PRESENTED BY : RAVIKIRAN KATTOLI
 The present construction methodology for
buildings calls for the best aesthetic look, high
quality and fast construction, cost effective and
innovative touch.
 Technological improvement over the year has
contributed immensely to the enhancement of
quality of life through various new products and
services.
 One such revolution was the PEB.
 A growing number of prominent International
contractors and designers ,who previously specified
conventional structural steel buildings exclusively, have
recently converted to the PEB approach.
 They now enjoy significant cost saving and benefits
from the faster construction cycle resulting from this
concept.
 Pre-Engineered Building concept involves the steel
building systems which are predesigned and
prefabricated.
 Conventional steel buildings (CSB) are low rise steel
structures with roofing systems of truss with roof
coverings.
PROPERTY PRE-ENGINEERED
BUILDINGS (PEB)
CONVENTIONAL
STEEL BUILDINGS
QUALITY Fully finished products in ready
to erect condition reaches at site
involving absolutely no welding,
cutting etc. at site and assembly
is only done by bolting.
All fabrication work at site
involving lot of wastage of
material and loss of
quality.
TIME SAVING Completely factory made/shop
fabricated system resulting
significant saving in time and
superior quality.
Site fabrication requires a
lot of infrastructure
facilities and involves more
time resulting in delays in
project implementation.
SINGLE
SOURCE
Entire product range of
roofing, structure,
mezzanine, staircases ,
beams, doors, windows,
Ventilations, insulations
everything is easily available
in stock from single source
supply in finish condition.
To procure from 10-15
sources from local market
results in non-
compatibility.
Needs lot of coordination
with several agency which
costs time and money.
STRUCTURE
WEIGHT
PEB is almost 10-15% lighter
compared to conventional
construction due to efficient
design and integral framing
system.
Use of standard hot rolled
sections result in heavy
steel structure and
comparatively
overdesigned
structure.
FOUNDATION Being light structure
foundation size and design is
lighter and simpler.
Corporately heavy
foundation design
resulting
higher cost.
Seismic
resistance
The low weight flexible frames
offer higher resistance to
seismic force.
Rigid heavy structures
do not perform well in
seismic zones.
Delivery Average 6 to 8 weeks. Average 5 to 6 months.
Erection Easy, fast, step by step. Erection
costs & time are accurately
known, based upon extensive
experience with similar buildings.
Slow, extensive field
labor required. Typically
20% more expensive than
a normal PEB building. In
most of the cases, the
erection costs and time
are not estimated
accurately.
Architecture Outstanding architectural design
at low cost.
Special architectural
design requires research
and high cost.
Performance All components have been
specified and designed specially
to act together as a system for
maximum efficiency and peak
performance in the field.
Components are custom
designed for a specific
application on a specific
job. Design and detailing
errors are possible when
assembling the diverse
components into unique
buildings.
Overall Price Price per square meter may be as
much as 40% lower than
conventional steel.
High price per square
meter.
Responsibility Single source of supply results in
total responsibility for one
supplier, including design liability.
Multiple responsibilities
can result in questions of
who is responsible when
components do not fit
properly, insufficient
material supplied, or
materials fail to perform,
particularly at supplier
interfaces. The consultant
carries total design
liability.
 Introduction to Pre Engineered Buildings, Gursharan Singh,
2008.
http://www.engineeringcivil.com/pre-engineered-
buildings.html http://www.laiserin.com
 www.pebsteel.com

More Related Content

What's hot

Composite construction
Composite constructionComposite construction
Composite construction
Hashim D. Hassan
 
Cable Structures.pdf
 Cable Structures.pdf Cable Structures.pdf
Cable Structures.pdf
SALONIKAAHUJA1
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
RRSA
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
Madan Mohan Jana
 
Structural systems notes
Structural systems notesStructural systems notes
Structural systems notes
Aaqib Iqbal
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Udisha15
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
ishant_kukreja
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Kush Agarwal
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
Est
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
Delta Steel Structures Pvt Ltd
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building construction
Shweta Modi
 
High rise building
High rise buildingHigh rise building
High rise building
Er. Ashis Kashyap
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
Jeelkumar Patel
 
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Yogita Kadam
 
Tube structures
Tube structuresTube structures
Tube structures
Aglaia Connect
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECAST
jagrutib22
 
Basic design criteria for high rise buildings
Basic design criteria for high rise buildings Basic design criteria for high rise buildings
Basic design criteria for high rise buildings
Parent Construction & Consultancy Ltd.
 
Space frame
Space frameSpace frame
Space frame
Taha Padrawala
 

What's hot (20)

Composite construction
Composite constructionComposite construction
Composite construction
 
Peb
PebPeb
Peb
 
Cable Structures.pdf
 Cable Structures.pdf Cable Structures.pdf
Cable Structures.pdf
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Structural systems notes
Structural systems notesStructural systems notes
Structural systems notes
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building construction
 
High rise building
High rise buildingHigh rise building
High rise building
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
 
Tube structures
Tube structuresTube structures
Tube structures
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECAST
 
Basic design criteria for high rise buildings
Basic design criteria for high rise buildings Basic design criteria for high rise buildings
Basic design criteria for high rise buildings
 
Space frame
Space frameSpace frame
Space frame
 

Similar to Pre engineered buildings vs conventional steel buildings

96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildingshlksd
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering building
Rathin Rakshit
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
hdssitacinhdssitacin
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
IRJET Journal
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
Mukesh Bhavsar
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteelhlksd
 
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel StructuresComparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
IRJET Journal
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building System
hilmanaqil1
 
A Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and TimeA Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and Time
IRJET Journal
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB MetalPEB Metal
 
PEB.pptx
PEB.pptxPEB.pptx
PEB.pptx
PavanNadgouda2
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
satish sajja
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
Arpan Dixit
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...
Pratik R. Atwal
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
An Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB StructureAn Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB Structure
IRJET Journal
 
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
civilstudio2208
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
mukul srivastava
 

Similar to Pre engineered buildings vs conventional steel buildings (20)

96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildings
 
PRE & CON (1)
PRE  & CON (1)PRE  & CON (1)
PRE & CON (1)
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering building
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel StructuresComparative Study of Pre-Engineered Building and Conventional Steel Structures
Comparative Study of Pre-Engineered Building and Conventional Steel Structures
 
Project 1 - Industrialised Building System
Project 1 - Industrialised Building SystemProject 1 - Industrialised Building System
Project 1 - Industrialised Building System
 
A Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and TimeA Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and Time
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB Metal
 
PEB.pptx
PEB.pptxPEB.pptx
PEB.pptx
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
An Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB StructureAn Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB Structure
 
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
LANDSCAPE STRATEGIES OG GREEN BUILDINGS 1
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 

Recently uploaded

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Pre engineered buildings vs conventional steel buildings

  • 1. PRESENTED BY : RAVIKIRAN KATTOLI
  • 2.  The present construction methodology for buildings calls for the best aesthetic look, high quality and fast construction, cost effective and innovative touch.  Technological improvement over the year has contributed immensely to the enhancement of quality of life through various new products and services.  One such revolution was the PEB.
  • 3.  A growing number of prominent International contractors and designers ,who previously specified conventional structural steel buildings exclusively, have recently converted to the PEB approach.  They now enjoy significant cost saving and benefits from the faster construction cycle resulting from this concept.  Pre-Engineered Building concept involves the steel building systems which are predesigned and prefabricated.  Conventional steel buildings (CSB) are low rise steel structures with roofing systems of truss with roof coverings.
  • 4. PROPERTY PRE-ENGINEERED BUILDINGS (PEB) CONVENTIONAL STEEL BUILDINGS QUALITY Fully finished products in ready to erect condition reaches at site involving absolutely no welding, cutting etc. at site and assembly is only done by bolting. All fabrication work at site involving lot of wastage of material and loss of quality. TIME SAVING Completely factory made/shop fabricated system resulting significant saving in time and superior quality. Site fabrication requires a lot of infrastructure facilities and involves more time resulting in delays in project implementation.
  • 5. SINGLE SOURCE Entire product range of roofing, structure, mezzanine, staircases , beams, doors, windows, Ventilations, insulations everything is easily available in stock from single source supply in finish condition. To procure from 10-15 sources from local market results in non- compatibility. Needs lot of coordination with several agency which costs time and money. STRUCTURE WEIGHT PEB is almost 10-15% lighter compared to conventional construction due to efficient design and integral framing system. Use of standard hot rolled sections result in heavy steel structure and comparatively overdesigned structure.
  • 6. FOUNDATION Being light structure foundation size and design is lighter and simpler. Corporately heavy foundation design resulting higher cost. Seismic resistance The low weight flexible frames offer higher resistance to seismic force. Rigid heavy structures do not perform well in seismic zones. Delivery Average 6 to 8 weeks. Average 5 to 6 months.
  • 7. Erection Easy, fast, step by step. Erection costs & time are accurately known, based upon extensive experience with similar buildings. Slow, extensive field labor required. Typically 20% more expensive than a normal PEB building. In most of the cases, the erection costs and time are not estimated accurately. Architecture Outstanding architectural design at low cost. Special architectural design requires research and high cost. Performance All components have been specified and designed specially to act together as a system for maximum efficiency and peak performance in the field. Components are custom designed for a specific application on a specific job. Design and detailing errors are possible when assembling the diverse components into unique buildings.
  • 8. Overall Price Price per square meter may be as much as 40% lower than conventional steel. High price per square meter. Responsibility Single source of supply results in total responsibility for one supplier, including design liability. Multiple responsibilities can result in questions of who is responsible when components do not fit properly, insufficient material supplied, or materials fail to perform, particularly at supplier interfaces. The consultant carries total design liability.
  • 9.  Introduction to Pre Engineered Buildings, Gursharan Singh, 2008. http://www.engineeringcivil.com/pre-engineered- buildings.html http://www.laiserin.com  www.pebsteel.com