
• Summary milestones (estimated deadline)
• Summary budget (estimated price)
• Assumptions and constrains
www.projektor.ee/pm/#scope
Scope Management Plan
• Process how the scope will be defined
• Process how the WBS will be created
• Process how verification will be obtained
• Process how changes will be handled
www.projektor.ee/pm/#scope
Methods
Scope Planning
www.projektor.ee/pm/#scope
SMART – Method for Defining Objectives
• Specific
• Measurable
• Assignable
• Realistic
• Time-related
www.projektor.ee/pm/#scope
Example Objective
• Project scope is to develop 2D graphical-adventure game for
learning language. Game is in FPV, web based and story
related. Dialogues will be presented in text format.
• Game contains 3 chapters (levels). Each chapter contains 5
scenes (action points). Each scene contains 1-2 dialogues (1-
2 NPC’s).
• Fully operational game is finished in the end of 3 month
project.
• Estimated budget 20 000 EUR
www.projektor.ee/pm/#scope
Exercise
Use SMART rule and define your project
objective
www.projektor.ee/pm/#scope
Needs VS Scope
www.projektor.ee/pm/#scope
WBS
Work Breakdown Structure
Deliverable oriented hierarchical
decomposition of the work
www.projektor.ee/pm/#scope
Purpose of the WBS
• Subdivides the project into smaller manageable units –
Work Packages
• Refine the scope, duration, cost and resources
• Basis for further planning
• Basis for responsibility assignments
www.projektor.ee/pm/#scope
Decomposition Procedure
1. Define main deliverables
2. Is it possible to estimate cost and duration for
deliverables?
3. If yes then continue with step 5, else step 4
4. Divide deliverables into sub-deliverables. Repeat
step 2
5. Check is the decomposition logical and complete?
6. Coding
www.projektor.ee/pm/#scope
Decomposition Procedure
Define level N deliverables
Can you
estimate
deliverable
duration
and cost?
Integrity and logical check
NO
YES
www.projektor.ee/pm/#scope
WBS Example
Game
Analyze Design Develop Implement Evaluation
www.projektor.ee/pm/#scope
WBS Example
Game
Rules Story Graphics Sound Code
www.projektor.ee/pm/#scope
Game
Rules
Resources Objects Events Connections Conditions
Story
Narrative Dialogues
Graphics
Avatar Characters Items Scenes
WBS Example
Game
Graphics
atar Characters Items Scenes UI
Sound
Music Effects Voice over
Code
Core
Main
gameplay
Menu
www.projektor.ee/pm/#scope
Exercise
Create your project WBS
www.projektor.ee/pm/#scope
www.projektor.ee/pm/#scope
Outcome
Scope Planning
www.projektor.ee/pm/#scope
Project Scope Statement
• Objectives
• Product description
• Requirements
• Boundaries
• Deliverables
• Acceptance criteria
• Constrains
• Assumptions
• Initial organization
• Initial risks
• Milestones
• Fund limitation
• Cost estimate
• Change management
• Specifications
• Approvals
www.projektor.ee/pm/#scope
Scope Verification and Control
www.projektor.ee/pm/#scope
Project Phases and Processes
Initiation
Planning
Execution Control
Closing
www.projektor.ee/pm/#scope
Scope Verification and Control
Information
distribution
Project
execution
Procurement
management
Reporting
Team
development
Schedule
control
Scope
verification
Cost
control
Quality
control
Risk
monitoring
Change
management
Planning
Closing
www.projektor.ee/pm/#scope
Scope Verification
Process for obtaining stakeholder’s formal
acceptance to the project scope and
deliverables
www.projektor.ee/pm/#scope
Scope Control
Management of scope changes
• Avoiding scope changes
• Identifying scope changes
• Evaluating change requests
• Planning and executing changes
• Communicating changes
• Archiving
www.projektor.ee/pm/#scope
Inputs:
- Project scope
statement
- WBS
- Project plan
- Performance reports
- Deliverables
Methods:
- Inspection
- Scope Change
control system
- Variance analysis
- Configuration
management system
Outputs
- Deliverables
- Change requests
- Corrective actions
- Plan updates
Scope Verification and Control
www.projektor.ee/pm/#scope
Scope Inspection (Review)
• Measuring
• Examining
• Verifying
Does the project work and deliverables meet
acceptance criteria?
www.projektor.ee/pm/#scope
Scope Change Control System
Procedures how the scope can be
changed (documentation, tracking,
approval procedures)
www.projektor.ee/pm/#scope
The End of Scope
martinsillaots@gmail.com

More Related Content

What's hot

Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
Galala University
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
test prod1
 
And The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role GoesAnd The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role Goes
Lisa McCurry, PMP, CSM, PMI-ACP
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1
test prod1
 
Wolff - 2016 Resume
Wolff - 2016 ResumeWolff - 2016 Resume
Wolff - 2016 Resume
Jamie Wolff
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1
test prod1
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
Samsul Alam
 
File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2
test prod1
 
File 3 original
File 3 original File 3 original
File 3 original
test prod1
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1
test prod1
 
File 3 removed 1 word 2
File 3 removed 1 word 2File 3 removed 1 word 2
File 3 removed 1 word 2
test prod1
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
test prod1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
test prod1
 
Construction project manager
Construction project managerConstruction project manager
Construction project manager
projectmanagement12
 
SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
Senthil Kumar, PMP®
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1
test prod1
 
File 3 removed 1 slide 2
File 3 removed 1 slide 2File 3 removed 1 slide 2
File 3 removed 1 slide 2
test prod1
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 

What's hot (18)

Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
And The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role GoesAnd The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role Goes
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1
 
Wolff - 2016 Resume
Wolff - 2016 ResumeWolff - 2016 Resume
Wolff - 2016 Resume
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2
 
File 3 original
File 3 original File 3 original
File 3 original
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1
 
File 3 removed 1 word 2
File 3 removed 1 word 2File 3 removed 1 word 2
File 3 removed 1 word 2
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
 
Construction project manager
Construction project managerConstruction project manager
Construction project manager
 
SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1
 
File 3 removed 1 slide 2
File 3 removed 1 slide 2File 3 removed 1 slide 2
File 3 removed 1 slide 2
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 

Similar to Project Scope Management

L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
MUST
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
MUST
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
university(kust)
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.ppt
MehediHasan636262
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
IlonaThornburg83
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
storybridge
 
Project management
Project managementProject management
Pm training day 3
Pm training   day 3Pm training   day 3
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profiles
PriyankaKale53
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
Daniel Thuraiappah
 
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
BDO IT Solutions
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentation
Kumar M.
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
Rafael Sultanov
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
Sushant895574
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
DavidMcLachlan1
 
project planning components.pdf
project planning components.pdfproject planning components.pdf
project planning components.pdf
saman Iftikhar
 
Primavera Course @ First CADD - Jayanagar,Bangalore
 Primavera Course @  First CADD - Jayanagar,Bangalore Primavera Course @  First CADD - Jayanagar,Bangalore
Primavera Course @ First CADD - Jayanagar,Bangalore
Ravi Jeyaraman
 
First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera course
FirstCADD2014
 
Project design and management
Project design and managementProject design and management
Project design and management
Andrew Zolnai
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 

Similar to Project Scope Management (20)

L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.ppt
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
Project management
Project managementProject management
Project management
 
Pm training day 3
Pm training   day 3Pm training   day 3
Pm training day 3
 
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profiles
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentation
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
project planning components.pdf
project planning components.pdfproject planning components.pdf
project planning components.pdf
 
Primavera Course @ First CADD - Jayanagar,Bangalore
 Primavera Course @  First CADD - Jayanagar,Bangalore Primavera Course @  First CADD - Jayanagar,Bangalore
Primavera Course @ First CADD - Jayanagar,Bangalore
 
First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera course
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Project management
Project managementProject management
Project management
 

More from Martin Sillaots

eAdventureEN
eAdventureENeAdventureEN
eAdventureEN
Martin Sillaots
 
Documents
DocumentsDocuments
Documents
Martin Sillaots
 
Game Monetisation and Marketing
Game Monetisation and MarketingGame Monetisation and Marketing
Game Monetisation and Marketing
Martin Sillaots
 
Prototyping
PrototypingPrototyping
Prototyping
Martin Sillaots
 
User Interface
User InterfaceUser Interface
User Interface
Martin Sillaots
 
Level Design
Level DesignLevel Design
Level Design
Martin Sillaots
 
Story
StoryStory
Characters
CharactersCharacters
Characters
Martin Sillaots
 
Game World
Game WorldGame World
Game World
Martin Sillaots
 
Game Balancing
Game BalancingGame Balancing
Game Balancing
Martin Sillaots
 
Core Mechanics
Core MechanicsCore Mechanics
Core Mechanics
Martin Sillaots
 
Gameplay
GameplayGameplay
Gameplay
Martin Sillaots
 
Game Concept
Game ConceptGame Concept
Game Concept
Martin Sillaots
 
Game Idea
Game IdeaGame Idea
Game Idea
Martin Sillaots
 
Game Design Process
Game Design ProcessGame Design Process
Game Design Process
Martin Sillaots
 
Game Elements
Game ElementsGame Elements
Game Elements
Martin Sillaots
 
Introduction to Game Design
Introduction to Game DesignIntroduction to Game Design
Introduction to Game Design
Martin Sillaots
 
Project Control
Project ControlProject Control
Project Control
Martin Sillaots
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
Martin Sillaots
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Martin Sillaots
 

More from Martin Sillaots (20)

eAdventureEN
eAdventureENeAdventureEN
eAdventureEN
 
Documents
DocumentsDocuments
Documents
 
Game Monetisation and Marketing
Game Monetisation and MarketingGame Monetisation and Marketing
Game Monetisation and Marketing
 
Prototyping
PrototypingPrototyping
Prototyping
 
User Interface
User InterfaceUser Interface
User Interface
 
Level Design
Level DesignLevel Design
Level Design
 
Story
StoryStory
Story
 
Characters
CharactersCharacters
Characters
 
Game World
Game WorldGame World
Game World
 
Game Balancing
Game BalancingGame Balancing
Game Balancing
 
Core Mechanics
Core MechanicsCore Mechanics
Core Mechanics
 
Gameplay
GameplayGameplay
Gameplay
 
Game Concept
Game ConceptGame Concept
Game Concept
 
Game Idea
Game IdeaGame Idea
Game Idea
 
Game Design Process
Game Design ProcessGame Design Process
Game Design Process
 
Game Elements
Game ElementsGame Elements
Game Elements
 
Introduction to Game Design
Introduction to Game DesignIntroduction to Game Design
Introduction to Game Design
 
Project Control
Project ControlProject Control
Project Control
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 

Recently uploaded

Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
ssuser13ffe4
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
Amin Marwan
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 

Recently uploaded (20)

Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 

Project Scope Management

  • 1. Scope Management Martin Sillaots 2019 # 3 www.projektor.ee/pm/#scope
  • 2. Scope Definition • Project Scope - The work that needs to be accomplished to deliver a product, service, or result with the specified features and functions • Product Scope - The features and functions that characterize a product, service, or result www.projektor.ee/pm/#scope
  • 3. Project Scope Management • Scope planning • Scope definition • WBS • Scope verification • Scope control www.projektor.ee/pm/#scope
  • 4. Project Phases and Processes Initiation Planning Execution Control Closing www.projektor.ee/pm/#scope
  • 5. Scope in the Project Plan Scope definition Quality planning Activity definition Activity sequencing Duration estimation Schedule development Organization planning Resource planning Communica- tion planning Procurement planning Plan contracting Select sellers Seller responses Risk management Risk identification Qualitative analysis Quantitative analysis Response planning Budgeting Project plan Initiation Execution WBS www.projektor.ee/pm/#scope
  • 6. Inputs: - Org process assets - Project charter* - Preliminary project scope statement - Project scope management plan - Approved change requests Methods: - SMART - Decomposition (WBS) Outputs - Scope statement - WBS - WBS dictionary - Request changes - Project scope management plan updates Scope Planning www.projektor.ee/pm/#scope
  • 8. Project Charter* • Project manager name • Organization (team) • Requirements and Business needs • Description of the end result • Main deliverables • Stakeholders influence • Business case • Summary milestones (estimated deadline) • Summary budget (estimated price) • Assumptions and constrains www.projektor.ee/pm/#scope
  • 9. Scope Management Plan • Process how the scope will be defined • Process how the WBS will be created • Process how verification will be obtained • Process how changes will be handled www.projektor.ee/pm/#scope
  • 11. SMART – Method for Defining Objectives • Specific • Measurable • Assignable • Realistic • Time-related www.projektor.ee/pm/#scope
  • 12. Example Objective • Project scope is to develop 2D graphical-adventure game for learning language. Game is in FPV, web based and story related. Dialogues will be presented in text format. • Game contains 3 chapters (levels). Each chapter contains 5 scenes (action points). Each scene contains 1-2 dialogues (1- 2 NPC’s). • Fully operational game is finished in the end of 3 month project. • Estimated budget 20 000 EUR www.projektor.ee/pm/#scope
  • 13. Exercise Use SMART rule and define your project objective www.projektor.ee/pm/#scope
  • 15. WBS Work Breakdown Structure Deliverable oriented hierarchical decomposition of the work www.projektor.ee/pm/#scope
  • 16. Purpose of the WBS • Subdivides the project into smaller manageable units – Work Packages • Refine the scope, duration, cost and resources • Basis for further planning • Basis for responsibility assignments www.projektor.ee/pm/#scope
  • 17. Decomposition Procedure 1. Define main deliverables 2. Is it possible to estimate cost and duration for deliverables? 3. If yes then continue with step 5, else step 4 4. Divide deliverables into sub-deliverables. Repeat step 2 5. Check is the decomposition logical and complete? 6. Coding www.projektor.ee/pm/#scope
  • 18. Decomposition Procedure Define level N deliverables Can you estimate deliverable duration and cost? Integrity and logical check NO YES www.projektor.ee/pm/#scope
  • 19. WBS Example Game Analyze Design Develop Implement Evaluation www.projektor.ee/pm/#scope
  • 20. WBS Example Game Rules Story Graphics Sound Code www.projektor.ee/pm/#scope
  • 21. Game Rules Resources Objects Events Connections Conditions Story Narrative Dialogues Graphics Avatar Characters Items Scenes WBS Example Game Graphics atar Characters Items Scenes UI Sound Music Effects Voice over Code Core Main gameplay Menu www.projektor.ee/pm/#scope
  • 22. Exercise Create your project WBS www.projektor.ee/pm/#scope
  • 25. Project Scope Statement • Objectives • Product description • Requirements • Boundaries • Deliverables • Acceptance criteria • Constrains • Assumptions • Initial organization • Initial risks • Milestones • Fund limitation • Cost estimate • Change management • Specifications • Approvals www.projektor.ee/pm/#scope
  • 26. Scope Verification and Control www.projektor.ee/pm/#scope
  • 27. Project Phases and Processes Initiation Planning Execution Control Closing www.projektor.ee/pm/#scope
  • 28. Scope Verification and Control Information distribution Project execution Procurement management Reporting Team development Schedule control Scope verification Cost control Quality control Risk monitoring Change management Planning Closing www.projektor.ee/pm/#scope
  • 29. Scope Verification Process for obtaining stakeholder’s formal acceptance to the project scope and deliverables www.projektor.ee/pm/#scope
  • 30. Scope Control Management of scope changes • Avoiding scope changes • Identifying scope changes • Evaluating change requests • Planning and executing changes • Communicating changes • Archiving www.projektor.ee/pm/#scope
  • 31. Inputs: - Project scope statement - WBS - Project plan - Performance reports - Deliverables Methods: - Inspection - Scope Change control system - Variance analysis - Configuration management system Outputs - Deliverables - Change requests - Corrective actions - Plan updates Scope Verification and Control www.projektor.ee/pm/#scope
  • 32. Scope Inspection (Review) • Measuring • Examining • Verifying Does the project work and deliverables meet acceptance criteria? www.projektor.ee/pm/#scope
  • 33. Scope Change Control System Procedures how the scope can be changed (documentation, tracking, approval procedures) www.projektor.ee/pm/#scope
  • 34. The End of Scope martinsillaots@gmail.com

Editor's Notes

  1. Piirangud: Org, struktuur Standardid Infrastruktuur Ressursid Turutingimused Riskitundlikus IS
  2. A - Accepted
  3. Testimine – kuidas kasutajad vastu võtavad? Levitamine – mitu kasutajat? Müük – palju raha?
  4. Based on project phases
  5. Project deliverables
  6. Objectives – include measurable success criteria Scope description – characteristics of the project, product or service (preliminary functionalities) Requirements – client needs, standards, Boundaries – what is excluded Deliverables – product outputs and project documents Criteria – Constrains – e.g. predefined budget, deadline Assumptions – e.g. experts with specific competences Organization – e.g. team members, stakeholders Risks –
  7. AKA Review, Audit, Walkthrough