PRESENTATION ON DISASTER RESPONSE
ROLE OF BANGLADESH ARMY
What is disaster response???
Aggregate of decisions and measures taken to mitigate the effects
of a disastrous event to prevent any further loss of life and
property, restore order in its immediate aftermath, and reestablish
normality through reconstruction and rehabilitation shortly
thereafter. The first and immediate response is called emergency
response
Operational Response Priorities
Priority actions for each cluster by time frame:
Priority actions at the initial response phase (first 4, 8 and 12 hours).
Priority actions at the intermediate response phase (through 24, 48
and 72 hours).
Priority actions at the initial recovery phase (after 72 hours but before
end of the first week).
Sustained response operation – as 72 hours is over,
the EOC should be supporting:
• - ongoing search and rescue operation
• - transitioning rear-complete response efforts
• - preparing for major recovery efforts
(3)
Goals, Objectives and Scope of
Emergency Response of Bangladesh army
• The primary response goal is to save maximum number of
lives in case of an earthquake and stabilize the event within
first 72 hours. The priority objectives are:
 Delivering immediate search, rescue and evacuate people to
safe locations.
 Providing immediate medical assistance and life-saving
medical services to the victims.
 Providing fatality management services and returning
deceased, to their relatives.
 Stabilizing or eliminating damaged buildings and
infrastructures to minimize health and safety threats
 Restoring the essential infrastructures to functional condition.
 Ensuring temporary shelters, including provision of adequate
food, water and sanitation facilities to the displaced population.
 Providing safety and security and maintaining law and order.
(4)
Emergency Response Activities of
Bangladesh army
• List of possible response activities :
 - Rapid damage assessment
 - Crisis decision making
 - Search, rescue and evacuation
 - Request for external assistance for search and rescue
 - Emergency Medical Services
 - Emergency communications
 - Fire-fighting
 - Emergency restoration of utility services
 - Building inspection and demolition/ restoration
 - Inspection of roads, bridges, overpass, dams, reservoirs, etc.
 - Protection of lives and property
 - Maintain the law and order situation
 - Public Information announcements and warnings
 - Clearance of evacuation routes and debris removal
(5)
Action Strategies
• Functional Response Cluster System:
• Command and Coordination
• Search, Rescue and Evacuation
• Healthcare Services
• Logistics Support & Relief Services (Food, Nutrition,
Relief)
• Shelter (Including camp management)
• Water Supply, Sanitation and Hygiene
• Transportation (Road, Rail, Air and Sea)
• Security and Welfare
• Immediate Recovery (Restoration of Urban
Services)
(6)
Recent response activities of
Bangladesh army at the time of
Disaster
Rana plaza
• Bangladesh Army was starting work
there from the first day till the last day.
• They use some heavy equipment at
the time of rescue operation.
• It was one of the biggest response
activities for them.
• Bangladesh army rejected foreign
assistance over Rana Plaza collapse.
(7)
2007 Chittagong mudslides
• The search and rescue
operation by the Bangladesh
army
• About 1000 solider worked at
the time of disaster.
Bangladesh army and US army to
participate in Disaster Response
Exercise
The exercise was review and
evaluate Dhaka City earthquake
response plans, practice
logistical and medical
emergency scenarios, and
identify current gaps in plans
and procedures.
(8)
Conclusion
Response is one of the important elements of the disaster cycle
The success of army measures in aid of Civil Power depends upon
the co‐operation between the civil and military authorities.
Successful co‐operation
is only achieved when there is mutual confidence and
understanding. Therefore it is important that in peace time, the
officers of Civil service and the officers of Army should know each ot
her and have knowledge of each other's duties.
REFERENCE
http://www.afd.gov.bd/index.php/activities/armed-forces-division-in-disaster-
management
https://www.ukessays.com/essays/envirnmental-sciences/roles-of-armed-forces-in-
disaster-management-environmental-sciences-essay.php?utm_expid=309629-
2.KXZ6CCs5RRCgVDyVYVWeng.0&utm_referrer=https%3A%2F%2Fwww.google.com%2F
http://reliefweb.int/sites/reliefweb.int/files/resources/2F7AAB0CC77BAF7FC12572FA
0044B74D-Full_Report.pdf
http://bangladeshpolitico.blogspot.com/2013/10/bangladesh-army-rejected-foreign.html
Thank you

More Related Content

What's hot

Les risque sur chantier
Les risque sur chantierLes risque sur chantier
Les risque sur chantier
Zahir Hadji
 
Disaster preparedness and hazard reduction processes
Disaster preparedness and hazard reduction processesDisaster preparedness and hazard reduction processes
Disaster preparedness and hazard reduction processes
Ash-Leigh
 

What's hot (20)

Note de doctrine opérationnelle tuerie de masse 2017 v2 définitive
Note de doctrine opérationnelle tuerie de masse 2017 v2 définitiveNote de doctrine opérationnelle tuerie de masse 2017 v2 définitive
Note de doctrine opérationnelle tuerie de masse 2017 v2 définitive
 
Involvement of pri in disaster risk reduction
Involvement of pri in disaster risk reductionInvolvement of pri in disaster risk reduction
Involvement of pri in disaster risk reduction
 
Management of disaster
Management of disasterManagement of disaster
Management of disaster
 
Disaster management modified
Disaster management modifiedDisaster management modified
Disaster management modified
 
Disaster management principle and preparedness-2019
Disaster management   principle and preparedness-2019Disaster management   principle and preparedness-2019
Disaster management principle and preparedness-2019
 
Leveraging technology in disaster management
Leveraging technology in disaster managementLeveraging technology in disaster management
Leveraging technology in disaster management
 
Structural collapse awareness hmm
Structural collapse awareness hmmStructural collapse awareness hmm
Structural collapse awareness hmm
 
Disaster-Preparedness-and-Disaster-Response.pptx
Disaster-Preparedness-and-Disaster-Response.pptxDisaster-Preparedness-and-Disaster-Response.pptx
Disaster-Preparedness-and-Disaster-Response.pptx
 
Introduction to disaster management
Introduction to disaster managementIntroduction to disaster management
Introduction to disaster management
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Les risque sur chantier
Les risque sur chantierLes risque sur chantier
Les risque sur chantier
 
Principles Of Emergency Planning
Principles Of Emergency PlanningPrinciples Of Emergency Planning
Principles Of Emergency Planning
 
Disaster preparedness and hazard reduction processes
Disaster preparedness and hazard reduction processesDisaster preparedness and hazard reduction processes
Disaster preparedness and hazard reduction processes
 
Role of Armed Forces & others in Disaster Management
Role of Armed Forces & others in Disaster ManagementRole of Armed Forces & others in Disaster Management
Role of Armed Forces & others in Disaster Management
 
Disaster management
Disaster managementDisaster management
Disaster management
 
A Presentation on "Disaster Preparedness and Management " Presented by Mr. Sh...
A Presentation on "Disaster Preparedness and Management " Presented by Mr. Sh...A Presentation on "Disaster Preparedness and Management " Presented by Mr. Sh...
A Presentation on "Disaster Preparedness and Management " Presented by Mr. Sh...
 
Disaster Managment
Disaster Managment Disaster Managment
Disaster Managment
 
CBRNE - An Introduction
CBRNE - An IntroductionCBRNE - An Introduction
CBRNE - An Introduction
 
HYOGO.pptx
HYOGO.pptxHYOGO.pptx
HYOGO.pptx
 
Unit no 05 disaster response
Unit no 05 disaster responseUnit no 05 disaster response
Unit no 05 disaster response
 

Similar to Presentation on disaster response of army final

Disaster Preparedness and Disaster Response.pptx
Disaster Preparedness and Disaster Response.pptxDisaster Preparedness and Disaster Response.pptx
Disaster Preparedness and Disaster Response.pptx
AbbieNunez
 

Similar to Presentation on disaster response of army final (20)

Armed Forces & others in Disaster Management
Armed Forces & others in Disaster ManagementArmed Forces & others in Disaster Management
Armed Forces & others in Disaster Management
 
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of  Hospital A...
Disaster Management Cycle (DMC)| Ms. Pooja Sharma , Department of Hospital A...
 
Disaster management cycle
Disaster management cycleDisaster management cycle
Disaster management cycle
 
Disaster Prepared Management
Disaster Prepared ManagementDisaster Prepared Management
Disaster Prepared Management
 
Disaster Preparedness and Disaster Response.pptx
Disaster Preparedness and Disaster Response.pptxDisaster Preparedness and Disaster Response.pptx
Disaster Preparedness and Disaster Response.pptx
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Disaster management and its planning
Disaster management and its planningDisaster management and its planning
Disaster management and its planning
 
Disaster management in india
Disaster management in indiaDisaster management in india
Disaster management in india
 
NDMA annual report 2014-2015
NDMA annual report 2014-2015NDMA annual report 2014-2015
NDMA annual report 2014-2015
 
lecture 4 response and recovery .pptx
lecture 4 response and recovery .pptxlecture 4 response and recovery .pptx
lecture 4 response and recovery .pptx
 
MODULE 3.pptx
MODULE  3.pptxMODULE  3.pptx
MODULE 3.pptx
 
EVS -Chapter 6 - Disaster management.ppt
EVS -Chapter 6 - Disaster management.pptEVS -Chapter 6 - Disaster management.ppt
EVS -Chapter 6 - Disaster management.ppt
 
Disaster management Planning and implementation.pptx
Disaster management Planning and implementation.pptxDisaster management Planning and implementation.pptx
Disaster management Planning and implementation.pptx
 
ROLE OF ENGINEERS IN DISASTER MANAGEMENT
ROLE OF ENGINEERS IN DISASTER MANAGEMENTROLE OF ENGINEERS IN DISASTER MANAGEMENT
ROLE OF ENGINEERS IN DISASTER MANAGEMENT
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management ppt
 
mod 3.pptx
mod 3.pptxmod 3.pptx
mod 3.pptx
 
Llb i el u 4.5 disaster management
Llb i el u 4.5 disaster managementLlb i el u 4.5 disaster management
Llb i el u 4.5 disaster management
 
Post disaster mangement
Post disaster mangementPost disaster mangement
Post disaster mangement
 
Reconstruction and development
Reconstruction and developmentReconstruction and development
Reconstruction and development
 
Disaster prevention and recovery
Disaster prevention and recoveryDisaster prevention and recovery
Disaster prevention and recovery
 

More from Nahin Mahfuz Seam (9)

Analysis of the budget Digital Bangladesh
Analysis of the budget Digital BangladeshAnalysis of the budget Digital Bangladesh
Analysis of the budget Digital Bangladesh
 
Cultural change and diversity
Cultural change and diversityCultural change and diversity
Cultural change and diversity
 
Salinity risk assessment in bangladesh
Salinity risk assessment in bangladeshSalinity risk assessment in bangladesh
Salinity risk assessment in bangladesh
 
Air and water pollution
Air and water pollutionAir and water pollution
Air and water pollution
 
Waste water management
Waste water managementWaste water management
Waste water management
 
Presentation on mountain ecosystem
 Presentation on mountain ecosystem Presentation on mountain ecosystem
Presentation on mountain ecosystem
 
Presentation on matrix
Presentation on matrixPresentation on matrix
Presentation on matrix
 
World water day
World water dayWorld water day
World water day
 
Biodiversity bangladesh
Biodiversity bangladeshBiodiversity bangladesh
Biodiversity bangladesh
 

Recently uploaded

Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
TristanJasperRamos
 
Article writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptxArticle writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptx
abhinandnam9997
 
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
aagad
 

Recently uploaded (12)

1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...
 
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shopHistory+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
 
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
 
How to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptxHow to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptx
 
Latest trends in computer networking.pptx
Latest trends in computer networking.pptxLatest trends in computer networking.pptx
Latest trends in computer networking.pptx
 
The AI Powered Organization-Intro to AI-LAN.pdf
The AI Powered Organization-Intro to AI-LAN.pdfThe AI Powered Organization-Intro to AI-LAN.pdf
The AI Powered Organization-Intro to AI-LAN.pdf
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
 
Article writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptxArticle writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptx
 
The+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptxThe+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptx
 
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
 
BASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptxBASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptx
 

Presentation on disaster response of army final

  • 1. Presented by Masuda Mahbub Toma (13) Taslima Akter (02) Nahin Mahfuz Seam (09) Dhaka School of Economics, University of Dhaka PRESENTATION ON DISASTER RESPONSE ROLE OF BANGLADESH ARMY
  • 2. What is disaster response??? Aggregate of decisions and measures taken to mitigate the effects of a disastrous event to prevent any further loss of life and property, restore order in its immediate aftermath, and reestablish normality through reconstruction and rehabilitation shortly thereafter. The first and immediate response is called emergency response
  • 3. Operational Response Priorities Priority actions for each cluster by time frame: Priority actions at the initial response phase (first 4, 8 and 12 hours). Priority actions at the intermediate response phase (through 24, 48 and 72 hours). Priority actions at the initial recovery phase (after 72 hours but before end of the first week). Sustained response operation – as 72 hours is over, the EOC should be supporting: • - ongoing search and rescue operation • - transitioning rear-complete response efforts • - preparing for major recovery efforts (3)
  • 4. Goals, Objectives and Scope of Emergency Response of Bangladesh army • The primary response goal is to save maximum number of lives in case of an earthquake and stabilize the event within first 72 hours. The priority objectives are:  Delivering immediate search, rescue and evacuate people to safe locations.  Providing immediate medical assistance and life-saving medical services to the victims.  Providing fatality management services and returning deceased, to their relatives.  Stabilizing or eliminating damaged buildings and infrastructures to minimize health and safety threats  Restoring the essential infrastructures to functional condition.  Ensuring temporary shelters, including provision of adequate food, water and sanitation facilities to the displaced population.  Providing safety and security and maintaining law and order. (4)
  • 5. Emergency Response Activities of Bangladesh army • List of possible response activities :  - Rapid damage assessment  - Crisis decision making  - Search, rescue and evacuation  - Request for external assistance for search and rescue  - Emergency Medical Services  - Emergency communications  - Fire-fighting  - Emergency restoration of utility services  - Building inspection and demolition/ restoration  - Inspection of roads, bridges, overpass, dams, reservoirs, etc.  - Protection of lives and property  - Maintain the law and order situation  - Public Information announcements and warnings  - Clearance of evacuation routes and debris removal (5)
  • 6. Action Strategies • Functional Response Cluster System: • Command and Coordination • Search, Rescue and Evacuation • Healthcare Services • Logistics Support & Relief Services (Food, Nutrition, Relief) • Shelter (Including camp management) • Water Supply, Sanitation and Hygiene • Transportation (Road, Rail, Air and Sea) • Security and Welfare • Immediate Recovery (Restoration of Urban Services) (6)
  • 7. Recent response activities of Bangladesh army at the time of Disaster Rana plaza • Bangladesh Army was starting work there from the first day till the last day. • They use some heavy equipment at the time of rescue operation. • It was one of the biggest response activities for them. • Bangladesh army rejected foreign assistance over Rana Plaza collapse. (7)
  • 8. 2007 Chittagong mudslides • The search and rescue operation by the Bangladesh army • About 1000 solider worked at the time of disaster. Bangladesh army and US army to participate in Disaster Response Exercise The exercise was review and evaluate Dhaka City earthquake response plans, practice logistical and medical emergency scenarios, and identify current gaps in plans and procedures. (8)
  • 9. Conclusion Response is one of the important elements of the disaster cycle The success of army measures in aid of Civil Power depends upon the co‐operation between the civil and military authorities. Successful co‐operation is only achieved when there is mutual confidence and understanding. Therefore it is important that in peace time, the officers of Civil service and the officers of Army should know each ot her and have knowledge of each other's duties.