Main objectives of the eProcurement reform
Increase efficiency and value for money in the procurement processes
Reduce transaction costs for all stakeholders, SMEs in particular and
ensure a competitive and sustainable eProcurement model
Increase transparency and prevent corruption behavior during end-to-end
public procurement cycle*, from pre-tendering to post-tendering
The Government of Moldova has the goal of implementing eProcurement in
compliance with the 2014 EU Directives on Public Procurement and with the aim
to:
Ministry of Finance
of Republic of Moldova
Main pillars of the eProcurement Reform
Key features
of the
eProcuremen
t model
Multi-
platform
hybrid
model
Cost-
efficient
Open
Source
Open Data
Open
Contracting
End-to-end
electronic
public
procuremen
t
Interoperabl
e with
eGovernme
nt services
eProcurement
scheme will seek
efficiency through
the reuse of
existing tools
whenever possible
and a sustainable
users’ fees
eProcurement
applications will be
open source and
fostering
transparency and
accountability by
incorporating Open
Data and Open
Contracting
standards
eProcurement scheme
will cover entire public
procurement process,
from procurement
planning to invoicing
and payments under
public contracts
eProcurement system
will be designed to
ensure interoperability
with existing and
future e-Government
services and national
public registers
Ministry of Finance
of Republic of Moldova
The decision for a multi-platform hybrid model
A comparative analysis of international best practices was conducted with the support
of EBRD. Two main alternatives were identified:
Single platform scheme
eProcurement Back-end
eProcurement Front-end
Contracting
Authorities
Economic
Operators
eProcurement
Front-end 1
eProcurement
Front-end N
CA 1 EO 1
eProcurement Back-end
CA N EO N
Legend
Government owned Private owned Procurement agents
Hybrid multi-platform scheme
Ministry of Finance
of Republic of Moldova
The decision for a multi-platform hybrid model
The following benefits and drawbacks were identified:
+ Easy end-to-end management of the
global procurement process
+ Simplified integration with other
eGovernment systems
+ Better suited to countries with low
eGovernment services maturity
— High initial investment
— Single supplier may exploit its
monopolistic position
— Discourages innovation and future
enhancements
— High dependency on a single system
and a single provider (security
breaches, provider drop-out, etc.)
+ Low development, implementation
and maintenance costs
+ Encourages competition between
eProcurement platform providers
+ Risk is shared between platform
suppliers
+ Platform providers encourage
participation of EO in PP processes
+ Central unit manages and replicates
all information to the multiple
eProcurement platforms
— Complex management of the
eProcurement environment
— Need for a private offer of
eProcurement platforms
Single platform scheme Hybrid multi-platform scheme
Ministry of Finance
of Republic of Moldova
The decision for a multi-platform hybrid model
The hybrid model was chosen for Moldova due to the following reasons:
Ministry of Finance
of Republic of Moldova
Coverage: the procurement life cycle for Moldova
All public procurements should be covered by the system starting
planning and finalising with the payment for the public contract
Selection
Tendering
Purchasing
Preparation Execution
Performance
Guarantees
Low Volume, High
Value
High Volume, Low
Value
Contract
Management
Identificatio
n
of needs
Call for bids
or quotes
Expiration
of
guarantee
Receipt of
products or
services
Planning
Reportingon
procurement
results
Post-tenderingTenderingPre-tendering
Public
Contract
Ordering
from
Framework
Ministry of Finance
of Republic of Moldova
Coverage: the procurement life cycle for Moldova
Allocation of the module Phase of the procurement lifecycle
Pre-tendering Tendering
Post-
tendering
Networking Electronic
Procurement Platform
Central Unit
eGovernment
tools
All public procurement should be covered by the system starting
planning and finalising with the payment for the public contract as it is
showed below
Ministry of Finance
of Republic of Moldova
MTender scheme
The functional scheme for the eProcurement system has been
designed as follows:
Public users
MTender
Central Database
Unit Modules
MLog
Governmental electronic
systems
MConnect
MSign
Mpass
(eAuthentication)
Registers and state
systems
State Register of
Juridical Units
Tax Service
Information System
State Treasury
State Register of
Population
State Register of
Licenses
State register of
non-commercial
organisations
Connection
between the
systems
Criminal Records
register
Electronic
Services
External
Systems
Mnotify
(eNotification)
TED
(eSender)
Business
Intelligence
System
Web
portal
N Networking Electronic Procurement Platforms
PPA
Government
institutions
Contracting Authorities/
Contracting Entities
Economic Operators
NCSA
Registers and state
systems
Cabinets
Ministry of Finance
of Republic of Moldova
MTender main characteristics
The main modules and characteristics of the Central Database Unit are depicted
as follows:
ePlanning
eContract
Management
Central
Database
eAuction
eGovernment
tools
Government
registers
The Central Database
allows for real-time
communication and
information exchange
within all eProcurement
platforms, while keeping
full traceability of the
public procurement
processIntegration with
eGovernment tools to
take advantage of a
modern and already
tested eGovernment
environment, which
reduces the need of
deploying other
alternative solutions
Integration with several government registers
in order to reduce the need of inputting
information manually and automatise
administrative checks
ePlanning allows Contracting authorities to
better organise their procurement needs
and aggregate purchases to maximise
efficiency
This module allows the
control of the contract
execution, including the
launch of second
competition procedures
within framework
agreements, payments
and invoicing
Advanced eAuction
functionality that allows
not only for evaluation
based on lowest price
criteria but also for other
quality criteria and a semi-
automated evaluation of
bids
Ministry of Finance
of Republic of Moldova
MTender pilot development
Test the eProcurement
system in a low risk
environment
Partial implementation
of newest eProcurement
features
Test micro and small
value procedures
Full coverage of the
public procurement cycle
Full coverage of the
public procurement
processes
Implementation of
aggregated demand
mechanisms
Train users in the use of
eProcurement
Connection to
government registers
Full integration with
eGovernment services
Pilot
Full
Deployme
nt
The eProcurement reform has been designed to be implemented in
two stages:
Ministry of Finance
of Republic of Moldova
MTender pilot development
The eProcurement reform pilot included the following developments:
Micro value
procedures
Partial
Implementati
on of
ePlanning
Business
Intelligence
tools for
internal use
Developme
nt of
Central
Database
Partial
connection
to State
Treasury
Integration
with
MCloud,
MPass and
MConnect
Developme
nt of
eAuction
Partial
Implementat
ion of
eContract
Managemen
t
Ministry of Finance
of Republic of Moldova
Open Contracting Data Standard
Open Contracting Data Standard (OCDS) is an open data schema
describing how to release documents and data at each stage of a
contracting process as machine readable, flexible, extensible, user
friendly data
Planning Tender Award Contract Implementation Contract Record
MTender
OCDS
• Digital public procurement cycle
• Market Access: big and small business
• Reporting, monitoring and audit of public
procurement
Ministry of Finance
of Republic of Moldova
eContract Management
https://mtender.gov.md/procurement/tenders/view?id=824#a1
https://achizitii.md/en/public/tender/10001326
Ministry of Finance
of Republic of Moldova
MTender: Business Intelligence
Ministry of Finance
of Republic of Moldova
16
At the moment – 3 platforms
e-licitatie.md achizitii.md yptender.md
Ministry of Finance
of Republic of Moldova
THANK YOU
Ministerul Finanțelor al Republicii Moldova
str. Constantin Tănase, 7,
MD-2005, Republica Moldova
tel. +373 22 262 500
web: www.mf.gov.md
17

More Related Content

Similar to Presentation by Iuri Cicibaba, Moldova (ENG) Second SIGMA Regional ENP East Conference on Public Procurement, Kyiv 29-30 May 2018.

Moldova Governance e-Transformation: a Government Reinventing Journey
Moldova Governance e-Transformation: a Government Reinventing JourneyMoldova Governance e-Transformation: a Government Reinventing Journey
Moldova Governance e-Transformation: a Government Reinventing Journey
Cornelia_Amihalachioae
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBM
Virginia Fernandez
 
Report on e procurement
Report on e procurementReport on e procurement
Report on e procurementharishk75
 
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
Support for Improvement in Governance and Management SIGMA
 
E Procurement 23 April 2009
E Procurement 23 April 2009E Procurement 23 April 2009
E Procurement 23 April 2009eGovProject
 
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Support for Improvement in Governance and Management SIGMA
 
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Support for Improvement in Governance and Management SIGMA
 
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
Support for Improvement in Governance and Management SIGMA
 
Electronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) BangladeshElectronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) Bangladesh
Fahad Aziz
 
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
AAEC_AFRICAN
 
Ict enabled municipal initiative
Ict enabled municipal initiativeIct enabled municipal initiative
Ict enabled municipal initiativepcmcindia
 
eGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UCeGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UC
Stéphane VINCENT
 
FRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: IntroductionFRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: Introduction
Grigoris Chatzikostas
 
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-ProcurementPEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
hippebrun
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
Est
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
Est
 
Implementation of selected principles of the OECD recommendation on public pr...
Implementation of selected principles of the OECD recommendation on public pr...Implementation of selected principles of the OECD recommendation on public pr...
Implementation of selected principles of the OECD recommendation on public pr...
Support for Improvement in Governance and Management SIGMA
 

Similar to Presentation by Iuri Cicibaba, Moldova (ENG) Second SIGMA Regional ENP East Conference on Public Procurement, Kyiv 29-30 May 2018. (20)

MAB07.docx
MAB07.docxMAB07.docx
MAB07.docx
 
Moldova Governance e-Transformation: a Government Reinventing Journey
Moldova Governance e-Transformation: a Government Reinventing JourneyMoldova Governance e-Transformation: a Government Reinventing Journey
Moldova Governance e-Transformation: a Government Reinventing Journey
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBM
 
Report on e procurement
Report on e procurementReport on e procurement
Report on e procurement
 
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
Presentation by Y. Dul, Ukraine, (ENG) Eighth SIGMA Regional IPA Conference o...
 
E Procurement 23 April 2009
E Procurement 23 April 2009E Procurement 23 April 2009
E Procurement 23 April 2009
 
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
Montenegro Presentation, Sandra Skataric, PPA, Legislative framework, 7th Reg...
 
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
Presentation by Ruslan Malai, Moldova (ENG) Second SIGMA Regional ENP East Co...
 
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
 
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
 
Electronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) BangladeshElectronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) Bangladesh
 
Models in E-government
Models in E-governmentModels in E-government
Models in E-government
 
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
Implementation of the Kenya National Single Window System_KENTRADE_SWC2016
 
Ict enabled municipal initiative
Ict enabled municipal initiativeIct enabled municipal initiative
Ict enabled municipal initiative
 
eGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UCeGovernment Action Plan 2016-2020, UC
eGovernment Action Plan 2016-2020, UC
 
FRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: IntroductionFRACTALS FIWARE Accelerator: Introduction
FRACTALS FIWARE Accelerator: Introduction
 
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-ProcurementPEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
PEPPOL key note at EXPP-SUMMIT - E-Invoicing and E-Procurement
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
 
Implementation of selected principles of the OECD recommendation on public pr...
Implementation of selected principles of the OECD recommendation on public pr...Implementation of selected principles of the OECD recommendation on public pr...
Implementation of selected principles of the OECD recommendation on public pr...
 

More from Support for Improvement in Governance and Management SIGMA

PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
Support for Improvement in Governance and Management SIGMA
 
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdfPhoto gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdfPPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdfPPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
Support for Improvement in Governance and Management SIGMA
 
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdfAcademies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
Support for Improvement in Governance and Management SIGMA
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
Support for Improvement in Governance and Management SIGMA
 
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Support for Improvement in Governance and Management SIGMA
 
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
Support for Improvement in Governance and Management SIGMA
 

More from Support for Improvement in Governance and Management SIGMA (20)

PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Ukraine roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Moldova roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdfPPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -CAF Armenia roadmap.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
PPT - SIGMA-GIZ Academies - Stage 1 - Financial support tu PAR in Montenegro....
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdfPhoto gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
Photo gallery - SIGMA-GIZ Academies on QM - Stage 1.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdfPPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - prezentacija gsb podgorica.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF-MONTENEGRO-29-FEB.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF Georgia.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdfPPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2  and 3.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - QM Roadmapping Day 2 and 3.pdf
 
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdfAcademies-QM_Stage1_Ministry of Higher Education CAF.pdf
Academies-QM_Stage1_Ministry of Higher Education CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - ReSPA and CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Bosnia Herzegovina CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Montenegro CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - North Macedonia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdfPPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - CAF in Ukraine.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdfPPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
PPT - SIGMA-GIZ Academies - Stage 1 -Serbia CAF.pdf
 
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdfPPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
PPT - SIGMA-GIZ Academies - Stage 1 - SIGMA opening.pdf
 
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
Omnichannel management, by Willem Pieterson - SIGMA Webinars on service desig...
 
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
eZdravlje, by Vladimir Raickovic - SIGMA Webinars on service design and deliv...
 

Recently uploaded

PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 

Recently uploaded (20)

PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 

Presentation by Iuri Cicibaba, Moldova (ENG) Second SIGMA Regional ENP East Conference on Public Procurement, Kyiv 29-30 May 2018.

  • 1. MTender: dilemmas and challenges in development of full cycle electronic procurement system Iuri CICIBABA May 2018 Ministry of Finance of Republic of Moldova
  • 2. Ministry of Finance of Republic of Moldova Main objectives of the eProcurement reform Increase efficiency and value for money in the procurement processes Reduce transaction costs for all stakeholders, SMEs in particular and ensure a competitive and sustainable eProcurement model Increase transparency and prevent corruption behavior during end-to-end public procurement cycle*, from pre-tendering to post-tendering The Government of Moldova has the goal of implementing eProcurement in compliance with the 2014 EU Directives on Public Procurement and with the aim to:
  • 3. Ministry of Finance of Republic of Moldova Main pillars of the eProcurement Reform Key features of the eProcuremen t model Multi- platform hybrid model Cost- efficient Open Source Open Data Open Contracting End-to-end electronic public procuremen t Interoperabl e with eGovernme nt services eProcurement scheme will seek efficiency through the reuse of existing tools whenever possible and a sustainable users’ fees eProcurement applications will be open source and fostering transparency and accountability by incorporating Open Data and Open Contracting standards eProcurement scheme will cover entire public procurement process, from procurement planning to invoicing and payments under public contracts eProcurement system will be designed to ensure interoperability with existing and future e-Government services and national public registers
  • 4. Ministry of Finance of Republic of Moldova The decision for a multi-platform hybrid model A comparative analysis of international best practices was conducted with the support of EBRD. Two main alternatives were identified: Single platform scheme eProcurement Back-end eProcurement Front-end Contracting Authorities Economic Operators eProcurement Front-end 1 eProcurement Front-end N CA 1 EO 1 eProcurement Back-end CA N EO N Legend Government owned Private owned Procurement agents Hybrid multi-platform scheme
  • 5. Ministry of Finance of Republic of Moldova The decision for a multi-platform hybrid model The following benefits and drawbacks were identified: + Easy end-to-end management of the global procurement process + Simplified integration with other eGovernment systems + Better suited to countries with low eGovernment services maturity — High initial investment — Single supplier may exploit its monopolistic position — Discourages innovation and future enhancements — High dependency on a single system and a single provider (security breaches, provider drop-out, etc.) + Low development, implementation and maintenance costs + Encourages competition between eProcurement platform providers + Risk is shared between platform suppliers + Platform providers encourage participation of EO in PP processes + Central unit manages and replicates all information to the multiple eProcurement platforms — Complex management of the eProcurement environment — Need for a private offer of eProcurement platforms Single platform scheme Hybrid multi-platform scheme
  • 6. Ministry of Finance of Republic of Moldova The decision for a multi-platform hybrid model The hybrid model was chosen for Moldova due to the following reasons:
  • 7. Ministry of Finance of Republic of Moldova Coverage: the procurement life cycle for Moldova All public procurements should be covered by the system starting planning and finalising with the payment for the public contract Selection Tendering Purchasing Preparation Execution Performance Guarantees Low Volume, High Value High Volume, Low Value Contract Management Identificatio n of needs Call for bids or quotes Expiration of guarantee Receipt of products or services Planning Reportingon procurement results Post-tenderingTenderingPre-tendering Public Contract Ordering from Framework
  • 8. Ministry of Finance of Republic of Moldova Coverage: the procurement life cycle for Moldova Allocation of the module Phase of the procurement lifecycle Pre-tendering Tendering Post- tendering Networking Electronic Procurement Platform Central Unit eGovernment tools All public procurement should be covered by the system starting planning and finalising with the payment for the public contract as it is showed below
  • 9. Ministry of Finance of Republic of Moldova MTender scheme The functional scheme for the eProcurement system has been designed as follows: Public users MTender Central Database Unit Modules MLog Governmental electronic systems MConnect MSign Mpass (eAuthentication) Registers and state systems State Register of Juridical Units Tax Service Information System State Treasury State Register of Population State Register of Licenses State register of non-commercial organisations Connection between the systems Criminal Records register Electronic Services External Systems Mnotify (eNotification) TED (eSender) Business Intelligence System Web portal N Networking Electronic Procurement Platforms PPA Government institutions Contracting Authorities/ Contracting Entities Economic Operators NCSA Registers and state systems Cabinets
  • 10. Ministry of Finance of Republic of Moldova MTender main characteristics The main modules and characteristics of the Central Database Unit are depicted as follows: ePlanning eContract Management Central Database eAuction eGovernment tools Government registers The Central Database allows for real-time communication and information exchange within all eProcurement platforms, while keeping full traceability of the public procurement processIntegration with eGovernment tools to take advantage of a modern and already tested eGovernment environment, which reduces the need of deploying other alternative solutions Integration with several government registers in order to reduce the need of inputting information manually and automatise administrative checks ePlanning allows Contracting authorities to better organise their procurement needs and aggregate purchases to maximise efficiency This module allows the control of the contract execution, including the launch of second competition procedures within framework agreements, payments and invoicing Advanced eAuction functionality that allows not only for evaluation based on lowest price criteria but also for other quality criteria and a semi- automated evaluation of bids
  • 11. Ministry of Finance of Republic of Moldova MTender pilot development Test the eProcurement system in a low risk environment Partial implementation of newest eProcurement features Test micro and small value procedures Full coverage of the public procurement cycle Full coverage of the public procurement processes Implementation of aggregated demand mechanisms Train users in the use of eProcurement Connection to government registers Full integration with eGovernment services Pilot Full Deployme nt The eProcurement reform has been designed to be implemented in two stages:
  • 12. Ministry of Finance of Republic of Moldova MTender pilot development The eProcurement reform pilot included the following developments: Micro value procedures Partial Implementati on of ePlanning Business Intelligence tools for internal use Developme nt of Central Database Partial connection to State Treasury Integration with MCloud, MPass and MConnect Developme nt of eAuction Partial Implementat ion of eContract Managemen t
  • 13. Ministry of Finance of Republic of Moldova Open Contracting Data Standard Open Contracting Data Standard (OCDS) is an open data schema describing how to release documents and data at each stage of a contracting process as machine readable, flexible, extensible, user friendly data Planning Tender Award Contract Implementation Contract Record MTender OCDS • Digital public procurement cycle • Market Access: big and small business • Reporting, monitoring and audit of public procurement
  • 14. Ministry of Finance of Republic of Moldova eContract Management https://mtender.gov.md/procurement/tenders/view?id=824#a1 https://achizitii.md/en/public/tender/10001326
  • 15. Ministry of Finance of Republic of Moldova MTender: Business Intelligence
  • 16. Ministry of Finance of Republic of Moldova 16 At the moment – 3 platforms e-licitatie.md achizitii.md yptender.md
  • 17. Ministry of Finance of Republic of Moldova THANK YOU Ministerul Finanțelor al Republicii Moldova str. Constantin Tănase, 7, MD-2005, Republica Moldova tel. +373 22 262 500 web: www.mf.gov.md 17