Project: Reduction of Dust
at DRI Plant
AIM: Dust Free DRI
Agenda & Task Identification
Area identified by external trainers from SSU “DRI Division”
 Identification of most dust generating areas.
 Reason of dust generation in this area.
 Are these reasons creating dust generation in this area AVOIDABLE or
UNAVOIDABLE.
 Can these reasons be eliminated without affecting the process.
 What machine or methodology is at place to control pollution.
 What is status of these machines in terms of maintenance, performance,
availability & utilization.
 Are machine and methodology adopted are adequate and effective.
 What can be alternate arrangement to control the dust.
 Are the workmen aware about the pollution control devices.
 Is there any procedure to define to control pollution at this place.
 Taking suggestion from the area in charges.
Team formed on 07.10.21
Team Members:
1. Mr.Lalji Mishra
2. Mr.Debasish Samal
3. Mr.C.K Senapati
4. Mr.P.K Ramudu
5. Mr.Arun Das
6. Mr.G.R Biswal
7. Mr.A.Permanik
8. Mr.B.B Sahu
9. Mr.Pratap Rai
10. Mr.S.P Satpathy
12. Mr.S.R.Patel
13. Mr.N.Kundu
14. Mr.A.Manna
15. Mr.Manoranjan Lenka
 Brain Storming Meeting held on dated 08.10.2021.
 Site visit after Brain Storming Meeting held on dated 08.10.2021.
 Meeting and site visit after taking some action
 Brain Storming Meeting held on dated 08.10.2021.
 Feasibility study of Suggestions
The Following points were concluded
after brain storming
 CD-2 belt chute modification to be done
 15-A belt tail end side impact idlers to be fixed
 Stone box fixing arrangement in chutes
 ZSS and BSS installation
 House keeping on 15-A platform and across it’s surrounding
 15-A Tail end suction point duct Modification has done to
 Minimise no's of bends.
 New staircase to be fixed in 15-A tail end platform.
 Guarding arrangement to be done across BC-15-A tail end side
 for safety purpose.
 All leakages in duct line and new skirt guard arrangement in
 BC 15-A tail end to avoid spoilages.
 Action Points Status
# Discussed Points Action Plan Target Date Compliance
Status
Responsibility
1 CD-2 belt chute
modification to be done
CD-1 belt chute modification has
been completed and CD-2 belt
chute modification has Planned to
do during shutdown time of KILN-
2
KIln-2
Shutdown
period
Completed
On Apr-22
Mech. DRI
G.R Biswal
2 15-A belt tailend side
impact idlers to be fixed
New idlers Installed
18-12-2021 18-12-2021
Mech. DRI
G.R Biswal
3 Stone box fixing
arragement in chutes Both the side was complete 17-12-2021 17-12-2021
Mech. DRI
G.R Biswal
4 ZSS and BSS installation Zero Speed Switch/Belt Sway
Switch were Installed
14-12-2021 14-12-2021
E&I DRI
B.B Sahu
5 House keeping on 15-A
platform and across it’s
sorrounding
Proper Housekeeping to be
maintained
31-12-2021 31-12-2021
Process DRI
T.R Bastia
 Action Points Status
6
15-A Tail end suction point duct
Modification has done to minimize no.
of bends
Properly Re-Routed and 3
nos. bend reduced.
13-11-2021
Mech. DRI
G.R Biswal
7
New staircase to be fixed in 15-A
tailend platform.
New Staircase Along with
proper hand railings has
been fixed
26-12-2021 Mech. DRI
G.R Biswal
8
Guarding arragement to be done
accross BC-15-A tailend side for
safety purpose.
Proper Barriacation and
Guarding has been Fixed
14-01-2022
Mech. DRI
G.R Biswal
9
All leakages in duct line and new skirt
guard arrangement in BC 15-A tail end
to avoid spilages.
All Leakages Has been
Attended and Minimised to
Optimum Level
29-10-2021
Mech. DRI
G.R Biswal
Process
Owner
VP(DRI)
E&I(DRI)
After
Before
 Before and After Video
Video No. Date
1 09.10.21
2 09.10.21
3 09.10.21
4 19.10.21
5 23.10.21
6 18.12.21
1. All the fines dust and waste materials across 15-A belt tail end platform and it’s ground floor to be
cleaned within 31-12-2021 to study the quantity of actual dust generation across this area.
2. After site visit it was concluded the dust generation has been reduced to 30% till now in this area.
3. The next meeting of MAA SHAKTI is scheduled on 1st week of jan-2022.
Special thanks to DRI team for their immense support as and when required.
Sustainability Study and Impact assessment
15.07.2022
Project Dust Reduction from dri junction houses.ppt

More Related Content

Similar to Project Dust Reduction from dri junction houses.ppt

CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
Ali Issa
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ssuser3797b9
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUS
Rajdip Das
 
d_walsh_directional.pdf
d_walsh_directional.pdfd_walsh_directional.pdf
d_walsh_directional.pdf
peter877754
 
CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
Bharath Gummaraj
 
BASP Service Quality Meeting EMK-45 Final.pptx
BASP Service Quality Meeting EMK-45 Final.pptxBASP Service Quality Meeting EMK-45 Final.pptx
BASP Service Quality Meeting EMK-45 Final.pptx
ssusera21b97
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
Minh Bui Si
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
Joshua Yu
 

Similar to Project Dust Reduction from dri junction houses.ppt (20)

CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
jahangir
jahangirjahangir
jahangir
 
Design Status.pptx
Design Status.pptxDesign Status.pptx
Design Status.pptx
 
PULSE-SBM.pptx
PULSE-SBM.pptxPULSE-SBM.pptx
PULSE-SBM.pptx
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUS
 
d_walsh_directional.pdf
d_walsh_directional.pdfd_walsh_directional.pdf
d_walsh_directional.pdf
 
CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
 
Work Term Overview
Work Term OverviewWork Term Overview
Work Term Overview
 
2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng
 
BASP Service Quality Meeting EMK-45 Final.pptx
BASP Service Quality Meeting EMK-45 Final.pptxBASP Service Quality Meeting EMK-45 Final.pptx
BASP Service Quality Meeting EMK-45 Final.pptx
 
MODULE 8 NOTES CEM (1).pdf
MODULE 8 NOTES CEM (1).pdfMODULE 8 NOTES CEM (1).pdf
MODULE 8 NOTES CEM (1).pdf
 
Rec 95 pdf688
Rec 95 pdf688Rec 95 pdf688
Rec 95 pdf688
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdf
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
ccl-weekly report week8.pptx
ccl-weekly report week8.pptxccl-weekly report week8.pptx
ccl-weekly report week8.pptx
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
 
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
 

Recently uploaded

21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 

Recently uploaded (20)

Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 

Project Dust Reduction from dri junction houses.ppt

  • 1. Project: Reduction of Dust at DRI Plant AIM: Dust Free DRI
  • 2. Agenda & Task Identification Area identified by external trainers from SSU “DRI Division”  Identification of most dust generating areas.  Reason of dust generation in this area.  Are these reasons creating dust generation in this area AVOIDABLE or UNAVOIDABLE.  Can these reasons be eliminated without affecting the process.  What machine or methodology is at place to control pollution.  What is status of these machines in terms of maintenance, performance, availability & utilization.  Are machine and methodology adopted are adequate and effective.  What can be alternate arrangement to control the dust.  Are the workmen aware about the pollution control devices.  Is there any procedure to define to control pollution at this place.  Taking suggestion from the area in charges.
  • 3. Team formed on 07.10.21 Team Members: 1. Mr.Lalji Mishra 2. Mr.Debasish Samal 3. Mr.C.K Senapati 4. Mr.P.K Ramudu 5. Mr.Arun Das 6. Mr.G.R Biswal 7. Mr.A.Permanik 8. Mr.B.B Sahu 9. Mr.Pratap Rai 10. Mr.S.P Satpathy 12. Mr.S.R.Patel 13. Mr.N.Kundu 14. Mr.A.Manna 15. Mr.Manoranjan Lenka
  • 4.  Brain Storming Meeting held on dated 08.10.2021.
  • 5.  Site visit after Brain Storming Meeting held on dated 08.10.2021.
  • 6.  Meeting and site visit after taking some action
  • 7.  Brain Storming Meeting held on dated 08.10.2021.
  • 8.  Feasibility study of Suggestions
  • 9. The Following points were concluded after brain storming  CD-2 belt chute modification to be done  15-A belt tail end side impact idlers to be fixed  Stone box fixing arrangement in chutes  ZSS and BSS installation  House keeping on 15-A platform and across it’s surrounding  15-A Tail end suction point duct Modification has done to  Minimise no's of bends.  New staircase to be fixed in 15-A tail end platform.  Guarding arrangement to be done across BC-15-A tail end side  for safety purpose.  All leakages in duct line and new skirt guard arrangement in  BC 15-A tail end to avoid spoilages.
  • 10.  Action Points Status # Discussed Points Action Plan Target Date Compliance Status Responsibility 1 CD-2 belt chute modification to be done CD-1 belt chute modification has been completed and CD-2 belt chute modification has Planned to do during shutdown time of KILN- 2 KIln-2 Shutdown period Completed On Apr-22 Mech. DRI G.R Biswal 2 15-A belt tailend side impact idlers to be fixed New idlers Installed 18-12-2021 18-12-2021 Mech. DRI G.R Biswal 3 Stone box fixing arragement in chutes Both the side was complete 17-12-2021 17-12-2021 Mech. DRI G.R Biswal 4 ZSS and BSS installation Zero Speed Switch/Belt Sway Switch were Installed 14-12-2021 14-12-2021 E&I DRI B.B Sahu 5 House keeping on 15-A platform and across it’s sorrounding Proper Housekeeping to be maintained 31-12-2021 31-12-2021 Process DRI T.R Bastia
  • 11.  Action Points Status 6 15-A Tail end suction point duct Modification has done to minimize no. of bends Properly Re-Routed and 3 nos. bend reduced. 13-11-2021 Mech. DRI G.R Biswal 7 New staircase to be fixed in 15-A tailend platform. New Staircase Along with proper hand railings has been fixed 26-12-2021 Mech. DRI G.R Biswal 8 Guarding arragement to be done accross BC-15-A tailend side for safety purpose. Proper Barriacation and Guarding has been Fixed 14-01-2022 Mech. DRI G.R Biswal 9 All leakages in duct line and new skirt guard arrangement in BC 15-A tail end to avoid spilages. All Leakages Has been Attended and Minimised to Optimum Level 29-10-2021 Mech. DRI G.R Biswal
  • 14.  Before and After Video Video No. Date 1 09.10.21 2 09.10.21 3 09.10.21 4 19.10.21 5 23.10.21 6 18.12.21
  • 15. 1. All the fines dust and waste materials across 15-A belt tail end platform and it’s ground floor to be cleaned within 31-12-2021 to study the quantity of actual dust generation across this area. 2. After site visit it was concluded the dust generation has been reduced to 30% till now in this area. 3. The next meeting of MAA SHAKTI is scheduled on 1st week of jan-2022. Special thanks to DRI team for their immense support as and when required.
  • 16. Sustainability Study and Impact assessment 15.07.2022