POWER SECTOR IN
ARGENTINA
INTRODUCTION
The electricity sector in Argentina constitutes the third largest
power market in Latin America. It relies mostly on thermal
generation (54% of installed capacity) and hydropower
generation (41%). The country still has a large untapped
hydroelectric potential. The prevailing natural gas-fired thermal
generation is at risk due to the uncertainty about future gas
supply.
Faced with rising electricity demand (over 6% annually) and
declining reserve margins, the government of Argentina is in
the process of commissioning large projects, both in the
generation and transmission sectors. To keep up with rising
demand, it is estimated that about 1,000 MW of new
generation capacity are needed each year. An important
number of these projects are being financed by the
government through trust funds, while independent private
initiative is still limited as it has not fully recovered yet from the
effects of the Argentine economic crisis.
INTRODUCTION (CONTD.)
The electricity sector was unbundled in generation,
transmission and distribution by the reforms carried out in the
early 1990s. Generation occurs in a competitive and mostly
liberalized market in which 75% of the generation capacity is
owned by private utilities. In contrast, the transmission and
distribution sectors are highly regulated and much less
competitive than generation.
ELECTRICITY
GENERATION
Private and state-owned companies carry out
generation in a competitive, mostly liberalized
electricity market, with 75% of total installed capacity
in private hands. The share in public hands
corresponds to nuclear generation and to the two bi-
national hydropower plants: Yacyretá (Argentina-
Paraguay) and Salto Grande (Argentina-Uruguay).
The generation sector is highly fragmented with
more than ten large companies, all of them providing
less than 15% of the system's total capacity. Power
generators sell their electricity in the wholesale
market operated by the CAMMESA.
TRANSMISSION &
DISTRIBUTION
The transmission and distribution sectors are highly
regulated and less competitive than generation. In
transmission, the Compañía Nacional de Transporte
Energético en Alta Tension (Transener) operates
the national electricity transmission grid under a
long-term agreement with the Argentine
government. In the distribution sector, three private
companies, Edenor (Em pre sa Distribuido ra y
Co m e rcializ ado ra No rte ), Edesur (Ele ctricidad
Distribuido ra Sur) and Edelap (Em pre sa de
Ele ctricidad de la Plata ), dominate a market with
75% control by private firms.
Other important distribution companies at the
provincial level are:
Public provincial: EPEC (Em pre sa Pro vincial de
Ene rg ía de Có rdo ba ), EPESFI (Em pre sa Pro vincial
de Ene rg ía de Santa Fé )
Private provincial: ESJ ( Ene rg ía San Juan), EDET
(Em pre sa de Distribució n Elé ctrica de Tucum án):
EDEN (Em pre sa Distribuido ra de Ene rg ía No rte ),
EDEA (Em pre sa Distribuido ra de Ene rg ía Atlántica ),
EDES (Em pre sa Distribuido ra de Ene rg ía Sur)
PRIVATE PARTNERSHIP
IN ELECTRICITY SECTOR
Prior to 1991, the electricity sector in Argentina was
vertically integrated. The new legal framework for
the electricity sector included: vertical and horizontal
unbundling of generation, transmission and
distribution; opening up of all segments to the
private sector; and separation of the regulatory
function from policy setting.
Current scenario of private sector participation is,Activity Private participation (%)
Generation 75% of installed capacity
Transmission 100%
Distribution 75% of clients
RENEWABLE ENERGY
RESOURCE
1. Hydro Power
2. Wind
3. Solar
HYDRO POWER
Argentina's hydroelectric potential is being exploited
only partially. While the identified potential is
170,000 GW·h/year, in 2006 hydroelectric
production amounted just to 42,360 GW·h.There are
also untapped mini-hydropower resources, whose
potential is estimated at 1.81% of overall electricity
production (in contrast with its current 0.88%).
WIND
Wind power has increased significantly in Argentina during the
last decade. Total operating wind power capacity in 2005 was
26.6 MW, shared by 13 plants. This is still only about 0.05% of
the theoretical potential of wind energy in Argentina. The
distribution of number plants and total capacity is:
Of the 13 plants, only three have been commissioned after the
year 2000, with the remaining 10 built during the 1990s.
Buenos Aires Province 6 plants, 6,100 kW
Chubut Province 4 plants, 17,460 kW
Santa Cruz Province 1 plant, 2,400 kW
La Pampa Province 1 plant, 1,800 kW
Neuquen Province 1 plant, 400 kW
WIND
The Argentine Patagonia region has a very large wind potential.
The Chubut Wind Power Regional Center (CREE) estimated the
theoretical potential for the region at 500 GW of electricity
generation. However, this large potential is still largely unexploited.
Reasons
1.One of the reasons for this underdevelopment is that existing
tariffs and incentives do not make wind power development
attractive enough yet.
2.the main deterrent to wind power development in the region has
been the lack of transmission lines that connect the Patagonia
region with the National Interconnected System.
SOLAR
Solar power is only present in remote areas. Just 81
MW·h were generated in 2005, less than 0.1% of
total electricity production.In 2012 the first of four 5
MW stages of Cañada Honda was completed, as
part of a plan to install 117 MW of renewable
energy.
POLICY & REGULATIONS
The Energy Secretariat (SENER) is responsible for policy
setting, while the National Electricity Regulator (ENRE) is the
independent entity within the Energy Secretariat responsible
for applying the regulatory framework established by Law
26,046 of 1991. ENRE is in charge of regulation and overall
supervision of the sector under federal control. Provincial
regulators regulate the rest of the utilities. ENRE and the
provincial regulators set tariffs and supervise compliance of
regulated transmission and distribution entities with safety,
quality, technical and environmental standards. CAMMESA
(Co m pañía Adm inistrado ra de lMe rcado Mayo rista Elé ctrico ) is
the administrator of the wholesale electricity market. Its main
functions include the operation and dispatch of generation and
price calculation in the spot market, the real-time operation of
the electricity system and the administration of the commercial
transactions in the electricity market.
POLICY & REGULATIONS
(CONTD.)
The Electric Power Federal Council (CFEE), created in 1960, plays a
very important role in the sector as well. It is the administrator of
funds that specifically target electricity operations (i.e. National Fund
for Electric Power, see Recent developments below) and is also an
adviser to the National and the Provincial Governments in issues
relating to the power industry, public and private energy services,
priorities in the execution of new projects and studies, concessions
and authorizations, and electricity tariffs and prices. It is also an
adviser for legislative modifications in the power industry.
The Argentine power sector is one of the most competitive and
deregulated in South America. However, the fact that the Energy
Secretariat has veto power over CAMMESA has the potential to alter
the functioning of the competitive market. The functions of
generation, transmission, and distribution are open to the private
sector, but there are restrictions on cross-ownership between these
three functions. Argentine law guarantees access to the grid in order
to create a competitive environment and to allow generators to serve
ELECTRICITY
MARKET
DEMAND
Electricity demand in Argentina has steadily grown
since 1991, with just a temporary decline caused by
the economic crisis of 2001-2002 that has been
followed by a quick recovery (6%-8% annual
increase) in the last five years, partially due to
economic recovery. In 2005, the country consumed
94.3 TW·h of electricity, which corresponds to
2,368 kWh per capita. Residential consumption
accounted for 29% of the total, while industrial, and
commercial and public represented 43% and 26%
respectively.
SUPPLY: GENERATION
CAPACITY
Thermal plants fueled by natural gas (CCGT) are the leading
source of electricity generation in Argentina. Argentina generates
electricity using thermal power plants based on fossil fuels (54%),
hydroelectric plants (41%), and nuclear plants (4%, two
operational, one incomplete). Installed nominal capacity in 2006
was 24,046 MW. However, this scenario of gas dominance is
likely to undergo changes due to gas exhaustion derived from the
existing "bottlenecks" in exploration and production (E+P) and
pipeline capacity. Today, gas reserves are 43% lower than in
2000.This situation is further aggravated by the uncertainty
surrounding the gas deals with Bolivia and the plans to build new
regional pipeline connections. Total generation in 2005 was 96.65
TW·h. The breakdown by source in 2003 had been: 59% from
conventional thermal sources, 35.4% from hydroelectricity, 7%
from nuclear power and 1% from geothermal sources. In 2015, the
Atucha II Nuclear Power Plant reached 100% power, increasing
the percentage of nuclear power in Argentina from 7% to 10%.
The generators are divided into eight regions:
Cuyo (CUY)
Comahue (COM)
Northwest (NOA)
Center (CEN)
Buenos Aires/Gran Buenos Aires (GBA-BAS)
Littoral (LIT)
Northeast (NEA)
Patagonia (PAT)
DEMAND & SUPPLY
PROJECTIONS
Argentina currently faces a tight supply/demand
scenario as reserve margins have declined from
above 30% in 2001 to less than 10%. This fact,
together with the deterioration in distribution
companies services (i.e. cables, transformers, etc.),
has the potential to endanger supply. To sustain a 6-
8% annual increase in demand, it is estimated that
the system should incorporate about 1,000 MW of
generation capacity each year.
TARIFFS
Electricity tariffs in Argentina are well below the LAC
average. In 2004, the average residential tariff was
US$0.0380 per kWh, very similar to the average
industrial tariff, which was US$0.0386 per kWh in
2003. Weighted averages for LAC were US$0.115
per kWh for residential consumers and US$0.107
per kWh for industrial customers.
SUBSIDIES,
INVESTMENTS &
FINANCING
1. 47.4%: Subsidiary Fund for Regional Tariff Compensation
to Final Users (FCT), for homogenization of tariffs across
the country (this created a de facto subsidy for those
consumers in the areas with higher electricity costs).
2. 31.6%: Fund for the Electric Development of the Interior
(FEDEI), for generation, transmission and rural and urban
distribution works. Most funds have been directed to rural
electrification
3. 19.75%: Fiduciary Fund for Federal Electricity
Transmission(FFTEF) (created in 2000), for co-financing or
projects in electricity transmission.
4. 1.26%: Wind Energy Fund (created in 2002), for the
development of wind energy.
CAMMESA
CAMMESA S.A., a wholesale electricity market
administrator offers operation and dispatch of
generation; price calculation in the spot market; and
the administration of the commercial transactions in
the electricity market. The company also purchases
and sells electric power from abroad and to other
countries. CAMMESA S.A. offers consulting
services. The company was founded in 1992 and is
based in Buenos Aires, Argentina.
IMPORTS & EXPORTS
1. In 2005, Argentina imported 6.38 TW·h of
electricity while it exported 3.49 TW·h. Net energy
imports thus were about 3% of consumption.
2. Argentina also imports electricity from Paraguay,
produced by the jointly built Yaciretá Dam. On 18
September 2006 Paraguay agreed to settling its
debt of $11,000,000,000 owed to Argentina for
the construction of Yaciretá by paying in
electricity, at the rate of 8,000 GWh per year for
40 years.
ACCESS TO ELECTRICITY
Total electricity coverage in Argentina was as high
as 95% in 2003. However, about 30% of the rural
population lacks access to electricity. The
Renewable Energy in the Rural Market Project
(PERMER) is one of several programs being
implemented to enlarge electricity coverage in rural
areas.
SERVICE QUALITY
Interruption frequency and duration
Interruption frequency and duration are considerably
below the averages for the LAC region. In 2002, the
average number of interruptions per subscriber was
5.15, while duration of interruptions per subscriber was
5.25 hours. The weighted averages for LAC were 13
interruptions and 14 hours respectively.
Distribution and transmission losses
Distribution losses in 2005 were 13.6%, down from 17%
a decade before.
PROJECTS &
ASSISTANCE
RECENT GOVERNMENT
PROJECTS
There are several projects that are part of the government's
response to the predicted electricity shortages in different
sectors:-
1.THERMAL POWER
2.NUCLEAR POWER
3.HYDRO POWER
4.TRANSMISSION
THERMAL POWER
PROJECTS1. Two new Combined Cycle Gas Turbine plants, the José de San
Martín Thermoelectric and Manuel Belgrano Thermoelectric, of 830
MW each, are under construction and expected to start full
operations at the beginning of 2009.Both plants, which have been
financed through the FONINVEMEM (total investment amounts up to
US$1,097 million), are expected to start full operations at the
beginning of 2009.
2. the Planning Ministry announced in July 2007 the commissioning of
five new thermal plants with a total capacity of 1.6 GW and an
overall investment of US$3,250 million. These dual-generation
turbine (gas or fuel oil) plants, which are expected to start operations
in 2008, will be located in Ensenada (540 MW), Necochea (270
MW), Campana (540 MW), Santa Fe (125 MW) and Córdoba (125
MW)
3. Enarsa has recently launched bidding for eleven small and
transportable generation units (15-30 MW each) and for other three
larger generation units (50-100 MW) to be installed on barges.
These new units, whose base price is still unknown, will add
NUCLEAR PROJECTS
1. In 2006, the Argentine government launched a
plan to boost nuclear energy. The Atucha II
nuclear power plant, whose construction started
in 1981, will be completed and will add 750 MW
of generation capacity by 2010.
2. In addition, the Embalse nuclear power plant, with
648 MW of generation capacity, will be
refurbished to extend its operational life beyond
2011.
HYDROPOWER
PROJECTS
1. On the hydropower side, the Yacyretá dam's
reservoir was elevated by 7 m to the height of 83
m as contemplated in its original design, which
increased its capacity from 1,700 to 3,100 MW.
This will lead to a 60% increase in its electricity
output (from 11,450 GW·h to 18,500 GW·h).The
reservoir rise was complete in February 2011
despite a serious controversy regarding the
resettlement of people.
2. in 2006, bidding for the expansion of Yacyretá
with the construction of a new 3-turbine plant in
the Añá Cuá arm of the Paraná River was
announced by the Government. This expansion,
to be finalized in 2010, would add 300 MW of new
TRANSMISSION
PROJECTS
1. In regard to transmission, the Federal Plan for
Transport of Electric Energy at 500 kV is under
implementation under the umbrella of the FFTEF
(Fondo Fiduciario para el Transporte Eléctrico
Federal).The main lines of the plan (Línea
Patagónica, Línea Minera, Yacyretá, Puerto Madryn
– Pico Truncado, NEA-NOA, Comahue – Cuyo, Pico
Truncado – Río Turbio – Río Gallegos) are already
built or currently under construction. The lines built
between 2007 and 2009 will add 4,813 new
kilometers of high voltage transmission capacity.
EXTERNAL ASSISTANCE
1. WORLD BANK
2. INTER-AMERICAN DEVELOPMENT BANK
3. ANDEAN DEVELOPMENT CORPORATION
WORLD BANK
The only active energy project financed by the World
Bank in Argentina is the Renewable Energy in the
Rural Market Project (PERMER). This project has
the objective of guaranteeing access to electricity to
1.8 million people (314,000 households) and to
6,000 public services (schools, hospitals, etc.)
located far from electricity distribution centers.
Electrification of this dispersed market will be mostly
carried out through the installation of solar
photovoltaic systems, but also through other
technologies such as micro-hydraulic turbines, wind
and, eventually, diesel generators. The project,
which started in 1999 and is expected to end in
December 2008, has received a US$10 million grant
from GEF and a US$30 million loan from the World
INTER-AMERICAN DEVELOPMENT
BANK
In November 2006, the Inter-American Development
Bank approved a $580 million loan for the
construction of a new 760-mile transmission line in
northern Argentina that will connect separate grids
in the northeastern and northwestern parts of the
country, the Norte Grande Electricity Transmission
Program.
ANDEAN DEVELOPMENT
CORPORATION (CAF)
In 2006, Argentina received financing from CAF (Andean
Development Corporation) for two electricity projects: the
Electricity Interconection Comahue-Cuyo (US$200 million) and
the Electricity Interconnection Rincón Santa María-Rodríguez
(US$300 million), two of the high voltage transmission lines
included in the Federal Transportation Plan. In the same year,
Argentina also borrowed US$210 million from CAF for a
program that aims at repairing the country's hydroelectric
infrastructure.
In June 2007, CAF approved a US$45 million loan to the
Buenos Aires province for partial financing of the electricity
transport capacity in the North of the province.
BIBLIOGRAPHY
1. Cámara Argentina de la Construcción, 2006. La
co nstrucció n co m o he rram ie nta de lcre cim ie nto co ntinuado .
Se cto r e lé ctrico . Evaluació n de las inve rsio ne s ne ce sarias
para e lse cto r e lé ctrico nacio nale n e lm e diano plazo .
Consultor: Dr. Ing. Alberto del Rosso.
2. Coordinación de Energías Renovables, 2006.Po te ncialde
lo s apro ve cham ie nto s e ne rg é tico s e n la Re pública
Arg e ntina
3. Oxford Analytica, 2006. Arg e ntina: Ene rg y issue s thre ate n
sustaine d g ro wth
4. Secretaria de Energía, 2006. Info rm e de lSe cto r Elé ctrico
20 0 5.
5. Secretaría de Energía, 2007. Balance Ene rg é tico Nacio nal.
Avance 20 0 6 .
Power sector in argentina

More Related Content

What's hot

WHY ENERGY STORAGE
WHY ENERGY STORAGEWHY ENERGY STORAGE
WHY ENERGY STORAGE
Power System Operation
 
IRENA : World Energy Transitions Outlook 2023
IRENA : World Energy Transitions Outlook 2023IRENA : World Energy Transitions Outlook 2023
IRENA : World Energy Transitions Outlook 2023
Energy for One World
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
Gensol Engineering Limited
 
Vanadium Redox Flow Battery
Vanadium Redox Flow Battery Vanadium Redox Flow Battery
Vanadium Redox Flow Battery
Rajkumar Tondare
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018
AshwaniSinha11
 
Energy Transition - A comprehensive approach
Energy Transition - A comprehensive approachEnergy Transition - A comprehensive approach
Energy Transition - A comprehensive approach
Sampe Purba
 
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMYTHE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
iQHub
 
Fuel cells
Fuel cellsFuel cells
Fuel cells
Hiren Mahida
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
Paul374728
 
Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
Manoj Bhambu
 
Renewable energy - India- future
Renewable energy - India- futureRenewable energy - India- future
Renewable energy - India- future
H Janardan Prabhu
 
Energy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisEnergy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment Analysis
Gensol Engineering Limited
 
Lithium-Ion Battery (LIB) Manufacturing Industry
Lithium-Ion Battery (LIB) Manufacturing IndustryLithium-Ion Battery (LIB) Manufacturing Industry
Lithium-Ion Battery (LIB) Manufacturing Industry
Ajjay Kumar Gupta
 
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVEBATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
iQHub
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
ummuhamzah2004
 
Solid-state Battery
Solid-state BatterySolid-state Battery
Solid-state Battery
Yole Developpement
 
COVID-19 Rapid Response Checklist for Nonprofits
COVID-19 Rapid Response Checklist for NonprofitsCOVID-19 Rapid Response Checklist for Nonprofits
COVID-19 Rapid Response Checklist for Nonprofits
Boston Consulting Group
 
Energy crisis and its effects
Energy crisis and its effectsEnergy crisis and its effects
Energy crisis and its effects
Raheela Shabbir
 
Market Clearing Price
Market Clearing PriceMarket Clearing Price
Market Clearing Price
matt
 
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
Andrew Gelston
 

What's hot (20)

WHY ENERGY STORAGE
WHY ENERGY STORAGEWHY ENERGY STORAGE
WHY ENERGY STORAGE
 
IRENA : World Energy Transitions Outlook 2023
IRENA : World Energy Transitions Outlook 2023IRENA : World Energy Transitions Outlook 2023
IRENA : World Energy Transitions Outlook 2023
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
 
Vanadium Redox Flow Battery
Vanadium Redox Flow Battery Vanadium Redox Flow Battery
Vanadium Redox Flow Battery
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018
 
Energy Transition - A comprehensive approach
Energy Transition - A comprehensive approachEnergy Transition - A comprehensive approach
Energy Transition - A comprehensive approach
 
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMYTHE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
THE ROLE OF DIGITALIZATION IN THE BATTERY CIRCULAR ECONOMY
 
Fuel cells
Fuel cellsFuel cells
Fuel cells
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
 
Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
 
Renewable energy - India- future
Renewable energy - India- futureRenewable energy - India- future
Renewable energy - India- future
 
Energy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisEnergy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment Analysis
 
Lithium-Ion Battery (LIB) Manufacturing Industry
Lithium-Ion Battery (LIB) Manufacturing IndustryLithium-Ion Battery (LIB) Manufacturing Industry
Lithium-Ion Battery (LIB) Manufacturing Industry
 
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVEBATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
BATTERY MATERIAL TRENDS 2030 – RAW MATERIAL SUPPLY CHAIN AND COST PERSPECTIVE
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Solid-state Battery
Solid-state BatterySolid-state Battery
Solid-state Battery
 
COVID-19 Rapid Response Checklist for Nonprofits
COVID-19 Rapid Response Checklist for NonprofitsCOVID-19 Rapid Response Checklist for Nonprofits
COVID-19 Rapid Response Checklist for Nonprofits
 
Energy crisis and its effects
Energy crisis and its effectsEnergy crisis and its effects
Energy crisis and its effects
 
Market Clearing Price
Market Clearing PriceMarket Clearing Price
Market Clearing Price
 
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value Ch...
 

Viewers also liked

Strategy Management : Porter's Value Chain
Strategy Management : Porter's Value Chain Strategy Management : Porter's Value Chain
Strategy Management : Porter's Value Chain
Machiraju Presentations Pvt. Ltd.
 
What are the indicators of electricity sector reforms_A comparative analysis ...
What are the indicators of electricity sector reforms_A comparative analysis ...What are the indicators of electricity sector reforms_A comparative analysis ...
What are the indicators of electricity sector reforms_A comparative analysis ...
Dilip Jena
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
PRIYANK JAIN
 
Programacion Dinamica
Programacion DinamicaProgramacion Dinamica
Programacion Dinamica
ingyon
 
Corporate fashions Inc: Case Study on Sampling, Business Research Methods
Corporate fashions Inc: Case Study on Sampling, Business Research MethodsCorporate fashions Inc: Case Study on Sampling, Business Research Methods
Corporate fashions Inc: Case Study on Sampling, Business Research Methods
Devansh Doshi
 
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLEKNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
Md Santo
 
Mapping of Knowledge in DDC Arun Joseph
Mapping of Knowledge in DDC Arun JosephMapping of Knowledge in DDC Arun Joseph
Mapping of Knowledge in DDC Arun Joseph
Arun Joseph (Librarian), MLISc, UGC NET
 
Deregulation
DeregulationDeregulation
Deregulation
Anas Vj
 
Knowledge mapping kmsi - 2012-02-16
Knowledge mapping   kmsi - 2012-02-16Knowledge mapping   kmsi - 2012-02-16
Knowledge mapping kmsi - 2012-02-16
Ir. Haitan Rachman MT, KMPC
 
UG POWER QUALITY (EE2028) ppt
UG POWER QUALITY (EE2028) pptUG POWER QUALITY (EE2028) ppt
UG POWER QUALITY (EE2028) ppt
Harris Raj
 
Modul 3 knowledge mapping
Modul 3   knowledge mappingModul 3   knowledge mapping
Modul 3 knowledge mapping
Ir. Haitan Rachman MT, KMPC
 
Programación Dinámica
Programación DinámicaProgramación Dinámica
Programación Dinámica
Angel Carreras
 
Porter’s value chain example
Porter’s value chain examplePorter’s value chain example
Porter’s value chain example
maxbond
 
Programación Dinámica
Programación DinámicaProgramación Dinámica
Programación Dinámica
Salvador Fernández Fernández
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
Prannay Kumar Giri
 
PMR Science Chapter 8 Generation of Electricity
PMR Science Chapter 8 Generation of ElectricityPMR Science Chapter 8 Generation of Electricity
PMR Science Chapter 8 Generation of Electricity
Sook Yen Wong
 
The Porter Value Chain
The Porter Value ChainThe Porter Value Chain
The Porter Value Chain
Mrirfan
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTs
MOHAN RAKIB
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in India
Indian Energy Sector
 
RAJARAM PPT
RAJARAM PPTRAJARAM PPT
RAJARAM PPT
Rajaram Meena
 

Viewers also liked (20)

Strategy Management : Porter's Value Chain
Strategy Management : Porter's Value Chain Strategy Management : Porter's Value Chain
Strategy Management : Porter's Value Chain
 
What are the indicators of electricity sector reforms_A comparative analysis ...
What are the indicators of electricity sector reforms_A comparative analysis ...What are the indicators of electricity sector reforms_A comparative analysis ...
What are the indicators of electricity sector reforms_A comparative analysis ...
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
 
Programacion Dinamica
Programacion DinamicaProgramacion Dinamica
Programacion Dinamica
 
Corporate fashions Inc: Case Study on Sampling, Business Research Methods
Corporate fashions Inc: Case Study on Sampling, Business Research MethodsCorporate fashions Inc: Case Study on Sampling, Business Research Methods
Corporate fashions Inc: Case Study on Sampling, Business Research Methods
 
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLEKNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
KNOWLEDGE MAP : TECHNOLOGY-MARKET-PEOPLE
 
Mapping of Knowledge in DDC Arun Joseph
Mapping of Knowledge in DDC Arun JosephMapping of Knowledge in DDC Arun Joseph
Mapping of Knowledge in DDC Arun Joseph
 
Deregulation
DeregulationDeregulation
Deregulation
 
Knowledge mapping kmsi - 2012-02-16
Knowledge mapping   kmsi - 2012-02-16Knowledge mapping   kmsi - 2012-02-16
Knowledge mapping kmsi - 2012-02-16
 
UG POWER QUALITY (EE2028) ppt
UG POWER QUALITY (EE2028) pptUG POWER QUALITY (EE2028) ppt
UG POWER QUALITY (EE2028) ppt
 
Modul 3 knowledge mapping
Modul 3   knowledge mappingModul 3   knowledge mapping
Modul 3 knowledge mapping
 
Programación Dinámica
Programación DinámicaProgramación Dinámica
Programación Dinámica
 
Porter’s value chain example
Porter’s value chain examplePorter’s value chain example
Porter’s value chain example
 
Programación Dinámica
Programación DinámicaProgramación Dinámica
Programación Dinámica
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
PMR Science Chapter 8 Generation of Electricity
PMR Science Chapter 8 Generation of ElectricityPMR Science Chapter 8 Generation of Electricity
PMR Science Chapter 8 Generation of Electricity
 
The Porter Value Chain
The Porter Value ChainThe Porter Value Chain
The Porter Value Chain
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTs
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in India
 
RAJARAM PPT
RAJARAM PPTRAJARAM PPT
RAJARAM PPT
 

Similar to Power sector in argentina

Guatemala, un país de oportunidades ( EXPO ASTANA).pptx
Guatemala, un país de oportunidades ( EXPO ASTANA).pptxGuatemala, un país de oportunidades ( EXPO ASTANA).pptx
Guatemala, un país de oportunidades ( EXPO ASTANA).pptx
Fernando Moscoso
 
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECTBangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
Smart Villages
 
Top 5 West African (WAF) power markets - 2014
Top 5 West African (WAF) power markets - 2014Top 5 West African (WAF) power markets - 2014
Top 5 West African (WAF) power markets - 2014
Patrick Hervé Baboga
 
Why solar energy is set to boom in Argentina - Argentina Renewables Analysis
Why solar energy is set to boom in Argentina - Argentina Renewables AnalysisWhy solar energy is set to boom in Argentina - Argentina Renewables Analysis
Why solar energy is set to boom in Argentina - Argentina Renewables Analysis
Tomas Ocampo
 
Report on Power failure: Ten (10) Years of EPIRA jun 2011
Report on Power failure: Ten (10) Years of EPIRA jun 2011Report on Power failure: Ten (10) Years of EPIRA jun 2011
Report on Power failure: Ten (10) Years of EPIRA jun 2011
AGHAM - Advocates of Science and Technology for the People
 
Fostering solar technology in the Mediterranean area - Guidelines Annex
Fostering solar technology in the Mediterranean area - Guidelines AnnexFostering solar technology in the Mediterranean area - Guidelines Annex
Fostering solar technology in the Mediterranean area - Guidelines Annex
FOSTEr in MED
 
No to privatization of eletrobras
No to privatization of eletrobrasNo to privatization of eletrobras
No to privatization of eletrobras
Fernando Alcoforado
 
Group2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countriesGroup2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countries
Pulakesh k kalita
 
BCS Fact Sheet - Energy BT
BCS Fact Sheet - Energy BTBCS Fact Sheet - Energy BT
BCS Fact Sheet - Energy BT
Marcia Gattoni
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
Alex Pischalnikov
 
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZILTHE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
Fernando Alcoforado
 
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Jacopo Pendezza
 
VRE: Solar and Wind Energy
VRE: Solar and Wind EnergyVRE: Solar and Wind Energy
VRE: Solar and Wind Energy
John Angelo Buscado
 
Innovation week, Roadmap for renewables in palestine tubas as a model
Innovation week, Roadmap for renewables in palestine tubas as a modelInnovation week, Roadmap for renewables in palestine tubas as a model
Innovation week, Roadmap for renewables in palestine tubas as a model
Maghrenov
 
J0364057060
J0364057060J0364057060
J0364057060
theijes
 
Case-Studies-Electric-Power.pptx
Case-Studies-Electric-Power.pptxCase-Studies-Electric-Power.pptx
Case-Studies-Electric-Power.pptx
UmairKamran3
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
PRIYANK JAIN
 
Argentina s12
Argentina s12Argentina s12
Argentina s12
M. Sakhawat Hussain
 
CO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in LibyaCO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in Libya
Husen E . Bader
 
GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4
Jon Shepard CEM, EI/FE, LEED GA
 

Similar to Power sector in argentina (20)

Guatemala, un país de oportunidades ( EXPO ASTANA).pptx
Guatemala, un país de oportunidades ( EXPO ASTANA).pptxGuatemala, un país de oportunidades ( EXPO ASTANA).pptx
Guatemala, un país de oportunidades ( EXPO ASTANA).pptx
 
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECTBangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
Bangkok | Mar-17 | ACCESS TO SUSTAINABLE ENERGY PROJECT
 
Top 5 West African (WAF) power markets - 2014
Top 5 West African (WAF) power markets - 2014Top 5 West African (WAF) power markets - 2014
Top 5 West African (WAF) power markets - 2014
 
Why solar energy is set to boom in Argentina - Argentina Renewables Analysis
Why solar energy is set to boom in Argentina - Argentina Renewables AnalysisWhy solar energy is set to boom in Argentina - Argentina Renewables Analysis
Why solar energy is set to boom in Argentina - Argentina Renewables Analysis
 
Report on Power failure: Ten (10) Years of EPIRA jun 2011
Report on Power failure: Ten (10) Years of EPIRA jun 2011Report on Power failure: Ten (10) Years of EPIRA jun 2011
Report on Power failure: Ten (10) Years of EPIRA jun 2011
 
Fostering solar technology in the Mediterranean area - Guidelines Annex
Fostering solar technology in the Mediterranean area - Guidelines AnnexFostering solar technology in the Mediterranean area - Guidelines Annex
Fostering solar technology in the Mediterranean area - Guidelines Annex
 
No to privatization of eletrobras
No to privatization of eletrobrasNo to privatization of eletrobras
No to privatization of eletrobras
 
Group2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countriesGroup2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countries
 
BCS Fact Sheet - Energy BT
BCS Fact Sheet - Energy BTBCS Fact Sheet - Energy BT
BCS Fact Sheet - Energy BT
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
 
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZILTHE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
 
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
 
VRE: Solar and Wind Energy
VRE: Solar and Wind EnergyVRE: Solar and Wind Energy
VRE: Solar and Wind Energy
 
Innovation week, Roadmap for renewables in palestine tubas as a model
Innovation week, Roadmap for renewables in palestine tubas as a modelInnovation week, Roadmap for renewables in palestine tubas as a model
Innovation week, Roadmap for renewables in palestine tubas as a model
 
J0364057060
J0364057060J0364057060
J0364057060
 
Case-Studies-Electric-Power.pptx
Case-Studies-Electric-Power.pptxCase-Studies-Electric-Power.pptx
Case-Studies-Electric-Power.pptx
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
 
Argentina s12
Argentina s12Argentina s12
Argentina s12
 
CO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in LibyaCO2 Reduction Measures in the Electricity Supply Chain in Libya
CO2 Reduction Measures in the Electricity Supply Chain in Libya
 
GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4GEM 6100 Project 2 GROUP 4
GEM 6100 Project 2 GROUP 4
 

More from Machiraju Presentations Pvt. Ltd.

Goods & Service Tax (GST)
Goods & Service Tax (GST)Goods & Service Tax (GST)
Goods & Service Tax (GST)
Machiraju Presentations Pvt. Ltd.
 
Regional economic integration in Africa
Regional economic integration in AfricaRegional economic integration in Africa
Regional economic integration in Africa
Machiraju Presentations Pvt. Ltd.
 
Regional economic integration for developing countries
Regional economic integration for developing countriesRegional economic integration for developing countries
Regional economic integration for developing countries
Machiraju Presentations Pvt. Ltd.
 
Strategic management : A basic introduction to the concept
Strategic management : A basic introduction to the concept Strategic management : A basic introduction to the concept
Strategic management : A basic introduction to the concept
Machiraju Presentations Pvt. Ltd.
 
International Trade Theory : Absolute Advantage Theory
International Trade Theory : Absolute Advantage Theory International Trade Theory : Absolute Advantage Theory
International Trade Theory : Absolute Advantage Theory
Machiraju Presentations Pvt. Ltd.
 
International Trade Theory : Mercantilism
International Trade Theory : MercantilismInternational Trade Theory : Mercantilism
International Trade Theory : Mercantilism
Machiraju Presentations Pvt. Ltd.
 
Hoa Ni shoe company
Hoa Ni shoe companyHoa Ni shoe company
European union & regional integration: A critical approach
European union & regional integration: A critical approachEuropean union & regional integration: A critical approach
European union & regional integration: A critical approach
Machiraju Presentations Pvt. Ltd.
 
Free trade versus Protectionism
Free trade versus ProtectionismFree trade versus Protectionism
Free trade versus Protectionism
Machiraju Presentations Pvt. Ltd.
 
Chandigarh: Travel Guide to the City Beautiful
Chandigarh: Travel Guide to the City Beautiful Chandigarh: Travel Guide to the City Beautiful
Chandigarh: Travel Guide to the City Beautiful
Machiraju Presentations Pvt. Ltd.
 
Multimodal transportation& Electronic Data Interchange
Multimodal transportation& Electronic Data InterchangeMultimodal transportation& Electronic Data Interchange
Multimodal transportation& Electronic Data Interchange
Machiraju Presentations Pvt. Ltd.
 
Patanjali Ayurved Limited (PAL)
Patanjali Ayurved Limited (PAL)Patanjali Ayurved Limited (PAL)
Patanjali Ayurved Limited (PAL)
Machiraju Presentations Pvt. Ltd.
 
Trans Pacific Partnership (TPP)
Trans Pacific Partnership (TPP)Trans Pacific Partnership (TPP)
Trans Pacific Partnership (TPP)
Machiraju Presentations Pvt. Ltd.
 
Senegal : Country Report & Investment Decision
Senegal : Country Report & Investment DecisionSenegal : Country Report & Investment Decision
Senegal : Country Report & Investment Decision
Machiraju Presentations Pvt. Ltd.
 
South Africa : Size, Accessibility, Economy, Trade & Market
South Africa : Size, Accessibility, Economy, Trade & MarketSouth Africa : Size, Accessibility, Economy, Trade & Market
South Africa : Size, Accessibility, Economy, Trade & Market
Machiraju Presentations Pvt. Ltd.
 
The Dabbawala: A Six Sigma Organization
The Dabbawala: A Six Sigma OrganizationThe Dabbawala: A Six Sigma Organization
The Dabbawala: A Six Sigma Organization
Machiraju Presentations Pvt. Ltd.
 
IPL: INDIAN PREMIER LEAGUE
IPL: INDIAN PREMIER LEAGUEIPL: INDIAN PREMIER LEAGUE
IPL: INDIAN PREMIER LEAGUE
Machiraju Presentations Pvt. Ltd.
 
International Monetary Fund (IMF)
International Monetary Fund (IMF)International Monetary Fund (IMF)
International Monetary Fund (IMF)
Machiraju Presentations Pvt. Ltd.
 
Gresham's law & Their's law
Gresham's law & Their's lawGresham's law & Their's law
Gresham's law & Their's law
Machiraju Presentations Pvt. Ltd.
 
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
Machiraju Presentations Pvt. Ltd.
 

More from Machiraju Presentations Pvt. Ltd. (20)

Goods & Service Tax (GST)
Goods & Service Tax (GST)Goods & Service Tax (GST)
Goods & Service Tax (GST)
 
Regional economic integration in Africa
Regional economic integration in AfricaRegional economic integration in Africa
Regional economic integration in Africa
 
Regional economic integration for developing countries
Regional economic integration for developing countriesRegional economic integration for developing countries
Regional economic integration for developing countries
 
Strategic management : A basic introduction to the concept
Strategic management : A basic introduction to the concept Strategic management : A basic introduction to the concept
Strategic management : A basic introduction to the concept
 
International Trade Theory : Absolute Advantage Theory
International Trade Theory : Absolute Advantage Theory International Trade Theory : Absolute Advantage Theory
International Trade Theory : Absolute Advantage Theory
 
International Trade Theory : Mercantilism
International Trade Theory : MercantilismInternational Trade Theory : Mercantilism
International Trade Theory : Mercantilism
 
Hoa Ni shoe company
Hoa Ni shoe companyHoa Ni shoe company
Hoa Ni shoe company
 
European union & regional integration: A critical approach
European union & regional integration: A critical approachEuropean union & regional integration: A critical approach
European union & regional integration: A critical approach
 
Free trade versus Protectionism
Free trade versus ProtectionismFree trade versus Protectionism
Free trade versus Protectionism
 
Chandigarh: Travel Guide to the City Beautiful
Chandigarh: Travel Guide to the City Beautiful Chandigarh: Travel Guide to the City Beautiful
Chandigarh: Travel Guide to the City Beautiful
 
Multimodal transportation& Electronic Data Interchange
Multimodal transportation& Electronic Data InterchangeMultimodal transportation& Electronic Data Interchange
Multimodal transportation& Electronic Data Interchange
 
Patanjali Ayurved Limited (PAL)
Patanjali Ayurved Limited (PAL)Patanjali Ayurved Limited (PAL)
Patanjali Ayurved Limited (PAL)
 
Trans Pacific Partnership (TPP)
Trans Pacific Partnership (TPP)Trans Pacific Partnership (TPP)
Trans Pacific Partnership (TPP)
 
Senegal : Country Report & Investment Decision
Senegal : Country Report & Investment DecisionSenegal : Country Report & Investment Decision
Senegal : Country Report & Investment Decision
 
South Africa : Size, Accessibility, Economy, Trade & Market
South Africa : Size, Accessibility, Economy, Trade & MarketSouth Africa : Size, Accessibility, Economy, Trade & Market
South Africa : Size, Accessibility, Economy, Trade & Market
 
The Dabbawala: A Six Sigma Organization
The Dabbawala: A Six Sigma OrganizationThe Dabbawala: A Six Sigma Organization
The Dabbawala: A Six Sigma Organization
 
IPL: INDIAN PREMIER LEAGUE
IPL: INDIAN PREMIER LEAGUEIPL: INDIAN PREMIER LEAGUE
IPL: INDIAN PREMIER LEAGUE
 
International Monetary Fund (IMF)
International Monetary Fund (IMF)International Monetary Fund (IMF)
International Monetary Fund (IMF)
 
Gresham's law & Their's law
Gresham's law & Their's lawGresham's law & Their's law
Gresham's law & Their's law
 
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
Indian agriculture:overview, types,major crops, Changing Trade Scenario & Cha...
 

Recently uploaded

Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
46adnanshahzad
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
sssourabhsharma
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 

Recently uploaded (20)

Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 

Power sector in argentina

  • 2. INTRODUCTION The electricity sector in Argentina constitutes the third largest power market in Latin America. It relies mostly on thermal generation (54% of installed capacity) and hydropower generation (41%). The country still has a large untapped hydroelectric potential. The prevailing natural gas-fired thermal generation is at risk due to the uncertainty about future gas supply. Faced with rising electricity demand (over 6% annually) and declining reserve margins, the government of Argentina is in the process of commissioning large projects, both in the generation and transmission sectors. To keep up with rising demand, it is estimated that about 1,000 MW of new generation capacity are needed each year. An important number of these projects are being financed by the government through trust funds, while independent private initiative is still limited as it has not fully recovered yet from the effects of the Argentine economic crisis.
  • 3. INTRODUCTION (CONTD.) The electricity sector was unbundled in generation, transmission and distribution by the reforms carried out in the early 1990s. Generation occurs in a competitive and mostly liberalized market in which 75% of the generation capacity is owned by private utilities. In contrast, the transmission and distribution sectors are highly regulated and much less competitive than generation.
  • 4. ELECTRICITY GENERATION Private and state-owned companies carry out generation in a competitive, mostly liberalized electricity market, with 75% of total installed capacity in private hands. The share in public hands corresponds to nuclear generation and to the two bi- national hydropower plants: Yacyretá (Argentina- Paraguay) and Salto Grande (Argentina-Uruguay). The generation sector is highly fragmented with more than ten large companies, all of them providing less than 15% of the system's total capacity. Power generators sell their electricity in the wholesale market operated by the CAMMESA.
  • 5. TRANSMISSION & DISTRIBUTION The transmission and distribution sectors are highly regulated and less competitive than generation. In transmission, the Compañía Nacional de Transporte Energético en Alta Tension (Transener) operates the national electricity transmission grid under a long-term agreement with the Argentine government. In the distribution sector, three private companies, Edenor (Em pre sa Distribuido ra y Co m e rcializ ado ra No rte ), Edesur (Ele ctricidad Distribuido ra Sur) and Edelap (Em pre sa de Ele ctricidad de la Plata ), dominate a market with 75% control by private firms.
  • 6. Other important distribution companies at the provincial level are: Public provincial: EPEC (Em pre sa Pro vincial de Ene rg ía de Có rdo ba ), EPESFI (Em pre sa Pro vincial de Ene rg ía de Santa Fé ) Private provincial: ESJ ( Ene rg ía San Juan), EDET (Em pre sa de Distribució n Elé ctrica de Tucum án): EDEN (Em pre sa Distribuido ra de Ene rg ía No rte ), EDEA (Em pre sa Distribuido ra de Ene rg ía Atlántica ), EDES (Em pre sa Distribuido ra de Ene rg ía Sur)
  • 7. PRIVATE PARTNERSHIP IN ELECTRICITY SECTOR Prior to 1991, the electricity sector in Argentina was vertically integrated. The new legal framework for the electricity sector included: vertical and horizontal unbundling of generation, transmission and distribution; opening up of all segments to the private sector; and separation of the regulatory function from policy setting. Current scenario of private sector participation is,Activity Private participation (%) Generation 75% of installed capacity Transmission 100% Distribution 75% of clients
  • 8. RENEWABLE ENERGY RESOURCE 1. Hydro Power 2. Wind 3. Solar
  • 9. HYDRO POWER Argentina's hydroelectric potential is being exploited only partially. While the identified potential is 170,000 GW·h/year, in 2006 hydroelectric production amounted just to 42,360 GW·h.There are also untapped mini-hydropower resources, whose potential is estimated at 1.81% of overall electricity production (in contrast with its current 0.88%).
  • 10. WIND Wind power has increased significantly in Argentina during the last decade. Total operating wind power capacity in 2005 was 26.6 MW, shared by 13 plants. This is still only about 0.05% of the theoretical potential of wind energy in Argentina. The distribution of number plants and total capacity is: Of the 13 plants, only three have been commissioned after the year 2000, with the remaining 10 built during the 1990s. Buenos Aires Province 6 plants, 6,100 kW Chubut Province 4 plants, 17,460 kW Santa Cruz Province 1 plant, 2,400 kW La Pampa Province 1 plant, 1,800 kW Neuquen Province 1 plant, 400 kW
  • 11. WIND The Argentine Patagonia region has a very large wind potential. The Chubut Wind Power Regional Center (CREE) estimated the theoretical potential for the region at 500 GW of electricity generation. However, this large potential is still largely unexploited. Reasons 1.One of the reasons for this underdevelopment is that existing tariffs and incentives do not make wind power development attractive enough yet. 2.the main deterrent to wind power development in the region has been the lack of transmission lines that connect the Patagonia region with the National Interconnected System.
  • 12. SOLAR Solar power is only present in remote areas. Just 81 MW·h were generated in 2005, less than 0.1% of total electricity production.In 2012 the first of four 5 MW stages of Cañada Honda was completed, as part of a plan to install 117 MW of renewable energy.
  • 13. POLICY & REGULATIONS The Energy Secretariat (SENER) is responsible for policy setting, while the National Electricity Regulator (ENRE) is the independent entity within the Energy Secretariat responsible for applying the regulatory framework established by Law 26,046 of 1991. ENRE is in charge of regulation and overall supervision of the sector under federal control. Provincial regulators regulate the rest of the utilities. ENRE and the provincial regulators set tariffs and supervise compliance of regulated transmission and distribution entities with safety, quality, technical and environmental standards. CAMMESA (Co m pañía Adm inistrado ra de lMe rcado Mayo rista Elé ctrico ) is the administrator of the wholesale electricity market. Its main functions include the operation and dispatch of generation and price calculation in the spot market, the real-time operation of the electricity system and the administration of the commercial transactions in the electricity market.
  • 14. POLICY & REGULATIONS (CONTD.) The Electric Power Federal Council (CFEE), created in 1960, plays a very important role in the sector as well. It is the administrator of funds that specifically target electricity operations (i.e. National Fund for Electric Power, see Recent developments below) and is also an adviser to the National and the Provincial Governments in issues relating to the power industry, public and private energy services, priorities in the execution of new projects and studies, concessions and authorizations, and electricity tariffs and prices. It is also an adviser for legislative modifications in the power industry. The Argentine power sector is one of the most competitive and deregulated in South America. However, the fact that the Energy Secretariat has veto power over CAMMESA has the potential to alter the functioning of the competitive market. The functions of generation, transmission, and distribution are open to the private sector, but there are restrictions on cross-ownership between these three functions. Argentine law guarantees access to the grid in order to create a competitive environment and to allow generators to serve
  • 16. DEMAND Electricity demand in Argentina has steadily grown since 1991, with just a temporary decline caused by the economic crisis of 2001-2002 that has been followed by a quick recovery (6%-8% annual increase) in the last five years, partially due to economic recovery. In 2005, the country consumed 94.3 TW·h of electricity, which corresponds to 2,368 kWh per capita. Residential consumption accounted for 29% of the total, while industrial, and commercial and public represented 43% and 26% respectively.
  • 17. SUPPLY: GENERATION CAPACITY Thermal plants fueled by natural gas (CCGT) are the leading source of electricity generation in Argentina. Argentina generates electricity using thermal power plants based on fossil fuels (54%), hydroelectric plants (41%), and nuclear plants (4%, two operational, one incomplete). Installed nominal capacity in 2006 was 24,046 MW. However, this scenario of gas dominance is likely to undergo changes due to gas exhaustion derived from the existing "bottlenecks" in exploration and production (E+P) and pipeline capacity. Today, gas reserves are 43% lower than in 2000.This situation is further aggravated by the uncertainty surrounding the gas deals with Bolivia and the plans to build new regional pipeline connections. Total generation in 2005 was 96.65 TW·h. The breakdown by source in 2003 had been: 59% from conventional thermal sources, 35.4% from hydroelectricity, 7% from nuclear power and 1% from geothermal sources. In 2015, the Atucha II Nuclear Power Plant reached 100% power, increasing the percentage of nuclear power in Argentina from 7% to 10%.
  • 18. The generators are divided into eight regions: Cuyo (CUY) Comahue (COM) Northwest (NOA) Center (CEN) Buenos Aires/Gran Buenos Aires (GBA-BAS) Littoral (LIT) Northeast (NEA) Patagonia (PAT)
  • 19.
  • 20. DEMAND & SUPPLY PROJECTIONS Argentina currently faces a tight supply/demand scenario as reserve margins have declined from above 30% in 2001 to less than 10%. This fact, together with the deterioration in distribution companies services (i.e. cables, transformers, etc.), has the potential to endanger supply. To sustain a 6- 8% annual increase in demand, it is estimated that the system should incorporate about 1,000 MW of generation capacity each year.
  • 21. TARIFFS Electricity tariffs in Argentina are well below the LAC average. In 2004, the average residential tariff was US$0.0380 per kWh, very similar to the average industrial tariff, which was US$0.0386 per kWh in 2003. Weighted averages for LAC were US$0.115 per kWh for residential consumers and US$0.107 per kWh for industrial customers.
  • 22. SUBSIDIES, INVESTMENTS & FINANCING 1. 47.4%: Subsidiary Fund for Regional Tariff Compensation to Final Users (FCT), for homogenization of tariffs across the country (this created a de facto subsidy for those consumers in the areas with higher electricity costs). 2. 31.6%: Fund for the Electric Development of the Interior (FEDEI), for generation, transmission and rural and urban distribution works. Most funds have been directed to rural electrification 3. 19.75%: Fiduciary Fund for Federal Electricity Transmission(FFTEF) (created in 2000), for co-financing or projects in electricity transmission. 4. 1.26%: Wind Energy Fund (created in 2002), for the development of wind energy.
  • 23. CAMMESA CAMMESA S.A., a wholesale electricity market administrator offers operation and dispatch of generation; price calculation in the spot market; and the administration of the commercial transactions in the electricity market. The company also purchases and sells electric power from abroad and to other countries. CAMMESA S.A. offers consulting services. The company was founded in 1992 and is based in Buenos Aires, Argentina.
  • 24. IMPORTS & EXPORTS 1. In 2005, Argentina imported 6.38 TW·h of electricity while it exported 3.49 TW·h. Net energy imports thus were about 3% of consumption. 2. Argentina also imports electricity from Paraguay, produced by the jointly built Yaciretá Dam. On 18 September 2006 Paraguay agreed to settling its debt of $11,000,000,000 owed to Argentina for the construction of Yaciretá by paying in electricity, at the rate of 8,000 GWh per year for 40 years.
  • 25. ACCESS TO ELECTRICITY Total electricity coverage in Argentina was as high as 95% in 2003. However, about 30% of the rural population lacks access to electricity. The Renewable Energy in the Rural Market Project (PERMER) is one of several programs being implemented to enlarge electricity coverage in rural areas.
  • 26. SERVICE QUALITY Interruption frequency and duration Interruption frequency and duration are considerably below the averages for the LAC region. In 2002, the average number of interruptions per subscriber was 5.15, while duration of interruptions per subscriber was 5.25 hours. The weighted averages for LAC were 13 interruptions and 14 hours respectively. Distribution and transmission losses Distribution losses in 2005 were 13.6%, down from 17% a decade before.
  • 28. RECENT GOVERNMENT PROJECTS There are several projects that are part of the government's response to the predicted electricity shortages in different sectors:- 1.THERMAL POWER 2.NUCLEAR POWER 3.HYDRO POWER 4.TRANSMISSION
  • 29. THERMAL POWER PROJECTS1. Two new Combined Cycle Gas Turbine plants, the José de San Martín Thermoelectric and Manuel Belgrano Thermoelectric, of 830 MW each, are under construction and expected to start full operations at the beginning of 2009.Both plants, which have been financed through the FONINVEMEM (total investment amounts up to US$1,097 million), are expected to start full operations at the beginning of 2009. 2. the Planning Ministry announced in July 2007 the commissioning of five new thermal plants with a total capacity of 1.6 GW and an overall investment of US$3,250 million. These dual-generation turbine (gas or fuel oil) plants, which are expected to start operations in 2008, will be located in Ensenada (540 MW), Necochea (270 MW), Campana (540 MW), Santa Fe (125 MW) and Córdoba (125 MW) 3. Enarsa has recently launched bidding for eleven small and transportable generation units (15-30 MW each) and for other three larger generation units (50-100 MW) to be installed on barges. These new units, whose base price is still unknown, will add
  • 30. NUCLEAR PROJECTS 1. In 2006, the Argentine government launched a plan to boost nuclear energy. The Atucha II nuclear power plant, whose construction started in 1981, will be completed and will add 750 MW of generation capacity by 2010. 2. In addition, the Embalse nuclear power plant, with 648 MW of generation capacity, will be refurbished to extend its operational life beyond 2011.
  • 31. HYDROPOWER PROJECTS 1. On the hydropower side, the Yacyretá dam's reservoir was elevated by 7 m to the height of 83 m as contemplated in its original design, which increased its capacity from 1,700 to 3,100 MW. This will lead to a 60% increase in its electricity output (from 11,450 GW·h to 18,500 GW·h).The reservoir rise was complete in February 2011 despite a serious controversy regarding the resettlement of people. 2. in 2006, bidding for the expansion of Yacyretá with the construction of a new 3-turbine plant in the Añá Cuá arm of the Paraná River was announced by the Government. This expansion, to be finalized in 2010, would add 300 MW of new
  • 32. TRANSMISSION PROJECTS 1. In regard to transmission, the Federal Plan for Transport of Electric Energy at 500 kV is under implementation under the umbrella of the FFTEF (Fondo Fiduciario para el Transporte Eléctrico Federal).The main lines of the plan (Línea Patagónica, Línea Minera, Yacyretá, Puerto Madryn – Pico Truncado, NEA-NOA, Comahue – Cuyo, Pico Truncado – Río Turbio – Río Gallegos) are already built or currently under construction. The lines built between 2007 and 2009 will add 4,813 new kilometers of high voltage transmission capacity.
  • 33. EXTERNAL ASSISTANCE 1. WORLD BANK 2. INTER-AMERICAN DEVELOPMENT BANK 3. ANDEAN DEVELOPMENT CORPORATION
  • 34. WORLD BANK The only active energy project financed by the World Bank in Argentina is the Renewable Energy in the Rural Market Project (PERMER). This project has the objective of guaranteeing access to electricity to 1.8 million people (314,000 households) and to 6,000 public services (schools, hospitals, etc.) located far from electricity distribution centers. Electrification of this dispersed market will be mostly carried out through the installation of solar photovoltaic systems, but also through other technologies such as micro-hydraulic turbines, wind and, eventually, diesel generators. The project, which started in 1999 and is expected to end in December 2008, has received a US$10 million grant from GEF and a US$30 million loan from the World
  • 35. INTER-AMERICAN DEVELOPMENT BANK In November 2006, the Inter-American Development Bank approved a $580 million loan for the construction of a new 760-mile transmission line in northern Argentina that will connect separate grids in the northeastern and northwestern parts of the country, the Norte Grande Electricity Transmission Program.
  • 36. ANDEAN DEVELOPMENT CORPORATION (CAF) In 2006, Argentina received financing from CAF (Andean Development Corporation) for two electricity projects: the Electricity Interconection Comahue-Cuyo (US$200 million) and the Electricity Interconnection Rincón Santa María-Rodríguez (US$300 million), two of the high voltage transmission lines included in the Federal Transportation Plan. In the same year, Argentina also borrowed US$210 million from CAF for a program that aims at repairing the country's hydroelectric infrastructure. In June 2007, CAF approved a US$45 million loan to the Buenos Aires province for partial financing of the electricity transport capacity in the North of the province.
  • 37. BIBLIOGRAPHY 1. Cámara Argentina de la Construcción, 2006. La co nstrucció n co m o he rram ie nta de lcre cim ie nto co ntinuado . Se cto r e lé ctrico . Evaluació n de las inve rsio ne s ne ce sarias para e lse cto r e lé ctrico nacio nale n e lm e diano plazo . Consultor: Dr. Ing. Alberto del Rosso. 2. Coordinación de Energías Renovables, 2006.Po te ncialde lo s apro ve cham ie nto s e ne rg é tico s e n la Re pública Arg e ntina 3. Oxford Analytica, 2006. Arg e ntina: Ene rg y issue s thre ate n sustaine d g ro wth 4. Secretaria de Energía, 2006. Info rm e de lSe cto r Elé ctrico 20 0 5. 5. Secretaría de Energía, 2007. Balance Ene rg é tico Nacio nal. Avance 20 0 6 .