1500
2000
2500
3000
3500
4000
MEGA-WATTS(MW)
QUARTER-HOUR TIME INTERVALS
4500
00:00 04:00 08:00 12:00 16:00 20:00 00:00
4 Aug 2013
22 Jan 2013
System Load Curves
Forecasting electricity demand during the day or year can
utilise the fact that normally demand follows the pattern
of similar conditions on the same day in previous years.
For instance, winter demand adopts the following pattern
normally: demand reaches its lowest level, or trough, in
the early hours of the morning, before rising sharply as the
population wakens. It then rises again over the lunchtime
period, and finally increases to its winter evening peak,
due to lighting, heating and cooking needs of consumers
returning home. In summertime, demand is far lower and
due to brighter conditions in the evening, the daily peak
is at lunchtime, rather than during the evening.
210 cover pages.indd 3 03/06/2014 12:50
EirGrid
EirGrid plc is the independent electricity Transmission System
Operator (TSO) in Ireland and the Market Operator in the
wholesale electricity trading system. EirGrid’s role is to deliver
services to generators, suppliers and customers across the
high voltage electricity system, and to put in place the grid
infrastructure needed to support Ireland’s economy. EirGrid
develops, maintains and operates a safe, secure, reliable,
economical and efficient transmission system.
Electricity is an essential and convenient service
provided to two million electricity consumers, including
domestic customers, small and medium industry, farms and
agribusiness, and large high-technology industrial customers.
This illustrates the vital nature of the service EirGrid provides.
The Power System
The power system consists of the transmission grid, along
with power generators (using gas, coal, oil, peat, wind or
hydro-power as their fuels) and the distribution system.
The transmission system is operated at the voltage levels of
400kV, 220kV and 110kV. An analogy can be drawn between
the transmission system and the national road network.
The 400kV system can be likened to the major inter-urban
motorways, the 220kV system to the dual carriageways and
the 110kV system to the national roads serving every county
and linking every town. It is the backbone which supports
electricity supplies to industry, offices, shops, schools, farms
and homes and all other users.
All-Island Fuel Mix 2013
400kV 3 440
220kV 19 1830
110kV 81 3850
Summary of Transmission Plant
Figures are indicative.
STATIONS CIRCUITS
(km approx)
Notes:
· Renewable % = Wind + Hydro + ½(Waste)
· These are preliminary percentages obtained from SCADA.
SONI will provide more accurate data for NI from meter readings and SEAI will add small scale renewables which are not visible to us,
so the final renewable figures are likely to be higher but probably by a small amount (in the order of 1%).
Renewable:
17.8%
Gas:
39.7%
Peat:
7.0%
Coal:
19.8%
Imports:
10.6%
CHP:
3.8%
Other:
1.3%
3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 2 03/06/2014 12:35
The National Control Centre (NCC)
The system is operated from EirGrid’s National Control Centre
(NCC) in its role as Transmission System Operator. The EirGrid
NCC is located in Dublin and exercises energy management
functions over the generation and transmission system.
The objective of the NCC is to operate the generation and
transmission system for maximum economy, consistent
with safety, security, continuity, quality and environmental
standards. It provides high quality delivery to all customers,
through maintaining this essential service, 24 hours a day,
every day of the year.
The NCC was originally opened in April 1987 and moved
to its current location in 2006. Previous to the NCC, a centre
called the Load Dispatch Office (LDO) carried out similar, but
not identical roles. This was superseded by the NCC, which
introduced the use of modern IT systems, replacing previous
systems which relied heavily upon telephone communications
between station operators and control centre personnel.
On 27th April 1995 the system was interconnected with the
Northern Ireland system via two 275/220kV links. The system
in Northern Ireland is operated by SONI, the System Operator
for Northern Ireland. The advent of the Single Electricity
Market on the island in November 2007 has emphasised the
requirement for, and major advantages of, close co-operation
in the operation of the power systems in both jurisdictions.
The EirGrid East West Interconnector (EWIC), a direct
current (DC) cable linking the Irish Transmission System to
the UK National Grid, commenced commercial operation in
December 2012. EWIC is approximately 260km in length and
has the capacity to transport 500 megawatts – enough energy
to power 300,000 homes. The NCC engineers are responsible
for the operation of EWIC and do so by controlling the flow of
power on the interconnector while simultaneously monitoring
conventional generators, wind generation levels and demand
fluctuations.
Critical to the work in the EirGrid NCC are all generators,
the Hydro-Electric Control Centre in Turlough Hill and the two
Distribution Control Centres (DCCs) which are operated by ESB.
The DCCs are located at the major load centres of Dublin and
Cork and have responsibility for distribution of power within
their regions. Distribution networks are at a medium and lower
voltage and link most customers to the National Grid.
To ensure the secure minute-to-minute operation of the
system, continual monitoring is essential. To facilitate this,
the NCC requires a substantial quantity of on-line information.
This information is collected by remote terminal units (RTUs)
which are located in each transmission station around Ireland
and transmit the information to the NCC computer system.
There is a simulator in the NCC which enables instructors
to provide challenging training scenarios in a real-time
environment. Operators are all highly-trained engineers having
spent extensive periods working alongside experienced grid
controllers and also undertaken a certification process prior to
assignment to the NCC.
3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 3 03/06/2014 12:35
The basic generation function of the NCC is to ensure enough
power is produced to meet customer demand.
This function must be carried out in a fair and transparent
manner while the supply-demand balance must be maintained
on an instantaneous basis in order to keep the frequency of
the system stable at 50Hz. The NCC engineers determine which
generation will be required throughout the day and schedule
and dispatch the appropriate generation units accordingly.
This generation schedule is influenced by the Single Electricity
Market (SEM). The NCC engineers must also allow for unforeseen
events, such as a greater demand than expected, the loss of
a generator from the system or damage to a piece of equipment
on the system.
Unusual events – such as football matches – can cause
changes in the operation of the system if demand deviates from
normal patterns. When one million people switch on their kettles
at half-time, the combined effect is a significant increase in
demand. NCC engineers are aware of the need to be prepared for
these events, as well as other normal fluctuations in demand on
a daily or seasonal basis.
Operation of the
Generation System -
second by second
3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 4 03/06/2014 12:35
3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 1 03/06/2014 12:35
The purpose of the transmission system is to facilitate
the bulk transfer of electrical energy from generators to
demand centres. This power transfer is carried out at high
voltages so as to minimise transmission losses. The control
engineers’ function is to ensure that voltages and flows on
the system are within acceptable limits at all times. System
stability and safety of the public and those working on the
system are key priorities. Significant changes in demand can
cause both the voltage and frequency to change; they must
therefore be monitored constantly. Changes in demand for
power nationally, therefore, must be anticipated and timely
action taken. This is primarily accomplished by continually
monitoring and controlling generators’ power production
and by managing the topology of the transmission system.
Stormy weather can cause problems on the transmission
system. To cope with the challenging conditions created by
high winds and lightning, the control centre engineers must
quickly decipher what has happened and act swiftly. In most
cases, this is achieved without any consumer being affected,
although major incidents can affect customers. The priority
is to restore the network as quickly as possible in a safe
manner. A lightning detection system is available to the
control engineers to assist with operating the system during
storms and Met Éireann is contracted to provide special
alerts and forecasts to the NCC in relation to upcoming
weather events. The engineers must be prepared to deal with
all unforeseen events. To assist them in this regard they
utilise powerful software tools such as Contingency Analysis,
Loadflow and State Estimation programmes.
Operation of the Transmission System
210 cover pages.indd 4 03/06/2014 12:50
208 cover pages.indd 2 03/06/2014 12:53
Map of Transmission
and Generation
System
Transmission Connected Generation
400kV Lines
275kV Lines
220kV Lines
110kV Lines
220kV Cables
110kV Cables
HVDC Cables
400kV Stations
275kV Stations
220kV Stations
110kV Stations
Hydro Generation
Thermal Generation
Pumped Storage Generation
Wind Generation
Transmission System
400kV, 275kV, 220kV & 110kV
The system in the Republic of
Ireland is operated by EirGrid.
The system in Northern Ireland
is operated by SONI.
208 cover pages.indd 1 03/06/2014 12:53
210 cover pages.indd 2 03/06/2014 12:50

More Related Content

What's hot

input output characteristics of thermal plant
input output characteristics of thermal plantinput output characteristics of thermal plant
input output characteristics of thermal plantmathamramesh
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerSMDDTech
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation Madeen Kumar
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19ZahidManiyar
 
Power system analysis material -Mathankumar.s VMKVEC
Power system analysis material -Mathankumar.s  VMKVECPower system analysis material -Mathankumar.s  VMKVEC
Power system analysis material -Mathankumar.s VMKVECMathankumar S
 
Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01vikram anand
 
Flying Capacitor Multi Level Inverter
Flying Capacitor Multi Level InverterFlying Capacitor Multi Level Inverter
Flying Capacitor Multi Level InverterSajid Sheikh
 
EE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationEE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationKarthikeyanK816516
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridKundan Kumar
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric driveVijay Krishna
 
Benifits of power factor improvement for industry
Benifits of power factor improvement for industryBenifits of power factor improvement for industry
Benifits of power factor improvement for industryGovinda Neupane
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERNitish NIT
 
Choice of converter configuration
Choice of converter configurationChoice of converter configuration
Choice of converter configurationjawaharramaya
 
Mesh analysis and Nodal Analysis
Mesh analysis and Nodal AnalysisMesh analysis and Nodal Analysis
Mesh analysis and Nodal AnalysisKomal Kotak
 
Starting method for 3 phase induction motor
Starting method for 3 phase induction motorStarting method for 3 phase induction motor
Starting method for 3 phase induction motorAhmed A.Hassan
 
Parallel operation of transformers
Parallel operation of transformersParallel operation of transformers
Parallel operation of transformersDr.Raja Masood Larik
 

What's hot (20)

input output characteristics of thermal plant
input output characteristics of thermal plantinput output characteristics of thermal plant
input output characteristics of thermal plant
 
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformer
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
Power system analysis material -Mathankumar.s VMKVEC
Power system analysis material -Mathankumar.s  VMKVECPower system analysis material -Mathankumar.s  VMKVEC
Power system analysis material -Mathankumar.s VMKVEC
 
Per unit system
Per unit systemPer unit system
Per unit system
 
Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01
 
EE6711 Power System Simulation Lab manual
EE6711 Power System Simulation Lab manualEE6711 Power System Simulation Lab manual
EE6711 Power System Simulation Lab manual
 
Flying Capacitor Multi Level Inverter
Flying Capacitor Multi Level InverterFlying Capacitor Multi Level Inverter
Flying Capacitor Multi Level Inverter
 
EE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationEE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordination
 
concept of resilience and self healing in smart grid
concept of resilience and self healing in smart gridconcept of resilience and self healing in smart grid
concept of resilience and self healing in smart grid
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric drive
 
Benifits of power factor improvement for industry
Benifits of power factor improvement for industryBenifits of power factor improvement for industry
Benifits of power factor improvement for industry
 
Earth Resistance Testing
Earth Resistance TestingEarth Resistance Testing
Earth Resistance Testing
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
Choice of converter configuration
Choice of converter configurationChoice of converter configuration
Choice of converter configuration
 
Mesh analysis and Nodal Analysis
Mesh analysis and Nodal AnalysisMesh analysis and Nodal Analysis
Mesh analysis and Nodal Analysis
 
Starting method for 3 phase induction motor
Starting method for 3 phase induction motorStarting method for 3 phase induction motor
Starting method for 3 phase induction motor
 
Parallel operation of transformers
Parallel operation of transformersParallel operation of transformers
Parallel operation of transformers
 

Similar to EirGrid NATIONAL CONTROL CENTRE

Power distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in NigeriaPower distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in NigeriaIJECEIAES
 
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...Isam Shahrour
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libreAbanihi
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Dhruv Agarwal
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemIOSR Journals
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemIOSR Journals
 
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
IRJET-  	  Optimization of Renewable Energy Sources for DC MicrogridIRJET-  	  Optimization of Renewable Energy Sources for DC Microgrid
IRJET- Optimization of Renewable Energy Sources for DC MicrogridIRJET Journal
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfHASSAN527910
 
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaTechnical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaIRJET Journal
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...IRJET Journal
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in IndiaSandipan Chakraborty
 
Data transmission through power line
Data transmission through power lineData transmission through power line
Data transmission through power lineIAEME Publication
 

Similar to EirGrid NATIONAL CONTROL CENTRE (20)

Power distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in NigeriaPower distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in Nigeria
 
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...Professor Isam Shahrour Summer Course « Smart and Sustainable City »  Chapter...
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
 
I010114657
I010114657I010114657
I010114657
 
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
IRJET-  	  Optimization of Renewable Energy Sources for DC MicrogridIRJET-  	  Optimization of Renewable Energy Sources for DC Microgrid
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
 
Recommendations and solutions to remove some barriers to the deployment of sm...
Recommendations and solutions to remove some barriers to the deployment of sm...Recommendations and solutions to remove some barriers to the deployment of sm...
Recommendations and solutions to remove some barriers to the deployment of sm...
 
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in NigeriaTechnical overview of all sources of Electrical Power used in BTSs in Nigeria
Technical overview of all sources of Electrical Power used in BTSs in Nigeria
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
 
IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 
Power sector
Power sectorPower sector
Power sector
 
Smart grid
Smart gridSmart grid
Smart grid
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
ppt main
ppt mainppt main
ppt main
 
J010146169
J010146169J010146169
J010146169
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Data transmission through power line
Data transmission through power lineData transmission through power line
Data transmission through power line
 

More from Power System Operation

Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsPower System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemePower System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

EirGrid NATIONAL CONTROL CENTRE

  • 1. N A T I O N A L C O N T R O L C E N T R E www.eirgrid.com 210 cover pages.indd 1 03/06/2014 12:50
  • 2. 1500 2000 2500 3000 3500 4000 MEGA-WATTS(MW) QUARTER-HOUR TIME INTERVALS 4500 00:00 04:00 08:00 12:00 16:00 20:00 00:00 4 Aug 2013 22 Jan 2013 System Load Curves Forecasting electricity demand during the day or year can utilise the fact that normally demand follows the pattern of similar conditions on the same day in previous years. For instance, winter demand adopts the following pattern normally: demand reaches its lowest level, or trough, in the early hours of the morning, before rising sharply as the population wakens. It then rises again over the lunchtime period, and finally increases to its winter evening peak, due to lighting, heating and cooking needs of consumers returning home. In summertime, demand is far lower and due to brighter conditions in the evening, the daily peak is at lunchtime, rather than during the evening. 210 cover pages.indd 3 03/06/2014 12:50
  • 3. EirGrid EirGrid plc is the independent electricity Transmission System Operator (TSO) in Ireland and the Market Operator in the wholesale electricity trading system. EirGrid’s role is to deliver services to generators, suppliers and customers across the high voltage electricity system, and to put in place the grid infrastructure needed to support Ireland’s economy. EirGrid develops, maintains and operates a safe, secure, reliable, economical and efficient transmission system. Electricity is an essential and convenient service provided to two million electricity consumers, including domestic customers, small and medium industry, farms and agribusiness, and large high-technology industrial customers. This illustrates the vital nature of the service EirGrid provides. The Power System The power system consists of the transmission grid, along with power generators (using gas, coal, oil, peat, wind or hydro-power as their fuels) and the distribution system. The transmission system is operated at the voltage levels of 400kV, 220kV and 110kV. An analogy can be drawn between the transmission system and the national road network. The 400kV system can be likened to the major inter-urban motorways, the 220kV system to the dual carriageways and the 110kV system to the national roads serving every county and linking every town. It is the backbone which supports electricity supplies to industry, offices, shops, schools, farms and homes and all other users. All-Island Fuel Mix 2013 400kV 3 440 220kV 19 1830 110kV 81 3850 Summary of Transmission Plant Figures are indicative. STATIONS CIRCUITS (km approx) Notes: · Renewable % = Wind + Hydro + ½(Waste) · These are preliminary percentages obtained from SCADA. SONI will provide more accurate data for NI from meter readings and SEAI will add small scale renewables which are not visible to us, so the final renewable figures are likely to be higher but probably by a small amount (in the order of 1%). Renewable: 17.8% Gas: 39.7% Peat: 7.0% Coal: 19.8% Imports: 10.6% CHP: 3.8% Other: 1.3% 3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 2 03/06/2014 12:35
  • 4. The National Control Centre (NCC) The system is operated from EirGrid’s National Control Centre (NCC) in its role as Transmission System Operator. The EirGrid NCC is located in Dublin and exercises energy management functions over the generation and transmission system. The objective of the NCC is to operate the generation and transmission system for maximum economy, consistent with safety, security, continuity, quality and environmental standards. It provides high quality delivery to all customers, through maintaining this essential service, 24 hours a day, every day of the year. The NCC was originally opened in April 1987 and moved to its current location in 2006. Previous to the NCC, a centre called the Load Dispatch Office (LDO) carried out similar, but not identical roles. This was superseded by the NCC, which introduced the use of modern IT systems, replacing previous systems which relied heavily upon telephone communications between station operators and control centre personnel. On 27th April 1995 the system was interconnected with the Northern Ireland system via two 275/220kV links. The system in Northern Ireland is operated by SONI, the System Operator for Northern Ireland. The advent of the Single Electricity Market on the island in November 2007 has emphasised the requirement for, and major advantages of, close co-operation in the operation of the power systems in both jurisdictions. The EirGrid East West Interconnector (EWIC), a direct current (DC) cable linking the Irish Transmission System to the UK National Grid, commenced commercial operation in December 2012. EWIC is approximately 260km in length and has the capacity to transport 500 megawatts – enough energy to power 300,000 homes. The NCC engineers are responsible for the operation of EWIC and do so by controlling the flow of power on the interconnector while simultaneously monitoring conventional generators, wind generation levels and demand fluctuations. Critical to the work in the EirGrid NCC are all generators, the Hydro-Electric Control Centre in Turlough Hill and the two Distribution Control Centres (DCCs) which are operated by ESB. The DCCs are located at the major load centres of Dublin and Cork and have responsibility for distribution of power within their regions. Distribution networks are at a medium and lower voltage and link most customers to the National Grid. To ensure the secure minute-to-minute operation of the system, continual monitoring is essential. To facilitate this, the NCC requires a substantial quantity of on-line information. This information is collected by remote terminal units (RTUs) which are located in each transmission station around Ireland and transmit the information to the NCC computer system. There is a simulator in the NCC which enables instructors to provide challenging training scenarios in a real-time environment. Operators are all highly-trained engineers having spent extensive periods working alongside experienced grid controllers and also undertaken a certification process prior to assignment to the NCC. 3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 3 03/06/2014 12:35
  • 5. The basic generation function of the NCC is to ensure enough power is produced to meet customer demand. This function must be carried out in a fair and transparent manner while the supply-demand balance must be maintained on an instantaneous basis in order to keep the frequency of the system stable at 50Hz. The NCC engineers determine which generation will be required throughout the day and schedule and dispatch the appropriate generation units accordingly. This generation schedule is influenced by the Single Electricity Market (SEM). The NCC engineers must also allow for unforeseen events, such as a greater demand than expected, the loss of a generator from the system or damage to a piece of equipment on the system. Unusual events – such as football matches – can cause changes in the operation of the system if demand deviates from normal patterns. When one million people switch on their kettles at half-time, the combined effect is a significant increase in demand. NCC engineers are aware of the need to be prepared for these events, as well as other normal fluctuations in demand on a daily or seasonal basis. Operation of the Generation System - second by second 3316_EirGrid_NCCbrochure_BODY_FA(spread).indd 4 03/06/2014 12:35
  • 7. The purpose of the transmission system is to facilitate the bulk transfer of electrical energy from generators to demand centres. This power transfer is carried out at high voltages so as to minimise transmission losses. The control engineers’ function is to ensure that voltages and flows on the system are within acceptable limits at all times. System stability and safety of the public and those working on the system are key priorities. Significant changes in demand can cause both the voltage and frequency to change; they must therefore be monitored constantly. Changes in demand for power nationally, therefore, must be anticipated and timely action taken. This is primarily accomplished by continually monitoring and controlling generators’ power production and by managing the topology of the transmission system. Stormy weather can cause problems on the transmission system. To cope with the challenging conditions created by high winds and lightning, the control centre engineers must quickly decipher what has happened and act swiftly. In most cases, this is achieved without any consumer being affected, although major incidents can affect customers. The priority is to restore the network as quickly as possible in a safe manner. A lightning detection system is available to the control engineers to assist with operating the system during storms and Met Éireann is contracted to provide special alerts and forecasts to the NCC in relation to upcoming weather events. The engineers must be prepared to deal with all unforeseen events. To assist them in this regard they utilise powerful software tools such as Contingency Analysis, Loadflow and State Estimation programmes. Operation of the Transmission System 210 cover pages.indd 4 03/06/2014 12:50
  • 8. 208 cover pages.indd 2 03/06/2014 12:53
  • 9. Map of Transmission and Generation System Transmission Connected Generation 400kV Lines 275kV Lines 220kV Lines 110kV Lines 220kV Cables 110kV Cables HVDC Cables 400kV Stations 275kV Stations 220kV Stations 110kV Stations Hydro Generation Thermal Generation Pumped Storage Generation Wind Generation Transmission System 400kV, 275kV, 220kV & 110kV The system in the Republic of Ireland is operated by EirGrid. The system in Northern Ireland is operated by SONI. 208 cover pages.indd 1 03/06/2014 12:53