-Jyoti Singh Tomar (12/AR/005)
-Shashank Bhatt (12/AR/007)
-Shah Zain(12/AR/008)
-Jai Vardhan Singh(12/AR/011)
-Komal Rathore(12/AR/014)
Illustration Of Regional Shopping Centers (Suburban)
South Dale Shopping Center, One Of The Suburban Shopping Center In
New York.
•This also is usually a strip of stores but substantially larger than the neighborhood
centerand usually containing a so-called "junior"department store as the major
unit.
•This type is vulnerable to competition from the larger centers and hence has
declined in desirability.
Downtown At Houston, USA
•Store Depths
Buildings are usually 120 to 140 ft deep, sometimes
more to accommodate larger stores . If there are
basements or mezzanines, the depth dimension
usually can be reduced 20 to 25 percent .
•Clear Heights
These vary from 10 to 14 ft or more, with 12 Ft. a good
average. Above this clear height, there must be
adequate space for air-conditioning ducts, recessed
lights, structural system, etc
•FlexibleServices For The Complex
It is essential that the mechanical engineer set up a schedule of the location
and sizes of the principal duct runs and shafts to avoid serious future space
problems.
Central plant equipment can be in a separate building, on the project roof, or
elsewhere so long as it is economical as to design and length of runs. Individual
plants in each store require roof space, cooling towers, etc .
•Provision of adequate and convenient parking is, in fact, a basic
requirement of any shopping center, regardless of its size or location.
•A ratio of between 5 and 6 car spaces per 1,000 sq ft of leasable store
area is mandatory.
•In the matter of parking layout, car stalls can be set at angles (say, 70
degs.) to the lanes, which then requires one-way traffic ; or stalls can be
at 90 degs. to the lanes, permitting two-way traffic.
•Although both are commonly used, the 90 arrangement is somewhat
more frequent for grade parking whereas the angled system is more
customary for garages and decks.
:
With regard to the design guidelines the special needs of the persons
with disabilities for construction of built environment are as follows.
Persons restricted on wheel chair should use the facilities within the
built environment alone without a helper’s assistance.
A wheelchair may be operated by the user alone or with a helper’s
assistance.However, wheelchair design must assume that the user
should be able to operate the wheelchair without help.
Persons in this category who use walking aids such as crutches or canes,
who are amputees, who have chest ailments or heart disease. The
persons in this category include those who can not walk without a cane
and those who have some trouble in their upper or lower limbs
although they can walk unassisted.
* Width of passage for crutch users (min. 900 mm)
* Finishes of floor surface with non slip floor material.
* Installation of handrail to support the body weight at the critical places e.g.
staircase,toilet, ramp, passage with a change of level (800-850 mm).
* Extension of handrail on the flat landing at the top and bottom of the stairs
(300mm).
* To prevent slipping off the cane or crutch from the side of the stairs or ramps (20 mm
high lip on the exposed edge).
.
* Walks should be smooth, hard level surface suitable for walking and wheeling.
.
* Walkway should be constructed with a
non-slip material & different from rest
of the area.
Approach to plinth level : Every building should have at least one entrance
Ramped Approach : Ramp shall be finished with non slip material to enter the
building.
S.NO Use Maximum
Ground coverage
Maximum FAR Maximum Height
In Metres
1 Convenient Shopping
Centre*
40% 80 15
2 Sector Shopping* 40% 120 15
3 Sub District Center,
Shopping along Street and
other Shopping Centers*
30% 150 45
S. NO PARTICULARS 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5
SCREENS
1 Minimum width of plot 38 mts. 38 mts. 38 mts.
2 Minimum plot area 2500 sqm 3800 sqm 6300 sqm
3 Minimum width of the front
road
12.25 mt. 18.50 mt. 30 mt.
S.no Plot Size Front
(in
metres)
Rear
(in meters)
Side 1
(in meters)
Side 2
(in meters)
1 Upto 150 3.0 1.5 0 0
2 Above 150 to up to 300 3.0 3.0 0 0
3 Above 300 up to 500 4.5 3.0 3.0 0
4 Above 500 up to 2000 6.0 3.0 3.0 3.0
5 Above 2000 up to 4000 9.0 6.0 6.0 6.0
6 Above 4000 up to 10,000 15.0 6.0 6.0 6.0
7 Above 10,000 up to 20,000 15.0 9.0 9.0 9.0
S. NO CANTILEVER PROJECTIONS
PERMITTED
1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5
SCREENS
1 Front 4 mts. 4.5 mts. 5 mts.
2 Rear 2.5 mts. 2.5 mts. 3 mts.
• Basement or cellar if used for many other purpose than given below in all types of buildings shall be
included in FAR calculations.
• Storage of any kind.
• Dark room.
• Strong room, bank cellars.
• Air conditioning equipment and other machine used for services and utilities of the building.
• Parking places and garages.
• Stock rooms of libraries.
• Mumty or stair cover shall not be counted towards FAR calculations in all types of building.
• A watchman shelter not exceeding 10 square meter in area and 3 meters in height on the housing
plot of 0.50 acre.
• In the case of mercantile buildings of shopping
centers, the open space shall be 3.0 meters
minimum in front and rear, side open spaces may
not be necessary if it is developed as shopping
area under Row Buildings Scheme.
• FAR for business mercantile is specified as (75 in
per cent)
1 Parking space for every 100 sq.m. carpet area or fraction
thereof.
• In providing the parking, care has to be taken that 50 per cent of the open
space is left for landscaping and is not accounted for in parking calculations.
• In addition to the parking space provided for building of mercantile
(commercial) industrial and storage at the rate of one such space for
loading and unloading activities for each 1,000 square meter of floor area
and fraction thereof exceeding the first 200 square meter of floor area shall
be provided.
• Parking lock up garage shall be included in the floor area ratio calculations
unless they are provided in basement of a building or under a building
constructed on silts with no external walls.
• The spaces to be left out for parking shall be in addition to the open spaces
left for lighting and ventilation purposes.
S.NO PARKING 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5
SCREENS
(1) FOR SCREEN
A For car 10% of the sitting
capacity
10% of the sitting
capacity
10% of the sitting
capacity
B For scooter 20% of the sitting
capacity
20% of the sitting
capacity
20% of the sitting
capacity
C For Bicycle 20% of the sitting
capacity
20% of the sitting
capacity
20% of the sitting
capacity
D For public transport Off street parking Off street parking Off street parking
(1) FOR SHOPPING CENTRE
A For car One car parking
for 40 sqm
commercial
carpet area
One car parking
for 40 sqm
commercial
carpet area
One car parking
for 40 sqm
commercial
carpet area
B For scooter and
bicycle
Area same as
provided for car
parking
Area same as
provided for car
parking
Area same as
provided for car
parking
• The absolute height of a building shall not exceed 1.50 times
width of the road abutting plus the front set back.
• If a building abuts on two or more roads of different widths,
the building shall be deemed to face upon the road that has the
greater width and the height of the building shall be regulated
by the width of that road.
• Water tanks on roof and their supports, lift rooms ventialting
air conditioning and similar services equipment, roof structure
chimneys other than pent houses, parapet walls and
architectural features not exceeding limit in height provided
the aggregate area of such structures.
Location Height Restriction
Town centre No restriction
Sub district and Institutional area 45 meters
Hospitals in institutional area 24 meters
All building in group housing pockets in the
residential area
24meters
 Main entrance to the premises shall be of width not less than 5 mts. If
archway is provided over the main entrance, the height of the archway
shall not be of height less than 5 mts.
 The external window shall not be blocked by louveres etc.
 Every building meant for human occupancy shall be provided with
exits sufficient to permit safe escape of occupants in case of fire or
other emergency.
 All exits shall be free of obstructions.
 Exits shall be clearly visible and the routes to reach exits shall be
clearly marked and signs posted to guide the occupants of floor
concerned.
 All exit ways shall be properly illuminated.
 Fire fighting equipment where provided along exits shall be located.
 Alarm devices shall be installed to ensure prompt evacuation of the
occupants concerned through the exits, wherever required.
S. NO. GROUP OF
OCCUPANCY
NO. OF OCCUPANTS
STAIRWAYS RAMPS DOORS
1 Multiplex/ shopping
centre
50 60 75
S. NO. LOCATIONS ILLUMINATION, LUX
a) Foyers 150
b) Auditoria 50
c) Corridors 70
d) Stairs/Ramps 100
S.
NO.
MINIMUM REQUIRED AREA
FOR-
1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5
SCREENS
ONE SEAT/ CHAIR 0.65 SQM. 0.65 SQM. 0.65 SQM.
Sustainibility Of A Building
Shopping Mall/Multiplexes
Sustainability - Meeting the needs
of the present without
compromising the ability of future
generations to meet their own
needs.
Sustainable Design
Reduces the negative impact on the environment and
human health, thus improving the performance
during a building’s life cycle. Careful consideration is
given to
Water
Energy
Building Materials
Solid Waste.
• Economy of Resources - Reduce, recycle, and reuse
natural resources.
• Life Cycle Design - Structured methodology for the
building process.
• Human Design - Harmony between humans and
nature.
• Pre-Building
• Building
• Post-Building
.
• Watson’s- All Types Of Building Types Vol.2.
• Neufret’s Time Savour.
Standards Requirement For Multiplexes And Bye Laws Of NOIDA

More Related Content

What's hot

dilli haat ina case study
dilli haat ina case study dilli haat ina case study
dilli haat ina case study sonali parashar
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAjinkya Randive
 
CHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYCHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYbrysonsolomon
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City CentreRashmi Gautam
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)tivar rose
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreAnsh Agarwal
 
Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Onal Kothari
 
Case study Z Square Mall, Kanpur
Case study  Z Square Mall, KanpurCase study  Z Square Mall, Kanpur
Case study Z Square Mall, KanpurSaryaRahman
 
Multiplex theatre
Multiplex theatreMultiplex theatre
Multiplex theatreSimi Sayed
 
Commercial Mall Literature Review
Commercial Mall Literature ReviewCommercial Mall Literature Review
Commercial Mall Literature ReviewRajayBajracharya
 
PVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathPVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathAkash Thottarath
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)Mansi Pushpakar
 
Elante mall Chandigarh case study
Elante mall Chandigarh case studyElante mall Chandigarh case study
Elante mall Chandigarh case studyVISHAKA BOTHRA
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Dimple Poddar
 
Select city walk mall case study
Select city walk mall case studySelect city walk mall case study
Select city walk mall case studyPrince Pathania
 
COMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxCOMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxAmreetaPoudel1
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbaiRAAJESH SHETH
 

What's hot (20)

dilli haat ina case study
dilli haat ina case study dilli haat ina case study
dilli haat ina case study
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case Study
 
CHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYCHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDY
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City Centre
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)
 
Select city mall
Select city mallSelect city mall
Select city mall
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 
Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore
 
Case study Z Square Mall, Kanpur
Case study  Z Square Mall, KanpurCase study  Z Square Mall, Kanpur
Case study Z Square Mall, Kanpur
 
Multiplex theatre
Multiplex theatreMultiplex theatre
Multiplex theatre
 
Commercial Mall Literature Review
Commercial Mall Literature ReviewCommercial Mall Literature Review
Commercial Mall Literature Review
 
DLF Mall of India Noida, Sector 18, Noida
DLF Mall of India Noida, Sector 18, NoidaDLF Mall of India Noida, Sector 18, Noida
DLF Mall of India Noida, Sector 18, Noida
 
PVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathPVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarath
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)
 
Elante mall Chandigarh case study
Elante mall Chandigarh case studyElante mall Chandigarh case study
Elante mall Chandigarh case study
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
Select city walk mall case study
Select city walk mall case studySelect city walk mall case study
Select city walk mall case study
 
Westend MALL
Westend MALLWestend MALL
Westend MALL
 
COMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptxCOMMERCIAL LITERATURE.pptx
COMMERCIAL LITERATURE.pptx
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbai
 

Similar to Standards Requirement For Multiplexes And Bye Laws Of NOIDA

352967258-Standards-for-Shopping-Mall-Ppt.pdf
352967258-Standards-for-Shopping-Mall-Ppt.pdf352967258-Standards-for-Shopping-Mall-Ppt.pdf
352967258-Standards-for-Shopping-Mall-Ppt.pdfssuser111045
 
study of a shopping mall
study of a shopping mallstudy of a shopping mall
study of a shopping mallAbhiniti Garg
 
Barrier free env
Barrier free envBarrier free env
Barrier free envsurya teja
 
Manual on Universal Design in built environments
Manual on Universal Design in built environmentsManual on Universal Design in built environments
Manual on Universal Design in built environmentsAishwarya Deopujari
 
A Hotelier's Guide to Universal Design by AccessAbility
A Hotelier's Guide to Universal Design by AccessAbilityA Hotelier's Guide to Universal Design by AccessAbility
A Hotelier's Guide to Universal Design by AccessAbilityScott Rains
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworEeelsa shrestha
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium Kathmandu Engineering College
 
ppt-140722084825-phpapp022222555555666666666666
ppt-140722084825-phpapp022222555555666666666666ppt-140722084825-phpapp022222555555666666666666
ppt-140722084825-phpapp022222555555666666666666UnknownBarmf20008
 
District center (college projects)
District center (college projects)District center (college projects)
District center (college projects)sonali parashar
 
Parking Building - building laws
Parking Building - building lawsParking Building - building laws
Parking Building - building lawsSQSY
 
Barrier of environment
Barrier of environmentBarrier of environment
Barrier of environmentIram Anwar
 
Barrier of environment
Barrier of environmentBarrier of environment
Barrier of environmentIram Anwar
 
Building design for differently abled
Building design for differently abledBuilding design for differently abled
Building design for differently abledVeena J P
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxNashmilYahya
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsAr. Md Shahroz Alam
 

Similar to Standards Requirement For Multiplexes And Bye Laws Of NOIDA (20)

Shopping centers
Shopping centersShopping centers
Shopping centers
 
352967258-Standards-for-Shopping-Mall-Ppt.pdf
352967258-Standards-for-Shopping-Mall-Ppt.pdf352967258-Standards-for-Shopping-Mall-Ppt.pdf
352967258-Standards-for-Shopping-Mall-Ppt.pdf
 
Parking final
Parking finalParking final
Parking final
 
study of a shopping mall
study of a shopping mallstudy of a shopping mall
study of a shopping mall
 
Barrier free env
Barrier free envBarrier free env
Barrier free env
 
Manual on Universal Design in built environments
Manual on Universal Design in built environmentsManual on Universal Design in built environments
Manual on Universal Design in built environments
 
A Hotelier's Guide to Universal Design by AccessAbility
A Hotelier's Guide to Universal Design by AccessAbilityA Hotelier's Guide to Universal Design by AccessAbility
A Hotelier's Guide to Universal Design by AccessAbility
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshwor
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium
 
Barrier Free Architecture
Barrier Free ArchitectureBarrier Free Architecture
Barrier Free Architecture
 
Ragavan data collection2
Ragavan data collection2Ragavan data collection2
Ragavan data collection2
 
ppt-140722084825-phpapp022222555555666666666666
ppt-140722084825-phpapp022222555555666666666666ppt-140722084825-phpapp022222555555666666666666
ppt-140722084825-phpapp022222555555666666666666
 
District center (college projects)
District center (college projects)District center (college projects)
District center (college projects)
 
Parking Building - building laws
Parking Building - building lawsParking Building - building laws
Parking Building - building laws
 
Barrier of environment
Barrier of environmentBarrier of environment
Barrier of environment
 
Barrier of environment
Barrier of environmentBarrier of environment
Barrier of environment
 
Building design for differently abled
Building design for differently abledBuilding design for differently abled
Building design for differently abled
 
Barrier free environment in schools
Barrier free environment in schoolsBarrier free environment in schools
Barrier free environment in schools
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptx
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For Hotels
 

Recently uploaded

在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxnewslab143
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 

Recently uploaded (20)

在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 

Standards Requirement For Multiplexes And Bye Laws Of NOIDA

  • 1. -Jyoti Singh Tomar (12/AR/005) -Shashank Bhatt (12/AR/007) -Shah Zain(12/AR/008) -Jai Vardhan Singh(12/AR/011) -Komal Rathore(12/AR/014)
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. Illustration Of Regional Shopping Centers (Suburban)
  • 8. South Dale Shopping Center, One Of The Suburban Shopping Center In New York.
  • 9. •This also is usually a strip of stores but substantially larger than the neighborhood centerand usually containing a so-called "junior"department store as the major unit. •This type is vulnerable to competition from the larger centers and hence has declined in desirability.
  • 10.
  • 12.
  • 13.
  • 14.
  • 15. •Store Depths Buildings are usually 120 to 140 ft deep, sometimes more to accommodate larger stores . If there are basements or mezzanines, the depth dimension usually can be reduced 20 to 25 percent . •Clear Heights These vary from 10 to 14 ft or more, with 12 Ft. a good average. Above this clear height, there must be adequate space for air-conditioning ducts, recessed lights, structural system, etc
  • 16. •FlexibleServices For The Complex It is essential that the mechanical engineer set up a schedule of the location and sizes of the principal duct runs and shafts to avoid serious future space problems. Central plant equipment can be in a separate building, on the project roof, or elsewhere so long as it is economical as to design and length of runs. Individual plants in each store require roof space, cooling towers, etc .
  • 17.
  • 18. •Provision of adequate and convenient parking is, in fact, a basic requirement of any shopping center, regardless of its size or location. •A ratio of between 5 and 6 car spaces per 1,000 sq ft of leasable store area is mandatory. •In the matter of parking layout, car stalls can be set at angles (say, 70 degs.) to the lanes, which then requires one-way traffic ; or stalls can be at 90 degs. to the lanes, permitting two-way traffic. •Although both are commonly used, the 90 arrangement is somewhat more frequent for grade parking whereas the angled system is more customary for garages and decks.
  • 19.
  • 20. :
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. With regard to the design guidelines the special needs of the persons with disabilities for construction of built environment are as follows. Persons restricted on wheel chair should use the facilities within the built environment alone without a helper’s assistance. A wheelchair may be operated by the user alone or with a helper’s assistance.However, wheelchair design must assume that the user should be able to operate the wheelchair without help.
  • 27.
  • 28. Persons in this category who use walking aids such as crutches or canes, who are amputees, who have chest ailments or heart disease. The persons in this category include those who can not walk without a cane and those who have some trouble in their upper or lower limbs although they can walk unassisted. * Width of passage for crutch users (min. 900 mm) * Finishes of floor surface with non slip floor material. * Installation of handrail to support the body weight at the critical places e.g. staircase,toilet, ramp, passage with a change of level (800-850 mm). * Extension of handrail on the flat landing at the top and bottom of the stairs (300mm). * To prevent slipping off the cane or crutch from the side of the stairs or ramps (20 mm high lip on the exposed edge).
  • 29.
  • 30.
  • 31. .
  • 32.
  • 33. * Walks should be smooth, hard level surface suitable for walking and wheeling. .
  • 34.
  • 35. * Walkway should be constructed with a non-slip material & different from rest of the area.
  • 36.
  • 37. Approach to plinth level : Every building should have at least one entrance Ramped Approach : Ramp shall be finished with non slip material to enter the building.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57. S.NO Use Maximum Ground coverage Maximum FAR Maximum Height In Metres 1 Convenient Shopping Centre* 40% 80 15 2 Sector Shopping* 40% 120 15 3 Sub District Center, Shopping along Street and other Shopping Centers* 30% 150 45 S. NO PARTICULARS 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5 SCREENS 1 Minimum width of plot 38 mts. 38 mts. 38 mts. 2 Minimum plot area 2500 sqm 3800 sqm 6300 sqm 3 Minimum width of the front road 12.25 mt. 18.50 mt. 30 mt.
  • 58. S.no Plot Size Front (in metres) Rear (in meters) Side 1 (in meters) Side 2 (in meters) 1 Upto 150 3.0 1.5 0 0 2 Above 150 to up to 300 3.0 3.0 0 0 3 Above 300 up to 500 4.5 3.0 3.0 0 4 Above 500 up to 2000 6.0 3.0 3.0 3.0 5 Above 2000 up to 4000 9.0 6.0 6.0 6.0 6 Above 4000 up to 10,000 15.0 6.0 6.0 6.0 7 Above 10,000 up to 20,000 15.0 9.0 9.0 9.0
  • 59. S. NO CANTILEVER PROJECTIONS PERMITTED 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5 SCREENS 1 Front 4 mts. 4.5 mts. 5 mts. 2 Rear 2.5 mts. 2.5 mts. 3 mts.
  • 60.
  • 61. • Basement or cellar if used for many other purpose than given below in all types of buildings shall be included in FAR calculations. • Storage of any kind. • Dark room. • Strong room, bank cellars. • Air conditioning equipment and other machine used for services and utilities of the building. • Parking places and garages. • Stock rooms of libraries. • Mumty or stair cover shall not be counted towards FAR calculations in all types of building. • A watchman shelter not exceeding 10 square meter in area and 3 meters in height on the housing plot of 0.50 acre.
  • 62. • In the case of mercantile buildings of shopping centers, the open space shall be 3.0 meters minimum in front and rear, side open spaces may not be necessary if it is developed as shopping area under Row Buildings Scheme. • FAR for business mercantile is specified as (75 in per cent)
  • 63. 1 Parking space for every 100 sq.m. carpet area or fraction thereof. • In providing the parking, care has to be taken that 50 per cent of the open space is left for landscaping and is not accounted for in parking calculations. • In addition to the parking space provided for building of mercantile (commercial) industrial and storage at the rate of one such space for loading and unloading activities for each 1,000 square meter of floor area and fraction thereof exceeding the first 200 square meter of floor area shall be provided. • Parking lock up garage shall be included in the floor area ratio calculations unless they are provided in basement of a building or under a building constructed on silts with no external walls. • The spaces to be left out for parking shall be in addition to the open spaces left for lighting and ventilation purposes.
  • 64. S.NO PARKING 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5 SCREENS (1) FOR SCREEN A For car 10% of the sitting capacity 10% of the sitting capacity 10% of the sitting capacity B For scooter 20% of the sitting capacity 20% of the sitting capacity 20% of the sitting capacity C For Bicycle 20% of the sitting capacity 20% of the sitting capacity 20% of the sitting capacity D For public transport Off street parking Off street parking Off street parking (1) FOR SHOPPING CENTRE A For car One car parking for 40 sqm commercial carpet area One car parking for 40 sqm commercial carpet area One car parking for 40 sqm commercial carpet area B For scooter and bicycle Area same as provided for car parking Area same as provided for car parking Area same as provided for car parking
  • 65. • The absolute height of a building shall not exceed 1.50 times width of the road abutting plus the front set back. • If a building abuts on two or more roads of different widths, the building shall be deemed to face upon the road that has the greater width and the height of the building shall be regulated by the width of that road. • Water tanks on roof and their supports, lift rooms ventialting air conditioning and similar services equipment, roof structure chimneys other than pent houses, parapet walls and architectural features not exceeding limit in height provided the aggregate area of such structures.
  • 66. Location Height Restriction Town centre No restriction Sub district and Institutional area 45 meters Hospitals in institutional area 24 meters All building in group housing pockets in the residential area 24meters
  • 67.  Main entrance to the premises shall be of width not less than 5 mts. If archway is provided over the main entrance, the height of the archway shall not be of height less than 5 mts.  The external window shall not be blocked by louveres etc.  Every building meant for human occupancy shall be provided with exits sufficient to permit safe escape of occupants in case of fire or other emergency.  All exits shall be free of obstructions.  Exits shall be clearly visible and the routes to reach exits shall be clearly marked and signs posted to guide the occupants of floor concerned.  All exit ways shall be properly illuminated.  Fire fighting equipment where provided along exits shall be located.  Alarm devices shall be installed to ensure prompt evacuation of the occupants concerned through the exits, wherever required.
  • 68. S. NO. GROUP OF OCCUPANCY NO. OF OCCUPANTS STAIRWAYS RAMPS DOORS 1 Multiplex/ shopping centre 50 60 75 S. NO. LOCATIONS ILLUMINATION, LUX a) Foyers 150 b) Auditoria 50 c) Corridors 70 d) Stairs/Ramps 100 S. NO. MINIMUM REQUIRED AREA FOR- 1 TO 2 SCREEN 3 TO 5 SCREEN MORE THAN 5 SCREENS ONE SEAT/ CHAIR 0.65 SQM. 0.65 SQM. 0.65 SQM.
  • 69. Sustainibility Of A Building Shopping Mall/Multiplexes
  • 70.
  • 71. Sustainability - Meeting the needs of the present without compromising the ability of future generations to meet their own needs.
  • 72. Sustainable Design Reduces the negative impact on the environment and human health, thus improving the performance during a building’s life cycle. Careful consideration is given to Water Energy Building Materials Solid Waste.
  • 73. • Economy of Resources - Reduce, recycle, and reuse natural resources. • Life Cycle Design - Structured methodology for the building process. • Human Design - Harmony between humans and nature.
  • 74.
  • 75.
  • 77. .
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84. • Watson’s- All Types Of Building Types Vol.2. • Neufret’s Time Savour.

Editor's Notes

  1. The practice of creating building products and methods that respect the environment and human health.
  2. The goal when designing a sustainable building is to design and create a structure that operates in harmony with the environment and its occupants. Natural resources are carefully considered in all phases of the structure.
  3. Economy of Resources Analysis of building inputs and outputs of natural resources require new methods and strategies to maximize all resources. Life Cycle Design Building may cost more up front, but savings is achieved over the life of the building. This may be achieved through passive heating and cooling, insulation, alternative sources of energy, energy–efficient equipment, and appliances. Humane Design Focuses on the interactions between humans preserving natural conditions. This may include integration of public transportation, natural light through windows, operable windows for fresh air, and non-toxic materials.
  4. Pre-Building Phase How building materials impact the environment: harvesting trees could result in deforestation; mining mineral resources (iron for steel; bauxite for aluminum; sand, gravel, and limestone for concrete) disturbs the natural environment; even the transport of these materials can be a highly polluting activity, depending on their weight and distance from the site. The manufacturing of building products also requires energy and creates environmental pollution: for example, a high level of energy is required to manufacture steel or aluminum products. Building Phase The operation of the building life cycle considers natural resources, its carbon footprint, and operating costs. Post-Building Phase Old materials become resources for other building or waste to be returned to nature. The sustainable-design strategy focuses on reducing construction waste (which currently comprises 60% of the solid waste in landfills) by recycling and reusing buildings and building materials.
  5. Neighborhood and cities can benefit by proper planning. Consideration of water demands and building material during the planning phase. Creative architects and planners can use the natural resources provided by the building site.
  6. Reduced energy consumption and the comfort of building occupants are two criteria that architects consider most during the life of the structure.
  7. The sustainable design strategy focuses on reducing construction waste (which currently comprises 60% of he solid waste in landfills) by recycling and reusing buildings and building materials.
  8. Architects and engineers now consider wildlife and the destruction of waterways and food chains for the proposed building site in all phases of the structure’s life.
  9. Occupants who are comfortable in there surroundings are more productive.