This document contains typical road section drawings including details for three road types as well as footpath and utility trench sections. It provides specifications for material types and compaction densities for elements of the road structure including subgrade, hardcore filling, crusher run, and asphalt. Dimensions are given for lane widths, roadway widths, planting servitudes, and other elements of the typical road sections. Footpath details include specifications for concrete slabs, mesh, sheeting, and compaction of crusher run material. Utility trench sections show arrangements for potable water, telecommunications, and electrical cables.
Noise is unwanted sound. It can cause hearing loss, disturb communication or cause nuisance.
Noise control is a set of strategies to reduce noise pollution or to reduce impact , whether outdoors or indoors.
Noise is unwanted sound. It can cause hearing loss, disturb communication or cause nuisance.
Noise control is a set of strategies to reduce noise pollution or to reduce impact , whether outdoors or indoors.
Building Bye Laws for Residential BuildingsRohan Dasgupta
This presentation gives you an overview of Building Bye Laws or Development Control Rules (D C Rules) for Residential Buildings as per National Building Code of India 2016.
This will be mostly useful for under-graduate Civil Engineering students studying the course Building Design and Drawing.
Presentation on building bye laws as per GTU (syllabus) building & town planning.
It is my first presentation on slide share so please give suggestion on given topic or any other requirement.
Thank you.
This presentation defines and enables the readers to understand the concept of modular construction and the aspects and applicability for the execution of modular construction.
An ELEVATOR is a type of vertical transportation that moves people or goods between floors of a building
Elevators are powered by electric motors that either drive traction cables or counterweight systems like a hoist or pump hydraulic fluid to raise a cylindrical piston like a jack.
Valuation - professional prractice and valuationKavin Raval
VALUATION IS USED TO DECIDE THE VALUE OF A STRUCTURE OR A RENT OF A HOUSE OR OFFICE . THE TYPES OF RENT ARE DESCRIBED. THE METHOD OF FIXING RENT IS ILLUSTRATED.
I came to know regarding this competition from rediff.com
Salient features of a well-designed inclusive Neighbourhood (Colony) for the urban poor is characterized by a well conceptualized effort at social cohesion:
I. Housing Unit and Layouts of Cluster Housing
II. Neighbourhood Colony Layouts
III. Basic Physical Infrastructure (Water Supply, Sanitation, Drainage, Roads, Street Lighting, Solid
Waste Management, etc.)
IV. Cohesive Social Infrastructure (Community Centre, Informal Sector Market, Livelihood Centre,
etc.)
Building Bye Laws for Residential BuildingsRohan Dasgupta
This presentation gives you an overview of Building Bye Laws or Development Control Rules (D C Rules) for Residential Buildings as per National Building Code of India 2016.
This will be mostly useful for under-graduate Civil Engineering students studying the course Building Design and Drawing.
Presentation on building bye laws as per GTU (syllabus) building & town planning.
It is my first presentation on slide share so please give suggestion on given topic or any other requirement.
Thank you.
This presentation defines and enables the readers to understand the concept of modular construction and the aspects and applicability for the execution of modular construction.
An ELEVATOR is a type of vertical transportation that moves people or goods between floors of a building
Elevators are powered by electric motors that either drive traction cables or counterweight systems like a hoist or pump hydraulic fluid to raise a cylindrical piston like a jack.
Valuation - professional prractice and valuationKavin Raval
VALUATION IS USED TO DECIDE THE VALUE OF A STRUCTURE OR A RENT OF A HOUSE OR OFFICE . THE TYPES OF RENT ARE DESCRIBED. THE METHOD OF FIXING RENT IS ILLUSTRATED.
I came to know regarding this competition from rediff.com
Salient features of a well-designed inclusive Neighbourhood (Colony) for the urban poor is characterized by a well conceptualized effort at social cohesion:
I. Housing Unit and Layouts of Cluster Housing
II. Neighbourhood Colony Layouts
III. Basic Physical Infrastructure (Water Supply, Sanitation, Drainage, Roads, Street Lighting, Solid
Waste Management, etc.)
IV. Cohesive Social Infrastructure (Community Centre, Informal Sector Market, Livelihood Centre,
etc.)
Sustainable Architecture is an effort to minimize the negative environmental impact of the buildings by using specific materials, energy and development space through strict moderation and efficiency
PPT on India's Drainage System (River System) Rohan Karmakar
The following presentation is on India's drainage or river system. It includes information about some of the major river systems in India. All comments are welcomed. Please LIKE this presentation.
2017 CalAPA Fall Asphalt Pavement Conference presentation: An overview and analysis of long-life (perpetual) asphalt pavements on the state highway system in California. Presented by Dr. John Harvey of the University of California Pavement Research Center.
Show how different projects were constructed, generally the construction methods, sequence and plant are included. The information is presented in a way that is easily understood and explained.
MEKA Wet Processing Solutions (WPS) is beyond equipment. MEKA WPS offers you a complete system that is designed to work with:
• Least possible water consumption
• Least wear costs possible
• Least power consumption
• Least amount of valuable material reporting to waste
• Least amount of operator involvement.
1. 2250 Lane 2250 Lane
4500 Roadway2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
Typical Road Section - Type 3
500
2500 Road Reserve
Dish Drain
1000
2.5 %
Kerb K1
PlotBoundary
PlotBoundary
100mm Crusher run
98% PROCTOR
well compacted Subgrade to be
compacted to 90% PROCTOR
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
450
3000 Planting Servitude3000 Planting Servitude
3000 Lane 3000 Lane
6000 Roadway
2.5 %
2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
Kerb K1
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
Typical Road Section - Type 1
100mm Crusher run
98% PROCTOR
well compacted Subgrade to be
compacted to 90% PROCTOR
PlotBoundary
500
2500 Road Reserve
PlotBoundary
Dish Drain
1000
Typical Road Section - (Type 2)
Stormwater Manhole
3000 Lane 3000 Lane
6000 Roadway
2.5 %
2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
PlotBoundary
2500 Road Reserve
PlotBoundary
1000
450
1156
900
500
Potable Water
Trench Telecom
Trench
300 444
450
3000 Planting Servitude
3000 Planting Servitude
3000 Planting Servitude
3000 Planting Servitude
9500 Road 5
10000 Road 6
850
Telecom
Trench
300 700
Telecom
Trench
300
900
500
Potable Water
Trench
600
500
Potable Water
Trench
11000
11000
Kerb K1
Chamfer 25x25
Chamfer 25x25
Chamfer 25x25
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
MV / LV CABLE
TRENCH SECTION
LV Cables for Street
22kV Cable
LV Cables for Street
LV CABLE
TRENCH SECTION
850700
LV Cables for Street
LV CABLE
TRENCH SECTION
1200 Footpath (Detail 1)
1200 Footpath (Detail 1)
1200 Footpath (Detail 1)
120
30
100100
230100
150180
Precast Concrete
Kerb K1
Hardcore
Layer Min.250
Beyond Kerb
Detail 1 - Kerb K1
1501200 Footpath
100mm Crusher run
98% PROCTOR
Subgrade to be compacted
to 90% PROCTOR
125mm Conc. Slab
Mesh A98
Polyethylene
sheeting Kerb K1
TYPICAL FOOTPATH DETAIL
100mm Compacted Crusher Run
50mm Stabilised material
(Coral Sand 0 / 3 mm +
20% Rock Sand +
Kerb K1
DETAIL 1
1200
Kerb K1
Job No
Drawing Status
Discipline
Scale at A1
Drawing No Rev
Drawing Title
Job Title
Client
Date By Chkd Appd
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Rev
CR-201 P12878
1:25
FOR APPROVAL
Civil
TYPICAL ROAD SECTION
/ /C1 03 12 12 Reza B. P.G P.G
ISSUED FOR CONSTRUCTION
/ /C2 10 04 13 Reza B. P.G P.G
FOOTPATH DETAIL ADDED
/ /P1 08 05 13 Reza B. P.G P.G
FOR APPROVAL