The Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement project in Fairfax County, VA was substantially completed in March 2017. The project involved constructing 817 linear feet of sidewalk, curb and gutter, handicap ramps, asphalt paving, and storm sewer to provide continuous pedestrian access from Burke Town Court to Burke Lake Road. The project team installed sidewalk, storm sewer, filtration units, and replaced/closed some curb cuts for improved accessibility.
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
Fairfax County Pedestrian Access Project
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Contract No. CN16026001
Project No. 5G25-060-003
Springfield District
June 16, 2017
2. Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
3. Project Details
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement project was
substantially completed on March 7, 2017. The scope of this project included construction of
817 linear feet of sidewalk, curb and gutter, handicap curb cuts, asphalt paving, and storm
sewer.
Project Overview:
• Installed sidewalk along Coffer Woods Road to provide a continuous pedestrian path from
Burke Town Court to Burke Lake Road, Route 645
• Installed storm sewer, 2 Filterra Units, and curb and gutter
• Replaced 3 existing handicap curb cuts and closed 1 curb cut at the intersection of Coffer
Woods Rd. and Burke Lake Rd. for improved access.
• Project Team:
• Department of Transportation – Masoud (Max) Hojatzadeh
• Utilities Design and Construction Division (UDCD) – Craig Carlin
• Project Inspector, UDCD – Ken Atkins
• Land Survey Branch, UDCD – Chris Jensen
4. Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Springfield District, Tax Map 78-1
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
5. Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
6. Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
7. Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Pre-Construction
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Construction
9. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Construction
10. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Construction
11. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Construction
12. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Completed Project
13. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Completed Project
14. Before After
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
15. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Burke Lake Road / Coffer Woods Road Pedestrian Access Improvement
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-5034, TTY 711
Matthew.kaiser@fairfaxcounty.gov