PC-1 FORM
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PROFORMA FOR DEVELOPMENT PROJECTS
(SOCIAL SECTORS)
• Education, Training and
Manpower
• Health, Nutrition, Family Planning &
Social Welfare
• Science & Technology
• Water Supply & Sewerage
• Culture, Sports, Tourism &
Youth
• Mass Media
• Governance
• Research
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PC-1 FORM
(SOCIAL SECTORS)
1. Name of the Project
2. Location
3. Authority responsible for:
i. Sponsoring
ii. Execution
iii. Operation and maintenance
iv. Concerned federal ministry
4. Plan Provision
5. Project objectives and its relationship with Sectoral objectives
6. Description, justification and technical parameters
7. Capital cost estimates
8. Annual operating and maintenance cost after completion of the
project
9. Demand and supply analysis
10. Financial Plan and mode of financing
11. Project benefits and analysis
i. Financial
ii. Social benefits with indicators
iii. Employment generation (direct and indirect)
iv. Environmental impact
2
v. Impact of delays on project cost and viability
12. a) Implementation schedule
b) Result Based Monitoring (RBM) Indicators.
13. Management structure and manpower requirements including
Specialized skills during execution and operational phases
14. Additional projects/decisions required to maximize socio-economic
benefits from the proposed project
15. Certified that the project proposal has been prepared on the basis of
instructions provided by the Planning Commission for the preparation of
PC-I for Social Sector projects.
Prepared by _________________________
Name, Designation & Phone#
Checked by _________________________
Name, Designation & Phone#
Approved by _________________________
Name, Designation & Phone#
3
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
Instructions to Fill-in PC-I Proforma(Social Sectors)
1. Name of the Project
Indicate name of the project.
2. Location
• Provide name of District/Province.
• Attach a map of the area, clearly indicating the project location.
3. Authorities responsible for
Indicate name of the agency responsible for sponsoring, execution,
operation and maintenance. For provincial projects, name of the concerned
federal ministry be provided.
4. (a) Plan provision
• If the project is included in the medium term/five year plan,
specify actual allocation.
• If not included in the current plan, what warrants its inclusion and
how is it now proposed to be accommodated.
• If the project is proposed to be financed out of block provision,
indicate:
Total block
provision
Amount already
committed
Amount proposed
for this project
Balance
available
(b) Provision in the current year PSDP/ADP
5. Project objectives
• The objectives of the sector/sub sector as indicated in the
medium term/five year plan be reproduced. Indicate objectives
of the project and develop a linkage between the proposed
project and sectoral objectives.
4
• In case of revised Projects, indicate objectives of the project, if
different from original PC-I.
6. Description and justification of project
 Describe the project and indicate existing facilities in the area and
justify the establishment of the Project.
 Provide technical parameters and discuss technology aspect of the
Project.
 Provide details of civil works, equipment, machinery and other
physical facilities required for the project.
 Indicate governance issues of the sector relevant to the project and
strategy to resolve them.
In addition to above, the following sector specific information be
provided
Education, training and manpower
• Give student-teacher ratio for the project and the national average for the
proposed level of education.
• Year-wise proposed enrolment of the institution for 5 years.
• For scholarship projects, indicate number of scholarships to be awarded each
year alongwith selection criteria .
• Provide faculty strength in relevant discipline, in case of expansion of
facilities.
• Indicate the extent of library and laboratory facilities available in case of
secondary, college and university education.
• Provide details of technical staff required for operation & maintenance of
laboratories.
Health, nutrition, family planning and social welfare
a) Health projects
• Indicate whether the proposed facilities are preventive or curative.
• Bifurcate the facilities between indoor, out door and department-wise.
b) Nutrition
• Indicate the infrastructure and mechanism required for the project.
• Measures taken for involvement and participation of the community.
5
• Net improvement in the nutritional status of target groups in quantitative
terms.
c) Family planning
• Provide information relating to motivation and distribution sub-
system.
• Give benchmark data and targets relating to number of couples to be
approached and number of contraceptives and other devices to be
distributed.
• Mode/mechanism of advocacy and awareness
Water supply & sewerage
• Present and projected population and water availability/ demand.
• Indicate source and water availability (mgd) during next 5,10,20 years.
• For waste water/sewerage, provide present and future disposal
requirements, gaps if any and proposed treatment methods and
capacity.
• Indicate present and proposed per capita water supply in the project
area, comparison be made with water supply in similar localities.
• Indicate whether the proposed project is a part of the master plan. If
so, provide details.
Culture, sports, tourism & youth
• Existing and projected flow of tourists in the country/project area.
• Capacity of existing departments to maintain archaeological
sites/museums.
• Relationship of archaeological projects with internal and foreign
tourism.
Mass media
• Indicate area and population to be covered with proposed project.
Research
• Indicate benefits of the research to the economy.
• Mention number of studies/papers to be produced.
6
• Indicate whether these studies would result in commercial application of the
process developed (if applicable).
7. Capital cost estimates
 Indicate date of estimation of Project cost.
 Basis of determining the capital cost be provided. It includes market
survey, schedule rates, estimation on the basis of previous work done etc.
 Provide year-wise estimates of Physical activities by main components as
per following:
Component-wise, year-wise physical activities
Items Unit Year-I Year-II Year-III
A.
B.
C.
• Phasing of Capital cost be worked out on the basis of each item of work
as stated above and provide information as per following.
Year-wise/component-wise financial phasing
(Million Rs)
Item Year-I Year-II Year-III Total
Total Local FEC Total Local FEC Total Local FEC Total Local FEC
A.
B.
C.
Total
In case of revised Projects, Provide
 Projects approval history, year wise PSDP allocations, releases and
expenditure.
 Item-wise, year-wise actual expenditure and Physical progress.
 Justification for revision of PC-I and variation in scope of the project
if applicable.
 Item-wise comparison of revised cost with the approved cost and give
reasons for variation.
7
 Indicate exchange rate used to work out FEC in the original and
revised PC-I.
8. Annual operating cost
 Item-wise annual operating cost for 5 years and sources of financing .
9. Demand supply analysis (excluding science & technology, research,
governance & culture, sports & tourism sectors
• Existing capacity of services and its supply
• Projected demand for ten years
• Capacity of projects being implemented both in the public & private sector
• Supply – demand gap
• Designed capacity & output of the proposed project
10. Financial plan
Sources of financing
(a) Equity:
Indicate the amount of equity to be financed from each source
 Sponsors own resources
 Federal government
 Provincial government
 DFI's/banks
 General public
 Foreign equity (indicate partner agency)
 NGO’s/beneficiaries
 Others
b) Debt
Indicate the local & foreign debt, interest rate, grace period and
repayment period for each loan separately. The loan repayment
schedule be also annexed.
c) Grants along with sources
d) Weighted cost of capital
8
11. (a) Project benefits and analysis
• Financial: Income to the project alongwith assumptions.
• Social: Quantify benefit to the target group
• Environmental: Environmental impact assessment negative/
positive.
(b) Project analysis
 Quantifiable output of the project
 Unit cost analysis
 Employment generation (direct and indirect)
 Impact of delays on project cost and viability
12. a) Implementation of the project
 Indicate starting and completion date of the project
 Item-wise/year-wise implementation schedule in line chart co-
related with the phasing of physical activities.
b) Result Based Monitoring (RBM) Indicators
 Indicate Result Based Monitoring (RBM) framework indicators in
quantifiable terms in the following table.
S.No Input Output
Outcome
Targeted
Impact
Baseline
Indicator
Targets after
Completion of
Project
1
2
3
4
5
.
.
.
.
9
.
13. Management structure and manpower requirements
 Administrative arrangements for implementation of the project.
 Manpower requirements during execution and operation of the
project be provided by skills/profession.
 Job description, qualification, experience, age and salary of each job
be provided.
14. Additional projects/decisions required
 Indicate additional projects/decisions required to optimize the
investment being undertaken on the project.
15. Certificate
• The name, designation and phone # of the officer responsible for ,
preparing and checking be provided. It may also be confirmed that
PC-I has been prepared as per instructions for the preparation of
PC-I for social sector projects.
• The PC-I alongwith certificate must be signed by the Principal
Accounting Officer to ensure its ownership.
10

More Related Content

What's hot

Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TADr. Md. Taibur Rahman
 
Public private partnership for poverty reduction on 18 07-2018 at naem
Public private partnership for poverty reduction on 18 07-2018 at naemPublic private partnership for poverty reduction on 18 07-2018 at naem
Public private partnership for poverty reduction on 18 07-2018 at naemDrShamsulArefin
 
4.banking sector reforms
4.banking sector reforms4.banking sector reforms
4.banking sector reformsHemangi Pandey
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESNavya Jayakumar
 
Monetary policy of nepal 2076 77
Monetary policy of nepal 2076 77 Monetary policy of nepal 2076 77
Monetary policy of nepal 2076 77 Manoj Subedi
 
Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Piyali Parashari
 
Role of infrastructure
Role of infrastructureRole of infrastructure
Role of infrastructuremohishukla
 
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdf
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdfSustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdf
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdfkochyermo
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property DevelopmentDebbie Loh
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) modelAxay Sharma
 
Property Tax in Indian Municipal Bodies
Property Tax in Indian Municipal BodiesProperty Tax in Indian Municipal Bodies
Property Tax in Indian Municipal BodiesRavikant Joshi
 
Pengelolaan Rekening Pemerintah
Pengelolaan Rekening PemerintahPengelolaan Rekening Pemerintah
Pengelolaan Rekening PemerintahAhmad Abdul Haq
 
Financing models of PPP
Financing models of PPPFinancing models of PPP
Financing models of PPPAPPPA4251
 
Detailed Project Report
Detailed Project ReportDetailed Project Report
Detailed Project ReportVishal Thapa
 
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...biometrust
 
IFRS- 15 with illustrative examples
IFRS- 15 with illustrative examples IFRS- 15 with illustrative examples
IFRS- 15 with illustrative examples Masum Gazi
 
Rural banking in india
Rural banking in indiaRural banking in india
Rural banking in indiaSanjiv Kumar
 

What's hot (20)

public private partnership
 public private partnership public private partnership
public private partnership
 
Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TA
 
Public private partnership for poverty reduction on 18 07-2018 at naem
Public private partnership for poverty reduction on 18 07-2018 at naemPublic private partnership for poverty reduction on 18 07-2018 at naem
Public private partnership for poverty reduction on 18 07-2018 at naem
 
4.banking sector reforms
4.banking sector reforms4.banking sector reforms
4.banking sector reforms
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
 
Monetary policy of nepal 2076 77
Monetary policy of nepal 2076 77 Monetary policy of nepal 2076 77
Monetary policy of nepal 2076 77
 
Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)
 
Role of infrastructure
Role of infrastructureRole of infrastructure
Role of infrastructure
 
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdf
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdfSustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdf
Sustainable-and-Inclusive-Housing-in-Ethiopia_A-policy-assessment_FINAL.pdf
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Ppv ppt
Ppv pptPpv ppt
Ppv ppt
 
Property Tax in Indian Municipal Bodies
Property Tax in Indian Municipal BodiesProperty Tax in Indian Municipal Bodies
Property Tax in Indian Municipal Bodies
 
Pengelolaan Rekening Pemerintah
Pengelolaan Rekening PemerintahPengelolaan Rekening Pemerintah
Pengelolaan Rekening Pemerintah
 
Financing models of PPP
Financing models of PPPFinancing models of PPP
Financing models of PPP
 
Detailed Project Report
Detailed Project ReportDetailed Project Report
Detailed Project Report
 
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
Reuse of wastewater as a climate mitigation strategy - Bengaluru and its hint...
 
Property tax or house tax in india
Property tax or house tax in indiaProperty tax or house tax in india
Property tax or house tax in india
 
IFRS- 15 with illustrative examples
IFRS- 15 with illustrative examples IFRS- 15 with illustrative examples
IFRS- 15 with illustrative examples
 
Rural banking in india
Rural banking in indiaRural banking in india
Rural banking in india
 

Similar to Pc i (social sector)

Project in punjab
Project in punjabProject in punjab
Project in punjabHuma Ilyas
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
Project document for public sector
Project document for public sector Project document for public sector
Project document for public sector Suhail Hussain
 
CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: EvidencePAS_Team
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Projectimrohan1
 
coordinate better to learn PPT IT DEPT-Tier II SAR.pptx
coordinate better to learn PPT IT DEPT-Tier II SAR.pptxcoordinate better to learn PPT IT DEPT-Tier II SAR.pptx
coordinate better to learn PPT IT DEPT-Tier II SAR.pptxbmit1
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce
 
Bank project appraisal,
Bank  project appraisal, Bank  project appraisal,
Bank project appraisal, sksbatish
 
3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of projectamritkhatri5
 
Pipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptxPipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptxwikig2
 
City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017Tracy Quintana
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bcaRobb Dods
 
8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptxIftekarHasnine
 
Building_Blocks_for_Investigators.ppt
Building_Blocks_for_Investigators.pptBuilding_Blocks_for_Investigators.ppt
Building_Blocks_for_Investigators.ppt5028MADHAVANG
 
Unvf application form_instructions
Unvf application form_instructionsUnvf application form_instructions
Unvf application form_instructionsShahriar06
 

Similar to Pc i (social sector) (20)

Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Project document for public sector
Project document for public sector Project document for public sector
Project document for public sector
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: Evidence
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
coordinate better to learn PPT IT DEPT-Tier II SAR.pptx
coordinate better to learn PPT IT DEPT-Tier II SAR.pptxcoordinate better to learn PPT IT DEPT-Tier II SAR.pptx
coordinate better to learn PPT IT DEPT-Tier II SAR.pptx
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
 
Bank project appraisal,
Bank  project appraisal, Bank  project appraisal,
Bank project appraisal,
 
Budget & Finance
Budget & FinanceBudget & Finance
Budget & Finance
 
Budget & Finance
Budget & FinanceBudget & Finance
Budget & Finance
 
3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project
 
Pipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptxPipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptx
 
City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx
 
Building_Blocks_for_Investigators.ppt
Building_Blocks_for_Investigators.pptBuilding_Blocks_for_Investigators.ppt
Building_Blocks_for_Investigators.ppt
 
Unvf application form_instructions
Unvf application form_instructionsUnvf application form_instructions
Unvf application form_instructions
 

More from hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

More from hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Recently uploaded

Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -
Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -
Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -Pooja Nehwal
 
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=kojalkojal131
 
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts Service
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts ServiceCall Girls In Goa 7028418221 Call Girls In Colva Beach Escorts Service
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts ServiceApsara Of India
 
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞Apsara Of India
 
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.soniya singh
 
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura Bhopalpura
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura BhopalpuraHi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura Bhopalpura
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura BhopalpuraApsara Of India
 
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...Apsara Of India
 
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy Girls
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy GirlsCall Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy Girls
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy GirlsPooja Nehwal
 
Moscow City People project Roman Kurganov
Moscow City People project Roman KurganovMoscow City People project Roman Kurganov
Moscow City People project Roman KurganovRomanKurganov
 
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )Pooja Nehwal
 
Top 10 Makeup Brands in India for women
Top 10  Makeup Brands in India for womenTop 10  Makeup Brands in India for women
Top 10 Makeup Brands in India for womenAkshitaBhatt19
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip CallMs Riya
 
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...Niamh verma
 
My Personal Testimony - James Eugene Barbush - March 11, 2024
My Personal Testimony - James Eugene Barbush - March 11, 2024My Personal Testimony - James Eugene Barbush - March 11, 2024
My Personal Testimony - James Eugene Barbush - March 11, 2024JAMES EUGENE BARBUSH
 
9892124323 - Book Call Girls in Andheri and escort services 9892124323
9892124323 - Book Call Girls in Andheri and escort services 98921243239892124323 - Book Call Girls in Andheri and escort services 9892124323
9892124323 - Book Call Girls in Andheri and escort services 9892124323Pooja Nehwal
 
‘I think I might die if I made it’ 'There were no singles'
‘I think I might die if I made it’ 'There were no singles'‘I think I might die if I made it’ 'There were no singles'
‘I think I might die if I made it’ 'There were no singles'cakepearls Official
 
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440Best VIP Call Girls Noida Sector 18 Call Me: 8264348440
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440soniya singh
 
A TO Z INDIA Monthly Magazine - MAY 2024
A TO Z INDIA Monthly Magazine - MAY 2024A TO Z INDIA Monthly Magazine - MAY 2024
A TO Z INDIA Monthly Magazine - MAY 2024Indira Srivatsa
 
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt ServiceApsara Of India
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhisoniya singh
 

Recently uploaded (20)

Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -
Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -
Mumbai Call Girls Malad West WhatsApp 9892124323 Full Night Enjoy -
 
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=
Dubai Call Girls Phone O525547819 Take+ Call Girls Dubai=
 
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts Service
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts ServiceCall Girls In Goa 7028418221 Call Girls In Colva Beach Escorts Service
Call Girls In Goa 7028418221 Call Girls In Colva Beach Escorts Service
 
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞
💞SEXY💞 UDAIPUR ESCORTS 09602870969 CaLL GiRLS in UdAiPuR EsCoRt SeRvIcE💞
 
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Govindpuri Escort Service Delhi N.C.R.
 
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura Bhopalpura
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura BhopalpuraHi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura Bhopalpura
Hi Profile Escorts In Udaipur 09602870969 Call Girls in Sobaghpura Bhopalpura
 
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...
💗📲09602870969💕-Royal Escorts in Udaipur Call Girls Service Udaipole-Fateh Sag...
 
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy Girls
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy GirlsCall Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy Girls
Call Girls In Vashi Call Girls Pooja 📞 9892124323 ✅Book Hot And Sexy Girls
 
Moscow City People project Roman Kurganov
Moscow City People project Roman KurganovMoscow City People project Roman Kurganov
Moscow City People project Roman Kurganov
 
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )
Call US 📞 9892124323 ✅ V.VIP Call Girls In Andheri ( Mumbai )
 
Top 10 Makeup Brands in India for women
Top 10  Makeup Brands in India for womenTop 10  Makeup Brands in India for women
Top 10 Makeup Brands in India for women
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199012 ☎️ Hard And Sexy Vip Call
 
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...
Call Girls in Chandigarh Annaya❤️🍑 9115573837 👄🫦Independent Escort Service Ch...
 
My Personal Testimony - James Eugene Barbush - March 11, 2024
My Personal Testimony - James Eugene Barbush - March 11, 2024My Personal Testimony - James Eugene Barbush - March 11, 2024
My Personal Testimony - James Eugene Barbush - March 11, 2024
 
9892124323 - Book Call Girls in Andheri and escort services 9892124323
9892124323 - Book Call Girls in Andheri and escort services 98921243239892124323 - Book Call Girls in Andheri and escort services 9892124323
9892124323 - Book Call Girls in Andheri and escort services 9892124323
 
‘I think I might die if I made it’ 'There were no singles'
‘I think I might die if I made it’ 'There were no singles'‘I think I might die if I made it’ 'There were no singles'
‘I think I might die if I made it’ 'There were no singles'
 
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440Best VIP Call Girls Noida Sector 18 Call Me: 8264348440
Best VIP Call Girls Noida Sector 18 Call Me: 8264348440
 
A TO Z INDIA Monthly Magazine - MAY 2024
A TO Z INDIA Monthly Magazine - MAY 2024A TO Z INDIA Monthly Magazine - MAY 2024
A TO Z INDIA Monthly Magazine - MAY 2024
 
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service
💞Call Girls In Sonipat 08168329307 Sonipat Kundli GTK Bypass EsCoRt Service
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Bhikaji Cama Palace | Delhi
 

Pc i (social sector)

  • 1. Revised 2005 PC-1 FORM GOVERNMENT OF PAKISTAN PLANNING COMMISSION PROFORMA FOR DEVELOPMENT PROJECTS (SOCIAL SECTORS) • Education, Training and Manpower • Health, Nutrition, Family Planning & Social Welfare • Science & Technology • Water Supply & Sewerage • Culture, Sports, Tourism & Youth • Mass Media • Governance • Research
  • 2. Revised 2005 GOVERNMENT OF PAKISTAN PLANNING COMMISSION PC-1 FORM (SOCIAL SECTORS) 1. Name of the Project 2. Location 3. Authority responsible for: i. Sponsoring ii. Execution iii. Operation and maintenance iv. Concerned federal ministry 4. Plan Provision 5. Project objectives and its relationship with Sectoral objectives 6. Description, justification and technical parameters 7. Capital cost estimates 8. Annual operating and maintenance cost after completion of the project 9. Demand and supply analysis 10. Financial Plan and mode of financing 11. Project benefits and analysis i. Financial ii. Social benefits with indicators iii. Employment generation (direct and indirect) iv. Environmental impact 2
  • 3. v. Impact of delays on project cost and viability 12. a) Implementation schedule b) Result Based Monitoring (RBM) Indicators. 13. Management structure and manpower requirements including Specialized skills during execution and operational phases 14. Additional projects/decisions required to maximize socio-economic benefits from the proposed project 15. Certified that the project proposal has been prepared on the basis of instructions provided by the Planning Commission for the preparation of PC-I for Social Sector projects. Prepared by _________________________ Name, Designation & Phone# Checked by _________________________ Name, Designation & Phone# Approved by _________________________ Name, Designation & Phone# 3
  • 4. Revised 2005 GOVERNMENT OF PAKISTAN PLANNING COMMISSION Instructions to Fill-in PC-I Proforma(Social Sectors) 1. Name of the Project Indicate name of the project. 2. Location • Provide name of District/Province. • Attach a map of the area, clearly indicating the project location. 3. Authorities responsible for Indicate name of the agency responsible for sponsoring, execution, operation and maintenance. For provincial projects, name of the concerned federal ministry be provided. 4. (a) Plan provision • If the project is included in the medium term/five year plan, specify actual allocation. • If not included in the current plan, what warrants its inclusion and how is it now proposed to be accommodated. • If the project is proposed to be financed out of block provision, indicate: Total block provision Amount already committed Amount proposed for this project Balance available (b) Provision in the current year PSDP/ADP 5. Project objectives • The objectives of the sector/sub sector as indicated in the medium term/five year plan be reproduced. Indicate objectives of the project and develop a linkage between the proposed project and sectoral objectives. 4
  • 5. • In case of revised Projects, indicate objectives of the project, if different from original PC-I. 6. Description and justification of project  Describe the project and indicate existing facilities in the area and justify the establishment of the Project.  Provide technical parameters and discuss technology aspect of the Project.  Provide details of civil works, equipment, machinery and other physical facilities required for the project.  Indicate governance issues of the sector relevant to the project and strategy to resolve them. In addition to above, the following sector specific information be provided Education, training and manpower • Give student-teacher ratio for the project and the national average for the proposed level of education. • Year-wise proposed enrolment of the institution for 5 years. • For scholarship projects, indicate number of scholarships to be awarded each year alongwith selection criteria . • Provide faculty strength in relevant discipline, in case of expansion of facilities. • Indicate the extent of library and laboratory facilities available in case of secondary, college and university education. • Provide details of technical staff required for operation & maintenance of laboratories. Health, nutrition, family planning and social welfare a) Health projects • Indicate whether the proposed facilities are preventive or curative. • Bifurcate the facilities between indoor, out door and department-wise. b) Nutrition • Indicate the infrastructure and mechanism required for the project. • Measures taken for involvement and participation of the community. 5
  • 6. • Net improvement in the nutritional status of target groups in quantitative terms. c) Family planning • Provide information relating to motivation and distribution sub- system. • Give benchmark data and targets relating to number of couples to be approached and number of contraceptives and other devices to be distributed. • Mode/mechanism of advocacy and awareness Water supply & sewerage • Present and projected population and water availability/ demand. • Indicate source and water availability (mgd) during next 5,10,20 years. • For waste water/sewerage, provide present and future disposal requirements, gaps if any and proposed treatment methods and capacity. • Indicate present and proposed per capita water supply in the project area, comparison be made with water supply in similar localities. • Indicate whether the proposed project is a part of the master plan. If so, provide details. Culture, sports, tourism & youth • Existing and projected flow of tourists in the country/project area. • Capacity of existing departments to maintain archaeological sites/museums. • Relationship of archaeological projects with internal and foreign tourism. Mass media • Indicate area and population to be covered with proposed project. Research • Indicate benefits of the research to the economy. • Mention number of studies/papers to be produced. 6
  • 7. • Indicate whether these studies would result in commercial application of the process developed (if applicable). 7. Capital cost estimates  Indicate date of estimation of Project cost.  Basis of determining the capital cost be provided. It includes market survey, schedule rates, estimation on the basis of previous work done etc.  Provide year-wise estimates of Physical activities by main components as per following: Component-wise, year-wise physical activities Items Unit Year-I Year-II Year-III A. B. C. • Phasing of Capital cost be worked out on the basis of each item of work as stated above and provide information as per following. Year-wise/component-wise financial phasing (Million Rs) Item Year-I Year-II Year-III Total Total Local FEC Total Local FEC Total Local FEC Total Local FEC A. B. C. Total In case of revised Projects, Provide  Projects approval history, year wise PSDP allocations, releases and expenditure.  Item-wise, year-wise actual expenditure and Physical progress.  Justification for revision of PC-I and variation in scope of the project if applicable.  Item-wise comparison of revised cost with the approved cost and give reasons for variation. 7
  • 8.  Indicate exchange rate used to work out FEC in the original and revised PC-I. 8. Annual operating cost  Item-wise annual operating cost for 5 years and sources of financing . 9. Demand supply analysis (excluding science & technology, research, governance & culture, sports & tourism sectors • Existing capacity of services and its supply • Projected demand for ten years • Capacity of projects being implemented both in the public & private sector • Supply – demand gap • Designed capacity & output of the proposed project 10. Financial plan Sources of financing (a) Equity: Indicate the amount of equity to be financed from each source  Sponsors own resources  Federal government  Provincial government  DFI's/banks  General public  Foreign equity (indicate partner agency)  NGO’s/beneficiaries  Others b) Debt Indicate the local & foreign debt, interest rate, grace period and repayment period for each loan separately. The loan repayment schedule be also annexed. c) Grants along with sources d) Weighted cost of capital 8
  • 9. 11. (a) Project benefits and analysis • Financial: Income to the project alongwith assumptions. • Social: Quantify benefit to the target group • Environmental: Environmental impact assessment negative/ positive. (b) Project analysis  Quantifiable output of the project  Unit cost analysis  Employment generation (direct and indirect)  Impact of delays on project cost and viability 12. a) Implementation of the project  Indicate starting and completion date of the project  Item-wise/year-wise implementation schedule in line chart co- related with the phasing of physical activities. b) Result Based Monitoring (RBM) Indicators  Indicate Result Based Monitoring (RBM) framework indicators in quantifiable terms in the following table. S.No Input Output Outcome Targeted Impact Baseline Indicator Targets after Completion of Project 1 2 3 4 5 . . . . 9
  • 10. . 13. Management structure and manpower requirements  Administrative arrangements for implementation of the project.  Manpower requirements during execution and operation of the project be provided by skills/profession.  Job description, qualification, experience, age and salary of each job be provided. 14. Additional projects/decisions required  Indicate additional projects/decisions required to optimize the investment being undertaken on the project. 15. Certificate • The name, designation and phone # of the officer responsible for , preparing and checking be provided. It may also be confirmed that PC-I has been prepared as per instructions for the preparation of PC-I for social sector projects. • The PC-I alongwith certificate must be signed by the Principal Accounting Officer to ensure its ownership. 10