1.Which of the following is considered a major process flow structure?
 Lead Time
 Fabrication
 [Lean Manufacturing]
 Project
2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following
result in the best certification of a firm?
 Certification is sought by any firm assuming they pay annual dues.
 2nd Party – where a customer audits its supplier
 [3rd Party – where a qualified national or international standards/certifying agency serves
as an auditor ]
 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
 Quality management
 Time management
 Continuous improvement management
 [Environmental management]
4. Which is the one correct value stream principle?
 Look for efficiencies in the factory, office, physical, procedural, and technical operations.
 [Eliminate waste that stops, slows down, or diverts the value stream].
 Concentrate on speeding up value-adding operations rather than removing waste.
 Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
 [Determining the effective capacity over time]
 Estimating design capacity
 Forecasting patient demand for a reasonable length of time
 Discovery of the bottleneck operation
6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time
frame for when each end product will be assembled?
 MRP (Material Requirements Plan)
 ERP (Enterprise Resource Planning)
 [MPS (Master Production Schedule)]
 WBS (Work Breakdown Structure)
7. Which of the following is an element that addresses elimination of waste under lean production?
 [Kanban production control system]
 Production ahead of demand
 Minimized run times
 Group plant loading technology
8. In most cases, demand for products or services can be broken into several components. Which of the
following is considered a component of demand?
 Level elements
 Future elements
 Past elements
 [Cyclical elements]
9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the
following:
 Reducing product quality during the assembly process
 Designing products so they can be manufactured by a virtual factory
 Reducing equipment in the production process
 [Simplification of the product by reducing the number of separate parts]
10. Which of the following is one of the principles of reengineering?
 Quality at the source
 Do not select suppliers on the basis of price alone.
 [Have those who use the output of a process perform the process.]
 Leverage high cost employees with lower cost employees.
11. Which of the following is a characteristic that can be used to guide the design of service systems?
 Services are all similar.
 Services businesses are inherently entrepreneurial.
 Quality work means quality service.
 [Services cannot be inventoried.]
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is
given to a supply chain which has an evolving supply process based on functional products?
 [Risk hedging]
 Forward looking
 Efficient
 Agile
13. There are many applications of poka-yokes in service organizations. Which of the following is one of
the three-T's used to classify poka-yokes?
 Trust
 Teamwork
 [Task]
 Time
14. Which of the following is a major factor that distinguishes service design and development from
manufacturing design and development?
 The service package has the same legal protection available to manufactured goods.
 Manufacturing is far more capital intensive than services.
 The service process and service product can be developed independently.
 [The service package is the major output of the development process].
15. A project can be segmented into which of the following?
 Events
 Sub-jobs
 [Work packages]
 Success markers
16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?
 Statistical tools
 [Decision trees]
 Work sampling
 Gap analysis
17. According to the theory of constraints, which of the following can be a capacity-constrained resource
(CCR)?
 Product design
 Inoperable equipment
 [An employee]
 A customer
18. The ability to rapidly and inexpensively switch production from one product to another enables which
of the following:
 Economies of shape
 Economies of size
 Economies of scale
 [Economies of scope]
19. According to the theory of constraints, which of the following financial measurements can be used to
measure the firm's ability to make money?
 Operating expenses
 Dividends
 Sales
 [ Return on investment ]
20. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?
 [Continuous improvement ]
 Control charting
 Standard deviation
 Project management
21. Which of the following is usually included as an inventory holding cost?
 Order placing
 Quantity discounts
 [Breakage ]
 Typing up an order
22. Which production process term best describes the situation when activities in a stage of production
must stop because there is no work?
 Blocking
 [Starving ]
 Staging
 Buffering
23. In a Gantt chart the vertical axis represents which of the following?
 Time
 Revenue
 [Tasks ]
 Cost
24. The Shingo system states that the way to prevent defects from coming out at the end of a process
is to do which of the following:
• Redesign the process in order to mitigate the bottlenecks.
• Utilize SQC (statistical quality control).
[• Introduce controls within the process. ]
• Slow down production rates until the process is in control.
25. Which of the following terms describes the time a unit spends actually being worked on together
with the time spent waiting in a queue?
[ Flow time ]
Build time
Cycle time
Run time
26. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized
production technology?
An hour saved at a bottleneck operation does not increase the process flow.
If you lose an hour at a bottleneck it is better than making scrap.
Do not allow bottlenecks to govern the flow of the line.
[Utilization and activation of a resource are not the same].
27. During the implementation of a project, which of the following should be the primary focus of a
consulting firm?
• The correct project software
• Application of the learning curve theory
[ • Tools and materials availability]
• People management skills
28. Which of the following is an analytical tool used in Six-Sigma quality improvement programs?
• Gantt charts
[• Pareto charts]
• Tree charts
• Pedigree charts
29. A project manager must consider several components when overseeing the planning process of
aggregate operations; specifically, whether such components are factors that are internal or external
to the organization. Which of the following factors would be classified as an internal component for
an organization?
• Inventory levels and economic conditions
• Market demand and subcontractor capacity
[• Current physical capacity and current workforce]
• Competitor behavior and current workforce
30. Which of the following is the net requirement using an MRP program if the gross requirement is
10,000 and the inventory on hand is 4,000?
• 10,000
• 14,000
[• 6,000 ]
• 4,000

More Related Content

What's hot

Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Er. Bade Bhausaheb
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencingAkanksha Gupta
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations Management
Christian Reinboth
 
Process Analysis
Process Analysis Process Analysis
Process Analysis
Joshua Miranda
 
Work study manual
Work study manualWork study manual
Work study manual
shamim hossain
 
CU Operations Management module 5
CU Operations Management module 5CU Operations Management module 5
CU Operations Management module 5
ChathamkulamInstitut
 
Production planning and control module 3 (OM)
Production planning and control module 3 (OM)Production planning and control module 3 (OM)
Production planning and control module 3 (OM)
ChathamkulamInstitut
 
capacity utilization
capacity utilizationcapacity utilization
capacity utilizationsai precious
 
Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )
ChathamkulamInstitut
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
Hari Vignesh R
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
Mohammad Younus
 
093 Productivity Measurement
093 Productivity Measurement093 Productivity Measurement
093 Productivity Measurement
Dr Fereidoun Dejahang
 
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNINGUNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
KIT-Kalaignar Karunanidhi Institute of Technology
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
Waleed Attalla
 
Production and operation management
Production and operation management Production and operation management
Production and operation management
venkateswararao meesala
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangement
Devendra Kachhi
 

What's hot (20)

Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.Industrial Engineering unit 4.Production planning and control Notes by badebhau.
Industrial Engineering unit 4.Production planning and control Notes by badebhau.
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
final Production
 final Production  final Production
final Production
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations Management
 
Value analysis
Value analysisValue analysis
Value analysis
 
Process Analysis
Process Analysis Process Analysis
Process Analysis
 
Work study manual
Work study manualWork study manual
Work study manual
 
CU Operations Management module 5
CU Operations Management module 5CU Operations Management module 5
CU Operations Management module 5
 
Production planning and control module 3 (OM)
Production planning and control module 3 (OM)Production planning and control module 3 (OM)
Production planning and control module 3 (OM)
 
capacity utilization
capacity utilizationcapacity utilization
capacity utilization
 
Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )
 
Process planning (lesson 1)
Process planning (lesson 1)Process planning (lesson 1)
Process planning (lesson 1)
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
093 Productivity Measurement
093 Productivity Measurement093 Productivity Measurement
093 Productivity Measurement
 
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNINGUNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
 
Production and operation management
Production and operation management Production and operation management
Production and operation management
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangement
 

Viewers also liked

(New) final exam for ops 571 all correct answers 100%
(New) final exam for ops 571 all correct answers 100%(New) final exam for ops 571 all correct answers 100%
(New) final exam for ops 571 all correct answers 100%quikly11
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
Shivangi Singh
 
Str581 final exam part 1
Str581 final exam part 1Str581 final exam part 1
Str581 final exam part 1
Rogue Phoenix
 
Forensic Accounting Topics and Issues
Forensic Accounting Topics and IssuesForensic Accounting Topics and Issues
Forensic Accounting Topics and Issues
zcreichenbach
 
Midterm Sociology Study Guide
Midterm Sociology Study GuideMidterm Sociology Study Guide
Midterm Sociology Study Guide
shoetzlein
 
Mobile App Tracking - How it Works
Mobile App Tracking - How it WorksMobile App Tracking - How it Works
Mobile App Tracking - How it WorksMobileAppTracking
 
Scrum in Practice
Scrum in PracticeScrum in Practice
Scrum in Practice
Naresh Jain
 
Web Based Fleet Management System
Web Based Fleet Management SystemWeb Based Fleet Management System
Web Based Fleet Management System
Vasil Yordanov
 
Pulsatile Drug Delivery System
Pulsatile Drug Delivery SystemPulsatile Drug Delivery System
Pulsatile Drug Delivery Systemoptimpharma
 
Identity and Access Management Reference Architecture for Cloud Computing
Identity and Access Management Reference Architecture for Cloud ComputingIdentity and Access Management Reference Architecture for Cloud Computing
Identity and Access Management Reference Architecture for Cloud Computing
John Bauer
 
Industry analysis of soft drinks industry
Industry analysis of soft drinks industryIndustry analysis of soft drinks industry
Industry analysis of soft drinks industry
HEMA SANKAR
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant Enamul Khan
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QC
Gargi Nanda
 
Building a STRATEGIC PLAN for an Educational Institution
Building a STRATEGIC PLAN for an Educational InstitutionBuilding a STRATEGIC PLAN for an Educational Institution
Building a STRATEGIC PLAN for an Educational Institution
National Institute of Technology Karnataka( NITK ),Surathkal
 
FREE Law 531 final exam
FREE Law 531 final examFREE Law 531 final exam
FREE Law 531 final exam
Rogue Phoenix
 
Positioning and radiographic anatomy of the skull
Positioning and radiographic anatomy of the skullPositioning and radiographic anatomy of the skull
Positioning and radiographic anatomy of the skullmr_koky
 
Software Defined Data Center: The Intersection of Networking and Storage
Software Defined Data Center: The Intersection of Networking and StorageSoftware Defined Data Center: The Intersection of Networking and Storage
Software Defined Data Center: The Intersection of Networking and Storage
EMC
 
10 important factors to consider before starting your
10 important factors to consider before starting your10 important factors to consider before starting your
10 important factors to consider before starting your
Ron Romero
 
The software Implementation Process
The software Implementation ProcessThe software Implementation Process
The software Implementation Process
rthompson604
 

Viewers also liked (20)

(New) final exam for ops 571 all correct answers 100%
(New) final exam for ops 571 all correct answers 100%(New) final exam for ops 571 all correct answers 100%
(New) final exam for ops 571 all correct answers 100%
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Str581 final exam part 1
Str581 final exam part 1Str581 final exam part 1
Str581 final exam part 1
 
Forensic Accounting Topics and Issues
Forensic Accounting Topics and IssuesForensic Accounting Topics and Issues
Forensic Accounting Topics and Issues
 
Midterm Sociology Study Guide
Midterm Sociology Study GuideMidterm Sociology Study Guide
Midterm Sociology Study Guide
 
Mobile App Tracking - How it Works
Mobile App Tracking - How it WorksMobile App Tracking - How it Works
Mobile App Tracking - How it Works
 
Scrum in Practice
Scrum in PracticeScrum in Practice
Scrum in Practice
 
Web Based Fleet Management System
Web Based Fleet Management SystemWeb Based Fleet Management System
Web Based Fleet Management System
 
Pulsatile Drug Delivery System
Pulsatile Drug Delivery SystemPulsatile Drug Delivery System
Pulsatile Drug Delivery System
 
Identity and Access Management Reference Architecture for Cloud Computing
Identity and Access Management Reference Architecture for Cloud ComputingIdentity and Access Management Reference Architecture for Cloud Computing
Identity and Access Management Reference Architecture for Cloud Computing
 
Industry analysis of soft drinks industry
Industry analysis of soft drinks industryIndustry analysis of soft drinks industry
Industry analysis of soft drinks industry
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QC
 
ocular drug delivery systems
ocular drug delivery systemsocular drug delivery systems
ocular drug delivery systems
 
Building a STRATEGIC PLAN for an Educational Institution
Building a STRATEGIC PLAN for an Educational InstitutionBuilding a STRATEGIC PLAN for an Educational Institution
Building a STRATEGIC PLAN for an Educational Institution
 
FREE Law 531 final exam
FREE Law 531 final examFREE Law 531 final exam
FREE Law 531 final exam
 
Positioning and radiographic anatomy of the skull
Positioning and radiographic anatomy of the skullPositioning and radiographic anatomy of the skull
Positioning and radiographic anatomy of the skull
 
Software Defined Data Center: The Intersection of Networking and Storage
Software Defined Data Center: The Intersection of Networking and StorageSoftware Defined Data Center: The Intersection of Networking and Storage
Software Defined Data Center: The Intersection of Networking and Storage
 
10 important factors to consider before starting your
10 important factors to consider before starting your10 important factors to consider before starting your
10 important factors to consider before starting your
 
The software Implementation Process
The software Implementation ProcessThe software Implementation Process
The software Implementation Process
 

Similar to Ops 571 free final exam sg 2014

1.Which of the following is considered a major process flow struct.docx
1.Which of the following is considered a major process flow struct.docx1.Which of the following is considered a major process flow struct.docx
1.Which of the following is considered a major process flow struct.docx
hyacinthshackley2629
 
Which of the following is the net requirement using an MRP program i.docx
Which of the following is the net requirement using an MRP program i.docxWhich of the following is the net requirement using an MRP program i.docx
Which of the following is the net requirement using an MRP program i.docx
jolleybendicty
 
1Which of the following is considered a major process flow struc.docx
1Which of the following is considered a major process flow struc.docx1Which of the following is considered a major process flow struc.docx
1Which of the following is considered a major process flow struc.docx
eugeniadean34240
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
Shivani Sharma
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
Visual Design Solution
 
Which of the following is the net requirement using an MRP program.docx
Which of the following is the net requirement using an MRP program.docxWhich of the following is the net requirement using an MRP program.docx
Which of the following is the net requirement using an MRP program.docx
alanfhall8953
 
A036501014
A036501014A036501014
A036501014
theijes
 
Chapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and ProductivityChapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and Productivitydpd
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
naveen kumar
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software developmentRatzman III
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvement
Jatinder Singh
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
Dibyajyoti Laha
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
Kushal Shah
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
ramuaa124
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
johann11374
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
johann11370
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET Journal
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
ramuaa130
 
Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9
Sarvesh Soni
 

Similar to Ops 571 free final exam sg 2014 (20)

1.Which of the following is considered a major process flow struct.docx
1.Which of the following is considered a major process flow struct.docx1.Which of the following is considered a major process flow struct.docx
1.Which of the following is considered a major process flow struct.docx
 
Which of the following is the net requirement using an MRP program i.docx
Which of the following is the net requirement using an MRP program i.docxWhich of the following is the net requirement using an MRP program i.docx
Which of the following is the net requirement using an MRP program i.docx
 
1Which of the following is considered a major process flow struc.docx
1Which of the following is considered a major process flow struc.docx1Which of the following is considered a major process flow struc.docx
1Which of the following is considered a major process flow struc.docx
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
 
Which of the following is the net requirement using an MRP program.docx
Which of the following is the net requirement using an MRP program.docxWhich of the following is the net requirement using an MRP program.docx
Which of the following is the net requirement using an MRP program.docx
 
A036501014
A036501014A036501014
A036501014
 
Chapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and ProductivityChapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and Productivity
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software development
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvement
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9
 

Recently uploaded

Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 

Recently uploaded (20)

Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 

Ops 571 free final exam sg 2014

  • 1. OPS 571 Final Exam SG 2014 1.Which of the following is considered a major process flow structure?  Lead Time  Fabrication  [Lean Manufacturing]  Project 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?  Certification is sought by any firm assuming they pay annual dues.  2nd Party – where a customer audits its supplier  [3rd Party – where a qualified national or international standards/certifying agency serves as an auditor ]  1st Party – where a firm audits itself against ISO standards 3.Which of the following is ISO 14000 primarily concerned with?  Quality management  Time management  Continuous improvement management  [Environmental management] 4. Which is the one correct value stream principle?  Look for efficiencies in the factory, office, physical, procedural, and technical operations.  [Eliminate waste that stops, slows down, or diverts the value stream].  Concentrate on speeding up value-adding operations rather than removing waste.  Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation?  [Determining the effective capacity over time]  Estimating design capacity  Forecasting patient demand for a reasonable length of time  Discovery of the bottleneck operation 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?  MRP (Material Requirements Plan)  ERP (Enterprise Resource Planning)  [MPS (Master Production Schedule)]  WBS (Work Breakdown Structure)
  • 2. 7. Which of the following is an element that addresses elimination of waste under lean production?  [Kanban production control system]  Production ahead of demand  Minimized run times  Group plant loading technology 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?  Level elements  Future elements  Past elements  [Cyclical elements] 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:  Reducing product quality during the assembly process  Designing products so they can be manufactured by a virtual factory  Reducing equipment in the production process  [Simplification of the product by reducing the number of separate parts] 10. Which of the following is one of the principles of reengineering?  Quality at the source  Do not select suppliers on the basis of price alone.  [Have those who use the output of a process perform the process.]  Leverage high cost employees with lower cost employees. 11. Which of the following is a characteristic that can be used to guide the design of service systems?  Services are all similar.  Services businesses are inherently entrepreneurial.  Quality work means quality service.  [Services cannot be inventoried.] 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?  [Risk hedging]  Forward looking  Efficient  Agile
  • 3. 13. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's used to classify poka-yokes?  Trust  Teamwork  [Task]  Time 14. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?  The service package has the same legal protection available to manufactured goods.  Manufacturing is far more capital intensive than services.  The service process and service product can be developed independently.  [The service package is the major output of the development process]. 15. A project can be segmented into which of the following?  Events  Sub-jobs  [Work packages]  Success markers 16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?  Statistical tools  [Decision trees]  Work sampling  Gap analysis 17. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?  Product design  Inoperable equipment  [An employee]  A customer 18. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:  Economies of shape  Economies of size  Economies of scale  [Economies of scope] 19. According to the theory of constraints, which of the following financial measurements can be used to measure the firm's ability to make money?  Operating expenses  Dividends  Sales  [ Return on investment ]
  • 4. 20. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?  [Continuous improvement ]  Control charting  Standard deviation  Project management 21. Which of the following is usually included as an inventory holding cost?  Order placing  Quantity discounts  [Breakage ]  Typing up an order 22. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?  Blocking  [Starving ]  Staging  Buffering 23. In a Gantt chart the vertical axis represents which of the following?  Time  Revenue  [Tasks ]  Cost 24. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following: • Redesign the process in order to mitigate the bottlenecks. • Utilize SQC (statistical quality control). [• Introduce controls within the process. ] • Slow down production rates until the process is in control. 25. Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue? [ Flow time ] Build time Cycle time Run time
  • 5. 26. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology? An hour saved at a bottleneck operation does not increase the process flow. If you lose an hour at a bottleneck it is better than making scrap. Do not allow bottlenecks to govern the flow of the line. [Utilization and activation of a resource are not the same]. 27. During the implementation of a project, which of the following should be the primary focus of a consulting firm? • The correct project software • Application of the learning curve theory [ • Tools and materials availability] • People management skills 28. Which of the following is an analytical tool used in Six-Sigma quality improvement programs? • Gantt charts [• Pareto charts] • Tree charts • Pedigree charts 29. A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization? • Inventory levels and economic conditions • Market demand and subcontractor capacity [• Current physical capacity and current workforce] • Competitor behavior and current workforce 30. Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000? • 10,000 • 14,000 [• 6,000 ] • 4,000