SAARC TRAINING FOR
PROFESSIONALS OF AFGHANISTAN’S
POWER REGULATORY SYSTEM
NPCC VISIT
National Transmission and Despatch Company Ltd.
THE POWER SYSTEM OPERATOR OF PAKISTAN
National Power Control
Centre
Presented by:
Salman Gul
Deputy Manager NPCC
INTRODUCTION TO NPCC
 National Power Control Center (NPCC) is part of National
Transmission and Despatch Company (NTDC) which is a corporate
entity unbundled from WAPDA power wing
 NTDC constructs, operates, maintains primary transmission
network (i-e 500,220 kV transmission lines & 500/220 kV grid
stations), provides wheeling facility to CPPA-G for purchase of power
from generators and selling to DISCOs
 DISCOs construct, maintain secondary transmission network (i-e
132,66 kV transmission lines & 132/11 kV grid stations) and 11/0.4
kV distribution system
 NPCC is responsible for operation, monitoring of generation , both
primary and secondary transmission system and coordination with all
Power sector stake holders (i-e MOE, NTDC head and field offices,
DISCOs, GENCOs, CPPA-G & IPPs
MD NTDC
DMD (P&E)
General
Manager (SO)
Chief Engineer
(Op’n
Planning)
Manager
PPC
Chief Engineer
(Network
Op’n)
Manager
Power Control
Manager
RCC-N
Manager
RCC-S
Manager
Database
NPCC-Employees Yardstick
Total Employees : 389
SYSTEM OPERATION HIERARCHY
•Generation Control
•Switching & Operating
Control of 500 & 220 kV
Network
Switching & Operation of 132 & 66
kV Southern Network
RCCS
(Regional Control Centre South)
Jamshoro
Switching & Operation of 132 & 66
kV Northern Network
RCCN
(Regional Control Centre North)
Islamabad
NCC
(National Control Centre)
OBJECTIVES OF NPCC
➢ Reliability & Security of power system
o Smooth Supply
o Minimum Interruptions
➢ Quality of Electric Power Supply
o Standard Voltage and Frequency
➢ Safety
o Personnel.
o Equipment.
➢ Economy
o Minimum Generation Cost
o Minimum Losses
MAJOR FUNCTIONS OF NPCC
1. National Power Control Centre, commonly known as
NPCC, is the nerve centre of Power Sector. Entire power
generation and its transmission to the load centres is
controlled and coordinated from its National and
Regional Control Centres.
2. Maintaining balance between Supply & Demand.
3. Frequency , voltage control and equipment loading
within permissible limits.
4. Maintaining security & stability of network.
MAJOR FUNCTIONS OF NPCC
6. Month-wise & Annual Energy Estimation.
7. Economic Dispatch.
8. Switching operations of Power Network.
9. Scheduling of maintenance shut-downs on power-
plants & Transmission network elements.
10.Short to medium term operational planning.
11. Advance notifications to thermal plants regarding
energy (Year Ahead, Quarter Ahead, Week Ahead and
Day Ahead).
12. Collection of system data and preparation of reports
ADMINISTRATIVE FUNCTION
 NPCC is headed by General Manager (System Operation)
in main NPCC Building Islamabad.
 GM (SO) is assisted by Chief Engineer (Network
Operation) & Chief Engineer (Network Planning).
 GM(SO) reports and coordinates with all Stakeholders
regarding Power system.
 NPCC is a control and command body and for smooth
operation of system, pass-on instructions to GENCOS,
IPPs, DISCOs and Hydro Stations from its Control rooms
which function round the clock in 3 shifts with Shift
Engineers on duty.
SYSTEM OPERATION & CONTROL
NPCC CONTROL ROOM
PRESENT OPERATIONAL STRATEGY
 System Security and Reliability are issues of top priority
nature. This is a technical urgency recognized by utilities
all over the world and may demand out of merit operation
of some of the generating units in the system.
 The provision of spinning reserve is equal to the 1/3rd of
the one biggest generator capacity in system according to
grid code.
 500 and 220 KV transmission lines/ transformers are
operated with single contingency compliance.
 Thermal Generators are dispatched in order of economic
merit order considering security and stability of system.
 Hydel, Nuclear, REs (Wind, Solar) are operated as must
run
Security
Constrained
Economic
Dispatch
Merit
Order
Plant
Avail.
Congestion
and Losses
Fuel Avail.
&
Contracts
Ramping
Rates
Startup /
down
Decision
Stability,
Reserves
Etc…
GENERATION PLANNING & DESPATCH
Procedure and steps.
 Demand forecasting/estimation on historical trends
 Generation forecasting/estimation keeping in view:
➢ Irrigation indents of Hydel stations
➢ Schedule outages
➢ Forced outages
➢ Weather/ Season.
➢ Special Events.
➢ Constraints if any
 Dispatch of available thermal generation as per merit order.
OPERATIONAL CONSIDERATIONS FOR
DISPATCH
(PLANNED)
 System Stability.
 Transmission/ Transformation constraints.
 Reactive power support for regulating system voltages.
 Planned and scheduled shutdowns on
a) Transmission Lines
b) Transformers.
c) Generating Plants.
 Limitations on No. of starts of steam turbines.
 Testing of generating Plants.
OPERATIONAL CONSIDERATIONS FOR
DISPATCH
(UN-PLANNED)
 Change in Water indents.
 Change in Gas quota allocations.
 Load restrictions on generating plants.
 Tripping of equipment/ Major Outages.
 Difference in Forecasted and actual load due to
abrupt weather change.
 Reactive power support for regulating system
voltages.
NEPRA GRID CODE
NEPRA GRID CODE
Operation of power system regulated
under NEPRA’s Grid Code
 OC-1 : General operating principles
 OC-2 : Demand Forecast
Input from all stakeholders for different time
horizons consolidated by NPCC
 OC-3 : Demand Management
NEPRA GRID CODE
 OC-4: Operational Planning
Network operation and outage planning/
coordination
Generation dispatch and outage coordination
Insufficient power operating margin
Frequency and voltage control and operating
margins
NEPRA PERFORMANCE LIMITS
 Frequency
 Frequency Sensitive Mode (Normal Range)
49.8-50.2 Hz
 Contingency Frequency Band (Load Shedding Threshold)
49.4-50.5 Hz
 Voltage
 N-0 Contingency N-1 Contingency
+8 % and -5 % ± 10 %
TRANSMISSION OPERATION & CONTROL
Operational objectives of NPCC are:
• Keeping balance between demand and supply all
the time
• Maintaining stable frequency
• Maintaining system security and reliability
• Keeping stable voltages over primary network
• Monitoring of transmission & transformer
parameters
SWITCHING OPERATIONS
NPCC performs switching operation on transmission
network in following scenarios:
• Planned shutdowns for maintenance, cleaning and
washing activities
• Emergent shutdowns in case of abnormal situations.
• Transmission lines and transformers tripping.
• 132 kV switching for optimal configuration of radial
network
GENERATION MIX
GENERATION SOURCES
ABSTRACT OF POWER PLANTS
Generation Type INSTALLED CAP AS
PER LICENCE (MW)
DERATED
CAPACITY (MW)
NO OF UNITS
TOTAL WAPDA HYDEL (22) 9,387 9,387 97
IPP HYDEL (5) 382 379 18
TOTAL HYDEL (27) 9,770 9,767 115
GENCO-I (3) 1,174 860 14
GENCO-II (3) 2,457 1,552 17
GENCO-III (4) 2,051 1,765 17
TOTAL GENCO (10) 5,682 4,177 48
IPP-THERMAL (37) 17,166 15,883 210
NUCLEAR (4) 1,345 1,246 4
SOLAR (4) 400 400 4
WIND (24) 1,235 1,235 718
TOTAL VRE'S (28) 1,635 1,635 722
BAGASSE (9) 363 353 13
TOTAL PLANTS (115) 35,961 33,060 1,112
GENERATION SOURCES
(Derated Capacity)
Type
Derated Percentage Share
MW %age
Total Hydel
(Wapda + IPPs)
9,767 29.5%
Gencos Fossil Fuel 4,177 12.6%
IPPs Fossil Fuel 15,883 48.0%
Bagasse 353 1.1%
Nuclear 1,246 3.8%
Solar 400 1.2%
Wind 1,235 3.7%
Total 33,060 100.0%
BREAKUP OF MAX RECORDED
GENERATION DURING PEAK HOURS
22,601 MW on 04 Sept 2019
Wapda-Hydel 7,937
Gencos 2,290
IPPs 12,374
Total 22,601
23,056 MW on 04 July 2019 @
14:18 Hours
ABSOLUTE MAX RECORDED
GENERATION DURING 24 HOURS
LOAD MANAGEMENT
GENERATION / DEMAND BALANCE
SYSTEM FREQUENCY
=
50 HZ
GENERATION DEMAND
The primary function of NPCC is to keep balance between
demand and supply & to ensure system security and
reliability. In balanced condition system frequency is 50 Hz.
GENERATION / DEMAND BALANCE
SYSTEM FREQUENCY
<
50 HZ
DEMAND
GENERATION
When demand exceeds generation, frequency depreciates
below 50 Hz and in order to maintain balance between
demand and generation, load management has to be
carried out.
GENERATION DEMAND BALANCE
 Load is continuously varying in time and so the
generation has to be varied in order to keep
frequency in permissible limits
 Variation in generation
• Hydel (Fastest ramping rates)
• Thermal
• Steam Turbines
• Gas Turbines
• DG Sets
GENERATION DEMAND BALANCE
 In case of deficit in generation capacity, balance
between demand and generation has to be
maintained through load management
 Therefore a multi tier strategy has been adopted
for this balance through load management
 Scheduled load management
 System security load management
 Emergency (Forced) Load Management
36
SCHEDULED LOAD MANAGEMENT
Scheduled load management is carried out by DISCO’s,
keeping in view the following factors.
 Load demand of respective DISCO.
 Generation share allocated to DISCO by NPCC.
 Constraints like voltage drop, transmission and
transformer loading including 11 kV & below system.
37
SYSTEM SECURITY LOAD MANAGEMENT
➢ Under Voltage, Under Frequency & Cross Trip
Protection schemes have been installed for
System Security Load Management
EMERGENCY LOAD MANAGEMENT
Emergency load management (Forced LS) is carried out
by NPCC by opening 132kV transmission lines in case
of extreme system emergencies.
Examples are:
1. Un-foreseen generating unit outages
2. Non implementation of schedule load
management by DISCOs
3. Rupturing of gas lines
4. Non availability of fuel
5. Sabotage activities on transmission lines
6. Transmission and transformation problems
MERIT ORDER
MERIT ORDER APPROVAL COMMITTEE
 Power Plants are operated on the basis of Despatch Merit
Order which is approved by a committee of the following
members.
 General Manager (SO) NPCC, Convener.
 General Manager (PSP) NTDC, Member.
 Chief Technical Officer CPPA-G, Member.
 Chief Financial Officer CPPA-G, Member.
 Chief Technical Officer GENCO, Member.
 Standard Operating Procedure SOP exists for the process of
preparing and revision of merit order for operation of power
plants.
PROCEDURE OF MERIT ORDER FORMATION
➢ Procedure
1) Chief Technical Officer CPPA-G will intimate the revised
applicable fuel prices and variable O&M Cost fortnightly in
respect of Gencos and IPPs Plants comprising of the following
components:
i) Fuel Price, ii) Calorific value of fuel, iii) Net Heat
Rate, iv) Variable O&M cost, v) Index Premium, vi)
Ratio of fuel mix gas and furnace oil, vii) Environment
Consideration, viii) Utilization of local gas and RLNG.
ix) International contract by GoP for purchase of
RLNG.
2) On receipt of information from CTO CPPA-G, office of GM
(SO) NPCC shall consolidate/ prepare the revised merit order
and put up immediately to all merit order committee
members for final approval.
IMPLEMENTATION OF MERIT ORDER
 As per Clause SDC 1.4.3.2 of NEPRA Grid Code, NPCC
always operates the plants without any discrimination.
Cheaper plants take the lead in despatching. In prevailing
situation of shortfall of power in the country, most of the
time in the year, all available plants have to be operated
and therefore question of any discrimination of despatch
does not arise.
 However during short period of lean demand ,Merit order is
strictly followed by NPCC keeping in view the technical
constraints of Gencos along with voltage transmission
issues if any.
 Plants under annual maintenance outages according to
planned programs and hydel generation drops during lean
period of system demand.
OPERATION PLANNING
OPERATION PLANNING
Pre Dispatch Functions
 Annual Production Plan
 Calculation of future fuel requirements
 Year/Quarter/Month/Week Ahead Planning
Post Dispatch Functions
 Event/NPMV Verification
 Liquidated Damages
 Operating Committees
CLOSING REMARKS
BY GM NPCC

More Related Content

Similar to Presentation-on-NPCC-by-Salman-Gul_4.pdf

Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Sarthak Panigrahi
 
Grid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power SystemGrid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power SystemChandan Kumar
 
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...IRJET Journal
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scadaHemendra Kumar Rajput
 
“Head of real time and back office systems in operation”
“Head of real time and back office systems in operation”“Head of real time and back office systems in operation”
“Head of real time and back office systems in operation”IMDEA Energia
 
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilecRick Case, PMP, P.E.
 
Energy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom PerspectiveEnergy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom PerspectiveACX
 
Defence mechanism in power system
Defence mechanism in power systemDefence mechanism in power system
Defence mechanism in power systemChandan Kumar
 
Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2Ezechukwu Ukiwe
 
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia LaboratoryRT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia LaboratoryOPAL-RT TECHNOLOGIES
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libreAbanihi
 
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...IRJET Journal
 
Power conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by OceanflowPower conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by OceanflowOptima Control Solutions
 

Similar to Presentation-on-NPCC-by-Salman-Gul_4.pdf (20)

Saif Ismail_CV
Saif Ismail_CVSaif Ismail_CV
Saif Ismail_CV
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
Grid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power SystemGrid Event Analysis In Indian Power System
Grid Event Analysis In Indian Power System
 
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...
IRJET- Improvement of Power System Stability in Wind Turbine by using Facts D...
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
“Head of real time and back office systems in operation”
“Head of real time and back office systems in operation”“Head of real time and back office systems in operation”
“Head of real time and back office systems in operation”
 
The merits of integrating renewables with smarter grid carilec
The merits of integrating renewables with smarter grid   carilecThe merits of integrating renewables with smarter grid   carilec
The merits of integrating renewables with smarter grid carilec
 
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
 
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
 
Energy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom PerspectiveEnergy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom Perspective
 
Defence mechanism in power system
Defence mechanism in power systemDefence mechanism in power system
Defence mechanism in power system
 
Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2Application of scada for system automation on smart grid rev2
Application of scada for system automation on smart grid rev2
 
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia LaboratoryRT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
RT15 Berkeley | Optimized Power Flow Control in Microgrids - Sandia Laboratory
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 
Poster
PosterPoster
Poster
 
Resume
ResumeResume
Resume
 
Protasis Gp 2011 6
Protasis Gp 2011 6Protasis Gp 2011 6
Protasis Gp 2011 6
 
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
 
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...
IRJET- A Review of Power Control Strategies for DFIG based Wind Energy Conver...
 
Power conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by OceanflowPower conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by Oceanflow
 

Recently uploaded

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemSampad Kar
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfAshrafRagab14
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookPeterJack13
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfMadan Karki
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological universityMohd Saifudeen
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 

Recently uploaded (20)

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s Handbook
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 

Presentation-on-NPCC-by-Salman-Gul_4.pdf

  • 1. SAARC TRAINING FOR PROFESSIONALS OF AFGHANISTAN’S POWER REGULATORY SYSTEM NPCC VISIT
  • 2.
  • 3. National Transmission and Despatch Company Ltd. THE POWER SYSTEM OPERATOR OF PAKISTAN National Power Control Centre Presented by: Salman Gul Deputy Manager NPCC
  • 4. INTRODUCTION TO NPCC  National Power Control Center (NPCC) is part of National Transmission and Despatch Company (NTDC) which is a corporate entity unbundled from WAPDA power wing  NTDC constructs, operates, maintains primary transmission network (i-e 500,220 kV transmission lines & 500/220 kV grid stations), provides wheeling facility to CPPA-G for purchase of power from generators and selling to DISCOs  DISCOs construct, maintain secondary transmission network (i-e 132,66 kV transmission lines & 132/11 kV grid stations) and 11/0.4 kV distribution system  NPCC is responsible for operation, monitoring of generation , both primary and secondary transmission system and coordination with all Power sector stake holders (i-e MOE, NTDC head and field offices, DISCOs, GENCOs, CPPA-G & IPPs
  • 5.
  • 6.
  • 7. MD NTDC DMD (P&E) General Manager (SO) Chief Engineer (Op’n Planning) Manager PPC Chief Engineer (Network Op’n) Manager Power Control Manager RCC-N Manager RCC-S Manager Database NPCC-Employees Yardstick Total Employees : 389
  • 8. SYSTEM OPERATION HIERARCHY •Generation Control •Switching & Operating Control of 500 & 220 kV Network Switching & Operation of 132 & 66 kV Southern Network RCCS (Regional Control Centre South) Jamshoro Switching & Operation of 132 & 66 kV Northern Network RCCN (Regional Control Centre North) Islamabad NCC (National Control Centre)
  • 9. OBJECTIVES OF NPCC ➢ Reliability & Security of power system o Smooth Supply o Minimum Interruptions ➢ Quality of Electric Power Supply o Standard Voltage and Frequency ➢ Safety o Personnel. o Equipment. ➢ Economy o Minimum Generation Cost o Minimum Losses
  • 10. MAJOR FUNCTIONS OF NPCC 1. National Power Control Centre, commonly known as NPCC, is the nerve centre of Power Sector. Entire power generation and its transmission to the load centres is controlled and coordinated from its National and Regional Control Centres. 2. Maintaining balance between Supply & Demand. 3. Frequency , voltage control and equipment loading within permissible limits. 4. Maintaining security & stability of network.
  • 11. MAJOR FUNCTIONS OF NPCC 6. Month-wise & Annual Energy Estimation. 7. Economic Dispatch. 8. Switching operations of Power Network. 9. Scheduling of maintenance shut-downs on power- plants & Transmission network elements. 10.Short to medium term operational planning. 11. Advance notifications to thermal plants regarding energy (Year Ahead, Quarter Ahead, Week Ahead and Day Ahead). 12. Collection of system data and preparation of reports
  • 12. ADMINISTRATIVE FUNCTION  NPCC is headed by General Manager (System Operation) in main NPCC Building Islamabad.  GM (SO) is assisted by Chief Engineer (Network Operation) & Chief Engineer (Network Planning).  GM(SO) reports and coordinates with all Stakeholders regarding Power system.  NPCC is a control and command body and for smooth operation of system, pass-on instructions to GENCOS, IPPs, DISCOs and Hydro Stations from its Control rooms which function round the clock in 3 shifts with Shift Engineers on duty.
  • 15. PRESENT OPERATIONAL STRATEGY  System Security and Reliability are issues of top priority nature. This is a technical urgency recognized by utilities all over the world and may demand out of merit operation of some of the generating units in the system.  The provision of spinning reserve is equal to the 1/3rd of the one biggest generator capacity in system according to grid code.  500 and 220 KV transmission lines/ transformers are operated with single contingency compliance.  Thermal Generators are dispatched in order of economic merit order considering security and stability of system.  Hydel, Nuclear, REs (Wind, Solar) are operated as must run
  • 17. GENERATION PLANNING & DESPATCH Procedure and steps.  Demand forecasting/estimation on historical trends  Generation forecasting/estimation keeping in view: ➢ Irrigation indents of Hydel stations ➢ Schedule outages ➢ Forced outages ➢ Weather/ Season. ➢ Special Events. ➢ Constraints if any  Dispatch of available thermal generation as per merit order.
  • 18. OPERATIONAL CONSIDERATIONS FOR DISPATCH (PLANNED)  System Stability.  Transmission/ Transformation constraints.  Reactive power support for regulating system voltages.  Planned and scheduled shutdowns on a) Transmission Lines b) Transformers. c) Generating Plants.  Limitations on No. of starts of steam turbines.  Testing of generating Plants.
  • 19. OPERATIONAL CONSIDERATIONS FOR DISPATCH (UN-PLANNED)  Change in Water indents.  Change in Gas quota allocations.  Load restrictions on generating plants.  Tripping of equipment/ Major Outages.  Difference in Forecasted and actual load due to abrupt weather change.  Reactive power support for regulating system voltages.
  • 21. NEPRA GRID CODE Operation of power system regulated under NEPRA’s Grid Code  OC-1 : General operating principles  OC-2 : Demand Forecast Input from all stakeholders for different time horizons consolidated by NPCC  OC-3 : Demand Management
  • 22. NEPRA GRID CODE  OC-4: Operational Planning Network operation and outage planning/ coordination Generation dispatch and outage coordination Insufficient power operating margin Frequency and voltage control and operating margins
  • 23. NEPRA PERFORMANCE LIMITS  Frequency  Frequency Sensitive Mode (Normal Range) 49.8-50.2 Hz  Contingency Frequency Band (Load Shedding Threshold) 49.4-50.5 Hz  Voltage  N-0 Contingency N-1 Contingency +8 % and -5 % ± 10 %
  • 24. TRANSMISSION OPERATION & CONTROL Operational objectives of NPCC are: • Keeping balance between demand and supply all the time • Maintaining stable frequency • Maintaining system security and reliability • Keeping stable voltages over primary network • Monitoring of transmission & transformer parameters
  • 25. SWITCHING OPERATIONS NPCC performs switching operation on transmission network in following scenarios: • Planned shutdowns for maintenance, cleaning and washing activities • Emergent shutdowns in case of abnormal situations. • Transmission lines and transformers tripping. • 132 kV switching for optimal configuration of radial network
  • 27. GENERATION SOURCES ABSTRACT OF POWER PLANTS Generation Type INSTALLED CAP AS PER LICENCE (MW) DERATED CAPACITY (MW) NO OF UNITS TOTAL WAPDA HYDEL (22) 9,387 9,387 97 IPP HYDEL (5) 382 379 18 TOTAL HYDEL (27) 9,770 9,767 115 GENCO-I (3) 1,174 860 14 GENCO-II (3) 2,457 1,552 17 GENCO-III (4) 2,051 1,765 17 TOTAL GENCO (10) 5,682 4,177 48 IPP-THERMAL (37) 17,166 15,883 210 NUCLEAR (4) 1,345 1,246 4 SOLAR (4) 400 400 4 WIND (24) 1,235 1,235 718 TOTAL VRE'S (28) 1,635 1,635 722 BAGASSE (9) 363 353 13 TOTAL PLANTS (115) 35,961 33,060 1,112
  • 28. GENERATION SOURCES (Derated Capacity) Type Derated Percentage Share MW %age Total Hydel (Wapda + IPPs) 9,767 29.5% Gencos Fossil Fuel 4,177 12.6% IPPs Fossil Fuel 15,883 48.0% Bagasse 353 1.1% Nuclear 1,246 3.8% Solar 400 1.2% Wind 1,235 3.7% Total 33,060 100.0%
  • 29. BREAKUP OF MAX RECORDED GENERATION DURING PEAK HOURS 22,601 MW on 04 Sept 2019 Wapda-Hydel 7,937 Gencos 2,290 IPPs 12,374 Total 22,601
  • 30. 23,056 MW on 04 July 2019 @ 14:18 Hours ABSOLUTE MAX RECORDED GENERATION DURING 24 HOURS
  • 32. GENERATION / DEMAND BALANCE SYSTEM FREQUENCY = 50 HZ GENERATION DEMAND The primary function of NPCC is to keep balance between demand and supply & to ensure system security and reliability. In balanced condition system frequency is 50 Hz.
  • 33. GENERATION / DEMAND BALANCE SYSTEM FREQUENCY < 50 HZ DEMAND GENERATION When demand exceeds generation, frequency depreciates below 50 Hz and in order to maintain balance between demand and generation, load management has to be carried out.
  • 34. GENERATION DEMAND BALANCE  Load is continuously varying in time and so the generation has to be varied in order to keep frequency in permissible limits  Variation in generation • Hydel (Fastest ramping rates) • Thermal • Steam Turbines • Gas Turbines • DG Sets
  • 35. GENERATION DEMAND BALANCE  In case of deficit in generation capacity, balance between demand and generation has to be maintained through load management  Therefore a multi tier strategy has been adopted for this balance through load management  Scheduled load management  System security load management  Emergency (Forced) Load Management
  • 36. 36 SCHEDULED LOAD MANAGEMENT Scheduled load management is carried out by DISCO’s, keeping in view the following factors.  Load demand of respective DISCO.  Generation share allocated to DISCO by NPCC.  Constraints like voltage drop, transmission and transformer loading including 11 kV & below system.
  • 37. 37 SYSTEM SECURITY LOAD MANAGEMENT ➢ Under Voltage, Under Frequency & Cross Trip Protection schemes have been installed for System Security Load Management
  • 38. EMERGENCY LOAD MANAGEMENT Emergency load management (Forced LS) is carried out by NPCC by opening 132kV transmission lines in case of extreme system emergencies. Examples are: 1. Un-foreseen generating unit outages 2. Non implementation of schedule load management by DISCOs 3. Rupturing of gas lines 4. Non availability of fuel 5. Sabotage activities on transmission lines 6. Transmission and transformation problems
  • 40. MERIT ORDER APPROVAL COMMITTEE  Power Plants are operated on the basis of Despatch Merit Order which is approved by a committee of the following members.  General Manager (SO) NPCC, Convener.  General Manager (PSP) NTDC, Member.  Chief Technical Officer CPPA-G, Member.  Chief Financial Officer CPPA-G, Member.  Chief Technical Officer GENCO, Member.  Standard Operating Procedure SOP exists for the process of preparing and revision of merit order for operation of power plants.
  • 41. PROCEDURE OF MERIT ORDER FORMATION ➢ Procedure 1) Chief Technical Officer CPPA-G will intimate the revised applicable fuel prices and variable O&M Cost fortnightly in respect of Gencos and IPPs Plants comprising of the following components: i) Fuel Price, ii) Calorific value of fuel, iii) Net Heat Rate, iv) Variable O&M cost, v) Index Premium, vi) Ratio of fuel mix gas and furnace oil, vii) Environment Consideration, viii) Utilization of local gas and RLNG. ix) International contract by GoP for purchase of RLNG. 2) On receipt of information from CTO CPPA-G, office of GM (SO) NPCC shall consolidate/ prepare the revised merit order and put up immediately to all merit order committee members for final approval.
  • 42. IMPLEMENTATION OF MERIT ORDER  As per Clause SDC 1.4.3.2 of NEPRA Grid Code, NPCC always operates the plants without any discrimination. Cheaper plants take the lead in despatching. In prevailing situation of shortfall of power in the country, most of the time in the year, all available plants have to be operated and therefore question of any discrimination of despatch does not arise.  However during short period of lean demand ,Merit order is strictly followed by NPCC keeping in view the technical constraints of Gencos along with voltage transmission issues if any.  Plants under annual maintenance outages according to planned programs and hydel generation drops during lean period of system demand.
  • 44. OPERATION PLANNING Pre Dispatch Functions  Annual Production Plan  Calculation of future fuel requirements  Year/Quarter/Month/Week Ahead Planning Post Dispatch Functions  Event/NPMV Verification  Liquidated Damages  Operating Committees
  • 45.