Modern Pentathlon center + Residential Building
Contents:
1. INTRODUCTION
2. COVERED HALL
POOL BUILDINGS
FENCING SPORT
SHOOTING RANGES
3. OUTDOOR SPORTS
EQUESTRIAN
SPRINT “RUNNING”
JAVELIN THROW
ARCHERY
4. PHYSICAL THERAPY ZONE
5. RESIDENTIAL ZONE & SERVICES
6. PLANNING STANDARDS
FOR SPORTS BUILDINGS
it is the slide for the design of the cricket stadium.It consists of the literature and case studies of the various national and international stadium.It will obviously help you.
it is the slide for the design of the cricket stadium.It consists of the literature and case studies of the various national and international stadium.It will obviously help you.
Urban Entertainment Center, introduction, live case study, literature case st...Sumit Jha
Thesis topic- Urban Entertainment Centre, proposed at Mysore, Karnataka,
presentation include - introduction, live case study of Select city walk, New Delhi and Entertainment city, noida,
literature case study- Elante mall, chandigarh and Essel world, Mumbai, comparative charts, inferences, observations etc to understand this thesis topic in detail. thank you
HYATT - factfile, ground floor plan, first floor plan, climatic study, physical and visual context, facade details, hardscape, watre features and artworks, services - parking, fire protection system, ACMV, electrification, plumbing , water supply drainage systems, codes and standards , architects interview, additional details and all the data for hotel desigining.
A motel, also known as a motor hotel or motor lodge, is a hotel designed for motorists, usually having each room entered directly from the parking area for motor vehicles rather than through a central lobby.
Urban Entertainment Center, introduction, live case study, literature case st...Sumit Jha
Thesis topic- Urban Entertainment Centre, proposed at Mysore, Karnataka,
presentation include - introduction, live case study of Select city walk, New Delhi and Entertainment city, noida,
literature case study- Elante mall, chandigarh and Essel world, Mumbai, comparative charts, inferences, observations etc to understand this thesis topic in detail. thank you
HYATT - factfile, ground floor plan, first floor plan, climatic study, physical and visual context, facade details, hardscape, watre features and artworks, services - parking, fire protection system, ACMV, electrification, plumbing , water supply drainage systems, codes and standards , architects interview, additional details and all the data for hotel desigining.
A motel, also known as a motor hotel or motor lodge, is a hotel designed for motorists, usually having each room entered directly from the parking area for motor vehicles rather than through a central lobby.
Pride Group Has Built a very High quality flats/apartments on mysore road near nayandanhalli close to vijaynagar it has very high amenities with affordable prices to know more visit https://www.pridegroup.net/bangalore/residential/ongoing-projects/pride-enchanta-ii
CommonWealth is a 201 acre township of
over 1900 Country Villas, near Whitefield.
Community living can be best explored each
day here, whether through the five specialized
zones themed around Sport, Art, Wellness,
Agriculture and Tech, or through the lifestyle
that an independent home provides.
PeopleTree Realty solutions offers sale and purchase of Luxurious Residential Apartments, flats in sarjapur road, 2 bhk flats in Bangalore,3 BHK Flats in Bangalore, Villas in Bangalore.
Project @ Bren Imperia
Spread over 16.33 acres, Bren Imperia is planned as a premium residential development that will offer its residents a convenient, luxurious and active lifestyle.
Bren Imperia is located at the end of a peaceful cul-de-sac just 2 Km from Total Mall on Sarjapur Road, the 2 & 3 BHK apartments are in Bangalore’s IT heart.
The luxury lifestyle project with 80% Open Space off Sarjapura Road (1.5 km from Big Bazaar 2 Km from Total Mall & ORR Junction)
2 bhk flats in Sarjapur Road,
Flats in Sarjapur Road,
3 bhk Flats in Sarjapur road,
Luxury Apartments in Sarjapur Road,
Real Estate Builder in Koramangala,
Apartments in sarjapur road,
Homes and commercial buildings in Sarjapur road,
2/3 bhk Flats in Sarjapur road.
Faculty of applied arts "Design standards" أسس تصميم كلية فنون تطبيقيةYasmine Bannoura
أسس تصميم كلية فنون تطبيقية
Faculty of applied arts "Design standards"
Design standards for faculties and study spaces + workshops & spaces for arts faculties
4 star hotels design standards for architects & architecture students
planning standards + design standards for every hotel area and sector
أسس تصميم فندق
الإسكان العشوائي في مصر و تجربة تطوير مساكن العشش Yasmine Bannoura
الإسكان العشوائي في مصر و تجربة تطوير مساكن العشش
مناقشة الأسباب و العوامل المؤثرة و خصائص الموقع و السكان
مع تحليل مثال تطوير منطقة عشش السودان بالجيزة - مصر
مشروع تطوير ميدان لاظوغلي بالقاهرة و دراسة الوضع الراهن و محددات الموقع بالإضافة الى النذة التاريخية للميدان و تديد المشكلات و حلها في مقترح متكامل
مقرر التصميم العمراني - قسم الهندسة المعمارية
كلية الهندسة جامعة طنطا - مصر
التجارب المحلية و الدولية للتنمية الريفية
تجربة 1 قرى شرق النيل بالمنيا - مصر
تجربة 2 - قرية كوميلا - بنجلاديش
مقرر التنمية الريفية - قسم الهندسة المعمارية
كلية الهندسة جامعة طنطا - مصر
المنهج العلمي في تصميم مبنى الكولوسيوم الروماني colosseumYasmine Bannoura
المنهج العلمي في تصميم مبنى الكولوسيوم الروماني colosseum
1 - مراحل التصميم
2 - وسائل التعبير
3 - المفاهيم الحاكمة
مقرر المنهج العلمي قسم الهندسة المعمارية - كلية الهندسة جامعة طنطا, مصر
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Pentathlon Sports Center | Architecture Design standards
1.
2. CONTENTS
1. INTRODUCTION
2. COVERED HALL
POOL BUILDINGS
FENCING SPORT
SHOOTING RANGES
3. OUTDOOR SPORTS
EQUESTRIAN
SPRINT “RUNNING”
JAVELIN THROW
ARCHERY
4. PHYSICAL THERAPY ZONE
5. RESIDENTIAL ZONE & SERVICES
6. PLANNING STANDARDS
FOR SPORTS BUILDINGS
3. Modern pentathlon or pentagon is a complex sport
consisting of 5 games played by one player and performed
in one day and is one of the oldest Olympic games. the
"pentagram" is Archery, Sword fencing, Swimming,
Equestrian, and Cross-country (Enemy) Weapon.
The participant gets certain points according to the result
achieved in each competition, and the players are ranked
according to the points they earn.
What’s
PENTATHLON?
11. LEARNER
POOLS
SWIMMING
POOLS
POOLS FOR THE VERY YOUNG ( TWO MONTHS OLD )
•These are frequently provided separately, to acclimatize children to
water accompanied by parents.
• Shallow water, seat/ steps, and water features such as slides and
play furniture. there are no dimensions or shapes.
Plan of toddler’s pool
Plan of toddler’s pool
12. DIVING
POOL
SWIMMING
POOLS
Plan of toddler’s pool
• Spaces where diving can be carried on without
interruption the minimum distance to other pools
should be 5 m.
Olympic regulations diving program assembly and pool
14. SERVICES
SWIMMING
POOLS
Plan of toddler’s pool
CHANGING ROOMS
Width length Celling height
Cleaning materiel room 1m 2m Minimum 2.50m
Foot disinfection bath 0.75m 0.50 m Minimum 2.50m
Built-in cubicles 1m 1.25 m 2.00m
Families cubicles At least 1.50 m At least 1.25
m
2.00m
Changing room for wheelchair users 2.0 m 1.25m 2.00m
Lockers 0.25-0.33 m 0.50m 0.90-1.8m
15. SERVICES
SWIMMING
POOLSCHANGING ROOMS
• all larger pools should contain at least two communal
changing room.
• Of the changing cubicles available 10% should be for families
and disabled people. The ratio of cubicles to clothes lockers
should be 1:4.
• In a communal changing room at least 30 lockers are
necessary and there should be no less than 7.50 m length of
bench.
• The ratio of changing room spaces to lockers ranges up to 1:8.
16. Changing provision for disabled
Facilities for changing or feeding young children
SERVICES
SWIMMING
POOLS
Changing provision for disabled
17. SERVICES
SWIMMING
POOLS
SHOWER ROOMS AND TOILETS
POOL
AREA
SHOWERS TOILETS
•should be there at least ten showers for each shower room
• Basic toilet provision in the sanitary area
is two toilets for women, one toilet and two urinals for men.
18. SERVICES
SWIMMING
POOLS
FIRST AID ROOM
• In a public swimming pool , a purpose – built first –aid room
equipment for serious accidents is essential.
area Height access Equipment
At least 8
m2
2.50 m It should be clearly
signposted and
directly accessibly
from the pool side.
- Couch or stretcher trolley
- Folding screen
- Stretcher
- Disposal bin
- Sink
- Cupboard for storing blankets, first aid
materials and oxygen cylinder
- Artificial respirator
20. SERVICES
SWIMMING
POOLS
POOLSIDE CONTROL POINT
Room name area Height
Instructors
room
At least 6 m2 2.50 m
Accessory
room
At least 20
m2
2.50 m
Waiting room 2.50 m
Teaching and
club room
30 -60 m2 2.50 m
• Pool hall lightening controls
including under water lights.
• Telephone
• Microphone / public address
system
• Tape desk
• Fire alarm
21. SERVICES
SWIMMING
POOLS
CATERING
For
televisio
ns
4 to 6 spaces are required each
space 1.20 × 1.50 m
Catering (café / restaurant ) at least 50
seating spaces 0.5 to 0.8 m2
Plant
area
Total area up to 1m2 of planned
water area
Service and ancillary room for : Area according to no. seating
cafes 60 % of seating
Restaurants 100% of seating
Stores and cold rooms 20-25% of seating
Empties stores 15 – 20% of seating
Kitchen and officess and staff Th remainder
23. SPECTATOR
REQUIREMENTS
Location of seating area Type of seating Circulation Space need for
one seat
Completion pools:
Prefers to be on both side
Diving pools:
Along one side of pool.
Temporary seats
or permanent.
It should be clear
and separated from
the swimmers.
0.5 m2
28. STRUCTURAL
SYSTEM
SWIMMING
POOLS
• Steel reinforced concrete pools
The most common material
used in community swimming
pool construction is steel
reinforced concrete.
• However, there are two different
application methodologies –
fully formed and sprayed –
which create different results.
30. L O N D O N A Q UAT I C S C E N T R E F O R 2 0 1 2 S U M M E R O LY M P I C S
Z A H A H A D I D A R C H I T E C T S
31. L O N D O N A Q U A T I C S C E N T R E F O R 2 0 1 2 S U M M E R O L Y M P I C S
Z A H A H A D I D A R C H I T E C T S
32.
33.
34.
35.
36. STANDARDS
FENCING
Dimensions Ceiling Orientation Structure
A field made of
insulated metal for
ground touches,
14 meters long
and 2 meters wide
3 : 3.5m North or
Northeast
Playground in wood, cork, rubber or
plastic material, and the stadium is
covered with a metal mesh to
insulate the touches that occur on
the floor
The surface of the fencing stadium
must be level and smooth
40. STANDARDS
SHOOTING
RANGESDimensions Ceiling Location Orientation Structure
15 – 20m
from the
firing line and
the target line
Width of
shooting
points = 1 :
1.5m
1.2 m2 per
shooter
3 : 3.5m Isolated
Away
from
streets
or
gardens
North or
Northeast
North: for
targets with
shades
South: for
shooters
type of flooring for the
range is a smooth, non-
absorptive hardened
concrete floor from the
firing line to the bullet trap.
Walls must be isolated with
sheets
44. THEARENA
EquestrianArea Ceiling Location Orientation Structure
20 x 60m is
minimum area for
riding races
3.0 m side strips
(5.0 m at the
entrance)
26 x 48 m is
perfect for total
arena
100 m2 for each
horse.
A covered
riding hall
: 4.5 :
11m
Far away from
other fields as
much as we can
The bigger axis
is to north –
south
& south-west
to north-west
are avoided
Frames systems are
preferred
Walls are covered
with wood to hight
2m
Doors width = 2 –
3m
Riding hall ground is
covered with wood
flakes
47. AUDIENCE
&JUDGES
Equestrian
Area Location Circulation
The audience
should be no
further than 5 m
from the riding
area.
The judges' grandstand is
positioned on the west side
of the arena because most
important competitions
take place in the afternoon
and so the sun will be at the
judges' backs.
Use a spectator
gallery with the first
row for seating and
the second for
standing. Behind this
is room for two rows
of circulating people.
This arrangement will
create 200 seated
and standing places
in a 20 x 40 m arena.
48. STABLES
Equestrian
Area Ceiling Location Orientation Ventilation Structure
1.8 * 3.5m for
each horse
3.5 : 4.5m Isolated
Under
the
riding
hall or
beside
it with
entry
ramp
East or South Windows with
height = 2.2m
from ground
with frosted
glass in the
sunny
direction
Frames
systems are
preferred
Ground is
covered with
solid asphalt
sheets with 3%
slope
Walls are
preferred to be
porous with
0.8m height
52. STANDARDS
SPRINT
Dimensions Orientation Structure
Total lanes width = 8.82m
Internal lane=1.2m
External lane= 1.5m
• The bigger axis is to north – south
• & south-west to north-west are
avoided
Borders of lanes
are from asphalt
sheets
57. STANDARDS
ARCHERY
• The various shooting distances are clearly defined on the
grass by white lines, tapes or spots and are always
measured in yards
• The overall distance for clout archery is about 230 m
• championships over 150 m depending on the number of
targets.
69. RESIDENTIAL
ZONES
SINGLE ROOMS
Total area 40 m²
Area without bathroom and
corridors
15 m²
Bathroom area 4.5
m²
Every Bed area 5 m²
Minimum height 2.4
m²
DOUBLE ROOMS
70. RESIDENTIAL
ZONES
DISABLED ROOMS
• 1-2% of the hotel room is prepared for
them.
• Bedroom: 3.65m wide and increase the
space between beds to be 1.2m
• -low window cill height : 0.6m
• -Bathroom: central turning space 1.52m
• -Basin tops : .8 m high with knee space
71. RESIDENTIAL
ZONES
BATHROOMS
-Min area of bathroom: 5 m2.
-Note: each adjacent room is preferred to participate in a single Duct.
-Duct width is about 60-90 cm.
CORRIDOR WIDTH
73. RESIDENTIAL
ZONES
SERVICES
HOUSEKEEPING
• Location: a room is putted in each floor with its own closet
for putting cleaning tools.
LAUNDRY
• -usually in the last floor under the roof and its door open
directly on the corridor.
Area in m² to number of guest rooms 100 rooms 250 rooms 500 rooms 1000 rooms
Hotel laundry 1.40 1.11 0.93 0.74
74. ENTRANCE
Entrances
Service Entrance Main Entrance
Main Entrance
Figure 1 revolving door
with extra emergency exits
• It must be clear and distinctive
• Porte-Cohere should be wide
enough to allow two cars to
pass and for porter with bags,
so we need 900mm clear
75. ENTRANCE
Other Entrances
Separate the circulation of resident and non-resident guests.
• Providing direct access to restaurants
and banqueting halls; this avoids
congestion in the main reception area
and gives better control.
Service Entrances
• Access for guests and building servicing must be clearly separate
• (figure 2).
• It is normally from a road different from the main entrance.
• suitable door width for furniture (Figure 3).
Figure 3 service
door
Figure 2 building and service entrance relations
76. RECEPTION
RECEPTION AREA
Front Desk lounge Reception Hall
Reception hall
Reception Hall
• A rough planning figure is 1.1 to
1.4 m2 per seat.
• It joins public area to entrance
area or part of bar.
• Furniture is normally easy chairs
and low coffee
• tables, Atmosphere should be
informal and relaxing.
Front Desk
• visible to the guest
immediately on entrance.
• connection between direct and
service and front desk service.
Figure 14 desk dimensions
77. ADMINISTRATION
- A rough planning figure is 1.1 to 1.4 m2 per seat.
ADMINSTRATION
manager assistant secretary
meetings
room
adminstrativ
e rooms
treasury atm
Figure 19 administration
rooms dimension in m²
Figure 21 details dimensions
Manager Room
81. RESIDENTIAL
ZONES
PUBLIC AREA
Dining Area
• The breakfast hall must contain 25%
of residents & Dining Room contains
50% of them.
• -The dining room is usually open to
non-residents, so there should be
convenient access from outside the
hotel in addition to access for
resident guests.
• -The main dining room must be
directly adjacent to the main kitchen.
83. RESIDENTIAL
ZONES
Kitchen / Catering
-routes between the kitchen, server and restaurant are as short as possible.
-Orientation of Kitchens always directed to the opposite direction of the wind & doesn’t
overlook any view like other services, next to the restaurant and connected with the staff
rooms and stores.
circulation from
outside to restaurant
path throw kitchen
85. RESIDENTIAL
ZONES
GYM
• 1.85 m^2 per person.
• -Minimum of Area 100 m^2
• -Open air, less internal walls.
• -Ground or first floor because
of heavy loads.
• -Soundproof walls.
• -Using Rubber tiles.
90. PUBLICSERVICES
STAIRS
Note a ramp with ratio of 1:12 to 1:20 with
110cm width are
suitable for handicaps with landing each 6
meters vertical length.
Note stairs with 14/28 is suitable and if the
stairs width is more than 3 meters then it is
required to add a handrail in center.
Note a ramp with ratio of 1:12 to 1:20
with 110cm width are
suitable for handicaps with landing each 6
meters vertical length.
Note stairs with 14/28 is suitable and if
the stairs width is more than 3 meters
then it is required to add a handrail in
center.
91. PUBLICSERVICES
escape stairs (for emergency)
LIFTS
A lift for each 150 beds.
-Must be visible from reception disk.
-lifts are grouped in facing rows of no more than four with adequate.
-Lifts lobby width must not be less than 3 m for a row
and 3.7 for double rows.
-for high standard hotels is around 25–
30 seconds in peak use.
94. It must be built within an attractive nature, close to the
important streets and secure for that parking lots.
Putting the main entrance as close to the center of
the earth's façade so that the building blocks can be
mediated to achieve ease of movement and
communication.
Attention to the main entrance as an aesthetic and as
a control device to enter the club.
The public door is located on the largest surrounding
streets (noting the work of sub-entrances to enter
individuals or supplies received by the club).
Movement compatibility with visual vision is one of the
important elements in planning, which is the presence
of a sequence between human movement and visual
vision of the coordination of the blocks and their
relationship to each other.
Planningstandards
95. The main administrative building of the club is
towards the neighbor's buildings
The green areas are facing the entry door.
Consider allowing vertical expansion of all
buildings in general, to allow future ramping on
one or two floors.
In the afforestation process, trees are considered
to be evergreen, giving shades throughout the
year.
Trees are placed in gardens and green areas next
to motion pathways, to feed the tracks in
shadows
Linking site elements to an internal road, at least
for pedestrians
Planningstandards
96. REFERENCES
• The metric handbook
• Neufert “EN & AR versions”
• Time saver
• Fire Safety
• Helena Regional Sports Association
• WEC World Equestrian Center