3. What is it?
• Optimizes decision-making
• Different types of analytics, however, provide
different types of insights.
Analytics include:
1. Business intelligence
2. Predictive analytics
3. Prescriptive analytics
4.
5. Why is it important?
• Increase service quality, reduce operating
costs and increase return on assets.
7. CASE STUDY
• The Kheri Construction Company uses
prescriptive analysis to solve the issue of high
staff turnover.
8. MANPOWER PLANNING
• Manpower planning is a very important part
of the overall planning of a business
organization. It is obvious that a business
cannot prosper unless the right number of
employees, having required skills, talents &
qualifications is available at right time.
9. Manpower planning is done to fulfill the two
main objectives, namely:
(1) To utilize the present employees fully.
(2) To fill up future manpower requirements
10. TYPES OF MANPOWER PLANNING
Types of manpower planning can be distinguished:
1. On the basis of the level at which it is done.
2. On the basis of the period for which it is done.
On the basis of level On period basis
Macro-level
(national level)
Micro-level
(Industrial
Unit level)
Short
period
Medium
period
Long
period
11. AIMS OF MANPOWER PLANNING
AND FORECASTING
• Walker (1968) points out that the aim of
manpower planning is ‘…forecasting and
planning for the right numbers and the right
kinds of people at the right places and the
right times to perform activities that will
benefit both the organisation and the
individual in it’.