This document summarizes the April 2014 management report for Parkchester. The goals for 2014 are to improve training programs for welders, burners, and machine personnel. Projects in March included repairs to air compressors, pumps, and steam lines. Plans for April include developing training tests and insulating control rooms. Projects for the summer include a plant shutdown to repair steam header valves and refractory work on boilers. The document also provides financial details on projects including the burner project which had $49,910 in overruns.
Do you looking for New Boiler Installations Glasgow?avacamm
A Gas Safety Certificate is a legal requirement for any landlord who is wishing to rent out their property. The most important aspect of this certificate is that it proves that all gas appliances in the premises are working properly and it is committed to the safety standards.
http://www.boilerinstallationsglasgow.com/
Do you looking for New Boiler Installations Glasgow?avacamm
A Gas Safety Certificate is a legal requirement for any landlord who is wishing to rent out their property. The most important aspect of this certificate is that it proves that all gas appliances in the premises are working properly and it is committed to the safety standards.
http://www.boilerinstallationsglasgow.com/
Case Study: National Sandwich Chain RebalanceLuci Feie
In the spring of 2015, Melink was hired by a Facilities Director at a popular sandwich deli chain for a pilot balance service at their Port Arthur, TX location to audit the previous balance work of their existing contractor during the new construction. When Melink’s technicians reported several deficiencies, the pilot program expanded for Melink to test and balance additional three stores.
At the technology round table strategic presentations on Industrial Refrigeration will be presented by leading industry representatives, followed by a panel discussion.
Air monitoring data for the City of Rhinelander, WI shows SO2 concentrations exceeding the 1-hour standard at the water tower monitoring location (WTM) and, as a result, this area has been designated a SO2 non-attainment area. An analysis of emission sources and air quality modeling indicates that the Expera Rhinelander Mill 63 m tall cyclone boiler stack (S09) appears to be the primary contributor to the ambient air impact at this monitor. One solution being evaluated for showing compliance with the 1-hr SO2 NAAQS is raising the 63 m tall S09 stack to the GEP stack height. Based on the Boiler 7 building dimensions the formula GEP stack height is 75 m.
After investigating the Expera Rhinelander Mill building geometry, it was noticed that the Boiler 7 building corner is directly upwind of the stack when the wind blows directly toward the WTM. When the wind blows along a building corner, building corner vortices are generated that enhance building downwash by as much as a factor of two over that observed for wind directions normal to a building face. Past wind tunnel results suggest that the actual GEP stack height could be up to 95 m for this corner vortex situation. Hence, the purpose of this study was to determine the actual GEP stack height for the Expera Rhinelander Mill cyclone boiler stack (S09) using wind tunnel modeling.
This paper provides detailed information on determining GEP stack height, outlines the wind tunnel modeling method required to demonstrate a GEP stack height taller than the EPA formula height and provides detailed results documenting that a 90 m stack height is creditable as GEP which is well above the 75 m EPA formula height. As part of the GEP stack height demonstration, results are provided that document that the wind tunnel simulation provides similar turbulence and dispersion characteristics as the atmosphere.
Case Study: National Sandwich Chain RebalanceLuci Feie
In the spring of 2015, Melink was hired by a Facilities Director at a popular sandwich deli chain for a pilot balance service at their Port Arthur, TX location to audit the previous balance work of their existing contractor during the new construction. When Melink’s technicians reported several deficiencies, the pilot program expanded for Melink to test and balance additional three stores.
At the technology round table strategic presentations on Industrial Refrigeration will be presented by leading industry representatives, followed by a panel discussion.
Air monitoring data for the City of Rhinelander, WI shows SO2 concentrations exceeding the 1-hour standard at the water tower monitoring location (WTM) and, as a result, this area has been designated a SO2 non-attainment area. An analysis of emission sources and air quality modeling indicates that the Expera Rhinelander Mill 63 m tall cyclone boiler stack (S09) appears to be the primary contributor to the ambient air impact at this monitor. One solution being evaluated for showing compliance with the 1-hr SO2 NAAQS is raising the 63 m tall S09 stack to the GEP stack height. Based on the Boiler 7 building dimensions the formula GEP stack height is 75 m.
After investigating the Expera Rhinelander Mill building geometry, it was noticed that the Boiler 7 building corner is directly upwind of the stack when the wind blows directly toward the WTM. When the wind blows along a building corner, building corner vortices are generated that enhance building downwash by as much as a factor of two over that observed for wind directions normal to a building face. Past wind tunnel results suggest that the actual GEP stack height could be up to 95 m for this corner vortex situation. Hence, the purpose of this study was to determine the actual GEP stack height for the Expera Rhinelander Mill cyclone boiler stack (S09) using wind tunnel modeling.
This paper provides detailed information on determining GEP stack height, outlines the wind tunnel modeling method required to demonstrate a GEP stack height taller than the EPA formula height and provides detailed results documenting that a 90 m stack height is creditable as GEP which is well above the 75 m EPA formula height. As part of the GEP stack height demonstration, results are provided that document that the wind tunnel simulation provides similar turbulence and dispersion characteristics as the atmosphere.
The game API is one of the most interesting and unique concepts of Java ME. It consists of very useful classes that help you with typical tasks that are required in almost ever game — for example sprite handling, tiled backgrounds or collision detection. This module will explain those concepts and how to create an own game loop. The challenge is the largest project yet and involves writing your own game called "Schlabo". The player moves his avatar at the bottom of the screen and has to shoot the enemy that moves randomly at the top.
Contents:
* Performance
* Game API
* Game loop
* GameCanvas
* Bitmaps
* Sprite
* Layer and TiledLayer
* LayerManager
Growing older has both joys and challenges, like every other life stage. As people age, they become free to engage in social and service actives that work and family demands did not permit earlier in life. This presentation describes vital involvement and wisdom in old age. As Cicero said more than 2000 years ago," If virtues are cultivated at every period of life, these produce wonderful fruits when you reach old age."
ERIKS Pump Services is a comprehensive and cost-effective solution to all your pump requirements, whatever the application. From abstraction, through the production process, to the final discharge, we offer a complete service to take care of every aspect.
MD Anderson Energy Initiatives, reduced annual energy costs by $1 million in 2009
Author: Timothy Peglow, MD Anderson Cancer Center, Patient Care and Prevention Facililties
MECCI Engineers Private Limited provides HVAC Design Engineering Course, HVAC Design and Operation Training, Industrial Training in HVAC Design for Mechanical Engineers, HVAC Design & Drafting Training, HVAC Design Training Programs, etc. For details, visit; http://www.mecciengineer.com/hvac-design.aspx
Presentation for Energy Star Wars, a one day seminar for best practices in HVAC. Project managed the event for a client, including art direction and presentation design.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
2. OVERVIEW
To get anywhere we first need to establish goals, without
goals the road can take us in any direction and it would be
correct. It is the goal that lets us measure to progress from
where we are to where we want to be.
It is our firms belief that a plants process is what builds their
habits and the plant personnel collection of habits is your
plant culture.
Our goal at Parkchester is to produce and deliver steam in a
way that constantly lowers cost and at the same time
provides an unmatched level of customer satisfaction.
3. GOALS FOR 2014 Improve Training
Welders
Trained
4 Burners
Trained
4 Lathe &
Mill
Personnel
Trained2
Pump Training Valve Training Building heat technical
training
Heat transfer Basic fluid dynamics Gas contract training
ADDITIONALLY
4. Improvements To Obtain Our Goals
Move the welding
and machine shop
into the basement of
the plant
Need to write a
specific safety
manual for the steam
operations group
Training/break room
up and running
No heat complaint
troubleshooting
standard
Change department
name to engineering
7. Actions Taken in March
1. #1 air compressor rebuild in progress (Scales Air Compressor)
2. #2 air compressor rebuild complete (Scales Air Compressor)
4. 2000 ETA vacuum condensate pump set complete
3. Worked with Isseks on house tank repairs
5. Repaired leaking Spence valve on 2000 ETA steam header
6. 1560 Met plugged leaking hot water coil
8. Actions Taken in March
7. 1614 UPR insulating ceiling in control room for noise/heat
condition in Apt: MB
a. Received 2 quotes for spray foam as a possible option
8. Pump Repairs:
a. E-6, W-12, W-6 & S-7 & 8 circulating pumps replaced
b. W-12 #3 & S-6 #1 booster pump seals replaced
9. 1925 McGraw Ave booth RPZ stations have been rebuilt
10.R3 issues addressed:
a. E-2 condensate pump switch repaired
b. E-11 house pump leaks repaired
11. Construction on training room ongoing
9. April Plans
Write the burner tests
Write the welding tests
Write the machining tests
Begin insulating the control rooms (21 in total)
Begin the trap program
Write the work scope for stack inspection
10. Summer Plans
Plant shutdown to fix steam header valves
Refractory work in Boilers #1 and #4
Electric load study
Condensing hot water boiler study
Campus steam line inspection
11. Project Cost
Amt Inv # Date
$55,000.00 10-001-13 10/15/13
$66,069.00 12-002-13 12/17/13
$141,007.32 01-001-14 1/9/14
$32,011.82 02-001-14 2/7/14
$85,133.49 03-001-14 3/1/14
$20,820.00 03-002-14 3/17/14
$24,765.00 actual bill CCA
$3,780.00 actual bill APCC
$6,250.00 actual bill CCA
$7,530.00 actual bill TOE
$11,667.62 23858 Sega
$10,713.06 23691 Sega
$464,747.31
12. Burner Project Final Cost
Amount Invoice # Date
$55.000.00 10-001-13 10/15/13
$66,069.00 12-002-13 12/17/13
$141,007.32 01-001-14 1/9/14
$32,011.82 02-001-14 2/7/14
$85,133.49 03-001-14 3/1/14
$20,820.00 03-002-14 3/17/14
$24,765.00 Actual Bill CCA
$3,780.00 Actual Bill APCC
$6,250.00 Actual Bill CCA
$10,000.00 Estimate TOE
$444,836.63
13. Overruns on the Burner Job
CCA $20,500 Steam pressure differential regulators
CCA $6,400 Extra swirlers
CCA $6,250 Boiler turning support
Power Support Services $4,800 Spence valve replacement
Power Support Services $4,800 Machining out gas tips
Power Support Services $3,600 Extra piping work
APCC $4,500 Delay of stack testing