1. Muhammad Asif Iqbal (QA/QC Mechanical)
Postal Address: Islamia Public Elementary School Amin Abad Tehsil Liaqat Pur. Dist. Rahim Yar Khan, Punjab, Pakistan.
Permanent Address: P/O Khan Bella, Basti Allah Bachaya Naich,
Mouza Chanjani,Teh. Liaqat Pur Distt. Rahim Yar Khan, Punjab, Pakistan.
Cell # +92 343 8750565, +92 313 8750565
E‐MAIL:m.asif1411@gmail.com, Skype ID: m.asif1411
CAREER OBJECTIVE:
QA/QC Supervisor Mechanical (Piping, Tanks, Heat Exchanger, Columns & Welding) at Oil & Gas/Petrochemical Plants to Participate
for Maintaining its assets integrity throughout good application of the proper working standards, codes and procedures.
ACADEMIC PROFILE:
GRADUATION B . Tech Pass Mechanical Engineering (3.3 GPA) from Preston University
SEP 2011‐SEP 2013 of Engineering & Technology, Karachi, Sindh, Pakistan.
INTERMEDIATE Associate Mechanical Engineering from G.C.T
MAY 2007‐AUG 2010 Bahawal Pur B‐Grade, Pujab, Pakistan.
MATRICULATION Govt. Higher Secondary School Allah Abad A+ Grade
AUGUST 2007 from PBTE Bahawal Pur, Punjab, Pakistan.
CERTIFICATION:
ASNT NDT Level II. Radiographic Test (RT)
Dye Penetrate Test (PT)
(Certificate No. Is GNDT‐113‐014)
From Gulf NDT & Inspection Technology (Korangi Industrial Area, Karachi, Pakistan).
COMPUTER LITRACY:
• M.S Office, Auto Cad, Net Browsing
SKILS & EXPERTIES
A result oriented professional with 4.5 Years exposure in Quality Control.
Expertise in inspection of piping fabrication, welding and witnessing hydro testing.
Monitoring of all QA/QC activities of Fabrication & Construction work of SS & CS Piping as per ASME B31.3/B31.1.
Monitoring of all QA/QC activities of Cross Country Line (Pipe Bending/Gauging, Stringing, Welding, Trenching,
Sandblasting, Painting, Coating, Holiday Testing, Lowering, Backfilling, Pigging/Gauging/Cleaning, Water Filling, Hydro
testing, Drying, Marking Post/Sign Boards and Reinstatement) as per ASME B31.4&API‐1104.
Monitoring of all QA/QC activities of SS & MS Storage Tank’s as per API‐650.
Monitoring of all QA/QC activities of Gas Holder Tank (Floating Shell with Roof) as per API‐650.
Monitoring of all QA/QC activities of Fabrication & Erection of Heat Exchanger & Column’s according to the procedure and
specification as per TEMA & ASME Sec. VIII.
Detail schedule & progress monitoring of Fit up and Welding according to ASME Sec . IX, Sec. VIII, B31.3,B 31.4 &
B31.1, TEMA & API‐650 Procedures and specifications, and also completed the modification works as per site requirements.
Review the complete Dossier.
Inspection and supervision of hydrostatic and pneumatic testing.
Material Inspection according to the MTCs, specification.
Maintain quality records for NDT, inspection and testing activities as per ASME Sec. V.
Inspection of surface preparation painting according to the procedure and specification.
Installation and commissioning of mechanical Job in oil and gas field activities in Cross Country Line, wellhead plant piping
and storage tanks.
Performed the VT, DPT, RT, Holyday, etc.
Inspection with NDE team at site, review NDT reports and interpretation of RT films.
Manages control the work shop/field fabrication, welding and erection of piping, underground lines, heat exchanger,
columns, structural and tanks works in accordance with IFC drawings, specifications, procedures and through daily
interaction with contractors and plant staff as they relate to safety, scheduling, quality control.
PROFESSIONAL EXPERIENCE:
Bismillah Engineering & Construction (PVT.) Ltd. (JAN‐2015 to Till Date)
Designation: QA/QC Supervisor Mechanical
Current Project:
Fabrication, Costruction & Installation Work of HVAC System at Big Bird foods, Lahore, Punjab, Pakistan.
2. Project Description:
• Fabrication and Installation work of 12570 Dia Inches of CS Piping.
• Installation of Coolers & valve assembly as per drawing.
Responsibilities:
• Coordination with Client and Inspection of all Fabrication, Construction & Installation work of HVAC System.
ABS Engineering & Corporation (PVT.) LIMITED. (FEB‐2013 to DEC‐2014)
Projects Completed:
Shop Fabrication Equipment 125000 L/D Alcohol and Anhydrous Plant.(MAR‐2014 to DEC‐2014)
Project Description: Shop Fabrication and Erection of Heat Exchanger and Columns.
• Fabrication and Construction work of M.S and S.S Storage Tanks quantity 30 Nos.
• Fabrication and Construction work of Heat Exchanger quantity 16 Nos.
• Fabrication and Construction work of Columns quantity 11 Nos.
Fabrication and Procurement of New TT‐307 (Heat Exchanger). (MAR‐2014 to AUG‐2014)
Responsibilities:
• Coordination with client and third party Inspector as a QA/QC Representative.
• Material inspection as per project specification and material test certificates.
• Witness Exchanger activities as per approved ITP.
• To check Quality control system.
• Witnessed of Procedure Qualification & welder qualification test (WQT).
• Control of NDT (RT, DPT).
• Reviewed of NDT reports as per ASME Code Sec. V.
• Control of Sandblasting and painting activities.
• Water Filling, Hydro testing & Drying.
• QA/QC documentations and complete Dossier review and approvals.
Fabrication and Erection Equipment 100000 L/D Alcohol and Anhydrous Plant (UNICOL).(FEB‐2013 to MAR‐2014)
Project Description: Fabrication and Erection of Petro‐Chemical Plant.
• Fabrication and Erection of Heat Exchanger and Columns.
• Fabrication and Erection of 26 Nos. M.S and S.S Large Storage Tanks.
• Fabrication and Erection of 45,000 Dia Inch of S.S and C.S Plant Piping.
• Fabrication and Installation of Steel Structure and Pipe Rack Structure.
Responsibilities:
• Implementation of (ITP) Inspection Test Plan.
• Look after contractor mechanical activities (Fabrication, welding, testing).
• Attend meeting with Client regarding Fabrication, Installation, Piping and other issues.
• Identify, suggest and implement corrective actions to improve quality of work.
• Reviewed of NDT reports as per ASME Code Section V.
• Prepare Quality Control Package of the project as per standard.
• Verified the mechanical completion/reinstatements activity.
ADNAN ENGINEERING (PVT.) LIMITED. (OCT‐2012 to FEB‐2013)
Designation: QA/QC Supervisor Mechanical
Project: Construction Work of C.S Network Loop’s System. (BYCO Petroleum (PVT.) Limited)
APPLIED ENGINEERING (PVT.) LIMITED. (JUL‐2010 to SEP‐2012)
Dasignation: QA/QC Inspector Mechanical
Projects Completed:
7 Nos. Water Storage Tanks KPS and SUI.(PPL)
Replacement 4.8 KM 20 Inch Dia Flow Line KPS to SUI.(PPL)
Chachar Well No. 4 , 4 Inch Dia Gas Feeder Line Chachar Gas Field.(PPL)
Well No. 89 Gas Feeder Line SUI Field. (PPL)
20 Inch Dia Flow Line to Replace 20 KM Corroded Section Of Existing Pipe Line at Two Difference Location. (PPL)
Personal Information:
• Father’s Name : Rasool Bakhsh
• Nationality: Pakistani
• Religion: Islam
• C.N.I.C No: 31302‐6572912‐1
• Passport No: MQ1339121
• Date of Birth: 22‐March‐1990