Outage Optimization Opportunities
908 770 4955
www.theoutageexpert.com
safety is nonnegotiable
and because of that it
needs not be mentioned
constantly because it is
part of everything we do.
908 770 4955
www.theoutageexpert.com
PROFITS = REVENUE COST
Sun Tzu said: The Art of War
(Outages) is of vital importance to
the State (Plant). It is a matter of
life and death, a road either to safety
or to ruin. Hence it is a subject of
inquiry which can on no account be
neglected.
Outages are significant events in any plant. It is generally the only
event that can simultaneously increase revenue and decrease cost.
908 770 4955
www.theoutageexpert.com
Outage, planning and execution
are significantly different than
normal plant operations and as
such need different mind sets,
methods and practices to be
successful. Outage Planning and
Execution is it’s own sweet
science
908 770 4955
www.theoutageexpert.com
SERVICES
TRAINING
908 770 4955
www.theoutageexpert.com
OUTAGE
FUNDAMENTALS
908 770 4955
www.theoutageexpert.com
PLANT
SPECIFIC
TRAINING
Zone
Maintenance™
Zone Outage
Control™
Operational
Dashboard™
CMMS Clean
Up™
908 770 4955
www.theoutageexpert.com
SERVICES
STAFF SERVICES
908 770 4955
www.theoutageexpert.com
OWNERS AGENT
TOE will manage all of the
steps of the outage and
report back to PPMS about
the outage readiness of
each plant at each step
908 770 4955
www.theoutageexpert.com
Fill in for Plant Management
•Plant Managers
•Operation Managers
•Maintenance
Managers
Outage Development
•Downtime analysis
•Heat rate analysis
•Generation analysis
•Potential component failure analysis
•Financial Projection
•Cash flows
Engineering
•Work scopes/ RFP’s
•Material specifications
•Code requirements
Planning
• Scheduling
• Spare parts
identification and
ordering
• Material
identification and
ordering
• Outage set up
• Contract selection
Project Management
• Critical path
• Outage Management
908 770 4955
www.theoutageexpert.com
SERVICES
TURN KEY
908 770 4955
www.theoutageexpert.com
TOE will guarantee the
“Open and Close” as well as
“known work” of the outage
from a dollar and schedule
perspective
• Note: every outage has an
adjustment to money and
schedule after all the
discovery work is completed
which will need to be
mutually agreed upon
during the outage
TOE will guarantee the unit
comes up and stays up
• Note: the unit will not come
down once released from
the outage for anything
outage related for 18 month
post outage
TOE will guarantee
performance of the unit
• Note: we will need to
handle each unit’s
performance individually
TURNKEY OUTAGES
Frontera Fall 2014
•We helped the plant develop plan and
schedule two days into the outage the
Maintenance Manager quit and we
assumed control of the entire outage
•The outage came in on time and the
units performance was the best in
history
Fibrominn Spring 2015
•We helped the plant develop plan and
schedule two days into the outage the
Maintenance Manager quit and we
assumed control of the entire outage
•The outage came in on time and the
units performance was the best in
history
Parkchester burners Winter
2014
•We were able to get the burners to
comply with new RACT Emissions
standards while still burning #6 oil by
burner modifications. By being able to
do this the facility was able to comply
while avoiding spending anywhere
between 1 and 10 million dollars extra
Detroit Turbine outage Winter
2013
•Unit produces 13% more Megawatts on
the same steam flow a net result of
approx. $1.5 million in a plant that has
an EBITA of $10 million
Detroit controls upgrade
Winter 2013
•With the new controls in place we were
able to test different operating
modalities and identified a different
valve line up that yielded a 1% to 2%
increase in Megawatt increase that nets
the plant approx. $400,000 against an
EBITA of $10,000,000
Detroit Black plant Fall 2012
•Planned and executed a black plant in 3
months. Executed 184 distinct tasks in
just 132 hours
Berkshire Fall Outage 2012
•Lowed Heat rate significantly unit
availability went from 30% to 90%
Detroit Boiler 12 outage
Summer 2012
•Saved $300,000 on a budgeted
$3,200,000 one week early
Berkshire Spring Outage 2012
•Saved $880,000 on a budgeted
$2,000,000 3 days early
Detroit Boiler 13 outage Fall
2011
•Saved $500,000 on a budgeted
$3,700,000 two weeks early

More Related Content

Similar to Outage Optimization Opportunities

JIT Brochure Pages
JIT Brochure PagesJIT Brochure Pages
JIT Brochure Pages
Rick Arellano
 
Lecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptxLecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptx
deivabalan1
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
Jainam Mehta
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
kalpeshvora4
 
Ch19
Ch19Ch19
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentation
mtingle
 
Srj tpm
Srj tpmSrj tpm
SMED Final
SMED FinalSMED Final
SMED Final
Chaitra Mhatre
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
EzraDhigo
 
seddaoui cv
seddaoui cvseddaoui cv
seddaoui cv
Khelaf Seddaoui
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Akhil Yelisetti
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
ijsrd.com
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
JABIL circuit india pvt ltd pune
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
Mohammed Hamed Ahmed Soliman
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challenges
Milling and Grain magazine
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
Shree Bhargava and Associate
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
Vibra
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
avijit biswas
 
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and ProfitabilityProper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
USC Consulting Group
 

Similar to Outage Optimization Opportunities (20)

JIT Brochure Pages
JIT Brochure PagesJIT Brochure Pages
JIT Brochure Pages
 
Lecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptxLecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptx
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
 
Ch19
Ch19Ch19
Ch19
 
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentation
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
SMED Final
SMED FinalSMED Final
SMED Final
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
 
seddaoui cv
seddaoui cvseddaoui cv
seddaoui cv
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challenges
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and ProfitabilityProper Asset Maintenance Improves Safety, Reliability, and Profitability
Proper Asset Maintenance Improves Safety, Reliability, and Profitability
 

More from jacevedo84

Core Competency Presentations
Core Competency PresentationsCore Competency Presentations
Core Competency Presentations
jacevedo84
 
Core Competency Email Marketing
Core Competency Email MarketingCore Competency Email Marketing
Core Competency Email Marketing
jacevedo84
 
Jamie Acevedo Visual Resume
Jamie Acevedo Visual ResumeJamie Acevedo Visual Resume
Jamie Acevedo Visual Resume
jacevedo84
 
Vendor Networks
Vendor NetworksVendor Networks
Vendor Networks
jacevedo84
 
How to Use the Tools
How to Use the ToolsHow to Use the Tools
How to Use the Tools
jacevedo84
 
Outage Schedule Timeline
Outage Schedule TimelineOutage Schedule Timeline
Outage Schedule Timeline
jacevedo84
 
Motivation
MotivationMotivation
Motivation
jacevedo84
 
Heating Plant Overall for CEOs
Heating Plant Overall for CEOsHeating Plant Overall for CEOs
Heating Plant Overall for CEOs
jacevedo84
 
Steam CEO Training
Steam CEO TrainingSteam CEO Training
Steam CEO Training
jacevedo84
 
You Don't Know What You Don't Know
You Don't Know What You Don't KnowYou Don't Know What You Don't Know
You Don't Know What You Don't Know
jacevedo84
 
Parkchester April 2014 Management Report
Parkchester April 2014 Management ReportParkchester April 2014 Management Report
Parkchester April 2014 Management Report
jacevedo84
 
ENGR 426
ENGR 426ENGR 426
ENGR 426
jacevedo84
 
Coil Trol Energy Star Wars 2015
Coil Trol Energy Star Wars 2015Coil Trol Energy Star Wars 2015
Coil Trol Energy Star Wars 2015
jacevedo84
 

More from jacevedo84 (13)

Core Competency Presentations
Core Competency PresentationsCore Competency Presentations
Core Competency Presentations
 
Core Competency Email Marketing
Core Competency Email MarketingCore Competency Email Marketing
Core Competency Email Marketing
 
Jamie Acevedo Visual Resume
Jamie Acevedo Visual ResumeJamie Acevedo Visual Resume
Jamie Acevedo Visual Resume
 
Vendor Networks
Vendor NetworksVendor Networks
Vendor Networks
 
How to Use the Tools
How to Use the ToolsHow to Use the Tools
How to Use the Tools
 
Outage Schedule Timeline
Outage Schedule TimelineOutage Schedule Timeline
Outage Schedule Timeline
 
Motivation
MotivationMotivation
Motivation
 
Heating Plant Overall for CEOs
Heating Plant Overall for CEOsHeating Plant Overall for CEOs
Heating Plant Overall for CEOs
 
Steam CEO Training
Steam CEO TrainingSteam CEO Training
Steam CEO Training
 
You Don't Know What You Don't Know
You Don't Know What You Don't KnowYou Don't Know What You Don't Know
You Don't Know What You Don't Know
 
Parkchester April 2014 Management Report
Parkchester April 2014 Management ReportParkchester April 2014 Management Report
Parkchester April 2014 Management Report
 
ENGR 426
ENGR 426ENGR 426
ENGR 426
 
Coil Trol Energy Star Wars 2015
Coil Trol Energy Star Wars 2015Coil Trol Energy Star Wars 2015
Coil Trol Energy Star Wars 2015
 

Recently uploaded

john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 

Recently uploaded (20)

john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 

Outage Optimization Opportunities

  • 2.
  • 3. 908 770 4955 www.theoutageexpert.com safety is nonnegotiable and because of that it needs not be mentioned constantly because it is part of everything we do.
  • 5. Sun Tzu said: The Art of War (Outages) is of vital importance to the State (Plant). It is a matter of life and death, a road either to safety or to ruin. Hence it is a subject of inquiry which can on no account be neglected. Outages are significant events in any plant. It is generally the only event that can simultaneously increase revenue and decrease cost.
  • 6. 908 770 4955 www.theoutageexpert.com Outage, planning and execution are significantly different than normal plant operations and as such need different mind sets, methods and practices to be successful. Outage Planning and Execution is it’s own sweet science
  • 12. 908 770 4955 www.theoutageexpert.com OWNERS AGENT TOE will manage all of the steps of the outage and report back to PPMS about the outage readiness of each plant at each step
  • 13. 908 770 4955 www.theoutageexpert.com Fill in for Plant Management •Plant Managers •Operation Managers •Maintenance Managers Outage Development •Downtime analysis •Heat rate analysis •Generation analysis •Potential component failure analysis •Financial Projection •Cash flows Engineering •Work scopes/ RFP’s •Material specifications •Code requirements Planning • Scheduling • Spare parts identification and ordering • Material identification and ordering • Outage set up • Contract selection Project Management • Critical path • Outage Management
  • 15. 908 770 4955 www.theoutageexpert.com TOE will guarantee the “Open and Close” as well as “known work” of the outage from a dollar and schedule perspective • Note: every outage has an adjustment to money and schedule after all the discovery work is completed which will need to be mutually agreed upon during the outage TOE will guarantee the unit comes up and stays up • Note: the unit will not come down once released from the outage for anything outage related for 18 month post outage TOE will guarantee performance of the unit • Note: we will need to handle each unit’s performance individually TURNKEY OUTAGES
  • 16.
  • 17. Frontera Fall 2014 •We helped the plant develop plan and schedule two days into the outage the Maintenance Manager quit and we assumed control of the entire outage •The outage came in on time and the units performance was the best in history Fibrominn Spring 2015 •We helped the plant develop plan and schedule two days into the outage the Maintenance Manager quit and we assumed control of the entire outage •The outage came in on time and the units performance was the best in history Parkchester burners Winter 2014 •We were able to get the burners to comply with new RACT Emissions standards while still burning #6 oil by burner modifications. By being able to do this the facility was able to comply while avoiding spending anywhere between 1 and 10 million dollars extra Detroit Turbine outage Winter 2013 •Unit produces 13% more Megawatts on the same steam flow a net result of approx. $1.5 million in a plant that has an EBITA of $10 million Detroit controls upgrade Winter 2013 •With the new controls in place we were able to test different operating modalities and identified a different valve line up that yielded a 1% to 2% increase in Megawatt increase that nets the plant approx. $400,000 against an EBITA of $10,000,000 Detroit Black plant Fall 2012 •Planned and executed a black plant in 3 months. Executed 184 distinct tasks in just 132 hours Berkshire Fall Outage 2012 •Lowed Heat rate significantly unit availability went from 30% to 90% Detroit Boiler 12 outage Summer 2012 •Saved $300,000 on a budgeted $3,200,000 one week early Berkshire Spring Outage 2012 •Saved $880,000 on a budgeted $2,000,000 3 days early Detroit Boiler 13 outage Fall 2011 •Saved $500,000 on a budgeted $3,700,000 two weeks early