C. Scope
 To review the existing study reports, standards and
specifications.
 Detailed engineering survey of alignment.
 Preparation of topographical map.
 Study for cross-drainage works and propose suitable drainage
structure.
 Preparation of working drawings.
 Preparation of quantity and cost estimate.
 Preparation of survey and design report
D. Project location
 The proposed road is located in the Lalitpur District,
Bagmati Zone, Central Region. The road starts from
Badikhel and ends at Badegaun.
 The road runs along Karmanasha River corridor.
 The latitude and the longitude of the starting point are
27057’07’’ and 85035’27’’ respectively.
F. Hydrology And Meteorology
 Small temporary streams running only during monsoon crosses
the alignment with small discharge.
 The project area experiences marked seasonal and specific
climate variation with moderately hot summer and relatively
cool winters. Average temperature is 25oC in summer and 10oC
in winter.
 Almost 80% of the rainfall occurs during monsoon which starts
at the middle of the June and continues until the end of August.
METHODOLOGY
 DESK STUDY
 SOCIAL IMPACT ASSESMENT
 FIELD WORK
 EQUIPMENT USED FOR SURVEYING
 OFFICE WORK
DESK STUDY
 The geographical and the topographical maps
were studied and the relevant information
regarding the alignment selection, cross drainage
structures, gradient of the road were discussed.
 The strategy for the field study was made
accordingly.
 The study team member discussed the related
matters of the project.
SOCIAL IMPACT ASSESMENT
The study identified the following key social issues
for investigation:
 Loss of private property and other assets (land,
houses and trees) and compensation modalities
for these losses.
 Population displacement.
 EQUIPMENT USED FOR
SURVEYING
 Total station
 GPS device
 Staff
 Compass
 Measuring tape
 Hammer
 Communicating Device
DESIGN
Road Classification
 As per the NRS 2045, the road project falls on the
category of District Roads.
 A Design speed of 30 km/hr is taken for the
design of geometric parameters of the
road.
Design Speed
 The Design values are taken as recommended by
NRS 2045 as far as practicable
 The shoulder width is taken as 1 m considering
the site condition and the utility of the road
 Minimum Gradient recommended by NRS (1% for
better drainage) cannot be incorporated
considering the site condition
Horizontal Alignment
 The most suitable horizontal alignment was
selected considering the following factors:
 Short (S)
 Easy (E)
 Safe (S)
 Economical (E)
 Minimum radius for the horizontal curve as
recommended by NRS is 12 m. The minimum
radius of 12m is provided at the intersection of
existing road and proposed road.
 The extrawidening and transition curves are not
provided owing to low design speed and
simplicity in construction
 A maximum of 5 % super elevation is provided at
each horizontal curve.
 Superelevation is provided by rotation of
pavement about the center line.
 Transition length for super elevation is provided
as 5 m
 Summit curves are designed considering stopping
sight distance.
 Valley curves are designed on the basis of night
visibility
 The radius of vertical curve is adopted as large as
possible so that all the factors are satisfied
 The least vertical radius taken in design is 1000 m
Cross Section Design
 Cross section is designed providing camber of 4%
on carriageway and 5 % on shoulder
 For embankment the side slope of 1.5H: 1V and
for cut the side slope of 1H: 1V is adopted
 Total pavement thickness of 28 cm is adopted as
per CBR method of design
 Gravel is used as the sub-base course
 Otta Seal is used as the surface course
Drainage
 Longitudinal drain is provided on the cut slope side of
the road
 The side slope is 1:1 and longitudinal slope is parallel
to the alignment
 Earthen drain is provided from chainage 0+000 to the
chainage of 1+251.35
 Stoned masonry drain of thickness 20 cm is provided
from the chainage of 1+309.82 to chainage 2+027.24
 Pipe culverts of 60 cm in diameter and total
length of 7.5m are provided at 12 sections of the
road
 They are provided at the lowest point of the
vertical alignment
 A minimum depth of 60 cm is provided between
the surface of the pavement and the crown of
the pipe
Plan and Profile
 Ch. 0+000-0+200
 Ch. 0+200-0+480
 Ch. 0+480-0+760
 Ch. 0+760-1+040
 Ch. 1+040-1+360
 Ch. 1+360-1+700
 Ch. 1+700-2+027.24
Cross Section
 Ch. 0+000-0+271.50
 Ch. 0+280-0+500
 Ch. 0+511.92-0+680
 Ch. 0+683.87-0+760
 Ch. 0+780-0+920
 Ch. 0+936.71-1+125.89
 Ch. 1+130.75-1+213.66
 Ch.1+220-1+319.59
 Ch.1+320-1+380
 Ch.1+397.04-1+465.09
 Ch.1+480-1+545.77
 Ch.1+560-1+800
 Ch.1+800.91-1+980
 Ch.1+984.58-2+027.24
Typical Pavement
Cross Drainage Structure
ESTIMATE
Quantity Estimate
Calculation of Earthwork
Necessary Calculations
Rate Analysis
BoQ /Cost Estimate
QUANTITY ESTIMATE
 Earthwork Calculations:
 Calculated at each cross-section
 Separate calculation according to soil type
 Total cut volume = 10283.57 m3
 Total fill volume = 16052.44 m3
 Balance (fill) = 5768.869 m3
 Earthwork for drain = 768.129 m3
All the detailed calculation is shown in the
tabular form in the following slides:
Contd………
 Necessary calculations:
i. For side drain:
Calculations were made taking the following
design considerations:
 Section = trapezoidal
 Depth: 0.3m
 Base width: 0.3m
 Side slope: 1:1
 Unlined earthen canal(Ch. 0+000 to 1251.35)
 Lined canal: (ch.1+309.82 to Ch. 2+027.24)
ii. Sub-grade calculations:
RATE ANALYSIS
 Rate analysis was performed under the
following criteria:
 The quantity of the materials, required labor
force and plants, machinery, tools and
equipments were taken from the work norms
provided by the DoR.
 The rate for the materials, labors, plants and
machinery, tools and equipments was taken
from the district rates provided by the Lalitpur
DDC.
COST ESTIMATE
 The BoQ was prepared on the basis of
the quantity of work calculated and
rate analysis done previously:
 The cost estimate is as below:

More Related Content

Similar to Detailed.pptx

Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
swaongniyogi
 
Road-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRoad-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptx
RagibShuvo1
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
'Sayed Asadullah
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
Er. Bam Bhandari
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
IRJET Journal
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Amali Pathiraja
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
DhananjayM13
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineering
Kailash Chander
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
srinivas2036
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
ayudge
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
Tej Binod Pandey
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
Gate20241
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
AkshathaBhandary
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
IRJET Journal
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
DESHANTAGGARWAL1
 
Site grading.pptx
Site grading.pptxSite grading.pptx
Site grading.pptx
ssuser9b12ee
 
Highway Project
Highway ProjectHighway Project
Highway Project
Pavan Nimbal
 
Canal Surveying.pdf
Canal Surveying.pdfCanal Surveying.pdf
Canal Surveying.pdf
BivaYadav3
 
designing simple drainage system.pptx
designing simple drainage system.pptxdesigning simple drainage system.pptx
designing simple drainage system.pptx
Pkaistan Agricultural Research Council
 

Similar to Detailed.pptx (20)

Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Road-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRoad-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptx
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineering
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
 
Site grading.pptx
Site grading.pptxSite grading.pptx
Site grading.pptx
 
Highway Project
Highway ProjectHighway Project
Highway Project
 
Canal Surveying.pdf
Canal Surveying.pdfCanal Surveying.pdf
Canal Surveying.pdf
 
designing simple drainage system.pptx
designing simple drainage system.pptxdesigning simple drainage system.pptx
designing simple drainage system.pptx
 

Recently uploaded

University of New South Wales degree offer diploma Transcript
University of New South Wales degree offer diploma TranscriptUniversity of New South Wales degree offer diploma Transcript
University of New South Wales degree offer diploma Transcript
soxrziqu
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
bopyb
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
u86oixdj
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
kuntobimo2016
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
Timothy Spann
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
rwarrenll
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
slg6lamcq
 
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
nuttdpt
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
Sachin Paul
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
mbawufebxi
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
Bill641377
 
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdfEnhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
GetInData
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
v7oacc3l
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
g4dpvqap0
 
Analysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performanceAnalysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performance
roli9797
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
mzpolocfi
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
vikram sood
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
Lars Albertsson
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
sameer shah
 

Recently uploaded (20)

University of New South Wales degree offer diploma Transcript
University of New South Wales degree offer diploma TranscriptUniversity of New South Wales degree offer diploma Transcript
University of New South Wales degree offer diploma Transcript
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
 
State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023State of Artificial intelligence Report 2023
State of Artificial intelligence Report 2023
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
 
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB文凭证书)圣芭芭拉分校毕业证如何办理
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
 
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdfEnhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
Enhanced Enterprise Intelligence with your personal AI Data Copilot.pdf
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
 
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
一比一原版(爱大毕业证书)爱丁堡大学毕业证如何办理
 
Analysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performanceAnalysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performance
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
 

Detailed.pptx

  • 1. C. Scope  To review the existing study reports, standards and specifications.  Detailed engineering survey of alignment.  Preparation of topographical map.  Study for cross-drainage works and propose suitable drainage structure.
  • 2.  Preparation of working drawings.  Preparation of quantity and cost estimate.  Preparation of survey and design report
  • 3. D. Project location  The proposed road is located in the Lalitpur District, Bagmati Zone, Central Region. The road starts from Badikhel and ends at Badegaun.  The road runs along Karmanasha River corridor.  The latitude and the longitude of the starting point are 27057’07’’ and 85035’27’’ respectively.
  • 4. F. Hydrology And Meteorology  Small temporary streams running only during monsoon crosses the alignment with small discharge.  The project area experiences marked seasonal and specific climate variation with moderately hot summer and relatively cool winters. Average temperature is 25oC in summer and 10oC in winter.  Almost 80% of the rainfall occurs during monsoon which starts at the middle of the June and continues until the end of August.
  • 5. METHODOLOGY  DESK STUDY  SOCIAL IMPACT ASSESMENT  FIELD WORK  EQUIPMENT USED FOR SURVEYING  OFFICE WORK
  • 6. DESK STUDY  The geographical and the topographical maps were studied and the relevant information regarding the alignment selection, cross drainage structures, gradient of the road were discussed.  The strategy for the field study was made accordingly.  The study team member discussed the related matters of the project.
  • 7. SOCIAL IMPACT ASSESMENT The study identified the following key social issues for investigation:  Loss of private property and other assets (land, houses and trees) and compensation modalities for these losses.  Population displacement.
  • 8.  EQUIPMENT USED FOR SURVEYING  Total station  GPS device  Staff  Compass  Measuring tape  Hammer  Communicating Device
  • 10. Road Classification  As per the NRS 2045, the road project falls on the category of District Roads.
  • 11.  A Design speed of 30 km/hr is taken for the design of geometric parameters of the road. Design Speed
  • 12.  The Design values are taken as recommended by NRS 2045 as far as practicable  The shoulder width is taken as 1 m considering the site condition and the utility of the road  Minimum Gradient recommended by NRS (1% for better drainage) cannot be incorporated considering the site condition
  • 13. Horizontal Alignment  The most suitable horizontal alignment was selected considering the following factors:  Short (S)  Easy (E)  Safe (S)  Economical (E)  Minimum radius for the horizontal curve as recommended by NRS is 12 m. The minimum radius of 12m is provided at the intersection of existing road and proposed road.
  • 14.  The extrawidening and transition curves are not provided owing to low design speed and simplicity in construction  A maximum of 5 % super elevation is provided at each horizontal curve.  Superelevation is provided by rotation of pavement about the center line.  Transition length for super elevation is provided as 5 m
  • 15.  Summit curves are designed considering stopping sight distance.  Valley curves are designed on the basis of night visibility  The radius of vertical curve is adopted as large as possible so that all the factors are satisfied  The least vertical radius taken in design is 1000 m
  • 16. Cross Section Design  Cross section is designed providing camber of 4% on carriageway and 5 % on shoulder  For embankment the side slope of 1.5H: 1V and for cut the side slope of 1H: 1V is adopted  Total pavement thickness of 28 cm is adopted as per CBR method of design
  • 17.  Gravel is used as the sub-base course  Otta Seal is used as the surface course
  • 18. Drainage  Longitudinal drain is provided on the cut slope side of the road  The side slope is 1:1 and longitudinal slope is parallel to the alignment  Earthen drain is provided from chainage 0+000 to the chainage of 1+251.35  Stoned masonry drain of thickness 20 cm is provided from the chainage of 1+309.82 to chainage 2+027.24
  • 19.  Pipe culverts of 60 cm in diameter and total length of 7.5m are provided at 12 sections of the road  They are provided at the lowest point of the vertical alignment  A minimum depth of 60 cm is provided between the surface of the pavement and the crown of the pipe
  • 20. Plan and Profile  Ch. 0+000-0+200  Ch. 0+200-0+480  Ch. 0+480-0+760  Ch. 0+760-1+040  Ch. 1+040-1+360  Ch. 1+360-1+700  Ch. 1+700-2+027.24
  • 21. Cross Section  Ch. 0+000-0+271.50  Ch. 0+280-0+500  Ch. 0+511.92-0+680  Ch. 0+683.87-0+760  Ch. 0+780-0+920  Ch. 0+936.71-1+125.89  Ch. 1+130.75-1+213.66  Ch.1+220-1+319.59  Ch.1+320-1+380  Ch.1+397.04-1+465.09  Ch.1+480-1+545.77  Ch.1+560-1+800  Ch.1+800.91-1+980  Ch.1+984.58-2+027.24
  • 23. ESTIMATE Quantity Estimate Calculation of Earthwork Necessary Calculations Rate Analysis BoQ /Cost Estimate
  • 24. QUANTITY ESTIMATE  Earthwork Calculations:  Calculated at each cross-section  Separate calculation according to soil type  Total cut volume = 10283.57 m3  Total fill volume = 16052.44 m3  Balance (fill) = 5768.869 m3  Earthwork for drain = 768.129 m3 All the detailed calculation is shown in the tabular form in the following slides:
  • 25. Contd………  Necessary calculations: i. For side drain: Calculations were made taking the following design considerations:  Section = trapezoidal  Depth: 0.3m  Base width: 0.3m  Side slope: 1:1  Unlined earthen canal(Ch. 0+000 to 1251.35)  Lined canal: (ch.1+309.82 to Ch. 2+027.24) ii. Sub-grade calculations:
  • 26. RATE ANALYSIS  Rate analysis was performed under the following criteria:  The quantity of the materials, required labor force and plants, machinery, tools and equipments were taken from the work norms provided by the DoR.  The rate for the materials, labors, plants and machinery, tools and equipments was taken from the district rates provided by the Lalitpur DDC.
  • 27. COST ESTIMATE  The BoQ was prepared on the basis of the quantity of work calculated and rate analysis done previously:  The cost estimate is as below: