Electrical Power System Protection (EE-455)
POSTLAB 2
SAMRA ASHRAF EE-184
SABAH FATIMAH EE-188
AFRAH ZIAUDDIN EE-197
OBJECTIVE:
ToApply a Relay for PHASE DETECTION, PHASE FAILURE AND LOAD UNBALANCING (%ASYMMETRY)
PROCEDURE:
Part (a)
1. Switch“ON” KESC supply (1 Φ 220V, 50Hz);.
2. Move selector switch from “0” to “1” position. The indication marked as “Line” on GCB-1/EV
controlboard will turn “ON”.
3. Move the button of motor drive from “Stand by” to “Run”.
4. Adjust the excitation voltage of three phase generator from control board so that the
terminal voltage of three phase generator becomes 400V.
5. Adjust the speed of DC motor Drive for50Hz frequency.
6. Connect three jumper sets of presence asymmetry & sequence failure phase relay on
GCB 1/EV.
7. Protection relay’s indication on GCB 1/EV will turn “ON” (% asymmetry LED & delay time
LEDwill turn “ON”).
8. Set the % asymmetry 10% & delay time as “minimum”.
9. Now connect balanced load at the output of three phase generator marked as L1, L2 & L3.
10. The voltage drop is almost same in all phases (Symmetry will be around ±10%), so relay will
not operate.
11. Now connect three phase balanced load at output terminals of generator in such a
manner that % asymmetry of voltage drop in any twophases is greater than 10%.
12. The moment when % asymmetry exceeds that set value of 10% the asymmetry relay will
interrupt that load; after the fixed time delay. Now relay LED will be “OFF” and relay
N/C contact will show “OPEN”.
13. When the parameters return back to the normal limits; relay will be switched OFF
automatically.
Part (b):-
Remove the load. Phase sequence of generated voltage is changed.(i.e. change the position of any of
two phases) As the phase sequence is changed again the asymmetry relay will operate after the set
time delay, so relay LEDwill be “OFF” and the N/C contactwill show “OPEN”.
RESULTS:

More Related Content

What's hot

FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation Armstrong
Armstrong Okai Ababio
 
Solutions -unit4
Solutions  -unit4Solutions  -unit4
Solutions -unit4
Abha Tripathi
 
Practice questions
Practice questionsPractice questions
Practice questions
Abha Tripathi
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis ppt
karikalan123
 
Symmetrical component method for 3 phase power representation
Symmetrical component method for 3 phase power representationSymmetrical component method for 3 phase power representation
Symmetrical component method for 3 phase power representation
Nisarg Amin
 
(6) finite
(6) finite(6) finite
(6) finite
Daniel Gray
 
symmetrical component of power system
symmetrical component of power systemsymmetrical component of power system
symmetrical component of power system
sneh pratap singh
 
Group 3 - Audio Amp Final Presentation
Group 3 - Audio Amp Final PresentationGroup 3 - Audio Amp Final Presentation
Group 3 - Audio Amp Final Presentation
Dan Greenwood
 
Fault Calculations
Fault CalculationsFault Calculations
Fault Calculations
michaeljmack
 
Symmetrical components......
Symmetrical components......Symmetrical components......
Symmetrical components......
Santhi Anumula
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
michaeljmack
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
Abha Tripathi
 
Emii
EmiiEmii
EEP303: Exp5
EEP303: Exp5EEP303: Exp5
EEP303: Exp5
Umang Gupta
 
1 7 earth fault relay
1 7 earth fault relay1 7 earth fault relay
1 7 earth fault relay
Ramesh Ananthanarayanan
 
Serial 8 Channel AC 230V SSR and Dimmer
Serial 8 Channel AC 230V SSR and DimmerSerial 8 Channel AC 230V SSR and Dimmer
Serial 8 Channel AC 230V SSR and Dimmer
Raghav Shetty
 
Unsymmetrical fault analysis
Unsymmetrical fault analysisUnsymmetrical fault analysis
Unsymmetrical fault analysis
Revathi Subramaniam
 
Output power meter
Output power meterOutput power meter
Output power meter
ajeet singh
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
michaeljmack
 
Questions unit4
Questions unit4Questions unit4
Questions unit4
Abha Tripathi
 

What's hot (20)

FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation Armstrong
 
Solutions -unit4
Solutions  -unit4Solutions  -unit4
Solutions -unit4
 
Practice questions
Practice questionsPractice questions
Practice questions
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis ppt
 
Symmetrical component method for 3 phase power representation
Symmetrical component method for 3 phase power representationSymmetrical component method for 3 phase power representation
Symmetrical component method for 3 phase power representation
 
(6) finite
(6) finite(6) finite
(6) finite
 
symmetrical component of power system
symmetrical component of power systemsymmetrical component of power system
symmetrical component of power system
 
Group 3 - Audio Amp Final Presentation
Group 3 - Audio Amp Final PresentationGroup 3 - Audio Amp Final Presentation
Group 3 - Audio Amp Final Presentation
 
Fault Calculations
Fault CalculationsFault Calculations
Fault Calculations
 
Symmetrical components......
Symmetrical components......Symmetrical components......
Symmetrical components......
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
 
Emii
EmiiEmii
Emii
 
EEP303: Exp5
EEP303: Exp5EEP303: Exp5
EEP303: Exp5
 
1 7 earth fault relay
1 7 earth fault relay1 7 earth fault relay
1 7 earth fault relay
 
Serial 8 Channel AC 230V SSR and Dimmer
Serial 8 Channel AC 230V SSR and DimmerSerial 8 Channel AC 230V SSR and Dimmer
Serial 8 Channel AC 230V SSR and Dimmer
 
Unsymmetrical fault analysis
Unsymmetrical fault analysisUnsymmetrical fault analysis
Unsymmetrical fault analysis
 
Output power meter
Output power meterOutput power meter
Output power meter
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
 
Questions unit4
Questions unit4Questions unit4
Questions unit4
 

Similar to Postlab2 ep nas4

ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
Chandrabhan Sharma
 
Inductorless DC-AC Cascaded H-bridge Multilevel Boost Inverter for Electric/...
Inductorless DC-AC Cascaded H-bridge MultilevelBoost Inverter for Electric/...Inductorless DC-AC Cascaded H-bridge MultilevelBoost Inverter for Electric/...
Inductorless DC-AC Cascaded H-bridge Multilevel Boost Inverter for Electric/...
mkanth
 
Lm555
Lm555Lm555
Lm555
negroalex
 
AVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.pptAVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.ppt
prasadkappala
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
Divya15121983
 
Advanced motion controls s60a40ac
Advanced motion controls s60a40acAdvanced motion controls s60a40ac
Advanced motion controls s60a40ac
Electromate
 
Sx460 avr newage_stamford
Sx460 avr newage_stamfordSx460 avr newage_stamford
Sx460 avr newage_stamford
Carlos Enrique Mansilla Zuniga
 
Power Circuits and Transforers-Unit 8 Labvolt Student Manual
Power Circuits and Transforers-Unit 8 Labvolt Student ManualPower Circuits and Transforers-Unit 8 Labvolt Student Manual
Power Circuits and Transforers-Unit 8 Labvolt Student Manual
phase3-120A
 
Advanced motion controls s100a20
Advanced motion controls s100a20Advanced motion controls s100a20
Advanced motion controls s100a20
Electromate
 
Advanced motion controls s16a8
Advanced motion controls s16a8Advanced motion controls s16a8
Advanced motion controls s16a8
Electromate
 
Avr se350
Avr se350Avr se350
Avr se350
Luis Campagnoli
 
Catalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manualCatalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manual
Dien Ha The
 
Catalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manualCatalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manual
Dien Ha The
 
Advanced motion controls s30a40ac
Advanced motion controls s30a40acAdvanced motion controls s30a40ac
Advanced motion controls s30a40ac
Electromate
 
Virgile Valente - Application Notes
Virgile Valente - Application NotesVirgile Valente - Application Notes
Virgile Valente - Application Notes
Virgile Valente
 
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
ijsrd.com
 
Advanced motion controls s100a40ac
Advanced motion controls s100a40acAdvanced motion controls s100a40ac
Advanced motion controls s100a40ac
Electromate
 
gas turbine generator set operation and maintenance
gas turbine generator set operation and maintenancegas turbine generator set operation and maintenance
gas turbine generator set operation and maintenance
AmrSherif54
 
Advanced motion controls b25a20ac
Advanced motion controls b25a20acAdvanced motion controls b25a20ac
Advanced motion controls b25a20ac
Electromate
 
Advanced motion controls mf2x510
Advanced motion controls mf2x510Advanced motion controls mf2x510
Advanced motion controls mf2x510
Electromate
 

Similar to Postlab2 ep nas4 (20)

ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
Inductorless DC-AC Cascaded H-bridge Multilevel Boost Inverter for Electric/...
Inductorless DC-AC Cascaded H-bridge MultilevelBoost Inverter for Electric/...Inductorless DC-AC Cascaded H-bridge MultilevelBoost Inverter for Electric/...
Inductorless DC-AC Cascaded H-bridge Multilevel Boost Inverter for Electric/...
 
Lm555
Lm555Lm555
Lm555
 
AVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.pptAVR_GENERAL KOSTI.ppt
AVR_GENERAL KOSTI.ppt
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
 
Advanced motion controls s60a40ac
Advanced motion controls s60a40acAdvanced motion controls s60a40ac
Advanced motion controls s60a40ac
 
Sx460 avr newage_stamford
Sx460 avr newage_stamfordSx460 avr newage_stamford
Sx460 avr newage_stamford
 
Power Circuits and Transforers-Unit 8 Labvolt Student Manual
Power Circuits and Transforers-Unit 8 Labvolt Student ManualPower Circuits and Transforers-Unit 8 Labvolt Student Manual
Power Circuits and Transforers-Unit 8 Labvolt Student Manual
 
Advanced motion controls s100a20
Advanced motion controls s100a20Advanced motion controls s100a20
Advanced motion controls s100a20
 
Advanced motion controls s16a8
Advanced motion controls s16a8Advanced motion controls s16a8
Advanced motion controls s16a8
 
Avr se350
Avr se350Avr se350
Avr se350
 
Catalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manualCatalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manual
 
Catalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manualCatalog mikro mikro mu250-user_manual
Catalog mikro mikro mu250-user_manual
 
Advanced motion controls s30a40ac
Advanced motion controls s30a40acAdvanced motion controls s30a40ac
Advanced motion controls s30a40ac
 
Virgile Valente - Application Notes
Virgile Valente - Application NotesVirgile Valente - Application Notes
Virgile Valente - Application Notes
 
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
Analysis Approach for Five Phase Two-Level Voltage Source Inverter with PWM T...
 
Advanced motion controls s100a40ac
Advanced motion controls s100a40acAdvanced motion controls s100a40ac
Advanced motion controls s100a40ac
 
gas turbine generator set operation and maintenance
gas turbine generator set operation and maintenancegas turbine generator set operation and maintenance
gas turbine generator set operation and maintenance
 
Advanced motion controls b25a20ac
Advanced motion controls b25a20acAdvanced motion controls b25a20ac
Advanced motion controls b25a20ac
 
Advanced motion controls mf2x510
Advanced motion controls mf2x510Advanced motion controls mf2x510
Advanced motion controls mf2x510
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 

Postlab2 ep nas4

  • 1. Electrical Power System Protection (EE-455) POSTLAB 2 SAMRA ASHRAF EE-184 SABAH FATIMAH EE-188 AFRAH ZIAUDDIN EE-197
  • 2. OBJECTIVE: ToApply a Relay for PHASE DETECTION, PHASE FAILURE AND LOAD UNBALANCING (%ASYMMETRY) PROCEDURE: Part (a) 1. Switch“ON” KESC supply (1 Φ 220V, 50Hz);. 2. Move selector switch from “0” to “1” position. The indication marked as “Line” on GCB-1/EV controlboard will turn “ON”. 3. Move the button of motor drive from “Stand by” to “Run”. 4. Adjust the excitation voltage of three phase generator from control board so that the terminal voltage of three phase generator becomes 400V. 5. Adjust the speed of DC motor Drive for50Hz frequency. 6. Connect three jumper sets of presence asymmetry & sequence failure phase relay on GCB 1/EV. 7. Protection relay’s indication on GCB 1/EV will turn “ON” (% asymmetry LED & delay time LEDwill turn “ON”). 8. Set the % asymmetry 10% & delay time as “minimum”. 9. Now connect balanced load at the output of three phase generator marked as L1, L2 & L3. 10. The voltage drop is almost same in all phases (Symmetry will be around ±10%), so relay will not operate. 11. Now connect three phase balanced load at output terminals of generator in such a manner that % asymmetry of voltage drop in any twophases is greater than 10%. 12. The moment when % asymmetry exceeds that set value of 10% the asymmetry relay will interrupt that load; after the fixed time delay. Now relay LED will be “OFF” and relay N/C contact will show “OPEN”. 13. When the parameters return back to the normal limits; relay will be switched OFF automatically. Part (b):- Remove the load. Phase sequence of generated voltage is changed.(i.e. change the position of any of two phases) As the phase sequence is changed again the asymmetry relay will operate after the set time delay, so relay LEDwill be “OFF” and the N/C contactwill show “OPEN”. RESULTS: