      Partial Discharge Measurement in HV Joints: Brugg Solutions
                                W. Weissenberg, Brugg Kabel AG, Switzerland


1.      Introduction

At Brugg Kabel AG silicones are used as the insulation material for high voltage accessories in
conjunction with polymeric-insulated power cables. Silicones are characterised by a long electrical service
life /1/. When subjected to electrical stress brought about by high voltage, a life expectancy far in excess
of 50 years can be assumed. If, however, as a result of partial discharges (PD), the ageing process is
accelerated, premature breakdown may be observed (Fig. 1).




                                   Figure 1:          Aging in Silicone

It is, therefore, of considerable importance that the accessories are free from partial discharge. In the
standards, which reflect the current state of the art technology, a PD level of ≤ 10 pC for a test voltage of
1,5 Uo is specified /2 ,3 /. As far as electrical tests, which are undertaken after a cable system has been
installed, are concerned no general PD testing is specified in the standards. A CIGRE TF 21-05 working
group has conducted a survey regarding practices, techniques, experiences and results of electrical tests
following the installation of polymeric extra high voltage (EHV) cable systems /4/. The results of the survey
carried out in 15 countries have come to the conclusion that for EHV cable systems, selective PD testing,
in particular, is extremely effective following the installation of joints. When undertaking the PD
measurement to ensure that the joints are free from partial discharge a lower test voltage can be used for
the a.c. voltage test. This rules out the possibility of causing any premature damage to the newly installed
cable by the electrical test. The general technical tendency towards assessing the state of joints in EHV
cable systems is the diagnostic appraisal of being free from partial discharge.


2.      Practical experience at Brugg Kabel AG

2.1     Routine tests in the factory

The PD measurement, as a routine test for prefabricated HV and EHV cable accessories is the first
important step for demonstrating the quality of the electrical long term robustness of the high voltage cable
accessories. Brugg Kabel AG uses special test equipment to carry out routine testing of all prefabricated
stress-cone and slip-on joints to establish freedom from partial discharge. A typical test system for this
operation comprises a short length of cable which has a water terminator at one end and a closed metal
housing on the other for mounting the stress-cone to be tested (Fig. 2).




                        Figure 2 : Routine test on prefabricated stress- cones


The partial discharge test for slip-on joints is carried out using two short lengths of cable equipped at one
end with water terminators. The other two ends of the cable are inserted into the slip-on joint and also
encased with a metal housing (Fig. 3)




                        Figure 3 : Routine test on prefabricated joints

So-called directional coupler sensors ( DCS ) /9/ have proven extremely suitable for carrying out partial
discharge measurements as a routine test for prefabricated slip-on joints in unscreened test rooms /6/.
They are also ideal for carrying out tests and monitoring /7, 8/ following installation. In principle, a
directional coupler can be understood as a mixed capacitive and inductive PD sensor with two outputs
(Fig. 4).
Figure 4 : Setup and signals of directional couplings

Two directional couplers are mounted to the left and right of the joint adjoining the outer semiconducting
layer of the high voltage cable. An impulse propagating from left to right is coupled at outputs A and C
whilst an impulse propagating from right to left is coupled at outputs D and B. This output coupling
configuration is typical for external noise or partial discharge of other successive accessories. PD from the
joints is coupled at outputs B and C. This method is used to accurately measure and localise PD in joints.


2.2     AC test after installation

Initial findings have been gathered in respect of on site electrical tests to establish the presence of partial
discharge following installation and monitoring of long-time 110 kV, 220 kV and 400 kV test installations in
Switzerland, Singapore and Germany. This method of PD testing was successful for tests carried out
following the installation of cable systems up to a nominal voltage of 400 kV. Monitoring of PD can also be
undertaken using the same test configuration. The sensitivity for assessing the presence or not of partial
discharge of the accessories was better than 5 pC. During testing, accessories were observed which
displayed a PD in excess of the specified noise level and the fault positions could be localised down to an
accuracy of a few centimetres. Following repairs to the accessory testing was resumed.
The next on site PD measurements to be conducted on a 400 kV high voltage slip-on joint following
installation will be carried out in Switzerland in September of this year. (Fig. 5). The slip-on joint has been
in operation for 2 1/2 years and the findings will be published.
Figure 5 : Test set-up for on-site-pd-measurement on 380- kV-joint in UW Bonaduz/Switzerland


3.      Conclusions

At Brugg Kabel AG, accessories for polymeric insulated (E)HV cable systems up to 400 kV are
manufactured from silicone. Silicone accessories are extremely reliable and have an electrical life span in
excess of 50 years if they are not destroyed prematurely by PD. The prefabricated accessories, therefore,
are consistently subjected to routine tests to determine the presence or not of partial discharge. The
progress of PD measurement technology has reached the stage whereby methods such as the direction
coupler method are able to detect, measure and localise a PD of less than 5 pC, even in unscreened test
rooms. This ensures that possible defects in joints can be accurately identified and localised by the on site
tests even after installation. The accessories can then be repaired and a breakdown during operation
subsequently avoided. Due to the considerable effort involved for on site PD measurements these are
generally only undertaken for extra-high voltage systems and for networks, such as power supply
systems, where high priority has to be given to ensure that operational failures are kept to a minimum.


4.      References

/1/     Oesterheld, J.: Dielektrisches Verhalten von Silikonelastomer-Isolierungen bei hohen elektrischen
        Feldstärken. Diss. TU Dresden 1995

/2/     IEC 62067, Ed. 1: Power cable systems – Cables with extruded insulation and their accessories
        for rated voltages above 150 kV (Um = 170 kV) up to 500 kV (Um = 550 kV) – Test methods and
        requirements

/3/     IEC 60840/Rev3: Power cables with extruded insulation and their accessories for rated voltages
        above 30 kV (Um = 36 kV) up to 150 kV (Um = 170 kV) – Test methods and requirements

/4/     CIGRE SC 21,TF21-05: Experiences with ac tests after installation

/5/     CIGRE SC 21, DOC 00/06, Report by WG21-16: Partial discharge detection in installed extruded
        cable systems

/6/     Schmidt F., Weissenberg W.: Stück- und Inbetriebnahmeprüfungen an Garnituren für VPE-
        isolierte Hochspannungskabel, Elektrizitätswirtschaft, Jg. 97 (1998), Heft 26, Seite 26-29

/7/     Craatz P., Plath R., Heinrich R., Kalkner W.,: Sensitive On-Site PD Measurement and Location
                                                                             th
        using Directional Coupler Sensors in 110 kV Prefabricated Joints, 11 ISH99, London, paper
        5.317 P5

/8/     Weissenberg W., Heinrich R., Kalkner W.,: Sensitive pd measurements at varios 110 kV
                                                                                     th
        accessories in an unscreened laboratory using directional coupler sensors, 12 ISH01, Bombey,
        paper 6.55

/9/     Pommerenke D., Strehl T., Heinrich R., Kalkner W., Schmidt F., Weissenberg W.: Discrimination
        between Internal PD and other Pulses using Directional Coupling Sensors on High Voltage Cable
        Systems, IEEE Transactions and Dielectrics and Electrical Insulation, Vol6, December 99, pp 814-
        824

More Related Content

What's hot

Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
Ryan McFallo
 
Descarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia VirtualDescarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia Virtual
TRANSEQUIPOS S.A.
 
Online condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cablesOnline condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cables
Muhammad Shafiq
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methods
Harshit Bhandari
 
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Thorne & Derrick International
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Thorne & Derrick International
 
Results of 10 years after installation tests with partial discharge detection...
Results of 10 years after installation tests with partial discharge detection...Results of 10 years after installation tests with partial discharge detection...
Results of 10 years after installation tests with partial discharge detection...
HighVoltageDUT
 
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
Swathi Venugopal
 
Cable fault location methods (Megger)
Cable fault location methods (Megger)Cable fault location methods (Megger)
Cable fault location methods (Megger)
AHMED MOHAMED HEGAB
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
Mahesh Chandra Manav
 
Partial discharge switchgear ea tech
Partial discharge switchgear ea techPartial discharge switchgear ea tech
Partial discharge switchgear ea tech
Mauritz Roni Gabe Manurung
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Mikolaj Kukawski
 
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Thorne & Derrick International
 
Improving substation reliability & availability
Improving substation reliability & availability Improving substation reliability & availability
Improving substation reliability & availability
Vincent Wedelich, PE MBA
 
Detection of Underground Cable Fault using Arduino
Detection of Underground Cable Fault using ArduinoDetection of Underground Cable Fault using Arduino
Detection of Underground Cable Fault using Arduino
IRJET Journal
 
Development of underground line fault detector
Development of underground line fault detectorDevelopment of underground line fault detector
Development of underground line fault detector
DODDI NAGASAI
 
SebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault LocatorsSebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault Locators
Thorne & Derrick International
 
App fluke1653
App fluke1653App fluke1653
App fluke1653
stanjack99
 
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
ESDEMC Technology LLC
 
final year project report
final year project reportfinal year project report
final year project report
Anuj Kumar
 

What's hot (20)

Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
 
Descarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia VirtualDescarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia Virtual
 
Online condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cablesOnline condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cables
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methods
 
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
Results of 10 years after installation tests with partial discharge detection...
Results of 10 years after installation tests with partial discharge detection...Results of 10 years after installation tests with partial discharge detection...
Results of 10 years after installation tests with partial discharge detection...
 
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
 
Cable fault location methods (Megger)
Cable fault location methods (Megger)Cable fault location methods (Megger)
Cable fault location methods (Megger)
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
 
Partial discharge switchgear ea tech
Partial discharge switchgear ea techPartial discharge switchgear ea tech
Partial discharge switchgear ea tech
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
 
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
Baur - Cable Fault Locators & Location Specialists (LV MV HV Cables)
 
Improving substation reliability & availability
Improving substation reliability & availability Improving substation reliability & availability
Improving substation reliability & availability
 
Detection of Underground Cable Fault using Arduino
Detection of Underground Cable Fault using ArduinoDetection of Underground Cable Fault using Arduino
Detection of Underground Cable Fault using Arduino
 
Development of underground line fault detector
Development of underground line fault detectorDevelopment of underground line fault detector
Development of underground line fault detector
 
SebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault LocatorsSebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault Locators
 
App fluke1653
App fluke1653App fluke1653
App fluke1653
 
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
ESDEMC_PB2014.08 An Ethernet Cable Discharge Event (CDE) Test and Measurement...
 
final year project report
final year project reportfinal year project report
final year project report
 

Similar to P D Measurements On H V Joints

The_insulation_of_HVDC_extruded_cable_sy.pdf
The_insulation_of_HVDC_extruded_cable_sy.pdfThe_insulation_of_HVDC_extruded_cable_sy.pdf
The_insulation_of_HVDC_extruded_cable_sy.pdf
Ahmed Refai ,M. Sc.,Ph. D
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
AHMED MOHAMED HEGAB
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
Karol Bielecki
 
IRJET - A Review of an Investigation of Partial Discharge Sources and Loc...
IRJET -  	  A Review of an Investigation of Partial Discharge Sources and Loc...IRJET -  	  A Review of an Investigation of Partial Discharge Sources and Loc...
IRJET - A Review of an Investigation of Partial Discharge Sources and Loc...
IRJET Journal
 
Underground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using ArduinoUnderground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using Arduino
IRJET Journal
 
HVDCT LAB MANUAL.docx
HVDCT LAB MANUAL.docxHVDCT LAB MANUAL.docx
HVDCT LAB MANUAL.docx
PriteshPandya8
 
40220140506001
4022014050600140220140506001
40220140506001
IAEME Publication
 
Electrical and Electronics lab manual
Electrical and Electronics lab manualElectrical and Electronics lab manual
Electrical and Electronics lab manual
Cyber4Tech
 
IEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdfIEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdf
NitinPandya14
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
Aarjun Singh Panesar
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
Dhaval Solanki
 
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdfComparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
AliNaderian2
 
Heinputter 2
Heinputter 2Heinputter 2
Heinputter 2
Thang Nd
 
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
IRJET Journal
 
Kikusui tos7210s pid insulation tester
Kikusui tos7210s pid insulation testerKikusui tos7210s pid insulation tester
Kikusui tos7210s pid insulation tester
NIHON DENKEI SINGAPORE
 
Kikusui tos7210s pid_insulation_tester_denkei
Kikusui tos7210s pid_insulation_tester_denkeiKikusui tos7210s pid_insulation_tester_denkei
Kikusui tos7210s pid_insulation_tester_denkei
NIHON DENKEI SINGAPORE
 
Engineering practice lab manual for electronics
Engineering practice lab manual for electronicsEngineering practice lab manual for electronics
Engineering practice lab manual for electronics
Padhu Ar
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing Methods
Ali Sepehri
 
Electrical instuments.pptx
Electrical instuments.pptxElectrical instuments.pptx
Electrical instuments.pptx
Rohith sai
 
IRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance LocatorIRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance Locator
IRJET Journal
 

Similar to P D Measurements On H V Joints (20)

The_insulation_of_HVDC_extruded_cable_sy.pdf
The_insulation_of_HVDC_extruded_cable_sy.pdfThe_insulation_of_HVDC_extruded_cable_sy.pdf
The_insulation_of_HVDC_extruded_cable_sy.pdf
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
 
IRJET - A Review of an Investigation of Partial Discharge Sources and Loc...
IRJET -  	  A Review of an Investigation of Partial Discharge Sources and Loc...IRJET -  	  A Review of an Investigation of Partial Discharge Sources and Loc...
IRJET - A Review of an Investigation of Partial Discharge Sources and Loc...
 
Underground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using ArduinoUnderground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using Arduino
 
HVDCT LAB MANUAL.docx
HVDCT LAB MANUAL.docxHVDCT LAB MANUAL.docx
HVDCT LAB MANUAL.docx
 
40220140506001
4022014050600140220140506001
40220140506001
 
Electrical and Electronics lab manual
Electrical and Electronics lab manualElectrical and Electronics lab manual
Electrical and Electronics lab manual
 
IEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdfIEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdf
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
 
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdfComparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
 
Heinputter 2
Heinputter 2Heinputter 2
Heinputter 2
 
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
 
Kikusui tos7210s pid insulation tester
Kikusui tos7210s pid insulation testerKikusui tos7210s pid insulation tester
Kikusui tos7210s pid insulation tester
 
Kikusui tos7210s pid_insulation_tester_denkei
Kikusui tos7210s pid_insulation_tester_denkeiKikusui tos7210s pid_insulation_tester_denkei
Kikusui tos7210s pid_insulation_tester_denkei
 
Engineering practice lab manual for electronics
Engineering practice lab manual for electronicsEngineering practice lab manual for electronics
Engineering practice lab manual for electronics
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing Methods
 
Electrical instuments.pptx
Electrical instuments.pptxElectrical instuments.pptx
Electrical instuments.pptx
 
IRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance LocatorIRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance Locator
 

Recently uploaded

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
Any kyc Account
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
SalesTown
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
sssourabhsharma
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 

Recently uploaded (20)

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 

P D Measurements On H V Joints

  • 1. Workshop 2001, Alexandria, Virginia, December 3 & 4, 2001 Partial Discharge Measurement in HV Joints: Brugg Solutions W. Weissenberg, Brugg Kabel AG, Switzerland 1. Introduction At Brugg Kabel AG silicones are used as the insulation material for high voltage accessories in conjunction with polymeric-insulated power cables. Silicones are characterised by a long electrical service life /1/. When subjected to electrical stress brought about by high voltage, a life expectancy far in excess of 50 years can be assumed. If, however, as a result of partial discharges (PD), the ageing process is accelerated, premature breakdown may be observed (Fig. 1). Figure 1: Aging in Silicone It is, therefore, of considerable importance that the accessories are free from partial discharge. In the standards, which reflect the current state of the art technology, a PD level of ≤ 10 pC for a test voltage of 1,5 Uo is specified /2 ,3 /. As far as electrical tests, which are undertaken after a cable system has been installed, are concerned no general PD testing is specified in the standards. A CIGRE TF 21-05 working group has conducted a survey regarding practices, techniques, experiences and results of electrical tests following the installation of polymeric extra high voltage (EHV) cable systems /4/. The results of the survey carried out in 15 countries have come to the conclusion that for EHV cable systems, selective PD testing, in particular, is extremely effective following the installation of joints. When undertaking the PD measurement to ensure that the joints are free from partial discharge a lower test voltage can be used for the a.c. voltage test. This rules out the possibility of causing any premature damage to the newly installed cable by the electrical test. The general technical tendency towards assessing the state of joints in EHV cable systems is the diagnostic appraisal of being free from partial discharge. 2. Practical experience at Brugg Kabel AG 2.1 Routine tests in the factory The PD measurement, as a routine test for prefabricated HV and EHV cable accessories is the first important step for demonstrating the quality of the electrical long term robustness of the high voltage cable accessories. Brugg Kabel AG uses special test equipment to carry out routine testing of all prefabricated stress-cone and slip-on joints to establish freedom from partial discharge. A typical test system for this
  • 2. operation comprises a short length of cable which has a water terminator at one end and a closed metal housing on the other for mounting the stress-cone to be tested (Fig. 2). Figure 2 : Routine test on prefabricated stress- cones The partial discharge test for slip-on joints is carried out using two short lengths of cable equipped at one end with water terminators. The other two ends of the cable are inserted into the slip-on joint and also encased with a metal housing (Fig. 3) Figure 3 : Routine test on prefabricated joints So-called directional coupler sensors ( DCS ) /9/ have proven extremely suitable for carrying out partial discharge measurements as a routine test for prefabricated slip-on joints in unscreened test rooms /6/. They are also ideal for carrying out tests and monitoring /7, 8/ following installation. In principle, a directional coupler can be understood as a mixed capacitive and inductive PD sensor with two outputs (Fig. 4).
  • 3. Figure 4 : Setup and signals of directional couplings Two directional couplers are mounted to the left and right of the joint adjoining the outer semiconducting layer of the high voltage cable. An impulse propagating from left to right is coupled at outputs A and C whilst an impulse propagating from right to left is coupled at outputs D and B. This output coupling configuration is typical for external noise or partial discharge of other successive accessories. PD from the joints is coupled at outputs B and C. This method is used to accurately measure and localise PD in joints. 2.2 AC test after installation Initial findings have been gathered in respect of on site electrical tests to establish the presence of partial discharge following installation and monitoring of long-time 110 kV, 220 kV and 400 kV test installations in Switzerland, Singapore and Germany. This method of PD testing was successful for tests carried out following the installation of cable systems up to a nominal voltage of 400 kV. Monitoring of PD can also be undertaken using the same test configuration. The sensitivity for assessing the presence or not of partial discharge of the accessories was better than 5 pC. During testing, accessories were observed which displayed a PD in excess of the specified noise level and the fault positions could be localised down to an accuracy of a few centimetres. Following repairs to the accessory testing was resumed. The next on site PD measurements to be conducted on a 400 kV high voltage slip-on joint following installation will be carried out in Switzerland in September of this year. (Fig. 5). The slip-on joint has been in operation for 2 1/2 years and the findings will be published.
  • 4. Figure 5 : Test set-up for on-site-pd-measurement on 380- kV-joint in UW Bonaduz/Switzerland 3. Conclusions At Brugg Kabel AG, accessories for polymeric insulated (E)HV cable systems up to 400 kV are manufactured from silicone. Silicone accessories are extremely reliable and have an electrical life span in excess of 50 years if they are not destroyed prematurely by PD. The prefabricated accessories, therefore, are consistently subjected to routine tests to determine the presence or not of partial discharge. The progress of PD measurement technology has reached the stage whereby methods such as the direction coupler method are able to detect, measure and localise a PD of less than 5 pC, even in unscreened test rooms. This ensures that possible defects in joints can be accurately identified and localised by the on site tests even after installation. The accessories can then be repaired and a breakdown during operation subsequently avoided. Due to the considerable effort involved for on site PD measurements these are generally only undertaken for extra-high voltage systems and for networks, such as power supply systems, where high priority has to be given to ensure that operational failures are kept to a minimum. 4. References /1/ Oesterheld, J.: Dielektrisches Verhalten von Silikonelastomer-Isolierungen bei hohen elektrischen Feldstärken. Diss. TU Dresden 1995 /2/ IEC 62067, Ed. 1: Power cable systems – Cables with extruded insulation and their accessories for rated voltages above 150 kV (Um = 170 kV) up to 500 kV (Um = 550 kV) – Test methods and requirements /3/ IEC 60840/Rev3: Power cables with extruded insulation and their accessories for rated voltages above 30 kV (Um = 36 kV) up to 150 kV (Um = 170 kV) – Test methods and requirements /4/ CIGRE SC 21,TF21-05: Experiences with ac tests after installation /5/ CIGRE SC 21, DOC 00/06, Report by WG21-16: Partial discharge detection in installed extruded cable systems /6/ Schmidt F., Weissenberg W.: Stück- und Inbetriebnahmeprüfungen an Garnituren für VPE- isolierte Hochspannungskabel, Elektrizitätswirtschaft, Jg. 97 (1998), Heft 26, Seite 26-29 /7/ Craatz P., Plath R., Heinrich R., Kalkner W.,: Sensitive On-Site PD Measurement and Location th using Directional Coupler Sensors in 110 kV Prefabricated Joints, 11 ISH99, London, paper 5.317 P5 /8/ Weissenberg W., Heinrich R., Kalkner W.,: Sensitive pd measurements at varios 110 kV th accessories in an unscreened laboratory using directional coupler sensors, 12 ISH01, Bombey, paper 6.55 /9/ Pommerenke D., Strehl T., Heinrich R., Kalkner W., Schmidt F., Weissenberg W.: Discrimination between Internal PD and other Pulses using Directional Coupling Sensors on High Voltage Cable Systems, IEEE Transactions and Dielectrics and Electrical Insulation, Vol6, December 99, pp 814- 824