Recommendation for commissioning testing
of medium voltage cables
The recommendation
© 2011 SebaKMT – MADE in GERMANY 2
Recommendation for commissioning
testing of medium voltage cables.
Includes:
 Sheath testing
 Withstand testing
 PD testing
 The treatment recommendation was created by the same work group,
which was responsible for the development of the VDE Cable Data Base
 Members of this working group are specialists of
- 18 Power Utilities
- 4 Universities
- 4 Service providers for testing and diagnosis
- 1 Accessory manufacturer
- 1 Cable consulting company
- 4 Manufacturers of PD measuring systems
Note: VDE cable database is a web-based database where PD measurements are stored
and where also the PD affected accessories has been inspected. This get a better
knowledge about the type of faults and its remaining life time. (www.VDE-Kabeldatenbank.de)
Initiators
© 2012 SebaKMT – MADE in GERMANY 3
 The experience of 20 years commissioning testing with 0.1 Hz VLF test
voltage indicate, that by a voltage test, only the very serious workmanship
failures are detected.
 There is a large variety of workmanship failures, which pass the com-
missioning tests, and fail only after several months or years of operation.
Target
 Fulfillment of the statutory requirements of the Operation Safety Act, the
BGV A3 and the VDE 0105 in respect to the commissioning test of newly
installed resp. modified electrical systems.
 Quality control of newly installed cables/ accessories by PD testing
 Gaining information for the condition assessment of cable systems
Motivation
© 2012 SebaKMT – MADE in GERMANY 4
Sheath Material PE PVC
Identification 2Y Y
Cable types (examples) NA2XS(F)2Y NA2XSY
Test voltage type DC DC
Test voltage level < 5 kV < 3 kV
Test duration < 5 min < 5 min
Typical leakage current < 100 µA/km < 800 µA/km @ 3 kV
Table 1: Test voltage levels and requirements
Contents
Cable sheath testing
© 2012 SebaKMT – MADE in GERMANY 5
N A 2X S 2Y 1 x 150 rm /25 12/20 kV
Norm cable acc. to DIN VDE
Conductor Material (A = Al / C = CU)
Shield (S = Cu / K = Pb)
Dielectric (2X = XLPE / Y = PVC)
Sheath (2Y = PE / Y = PVC)
Description of German abbreviations of cables
Contents
Cable sheath testing
© 2012 SebaKMT – MADE in GERMANY 6
Table 2: Overview of the voltage levels and durations to be used for plastic
and paper mass impregnated MV cables after repair or reallocation.
Insulation DC AC 45 Hz < f < 65 Hz AC f = 0,1 Hz
Test Level
UT = x Uo
Test
duration
min
Test
Level
UT = x Uo
Test
duration
min
Test Level
UT = x Uo
Test
duration
min
PVC Uo/U=6/10 kV
34 to 48 kV
Uo/U=12/20 kV
67 to 96 kV
Uo/U=18/30 kV
76 to 108 kV
15 to 30 2 30
XLPE, PE 2 60 3 60
PILC and mixed
cables with PVC
Uo/U=6/10 kV
34 to 48 kV
Uo/U=12/20 kV
67 to 96 kV
Uo/U=18/30 kV
76 to 108 kV
15 to 30 2 30 3 30
Mixed cables of
XLPE/PE with
PVC and PILC
2 60 3 60
Contents
Cable withstand testing (aged/ in-service cables)
© 2012 SebaKMT – MADE in GERMANY 7
Experiences of 20 years commissioning tests with 0.1 Hz VLF test voltages
indicated that this reveals only the very serious workmanship failures. There
is a large variety of workmanship issues which pass the VLF commissioning
tests, and fail only after several months/ years of operation under load.
Field statistics on newly installed cables indicates that test failures appear
within 15 to 30 minutes of operation. Test durations of 60 minutes produced
no additional information or results. Therefore, a test duration of 30 minutes
is considered as sufficient.
A significant amount of the faults that are probably not detected during the
withstand tests can be detected and localized by an additional partial
discharge measurement.
Testing of cable insulation after new installation of pure XLPE Cables
Contents
Cable withstand testing (new cables)
© 2012 SebaKMT – MADE in GERMANY 8
PD Measurements for commissioning tests
PD measurements allows to check the cable installation quality as well
as the condition of the complete system installation. Potential fault
spots can be detected in an early stage, and an evaluation of the
system and a budgeting of the required investments can be made.
A fundamental rule is:
Partial discharges occurring at U0 indicates a high risk of operating.
PD measurement test systems with the following type of voltages are
commercially available:
 0.1 Hz VLF (VLF – Very Low Frequency)
 20 – 300 Hz AC (AC – Alternating Current)
100 – 500 Hz damped AC ( DAC – Damped AC)
Contents
Cable withstand testing (new cables)
© 2012 SebaKMT – MADE in GERMANY 9
PD Measurement for quality assurance on newly installed systems
Newly installed cable accessories are, with a correct installation, PD free up
to at least 1.7 U0.
Field experiences showed that some types of accessories require several
load changes resp. temperature cycles, before they are PD free. This has
to be considered during the evaluation, or the PD test has to be repeated
after some load cycles.
The voltage has to be increased in steps up to the maximum test voltage
level. Possible PD signal have to recorded.
The test voltage has to be present for a sufficient duration to enable a
reliable detection of fault spots and to confirm the dielectric strength.
Contents
Cable withstand testing (new cables)
© 2012 SebaKMT – MADE in GERMANY 10
PD Measurement for quality assurance on newly installed systems
For different voltage types, the following test procedure is recommended:
0,1 Hz VLF - Stepwise increase of the test voltage up to 2 U0
- 10 minutes stress duration @ 2 U0 to test the
dielectric strength and operational readiness
20 – 300 Hz - Stepwise increase of the test voltage up to 2 U0
- 5 minutes stress duration @ 2 U0 to test the
dielectric strength and operational readiness
100 – 500 Hz DAC - Stepwise increase of the test voltage up to 1.7 U0
- VWD (multiple test 50 cycles) @ 1.7 U0 to test the
dielectric strength and operational readiness
Contents
Cable withstand testing (new cables)
© 2012 SebaKMT – MADE in GERMANY 11
Test result Evaluation Recommendation
No detectable
PD
Test passed Requirement BNL < 100 pC (BNL = background noise level)
For cables with high attenuation (during calibration with 1000 pC, no end
reflection detectable) the PD measurement must be performed from
both ends.
Ui < Uo Test not passed Replacement of the affected accessories, new measurement on the new
installed accessory (confirmation of the PD fault spot only based on
visible installation errors, there are not PD tracks visible)
Entry into www.VDE-Kabeldatenbank.de)
For operational reasons, a temporary net operation after passed test
acc. to table 2 is permittable.
Ui between 1
and 1.7 Uo
Commissioning
of the cable
system possible,
but repeated
tests after 4 to 8
weeks
Result of the repeated measurement:
- If Ui  1.7 Uo the test is passed
- If Ui < 1.7 Uo the test is not passed
-Replacement of the affected accessories (visual inspection to identify
the installation errors and PD fault spots (Voids, de-lamination,
tracking/PD erosion) Entry into www.VDE-Kabeldatenbank.de)
In exceptional situations, at Ui between 1.2 and 1.7 Uo, the system can
be released for continuous operation. In this case annual repeated
measurements to control the stability of Ui have to be performed.
Contents
Cable withstand testing (new cables)
Table 3: Evaluation and recommendation of measurement results
© 2012 SebaKMT – MADE in GERMANY 12
Case Procedure Requirements
New cables
(completely new installation)
- Sheath testing
- 0.1 Hz VLF test
alternatively
- PD measurement
Table 1
Table 2, Part 2.2
Table 3
Aged cables
(Fault elimination, partial
replacement, re-jointing, loop
insertion
- Sheath testing
- 0.1 Hz VLF test
alternatively
- PD measurement
Table 1
Table 2, Part 2.2
Table 3
The PD measurement has to be considered as a qualitative valuable part of the
commissioning test
Contents
Final recommended procedures
Table 4: Recommendation for testing of MV cables
© 2012 SebaKMT – MADE in GERMANY 13
Contact
Name: Hein Putter
Telefon: 0049-1759361560
E-Mail: putter.h@sebakmt.com
Thank you for your attention!
© 2012 SebaKMT – MADE in GERMANY 14
For more info please visit our website:
www.sebakmt.com
© 2012 SebaKMT – MADE in GERMANY 15

More Related Content

What's hot

Construction and Test Results for Automotive Conductive Polymer Capacitors
Construction and Test Results for Automotive Conductive Polymer CapacitorsConstruction and Test Results for Automotive Conductive Polymer Capacitors
Construction and Test Results for Automotive Conductive Polymer Capacitors
KEMET Electronics Corporation
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationRina Florentes
 
Advances in Ceramic Capacitors
Advances in Ceramic CapacitorsAdvances in Ceramic Capacitors
Advances in Ceramic Capacitors
KEMET Electronics Corporation
 
Webinar 85 85-box_dc_link
Webinar 85 85-box_dc_linkWebinar 85 85-box_dc_link
Webinar 85 85-box_dc_link
KEMET Electronics Corporation
 
Split core ct, rogowski coil (2016)
Split core ct, rogowski coil (2016)Split core ct, rogowski coil (2016)
Split core ct, rogowski coil (2016)
Eric Bin
 
Transformer Oil Testing services
Transformer Oil Testing servicesTransformer Oil Testing services
Transformer Oil Testing services
Power Electronical
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
Dhaval Solanki
 
K-SIM Usage and Techniques for Simulating KEMET Capacitors
K-SIM Usage and Techniques for Simulating KEMET CapacitorsK-SIM Usage and Techniques for Simulating KEMET Capacitors
K-SIM Usage and Techniques for Simulating KEMET Capacitors
KEMET Electronics Corporation
 
Runlite 38mm Filament LED LM-80 test report.PDF
Runlite  38mm Filament LED  LM-80 test report.PDFRunlite  38mm Filament LED  LM-80 test report.PDF
Runlite 38mm Filament LED LM-80 test report.PDFNancy Yu
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
NSW Environment and Planning
 
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
IndiaMART InterMESH Limited
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenanceLucian Lazar
 
A2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorialA2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorial
Jack Duff
 
Ceramic Safety Capacitors - Avoiding the Confusion
Ceramic Safety Capacitors - Avoiding the ConfusionCeramic Safety Capacitors - Avoiding the Confusion
Ceramic Safety Capacitors - Avoiding the Confusion
KEMET Electronics Corporation
 
The Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
The Cable Sniffer - A New & Proven Technique For Locating LV Cable FaultsThe Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
The Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
Thorne & Derrick International
 
Traditional Ratio, Burden, Admittance and Demag Testing – Part I
Traditional Ratio, Burden, Admittance and Demag Testing – Part ITraditional Ratio, Burden, Admittance and Demag Testing – Part I
Traditional Ratio, Burden, Admittance and Demag Testing – Part I
TESCO - The Eastern Specialty Company
 
Understanding isoiec 14763 3 cabling standards
Understanding isoiec 14763 3 cabling standardsUnderstanding isoiec 14763 3 cabling standards
Understanding isoiec 14763 3 cabling standards
smithponting
 
KEMET AEC Reliability 2016 Workshop Slides
KEMET AEC Reliability 2016 Workshop SlidesKEMET AEC Reliability 2016 Workshop Slides
KEMET AEC Reliability 2016 Workshop Slides
KEMET Electronics Corporation
 
New ALS70/80 Series & Press-Fit
New ALS70/80 Series & Press-FitNew ALS70/80 Series & Press-Fit
New ALS70/80 Series & Press-Fit
KEMET Electronics Corporation
 
Box DC Link in industrial and automotive applications
Box DC Link in industrial and automotive applicationsBox DC Link in industrial and automotive applications
Box DC Link in industrial and automotive applications
KEMET Electronics Corporation
 

What's hot (20)

Construction and Test Results for Automotive Conductive Polymer Capacitors
Construction and Test Results for Automotive Conductive Polymer CapacitorsConstruction and Test Results for Automotive Conductive Polymer Capacitors
Construction and Test Results for Automotive Conductive Polymer Capacitors
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault Location
 
Advances in Ceramic Capacitors
Advances in Ceramic CapacitorsAdvances in Ceramic Capacitors
Advances in Ceramic Capacitors
 
Webinar 85 85-box_dc_link
Webinar 85 85-box_dc_linkWebinar 85 85-box_dc_link
Webinar 85 85-box_dc_link
 
Split core ct, rogowski coil (2016)
Split core ct, rogowski coil (2016)Split core ct, rogowski coil (2016)
Split core ct, rogowski coil (2016)
 
Transformer Oil Testing services
Transformer Oil Testing servicesTransformer Oil Testing services
Transformer Oil Testing services
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
 
K-SIM Usage and Techniques for Simulating KEMET Capacitors
K-SIM Usage and Techniques for Simulating KEMET CapacitorsK-SIM Usage and Techniques for Simulating KEMET Capacitors
K-SIM Usage and Techniques for Simulating KEMET Capacitors
 
Runlite 38mm Filament LED LM-80 test report.PDF
Runlite  38mm Filament LED  LM-80 test report.PDFRunlite  38mm Filament LED  LM-80 test report.PDF
Runlite 38mm Filament LED LM-80 test report.PDF
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
Multifunction Calibrator By Zeal Manufacturing And Calibration Services Priva...
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 
A2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorialA2.34+transformer+maintenance+tutorial
A2.34+transformer+maintenance+tutorial
 
Ceramic Safety Capacitors - Avoiding the Confusion
Ceramic Safety Capacitors - Avoiding the ConfusionCeramic Safety Capacitors - Avoiding the Confusion
Ceramic Safety Capacitors - Avoiding the Confusion
 
The Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
The Cable Sniffer - A New & Proven Technique For Locating LV Cable FaultsThe Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
The Cable Sniffer - A New & Proven Technique For Locating LV Cable Faults
 
Traditional Ratio, Burden, Admittance and Demag Testing – Part I
Traditional Ratio, Burden, Admittance and Demag Testing – Part ITraditional Ratio, Burden, Admittance and Demag Testing – Part I
Traditional Ratio, Burden, Admittance and Demag Testing – Part I
 
Understanding isoiec 14763 3 cabling standards
Understanding isoiec 14763 3 cabling standardsUnderstanding isoiec 14763 3 cabling standards
Understanding isoiec 14763 3 cabling standards
 
KEMET AEC Reliability 2016 Workshop Slides
KEMET AEC Reliability 2016 Workshop SlidesKEMET AEC Reliability 2016 Workshop Slides
KEMET AEC Reliability 2016 Workshop Slides
 
New ALS70/80 Series & Press-Fit
New ALS70/80 Series & Press-FitNew ALS70/80 Series & Press-Fit
New ALS70/80 Series & Press-Fit
 
Box DC Link in industrial and automotive applications
Box DC Link in industrial and automotive applicationsBox DC Link in industrial and automotive applications
Box DC Link in industrial and automotive applications
 

Viewers also liked

Basic Partial Discharge
Basic Partial DischargeBasic Partial Discharge
Basic Partial Discharge
Mauritz Roni Gabe Manurung
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Thorne & Derrick International
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
Schneider Electric
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methods
Harshit Bhandari
 
Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
Ryan McFallo
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
Thorne & Derrick International
 
Hv Cable Testing
Hv Cable TestingHv Cable Testing
Hv Cable Testing
theron_richardson
 
cable testing and intallation
cable testing and intallationcable testing and intallation
cable testing and intallation
manishgoswami66
 
Joints and terminations
Joints and terminationsJoints and terminations
Joints and terminations
kariuki kinuthia
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNageswar Rao
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nikhil Kachare
 
Precise kilometer calculation by underground cable fault detector
Precise kilometer calculation by underground cable fault detectorPrecise kilometer calculation by underground cable fault detector
Precise kilometer calculation by underground cable fault detector
vivekmv716
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nadir Baloch
 
Underground cables
Underground cablesUnderground cables
Underground cables
Anu71
 

Viewers also liked (15)

C&I Cables Tests
C&I Cables TestsC&I Cables Tests
C&I Cables Tests
 
Basic Partial Discharge
Basic Partial DischargeBasic Partial Discharge
Basic Partial Discharge
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
 
Seminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methodsSeminar on Partial Discharge detection methods
Seminar on Partial Discharge detection methods
 
Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
 
Hv Cable Testing
Hv Cable TestingHv Cable Testing
Hv Cable Testing
 
cable testing and intallation
cable testing and intallationcable testing and intallation
cable testing and intallation
 
Joints and terminations
Joints and terminationsJoints and terminations
Joints and terminations
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Precise kilometer calculation by underground cable fault detector
Precise kilometer calculation by underground cable fault detectorPrecise kilometer calculation by underground cable fault detector
Precise kilometer calculation by underground cable fault detector
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Underground cables
Underground cablesUnderground cables
Underground cables
 

Similar to Heinputter 2

Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
PT. Siwali Swantika
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Emeka Ojeah
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
Asha Anu Kurian
 
IEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdfIEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdf
NitinPandya14
 
ABB Instrumentation. Automation products, ProcessMaster
ABB Instrumentation. Automation products, ProcessMaster ABB Instrumentation. Automation products, ProcessMaster
ABB Instrumentation. Automation products, ProcessMaster ie-net ingenieursvereniging vzw
 
Seaward Catalog High Voltage Test Tools
Seaward Catalog High Voltage Test ToolsSeaward Catalog High Voltage Test Tools
Seaward Catalog High Voltage Test Tools
PT. Siwali Swantika
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Thorne & Derrick International
 
OWTS M28.ppt
OWTS M28.pptOWTS M28.ppt
OWTS M28.ppt
akmal643738
 
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
Thorne & Derrick International
 
ABB Training Manual.pdf
ABB Training Manual.pdfABB Training Manual.pdf
ABB Training Manual.pdf
HassanRaza890037
 
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDerek Murray
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
Aarjun Singh Panesar
 
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...Ramy Saboungui
 
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdfComparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
AliNaderian2
 
350kV 8000KVA series resonant cable test system
350kV 8000KVA series resonant cable test system350kV 8000KVA series resonant cable test system
350kV 8000KVA series resonant cable test systemJohnny Chan
 
Runlite 26mm Filament LED LM-80 test report.PDF
Runlite  26mm Filament LED  LM-80 test report.PDFRunlite  26mm Filament LED  LM-80 test report.PDF
Runlite 26mm Filament LED LM-80 test report.PDFNancy Yu
 
F04844043
F04844043F04844043
F04844043
IOSR-JEN
 

Similar to Heinputter 2 (20)

B10d en
B10d enB10d en
B10d en
 
Cable test set_easytest_20_kv
Cable test set_easytest_20_kvCable test set_easytest_20_kv
Cable test set_easytest_20_kv
 
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
IEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdfIEEE-Alberta_Partial-Discharge.pdf
IEEE-Alberta_Partial-Discharge.pdf
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
ABB Instrumentation. Automation products, ProcessMaster
ABB Instrumentation. Automation products, ProcessMaster ABB Instrumentation. Automation products, ProcessMaster
ABB Instrumentation. Automation products, ProcessMaster
 
Seaward Catalog High Voltage Test Tools
Seaward Catalog High Voltage Test ToolsSeaward Catalog High Voltage Test Tools
Seaward Catalog High Voltage Test Tools
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
 
OWTS M28.ppt
OWTS M28.pptOWTS M28.ppt
OWTS M28.ppt
 
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
Seaward KD1E High Voltage HV Indicators & Detectors, Phasing Units, Ammeters ...
 
ABB Training Manual.pdf
ABB Training Manual.pdfABB Training Manual.pdf
ABB Training Manual.pdf
 
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...
Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pi...
 
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdfComparison of Different Voltage Waveforms for Cable PD Testing.pdf
Comparison of Different Voltage Waveforms for Cable PD Testing.pdf
 
350kV 8000KVA series resonant cable test system
350kV 8000KVA series resonant cable test system350kV 8000KVA series resonant cable test system
350kV 8000KVA series resonant cable test system
 
Runlite 26mm Filament LED LM-80 test report.PDF
Runlite  26mm Filament LED  LM-80 test report.PDFRunlite  26mm Filament LED  LM-80 test report.PDF
Runlite 26mm Filament LED LM-80 test report.PDF
 
F04844043
F04844043F04844043
F04844043
 

Heinputter 2

  • 1. Recommendation for commissioning testing of medium voltage cables
  • 2. The recommendation © 2011 SebaKMT – MADE in GERMANY 2 Recommendation for commissioning testing of medium voltage cables. Includes:  Sheath testing  Withstand testing  PD testing
  • 3.  The treatment recommendation was created by the same work group, which was responsible for the development of the VDE Cable Data Base  Members of this working group are specialists of - 18 Power Utilities - 4 Universities - 4 Service providers for testing and diagnosis - 1 Accessory manufacturer - 1 Cable consulting company - 4 Manufacturers of PD measuring systems Note: VDE cable database is a web-based database where PD measurements are stored and where also the PD affected accessories has been inspected. This get a better knowledge about the type of faults and its remaining life time. (www.VDE-Kabeldatenbank.de) Initiators © 2012 SebaKMT – MADE in GERMANY 3
  • 4.  The experience of 20 years commissioning testing with 0.1 Hz VLF test voltage indicate, that by a voltage test, only the very serious workmanship failures are detected.  There is a large variety of workmanship failures, which pass the com- missioning tests, and fail only after several months or years of operation. Target  Fulfillment of the statutory requirements of the Operation Safety Act, the BGV A3 and the VDE 0105 in respect to the commissioning test of newly installed resp. modified electrical systems.  Quality control of newly installed cables/ accessories by PD testing  Gaining information for the condition assessment of cable systems Motivation © 2012 SebaKMT – MADE in GERMANY 4
  • 5. Sheath Material PE PVC Identification 2Y Y Cable types (examples) NA2XS(F)2Y NA2XSY Test voltage type DC DC Test voltage level < 5 kV < 3 kV Test duration < 5 min < 5 min Typical leakage current < 100 µA/km < 800 µA/km @ 3 kV Table 1: Test voltage levels and requirements Contents Cable sheath testing © 2012 SebaKMT – MADE in GERMANY 5
  • 6. N A 2X S 2Y 1 x 150 rm /25 12/20 kV Norm cable acc. to DIN VDE Conductor Material (A = Al / C = CU) Shield (S = Cu / K = Pb) Dielectric (2X = XLPE / Y = PVC) Sheath (2Y = PE / Y = PVC) Description of German abbreviations of cables Contents Cable sheath testing © 2012 SebaKMT – MADE in GERMANY 6
  • 7. Table 2: Overview of the voltage levels and durations to be used for plastic and paper mass impregnated MV cables after repair or reallocation. Insulation DC AC 45 Hz < f < 65 Hz AC f = 0,1 Hz Test Level UT = x Uo Test duration min Test Level UT = x Uo Test duration min Test Level UT = x Uo Test duration min PVC Uo/U=6/10 kV 34 to 48 kV Uo/U=12/20 kV 67 to 96 kV Uo/U=18/30 kV 76 to 108 kV 15 to 30 2 30 XLPE, PE 2 60 3 60 PILC and mixed cables with PVC Uo/U=6/10 kV 34 to 48 kV Uo/U=12/20 kV 67 to 96 kV Uo/U=18/30 kV 76 to 108 kV 15 to 30 2 30 3 30 Mixed cables of XLPE/PE with PVC and PILC 2 60 3 60 Contents Cable withstand testing (aged/ in-service cables) © 2012 SebaKMT – MADE in GERMANY 7
  • 8. Experiences of 20 years commissioning tests with 0.1 Hz VLF test voltages indicated that this reveals only the very serious workmanship failures. There is a large variety of workmanship issues which pass the VLF commissioning tests, and fail only after several months/ years of operation under load. Field statistics on newly installed cables indicates that test failures appear within 15 to 30 minutes of operation. Test durations of 60 minutes produced no additional information or results. Therefore, a test duration of 30 minutes is considered as sufficient. A significant amount of the faults that are probably not detected during the withstand tests can be detected and localized by an additional partial discharge measurement. Testing of cable insulation after new installation of pure XLPE Cables Contents Cable withstand testing (new cables) © 2012 SebaKMT – MADE in GERMANY 8
  • 9. PD Measurements for commissioning tests PD measurements allows to check the cable installation quality as well as the condition of the complete system installation. Potential fault spots can be detected in an early stage, and an evaluation of the system and a budgeting of the required investments can be made. A fundamental rule is: Partial discharges occurring at U0 indicates a high risk of operating. PD measurement test systems with the following type of voltages are commercially available:  0.1 Hz VLF (VLF – Very Low Frequency)  20 – 300 Hz AC (AC – Alternating Current) 100 – 500 Hz damped AC ( DAC – Damped AC) Contents Cable withstand testing (new cables) © 2012 SebaKMT – MADE in GERMANY 9
  • 10. PD Measurement for quality assurance on newly installed systems Newly installed cable accessories are, with a correct installation, PD free up to at least 1.7 U0. Field experiences showed that some types of accessories require several load changes resp. temperature cycles, before they are PD free. This has to be considered during the evaluation, or the PD test has to be repeated after some load cycles. The voltage has to be increased in steps up to the maximum test voltage level. Possible PD signal have to recorded. The test voltage has to be present for a sufficient duration to enable a reliable detection of fault spots and to confirm the dielectric strength. Contents Cable withstand testing (new cables) © 2012 SebaKMT – MADE in GERMANY 10
  • 11. PD Measurement for quality assurance on newly installed systems For different voltage types, the following test procedure is recommended: 0,1 Hz VLF - Stepwise increase of the test voltage up to 2 U0 - 10 minutes stress duration @ 2 U0 to test the dielectric strength and operational readiness 20 – 300 Hz - Stepwise increase of the test voltage up to 2 U0 - 5 minutes stress duration @ 2 U0 to test the dielectric strength and operational readiness 100 – 500 Hz DAC - Stepwise increase of the test voltage up to 1.7 U0 - VWD (multiple test 50 cycles) @ 1.7 U0 to test the dielectric strength and operational readiness Contents Cable withstand testing (new cables) © 2012 SebaKMT – MADE in GERMANY 11
  • 12. Test result Evaluation Recommendation No detectable PD Test passed Requirement BNL < 100 pC (BNL = background noise level) For cables with high attenuation (during calibration with 1000 pC, no end reflection detectable) the PD measurement must be performed from both ends. Ui < Uo Test not passed Replacement of the affected accessories, new measurement on the new installed accessory (confirmation of the PD fault spot only based on visible installation errors, there are not PD tracks visible) Entry into www.VDE-Kabeldatenbank.de) For operational reasons, a temporary net operation after passed test acc. to table 2 is permittable. Ui between 1 and 1.7 Uo Commissioning of the cable system possible, but repeated tests after 4 to 8 weeks Result of the repeated measurement: - If Ui  1.7 Uo the test is passed - If Ui < 1.7 Uo the test is not passed -Replacement of the affected accessories (visual inspection to identify the installation errors and PD fault spots (Voids, de-lamination, tracking/PD erosion) Entry into www.VDE-Kabeldatenbank.de) In exceptional situations, at Ui between 1.2 and 1.7 Uo, the system can be released for continuous operation. In this case annual repeated measurements to control the stability of Ui have to be performed. Contents Cable withstand testing (new cables) Table 3: Evaluation and recommendation of measurement results © 2012 SebaKMT – MADE in GERMANY 12
  • 13. Case Procedure Requirements New cables (completely new installation) - Sheath testing - 0.1 Hz VLF test alternatively - PD measurement Table 1 Table 2, Part 2.2 Table 3 Aged cables (Fault elimination, partial replacement, re-jointing, loop insertion - Sheath testing - 0.1 Hz VLF test alternatively - PD measurement Table 1 Table 2, Part 2.2 Table 3 The PD measurement has to be considered as a qualitative valuable part of the commissioning test Contents Final recommended procedures Table 4: Recommendation for testing of MV cables © 2012 SebaKMT – MADE in GERMANY 13
  • 14. Contact Name: Hein Putter Telefon: 0049-1759361560 E-Mail: putter.h@sebakmt.com Thank you for your attention! © 2012 SebaKMT – MADE in GERMANY 14
  • 15. For more info please visit our website: www.sebakmt.com © 2012 SebaKMT – MADE in GERMANY 15