Planning of Distribution System
A distribution system deals with the distribution of
electrical energy. A good system planning should provide
for an orderly development of the system to meet the power
requirements for a period of about five years and to obtain
optimum benefit from the available resources. The main
purpose of planning is:
 To make the system economical while conforming
to the Indian electricity rules.
 To minimize losses and maintain regulation within
permissible limits. For proper Planning of a distribution
system. Load survey and load forecasting of the area is
necessary.
* Load Survey *
The load survey of a particular area is carried out to find present load
requirement as well as the expected load growth over a period of 5 to 7 years.
The following basic data should be collected for starting this work:
 A detailed map of the area showing important features.
 The number of houses, population and the new construction
anticipated the area.
 The expected number of shops post-office, rural health center
Panchayat office etc.
 Details of hospital s, railway stations, public health sewage systems and
water supply schemes.
 The cultivated area, number of wells, available irrigation facilities and
irrigated area.
 The type of industries and number of industries possible in these areas.
 Development programs implemented and envisaged in the area.
* Load Calculation of Hostel *
 1st Year Block 10.48 kW
 2nd Year Block 12.21 kW
 3rd Year Block 12.21 kW
 Common Room 0.883 kW
 Dining Room 0.883 kW
* Load Calculation of Nodal Office *
Regional Office 9.004 kW
 VET Office 2.667 kW
* Load Calculation of College Building *
 Workshops & Laboratories 153.67 kW
 Classrooms 20.68 kW
 Teachers’ Rooms 4.95 kW
 Other Official Rooms 8.41 kW
 Stadium 79.42 kW
* Demand Factors *
 Single Storied → 0.8 Public Building → 0.8
 Double Storied → 0.7 Commercial Building → 0.9
 Triple Storied → 0.6 Cinema Hall → 0.9
 Multi Storied → 0.8 Industry → 0.8
Street Light → 1.0
 Public Fan → 0.9
 Domestic Fan → 0.3 to 0.6
 Domestic Light → 0.3 to 0.6
 Public Light → 0.8 to 0.9
 Commercial Light → 0.5 to 0.75
 Industrial Motor → 0.95
 Pump Motor → 0.95
* Total Load Calculation *
 1st Year Block 10.48 kW
 2nd + 3rd Year Block 26.136 kW
 Nodal Office 9.004 kW
 Workshops 37.662 kW
 College 118.273 kW
 Automobile 1st Yr+Mechanical 1st Yr 1.996 kW
 Stadium 79.420 kW
 Total Load 282.971 kW
* Some Important Definitions
*
 Connected Load: It is the sum the continuous rating in KW of all electrical devices at the consumers premises
and connected to the supply system.
 Demand factor: Demand factor is defined as the ratio of maximum demand made by the load to the rating of
the connecting load.
Demand Factor= (Maximum demand made by the Load)/ (Rating of Connected Load)
The value of Demand Factor determines the rating and hence the cost of power equipments to
supply given connected load.
 Load Factor : Load Factor is the ratio of average Demand to the Maximum Demand during a certain period of
time such a month or a day or a year and is applicable to both generating equipment or receiving equipment.
Load Factor = (Average Demand)/ (Maximum demand)
 Connected Load Factor: It is the ratio of average power input to the connected load and related only to the
receiving equipment.
Connected Load Factor = (Average Power Input)/ (Connected Load)
* Distributor Design *
By back calculation the current turns negative at between e and
f. hence, f point in the minimum potential point where current turns
negative.
Now, as per I.E rule voltage drop up to MP is 11.5 V (5% of 230v).
45𝝆 x224.09 + 125 𝝆 x 176.75 + 100 𝝆 x32.88 + 95 𝝆 x 13.9 = 11.5 V
Hence 𝝆 =0.00031 ohm/ m
=0.31 ohm/ km.
* Determination of Load Centre
*
* Graphical Representation of ‘Load Centre’ *
* Calculation for Water Works *
Assume, total Population= 450.
Water used by each= 25 Gallons/Head/Day.
So, Water necessary= 11,250 Gallons/ Day.
Now, H.P.= = 17.08 HP
Here, W= Specific Gravity= 62.4 Lb/ft.
Q= Discharge in cubic ft./sec.
H= Total head (In ft.)
Taking Efficiency of the Pump= 70% & Demand Factor= 1,
we can calculate that Maximum Demand for Water Works=
18 kW
* Prediction of Future Loads
*
Forecasting the future load requirement is essential part of power
project design. This forecast of lone is done by two namely statically
method and field survey method.
Fundamental law of statistical is that every phenomenon in future
obeys some mathematical law which can be represented by a smooth curve
load development in any area except due to unforeseen developments such
as the establishment to this low. According to this method of annual
maximum demand pertaining to the area is collected for past several years.
In the field survey method, existing requirement area is found out
under different classes of load i.e. residential, commercial, industrial,
municipal and agricultural. Future load requirement are then forecast taking
into account various factors such as population growth , natural resources of
the region standard of living of the people, topography and climate of the
region.
TRANSMISSION AND DISTRIBUTION
SYSTEMS *
(In Accordance With Indian Electricity Rules
1956 and IS: 585-1962)
1. VOLTAGE:
1.1 Declared voltage The declared voltage is the voltage at the consumers’ terminals declared by the supplier of
electrical energy. It is to maintenance within the limits prescribed the Indian electricity rules.
1.2 System Voltage (Nominal Voltage) This is the line-to-line voltage for which the system is designed and
installed. This is the voltage by which the system is generally designed. It is not necessarily the rated voltage of
every piece of apparatus connected to the system.
1.3 Rated voltage This is the voltage at which the apparatus connected to the system is designed to operate under
normal conditions. This is normally the same as the system voltage.
1.4 Low voltage A voltage not exceeding 250 V under normal conditions is considered low.
1.5 Medium Voltage A voltage exceeding 250 V but not 650 V under normal conditions are considered high.
1.6 High Voltage Voltages exceeding 650 V but not 33 KV under normal conditions are considered high.
1.7 Extra-High Voltage It is a voltage exceeding 33 KV under normal conditions.
2. STANDARD VOLTAGE FOR SINGLE - PHASE SYSTEM:
The standard voltage system for a two-wire single-phase system is 240V.
3. STANDARD VOLTAGE FOR THREE-PHASE SYSTEM:
The standard preferred voltage for three-phase systems is as follows.
415 V (Voltage to neutral=240V)
3.3 kV 66 kV
6.6 kV 132 kV
11 kV 220 kV
33 kV 400 kV
Note: The above voltage refers to line-to-line voltages.
4. VOLTAGE LIMITS:
The voltage at the point of commencement of supply under conditions should not vary from
the declared voltage by more than:
(i) 6% in case low or medium voltages.
(ii) 6% on the higher side or by more than 9% on the lower side, in case of high voltages.
(iii)12.5% In case of extra-high voltages.
5. STANDARD SYSTEM FREQUENCY:
The standard system frequency is 50 Hz. The frequency of an alternating current supply
should not very from the declared frequency by more than 3%.
* INDIAN ELECTRICITY RULES,
REGARDING THE CLEARANCE
OF OVERHEAD LINES *
IV.1 Rule- 77 CLEARENCE ABOVE GROUND OF THE LOWEST CONDUCTOR:
1. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a
height less than:
(i) For low and medium voltage lines 5,971 m (19 ft).
(ii) For high voltage lines 6,096 m (20 ft).
2. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a
height less than:
(i) For low and medium voltage lines 5,486 m (18 ft).
(ii) For high voltage lines 5,791 m (19 ft).
3. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a
height less than:
(i) For low, medium and high voltage lines up to and including 11,000 V if bare 4,572m (15 ft).
(ii) For low, medium and high voltage lines up to and including 11,000 V if insulated 3,962 m (13 ft).
(iii) For high voltage lines above 11,000 V 5,182 m (17 ft).
(iv) For extra –high voltage lines, the clearance above ground shall not be less than 5,182 m (17 ft) plus
0.305 m (1 ft) for every 33,000 V or part thereof by which the voltage of the line exceeds 33,000 V provided
that the minimum clearance along or across any street is not less than 6.096 m (20 ft).
IV.3 Rule- 79 CLEARANCE FROM OF BUILDING OF LOW AND
MEDIUM VOLTAGE LINES AND SERVICE LINES:
1. Where a low or medium voltage overhead line passes above or adjacent to or terminates on any
building, the following minimum clearance from any accessible point, on the basis of maximum sag
shall be observed:
(i) For any flat, roof, open balcony, verandah, roof and lean to roof: (a) when the line passes above
the building a vertical clearance of 2.439 m(8 ft) from the highest point, (b) when the line passes
adjacent to the building, a horizontal clearance 1.219m (4 ft).
(ii) For pitched roof: (a) When the line passes above the building a vertical clearance of 2.498m (8
ft), immediately under the lines and (b) When the line passes adjacent to the building, a horizontal
clearance of 1.219m (4 ft).
2. Any conductor so situated as to have a clearance less than that specified in sub rule 1 shall be
adequately insulated and shall be attached at suitable interval to a bare earthed bearer when having a
breaking strength of not less than 377.51 kg (700ib).
3. The horizontal clearance shall be measure when the is at a maximum deflection from the vertical due
to wind pressure.
Planning & Designing of Distribution System

More Related Content

What's hot

Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
Ayyarao T S L V
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
Sifan Welisa
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
Dinesh Sarda
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
Jeffrey Dorsey
 

What's hot (20)

Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Calculation of short circuit currents
Calculation of short circuit currents Calculation of short circuit currents
Calculation of short circuit currents
 
Control of hvdc system
Control of hvdc systemControl of hvdc system
Control of hvdc system
 
Power system stability
Power system stabilityPower system stability
Power system stability
 
Electric substation
Electric substation Electric substation
Electric substation
 
EDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptxEDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptx
 
Distribution System
Distribution SystemDistribution System
Distribution System
 
Static var compensator
Static var compensatorStatic var compensator
Static var compensator
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Electrical distribution system planning
Electrical distribution system planningElectrical distribution system planning
Electrical distribution system planning
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
 

Similar to Planning & Designing of Distribution System

Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection point
slmnsvn
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 

Similar to Planning & Designing of Distribution System (20)

NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Review notes power transmssion
Review notes power transmssionReview notes power transmssion
Review notes power transmssion
 
45 16255 ee543_2015_1__2_1_week_1_2
45 16255 ee543_2015_1__2_1_week_1_245 16255 ee543_2015_1__2_1_week_1_2
45 16255 ee543_2015_1__2_1_week_1_2
 
Vinay r epo rt
Vinay r epo rtVinay r epo rt
Vinay r epo rt
 
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
 
Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection point
 
Lec 6.pptx hjshkjadfhiuhiusdghsiudgfsdkuskus
Lec 6.pptx hjshkjadfhiuhiusdghsiudgfsdkuskusLec 6.pptx hjshkjadfhiuhiusdghsiudgfsdkuskus
Lec 6.pptx hjshkjadfhiuhiusdghsiudgfsdkuskus
 
Module 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabusModule 4 power generation & Economics - Substation vtu syllabus
Module 4 power generation & Economics - Substation vtu syllabus
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 
315564438 hvdc-transmission-ppt
315564438 hvdc-transmission-ppt315564438 hvdc-transmission-ppt
315564438 hvdc-transmission-ppt
 
Chapter-2.-Variable-Load-Problem_2.pdf
Chapter-2.-Variable-Load-Problem_2.pdfChapter-2.-Variable-Load-Problem_2.pdf
Chapter-2.-Variable-Load-Problem_2.pdf
 
Trans distn.ppt
Trans distn.pptTrans distn.ppt
Trans distn.ppt
 
TD unit 5-1.ppt
TD unit 5-1.pptTD unit 5-1.ppt
TD unit 5-1.ppt
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
H09 Building Level Design
H09 Building Level DesignH09 Building Level Design
H09 Building Level Design
 
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
 
POWER FACTOR.pptx
POWER FACTOR.pptxPOWER FACTOR.pptx
POWER FACTOR.pptx
 
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
 

Recently uploaded

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Planning & Designing of Distribution System

  • 1. A Presentation on: Electrification on “Malda Polytechnic”: Planning & Designing of Distribution System
  • 2. Project Members: Sourav Das Milan kr Das Santu Majee Ujjwal Maiti Santu Maiti Pratim Chakrabortty Debabrata Karmakar Subho Mondal Animesh Kanrar Jahir Mallick Manas Adak
  • 3. Planning of Distribution System A distribution system deals with the distribution of electrical energy. A good system planning should provide for an orderly development of the system to meet the power requirements for a period of about five years and to obtain optimum benefit from the available resources. The main purpose of planning is:  To make the system economical while conforming to the Indian electricity rules.  To minimize losses and maintain regulation within permissible limits. For proper Planning of a distribution system. Load survey and load forecasting of the area is necessary.
  • 4. * Load Survey * The load survey of a particular area is carried out to find present load requirement as well as the expected load growth over a period of 5 to 7 years. The following basic data should be collected for starting this work:  A detailed map of the area showing important features.  The number of houses, population and the new construction anticipated the area.  The expected number of shops post-office, rural health center Panchayat office etc.  Details of hospital s, railway stations, public health sewage systems and water supply schemes.  The cultivated area, number of wells, available irrigation facilities and irrigated area.  The type of industries and number of industries possible in these areas.  Development programs implemented and envisaged in the area.
  • 5. * Load Calculation of Hostel *  1st Year Block 10.48 kW  2nd Year Block 12.21 kW  3rd Year Block 12.21 kW  Common Room 0.883 kW  Dining Room 0.883 kW
  • 6. * Load Calculation of Nodal Office * Regional Office 9.004 kW  VET Office 2.667 kW
  • 7. * Load Calculation of College Building *  Workshops & Laboratories 153.67 kW  Classrooms 20.68 kW  Teachers’ Rooms 4.95 kW  Other Official Rooms 8.41 kW  Stadium 79.42 kW
  • 8. * Demand Factors *  Single Storied → 0.8 Public Building → 0.8  Double Storied → 0.7 Commercial Building → 0.9  Triple Storied → 0.6 Cinema Hall → 0.9  Multi Storied → 0.8 Industry → 0.8 Street Light → 1.0  Public Fan → 0.9  Domestic Fan → 0.3 to 0.6  Domestic Light → 0.3 to 0.6  Public Light → 0.8 to 0.9  Commercial Light → 0.5 to 0.75  Industrial Motor → 0.95  Pump Motor → 0.95
  • 9. * Total Load Calculation *  1st Year Block 10.48 kW  2nd + 3rd Year Block 26.136 kW  Nodal Office 9.004 kW  Workshops 37.662 kW  College 118.273 kW  Automobile 1st Yr+Mechanical 1st Yr 1.996 kW  Stadium 79.420 kW  Total Load 282.971 kW
  • 10. * Some Important Definitions *  Connected Load: It is the sum the continuous rating in KW of all electrical devices at the consumers premises and connected to the supply system.  Demand factor: Demand factor is defined as the ratio of maximum demand made by the load to the rating of the connecting load. Demand Factor= (Maximum demand made by the Load)/ (Rating of Connected Load) The value of Demand Factor determines the rating and hence the cost of power equipments to supply given connected load.  Load Factor : Load Factor is the ratio of average Demand to the Maximum Demand during a certain period of time such a month or a day or a year and is applicable to both generating equipment or receiving equipment. Load Factor = (Average Demand)/ (Maximum demand)  Connected Load Factor: It is the ratio of average power input to the connected load and related only to the receiving equipment. Connected Load Factor = (Average Power Input)/ (Connected Load)
  • 12. By back calculation the current turns negative at between e and f. hence, f point in the minimum potential point where current turns negative. Now, as per I.E rule voltage drop up to MP is 11.5 V (5% of 230v). 45𝝆 x224.09 + 125 𝝆 x 176.75 + 100 𝝆 x32.88 + 95 𝝆 x 13.9 = 11.5 V Hence 𝝆 =0.00031 ohm/ m =0.31 ohm/ km.
  • 13. * Determination of Load Centre *
  • 14. * Graphical Representation of ‘Load Centre’ *
  • 15. * Calculation for Water Works * Assume, total Population= 450. Water used by each= 25 Gallons/Head/Day. So, Water necessary= 11,250 Gallons/ Day. Now, H.P.= = 17.08 HP Here, W= Specific Gravity= 62.4 Lb/ft. Q= Discharge in cubic ft./sec. H= Total head (In ft.) Taking Efficiency of the Pump= 70% & Demand Factor= 1, we can calculate that Maximum Demand for Water Works= 18 kW
  • 16. * Prediction of Future Loads * Forecasting the future load requirement is essential part of power project design. This forecast of lone is done by two namely statically method and field survey method. Fundamental law of statistical is that every phenomenon in future obeys some mathematical law which can be represented by a smooth curve load development in any area except due to unforeseen developments such as the establishment to this low. According to this method of annual maximum demand pertaining to the area is collected for past several years. In the field survey method, existing requirement area is found out under different classes of load i.e. residential, commercial, industrial, municipal and agricultural. Future load requirement are then forecast taking into account various factors such as population growth , natural resources of the region standard of living of the people, topography and climate of the region.
  • 17. TRANSMISSION AND DISTRIBUTION SYSTEMS * (In Accordance With Indian Electricity Rules 1956 and IS: 585-1962) 1. VOLTAGE: 1.1 Declared voltage The declared voltage is the voltage at the consumers’ terminals declared by the supplier of electrical energy. It is to maintenance within the limits prescribed the Indian electricity rules. 1.2 System Voltage (Nominal Voltage) This is the line-to-line voltage for which the system is designed and installed. This is the voltage by which the system is generally designed. It is not necessarily the rated voltage of every piece of apparatus connected to the system. 1.3 Rated voltage This is the voltage at which the apparatus connected to the system is designed to operate under normal conditions. This is normally the same as the system voltage. 1.4 Low voltage A voltage not exceeding 250 V under normal conditions is considered low. 1.5 Medium Voltage A voltage exceeding 250 V but not 650 V under normal conditions are considered high. 1.6 High Voltage Voltages exceeding 650 V but not 33 KV under normal conditions are considered high. 1.7 Extra-High Voltage It is a voltage exceeding 33 KV under normal conditions.
  • 18. 2. STANDARD VOLTAGE FOR SINGLE - PHASE SYSTEM: The standard voltage system for a two-wire single-phase system is 240V. 3. STANDARD VOLTAGE FOR THREE-PHASE SYSTEM: The standard preferred voltage for three-phase systems is as follows. 415 V (Voltage to neutral=240V) 3.3 kV 66 kV 6.6 kV 132 kV 11 kV 220 kV 33 kV 400 kV Note: The above voltage refers to line-to-line voltages.
  • 19. 4. VOLTAGE LIMITS: The voltage at the point of commencement of supply under conditions should not vary from the declared voltage by more than: (i) 6% in case low or medium voltages. (ii) 6% on the higher side or by more than 9% on the lower side, in case of high voltages. (iii)12.5% In case of extra-high voltages. 5. STANDARD SYSTEM FREQUENCY: The standard system frequency is 50 Hz. The frequency of an alternating current supply should not very from the declared frequency by more than 3%.
  • 20. * INDIAN ELECTRICITY RULES, REGARDING THE CLEARANCE OF OVERHEAD LINES * IV.1 Rule- 77 CLEARENCE ABOVE GROUND OF THE LOWEST CONDUCTOR: 1. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a height less than: (i) For low and medium voltage lines 5,971 m (19 ft). (ii) For high voltage lines 6,096 m (20 ft). 2. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a height less than: (i) For low and medium voltage lines 5,486 m (18 ft). (ii) For high voltage lines 5,791 m (19 ft). 3. No conductor of an overhead line, including service lines, created a street shall at any part thereof be at a height less than: (i) For low, medium and high voltage lines up to and including 11,000 V if bare 4,572m (15 ft). (ii) For low, medium and high voltage lines up to and including 11,000 V if insulated 3,962 m (13 ft). (iii) For high voltage lines above 11,000 V 5,182 m (17 ft). (iv) For extra –high voltage lines, the clearance above ground shall not be less than 5,182 m (17 ft) plus 0.305 m (1 ft) for every 33,000 V or part thereof by which the voltage of the line exceeds 33,000 V provided that the minimum clearance along or across any street is not less than 6.096 m (20 ft).
  • 21. IV.3 Rule- 79 CLEARANCE FROM OF BUILDING OF LOW AND MEDIUM VOLTAGE LINES AND SERVICE LINES: 1. Where a low or medium voltage overhead line passes above or adjacent to or terminates on any building, the following minimum clearance from any accessible point, on the basis of maximum sag shall be observed: (i) For any flat, roof, open balcony, verandah, roof and lean to roof: (a) when the line passes above the building a vertical clearance of 2.439 m(8 ft) from the highest point, (b) when the line passes adjacent to the building, a horizontal clearance 1.219m (4 ft). (ii) For pitched roof: (a) When the line passes above the building a vertical clearance of 2.498m (8 ft), immediately under the lines and (b) When the line passes adjacent to the building, a horizontal clearance of 1.219m (4 ft). 2. Any conductor so situated as to have a clearance less than that specified in sub rule 1 shall be adequately insulated and shall be attached at suitable interval to a bare earthed bearer when having a breaking strength of not less than 377.51 kg (700ib). 3. The horizontal clearance shall be measure when the is at a maximum deflection from the vertical due to wind pressure.