PC-II FORM
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PROFORMA FOR DEVELOPMENT PROJECTS
(SURVEY AND FEASIBILITY STUDIES)
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PC-1I FORM
PROFORMA FOR DEVELOPMENT PROJECTS
(SURVEY AND FEASIBILITY STUDIES)
.
1) Name by which survey/ feasibility will be identified
2) Administrative authorities responsible for
i) Sponsoring
ii) Execution
3) Details of survey/feasibility study
i. General description and justification
ii. Implementation period
iii. Year wise estimated cost
iv. Manpower requirements
v. Financial plan
4) Expected outcome of the survey feasibility study and details of
projects likely to be submitted after the survey.
Prepared by _______________________
Name, Designation & Phone #
Checked by _______________________
Name, Designation & Phone #
Approved by _______________________
Name, Designation & Phone #
2
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
Instructions to fill in PC-II Proforma
1. Name of the Project
Please indicate the name by which survey/feasibility study
will be undertaken.
2. Administrative authority
Indicate name of the agency responsible for sponsoring and
execution of the project.
3. Details of survey/feasibility study
• Provide a general description of the aims, objectives and
coverage of the survey/feasibility Study.
• Provide justification for undertaking the survey/feasibility
Study. Indicate whether previous studies in the field have
been undertaken. If so, provide details.
• Indicate duration of study and proposed months of
commencement and completion of the study.
• Provide item-wise/year-wise capital cost estimate of the
study broken down between local and foreign exchange.
• Indicate date on which cost estimates were prepared and
the basis of these estimates.
• Sources of financing the capital cost be provided
• Indicate requirements separately for local and foreign
personnel i.e. professional, technical, administrative,
clerical, skilled, unskilled, others alongwith their terms of
reference.
• Indicate the period of contract of both the local and foreign
consultants alongwith qualifications, experience and the
terms of their appointment.
3
4. Expected outcome
• Indicate the expected outcome of the survey/feasibility study
in quantifiable terms. It may also be indicated whether any
project will be prepared after the survey.
4

More Related Content

What's hot

BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel Almenares
Daniel Almenares
 
Construction Management Introduction ppt
Construction Management  Introduction pptConstruction Management  Introduction ppt
Construction Management Introduction ppt
RajeshPV12
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
Chun Keung Ng
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation Slides
SlideTeam
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
Abhishek Shah
 
6.3 sequence activities
6.3 sequence activities6.3 sequence activities
6.3 sequence activities
PMVISION Training
 
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعArchitectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Galala University
 
Drafting Portfolio
Drafting PortfolioDrafting Portfolio
Drafting Portfolio
fireram
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
Shree Swami atmanand saraswati inst. of technology, surat
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
Eduardo Alves
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & management
Kundan Sanap
 
Singapore bim-guide v2
Singapore bim-guide v2Singapore bim-guide v2
Singapore bim-guide v2
Huytraining
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09LisaSnyder
 
Bridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric DesignBridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric Design
Stefan Boeykens
 
Building approval.ppt
Building approval.pptBuilding approval.ppt
Building approval.ppt
wan izzati
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1
Weng Chuan
 
Cad Portfolio
Cad PortfolioCad Portfolio
Cad Portfolio
RogerC62
 
Construction project management
Construction project managementConstruction project management
Construction project management
saif hasan
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
Ian McGaw
 

What's hot (20)

BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel Almenares
 
Construction Management Introduction ppt
Construction Management  Introduction pptConstruction Management  Introduction ppt
Construction Management Introduction ppt
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation Slides
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
STUDY OF CONSTRUCTION DISPUTES & IT’s RESOLUTION THROUGH ARBITRATION FOR AHME...
 
6.3 sequence activities
6.3 sequence activities6.3 sequence activities
6.3 sequence activities
 
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعArchitectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
 
Drafting Portfolio
Drafting PortfolioDrafting Portfolio
Drafting Portfolio
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & management
 
Singapore bim-guide v2
Singapore bim-guide v2Singapore bim-guide v2
Singapore bim-guide v2
 
Construction portfolio pdf 7-9-09
Construction portfolio   pdf 7-9-09Construction portfolio   pdf 7-9-09
Construction portfolio pdf 7-9-09
 
Bridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric DesignBridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric Design
 
Building approval.ppt
Building approval.pptBuilding approval.ppt
Building approval.ppt
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1
 
Cad Portfolio
Cad PortfolioCad Portfolio
Cad Portfolio
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
 

Similar to Proforma pc ii(survey feasbility study)1

Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
AbdulrahmanAfabafal
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
Huma Ilyas
 
Template Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptxTemplate Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptx
JamesJoeJoeseph
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Projectimrohan1
 
Project proposal to start a new enterprise
Project proposal to start a new enterpriseProject proposal to start a new enterprise
Project proposal to start a new enterprise
Samaira Mujeeb
 
Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
hayat alishah
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
hayat alishah
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdf
Saqib Imran
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdf
Dereje Jima
 
Developed By and For the Use of the PMI Baltimore ChapterProject.docx
Developed By and For the Use of the PMI Baltimore ChapterProject.docxDeveloped By and For the Use of the PMI Baltimore ChapterProject.docx
Developed By and For the Use of the PMI Baltimore ChapterProject.docx
simonithomas47935
 
Drafting a project proposal
Drafting a project proposalDrafting a project proposal
Drafting a project proposal
Vidyavinutha
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
taruian
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
Amit Pokharel
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptx
BlackEagles1
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Alan Millett
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
rinkumandaljis
 
project management
project managementproject management
project management
KomalaselvanV1
 

Similar to Proforma pc ii(survey feasbility study)1 (20)

Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Template Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptxTemplate Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptx
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
Project proposal to start a new enterprise
Project proposal to start a new enterpriseProject proposal to start a new enterprise
Project proposal to start a new enterprise
 
Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdf
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdf
 
Developed By and For the Use of the PMI Baltimore ChapterProject.docx
Developed By and For the Use of the PMI Baltimore ChapterProject.docxDeveloped By and For the Use of the PMI Baltimore ChapterProject.docx
Developed By and For the Use of the PMI Baltimore ChapterProject.docx
 
Drafting a project proposal
Drafting a project proposalDrafting a project proposal
Drafting a project proposal
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
 
Primavera trainer
Primavera trainerPrimavera trainer
Primavera trainer
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptx
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
My CV
My CVMy CV
My CV
 
project management
project managementproject management
project management
 

More from hayat alishah

Tourism policy
Tourism policyTourism policy
Tourism policy
hayat alishah
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
hayat alishah
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
hayat alishah
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
hayat alishah
 
Aip tourism
Aip tourismAip tourism
Aip tourism
hayat alishah
 
Aip dev
Aip devAip dev
Aip dev
hayat alishah
 
Progress report
Progress reportProgress report
Progress report
hayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
hayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
hayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
hayat alishah
 
Member list
Member listMember list
Member list
hayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
hayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
hayat alishah
 
Document 26
Document 26Document 26
Document 26
hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
hayat alishah
 

More from hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Recently uploaded

一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
slg6lamcq
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
u86oixdj
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
Timothy Spann
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
mbawufebxi
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
Oppotus
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
axoqas
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
javier ramirez
 
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
pchutichetpong
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
ewymefz
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
Adjusting OpenMP PageRank : SHORT REPORT / NOTES
Adjusting OpenMP PageRank : SHORT REPORT / NOTESAdjusting OpenMP PageRank : SHORT REPORT / NOTES
Adjusting OpenMP PageRank : SHORT REPORT / NOTES
Subhajit Sahu
 
Everything you wanted to know about LIHTC
Everything you wanted to know about LIHTCEverything you wanted to know about LIHTC
Everything you wanted to know about LIHTC
Roger Valdez
 
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
NABLAS株式会社
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
slg6lamcq
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
axoqas
 
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
v3tuleee
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
74nqk8xf
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
jerlynmaetalle
 

Recently uploaded (20)

一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
 
The Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series DatabaseThe Building Blocks of QuestDB, a Time Series Database
The Building Blocks of QuestDB, a Time Series Database
 
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
Data Centers - Striving Within A Narrow Range - Research Report - MCG - May 2...
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
Adjusting OpenMP PageRank : SHORT REPORT / NOTES
Adjusting OpenMP PageRank : SHORT REPORT / NOTESAdjusting OpenMP PageRank : SHORT REPORT / NOTES
Adjusting OpenMP PageRank : SHORT REPORT / NOTES
 
Everything you wanted to know about LIHTC
Everything you wanted to know about LIHTCEverything you wanted to know about LIHTC
Everything you wanted to know about LIHTC
 
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
 
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理一比一原版(UofS毕业证书)萨省大学毕业证如何办理
一比一原版(UofS毕业证书)萨省大学毕业证如何办理
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
 
Influence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business PlanInfluence of Marketing Strategy and Market Competition on Business Plan
Influence of Marketing Strategy and Market Competition on Business Plan
 

Proforma pc ii(survey feasbility study)1

  • 1. Revised 2005 PC-II FORM GOVERNMENT OF PAKISTAN PLANNING COMMISSION PROFORMA FOR DEVELOPMENT PROJECTS (SURVEY AND FEASIBILITY STUDIES)
  • 2. Revised 2005 GOVERNMENT OF PAKISTAN PLANNING COMMISSION PC-1I FORM PROFORMA FOR DEVELOPMENT PROJECTS (SURVEY AND FEASIBILITY STUDIES) . 1) Name by which survey/ feasibility will be identified 2) Administrative authorities responsible for i) Sponsoring ii) Execution 3) Details of survey/feasibility study i. General description and justification ii. Implementation period iii. Year wise estimated cost iv. Manpower requirements v. Financial plan 4) Expected outcome of the survey feasibility study and details of projects likely to be submitted after the survey. Prepared by _______________________ Name, Designation & Phone # Checked by _______________________ Name, Designation & Phone # Approved by _______________________ Name, Designation & Phone # 2
  • 3. Revised 2005 GOVERNMENT OF PAKISTAN PLANNING COMMISSION Instructions to fill in PC-II Proforma 1. Name of the Project Please indicate the name by which survey/feasibility study will be undertaken. 2. Administrative authority Indicate name of the agency responsible for sponsoring and execution of the project. 3. Details of survey/feasibility study • Provide a general description of the aims, objectives and coverage of the survey/feasibility Study. • Provide justification for undertaking the survey/feasibility Study. Indicate whether previous studies in the field have been undertaken. If so, provide details. • Indicate duration of study and proposed months of commencement and completion of the study. • Provide item-wise/year-wise capital cost estimate of the study broken down between local and foreign exchange. • Indicate date on which cost estimates were prepared and the basis of these estimates. • Sources of financing the capital cost be provided • Indicate requirements separately for local and foreign personnel i.e. professional, technical, administrative, clerical, skilled, unskilled, others alongwith their terms of reference. • Indicate the period of contract of both the local and foreign consultants alongwith qualifications, experience and the terms of their appointment. 3
  • 4. 4. Expected outcome • Indicate the expected outcome of the survey/feasibility study in quantifiable terms. It may also be indicated whether any project will be prepared after the survey. 4