Q1. A large number of forecasting methods are available. Discuss the categories /classification of forecasting
methods.
(Opinion and judgmental (Predictive) methods : Explanation- 0.5 marks; Methods under this category- 4 marks,
Time series methods or quantitative methods Explanation- 0.5 marks; Methods under this category- 5 marks) 10
marks
Answer : Opinion and judgmental (Predictive) methods:
The qualitative or judgment method is a method that translates the opinions of managers, experts in the field,
consumer surveys, and sales force estimates into quantitative estimates. These methods range from a scientifically
conducted opinion survey to the nominal group technique. There are four methods adopted under this category,
namely:
1. Opinion survey method:
Q2. Explain how economic order quantity can be calculated by Model 1: EOQ with Uniform Rate of Demand and
Instantaneous Replenishment.
(Type of model and how it is developed-1 mark; Assumptions of the model – 2 marks; Graphical representation
of the varying inventory level with time (along with explanation)- 3 marks; Formulae for(Total annual inventory
cost, Total annual ordering cost ,Total Annual Holding Cost)- 2 marks; Determination of EOQ for Model 1 – 2
marks) 10 marks
Answer :
Model 1: EOQ with Uniform Rate of Demand and Instantaneous Replenishment:
This model is analytical. Initially a cost model is developed and inventory model is developed from it.
In this model the assumptions made are:
Assumptions :
The demand is certain and constant over time.
Stock replenishment is instantaneous (lead time is zero) i.e. the quantity of items will be realised
instantly, as soon as the consumption reaches a point.
Price of materials is fixed (no quantity discount is assumed).· Inventory carrying cost per unit is
constant.
Q3. The priority rule is a systematic procedure for assigning priorities for awaiting jobs. The common problem
faced in most of the companies is assigning priority with respect to the job on hand for production. When there
is a set of orders to be executed, the question of prioritising arises. Priority rules give the solution to the priority
problems faced by companies. Explain in brief about priority rules for scheduling?
(Major criteria for selecting priority rules- 1.75 marks; classification of priority rules – 1.25 marks; definition of
major criteria rules- 4.5 marks; definition of priority criteria rules – 2.5 marks) 10 marks
Answer : Major criteria for selecting priority rules :
Due to the rapid development and strong competition amongst the manufacturing companies, needing a
systematic planning in job shop manufacturing is crucial in order to enable smooth release of inventory and great
assembling. Hence, it is needed to expose on the suitable method in managing small scale production, and what is
it can be done to minimize the completion time of jobs, mean flow time, lateness of jobs, and processing cost. The
main aim is to find out what is the effective priority rules in scheduling application used by the manufacturing
companies that focus on job shop manufacturing.
Q4. A Flexible Manufacturing System (FMS) is a manufacturing system comprising a set of similar and/or
corresponding numerically controlled machines, which are connected through an automated transportation
system. What are the fundamental building blocks and benefits of FMS?
(Workstations.(explanation and list of various workstations) – 2 marks; Automated Material Handling and
Storage system.(explanation and functions) – 2 marks; Computer Control System.(explanation and functions) – 2
marks; Potential benefits (tangible and intangible) of establishing FMS- 4 marks)
Answer :A. Workstations :
In present day applications , these workstations are typically numeric control machine tools that perform machine
operations on family of parts. FMS is being designed with another type of processing equipment including
inspection station assembly work etc.
Various workstations :
1.Load/ unload
2. Machining
Q5. Supply chain management is essential for the success of every company and to satisfy customer demand.
Supply chain management plays a critical role in the success of the company. Supply chain management is
equipped to deal with anything from flow of products to unexpected natural disasters. Supply chain
management diagnoses the problem and innovatively works around the problems. Explain the impact Supply
chain management has on business.
(Explanation of impact on business Reduce operating costs – 3 marks; Improve financial position- 3 marks ; Boost
customer service – 3 marks; conclusion -1 mark) 10 marks
Answer : Impacts of SCM on business :
1. Reduce operating costs :
The most-sought and most common result of applying supply chain management is reduced costs in the supply
chain. A cost that exists throughout most supply chains and therefore is often the target of supply chain
management is the cost of inventory, managing it and carrying it.
Increased automation maximizes the efficiency of order processes.
Integrate with public or private e-marketplaces to quickly and easily compare suppliers on a global basis.
Q6. Quality Planning is defined as a “Systematic process that translates the quality policy into measurable
objectives and requirements, and lays down a sequence of steps for realising them within a specified
timeframe.” Explain the elements associated with quality plan.
(Explanation of: What needs to be checked? – 2 marks; What is the most suitable way to check? - 2.5 marks;
When should the check be carried out? – 2 marks; Who should be involved in the checking?- 1 mark; What
quality materials should be used?- 2.5 marks) 10 marks
Answer : Elements of quality planning :
1. What needs to be checked:
Seven areas must be addressed to ensure that the proper goals are established:
• Product performance
• Competitive performance
• Business improvement
• Cost of poor quality
• Performance of business processes
• Customer satisfaction
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id
-> help.mbaassignments@gmail.com
or
call us at -> 08263069601

More Related Content

What's hot

Mikay(competitive priorities)
Mikay(competitive priorities)Mikay(competitive priorities)
Mikay(competitive priorities)cymark09
 
market cost
market cost market cost
market cost barbhuiya
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selectionSujan Oli
 
Product Design
Product DesignProduct Design
Product Designajithsrc
 
SMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignmentsSMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignmentssolved_assignments
 
Design of Goods and Services
Design of Goods and ServicesDesign of Goods and Services
Design of Goods and ServicesUly Jr Maniago
 
Om 2012 m1 intro - operations strategy
Om 2012 m1   intro - operations strategyOm 2012 m1   intro - operations strategy
Om 2012 m1 intro - operations strategygeelacaps
 
Product Design & Process Selection Manufacturing
Product Design & Process Selection  ManufacturingProduct Design & Process Selection  Manufacturing
Product Design & Process Selection Manufacturingwizkidrx
 
Om0012 supply chain management
Om0012 supply chain managementOm0012 supply chain management
Om0012 supply chain managementconsult4solutions
 
Quality cost and quality control tools
Quality cost and quality control toolsQuality cost and quality control tools
Quality cost and quality control toolsYashwant Singh Rathore
 
Operations Strategy
Operations StrategyOperations Strategy
Operations StrategyJoanmaines
 
Operations & Supply Chain Management MCQ
Operations & Supply Chain Management MCQOperations & Supply Chain Management MCQ
Operations & Supply Chain Management MCQDr. Prashant Kalaskar
 
2nd Generation Six Sigma the Breakdown (at Samsung)
2nd Generation Six Sigma the Breakdown (at Samsung)2nd Generation Six Sigma the Breakdown (at Samsung)
2nd Generation Six Sigma the Breakdown (at Samsung)Richard Platt
 
Process Quality Management, Human Resources, Quality Assurance
Process Quality Management, Human Resources, QualityAssuranceProcess Quality Management, Human Resources, QualityAssurance
Process Quality Management, Human Resources, Quality AssuranceReem Alattas
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015naveen kumar
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Ivan Lanin
 

What's hot (20)

Mikay(competitive priorities)
Mikay(competitive priorities)Mikay(competitive priorities)
Mikay(competitive priorities)
 
market cost
market cost market cost
market cost
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selection
 
CQE Preparation | asq code of ethics
CQE Preparation | asq code of ethicsCQE Preparation | asq code of ethics
CQE Preparation | asq code of ethics
 
Product Design
Product DesignProduct Design
Product Design
 
SMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignmentsSMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignments
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
Design of Goods and Services
Design of Goods and ServicesDesign of Goods and Services
Design of Goods and Services
 
Om 2012 m1 intro - operations strategy
Om 2012 m1   intro - operations strategyOm 2012 m1   intro - operations strategy
Om 2012 m1 intro - operations strategy
 
C12 quality
C12 qualityC12 quality
C12 quality
 
Product Design & Process Selection Manufacturing
Product Design & Process Selection  ManufacturingProduct Design & Process Selection  Manufacturing
Product Design & Process Selection Manufacturing
 
Om0012 supply chain management
Om0012 supply chain managementOm0012 supply chain management
Om0012 supply chain management
 
Quality cost and quality control tools
Quality cost and quality control toolsQuality cost and quality control tools
Quality cost and quality control tools
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Operations Strategy
Operations StrategyOperations Strategy
Operations Strategy
 
Operations & Supply Chain Management MCQ
Operations & Supply Chain Management MCQOperations & Supply Chain Management MCQ
Operations & Supply Chain Management MCQ
 
2nd Generation Six Sigma the Breakdown (at Samsung)
2nd Generation Six Sigma the Breakdown (at Samsung)2nd Generation Six Sigma the Breakdown (at Samsung)
2nd Generation Six Sigma the Breakdown (at Samsung)
 
Process Quality Management, Human Resources, Quality Assurance
Process Quality Management, Human Resources, QualityAssuranceProcess Quality Management, Human Resources, QualityAssurance
Process Quality Management, Human Resources, Quality Assurance
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)
 

Similar to Om 0017 advanced production and planning control

Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..smumbahelp
 
Sc0001 –supply chain management
Sc0001 –supply chain managementSc0001 –supply chain management
Sc0001 –supply chain managementsmumbahelp
 
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTS
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTSTQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTS
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTSsmumbahelp
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materialssmumbahelp
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations managementStudy Stuff
 
Sc0009 supply chain cost management
Sc0009   supply chain cost managementSc0009   supply chain cost management
Sc0009 supply chain cost managementsmumbahelp
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations managementsmumbahelp
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasingsmumbahelp
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemjohann11374
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Om0010 operations management
Om0010   operations managementOm0010   operations management
Om0010 operations managementsmumbahelp
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situationjohann11370
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Implementing a New QMS Improvement System
Implementing a New QMS Improvement SystemImplementing a New QMS Improvement System
Implementing a New QMS Improvement SystemPECB
 
Om 0012 supply chain management
Om 0012   supply chain managementOm 0012   supply chain management
Om 0012 supply chain managementsmumbahelp
 

Similar to Om 0017 advanced production and planning control (20)

Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..
 
Sc0001 –supply chain management
Sc0001 –supply chain managementSc0001 –supply chain management
Sc0001 –supply chain management
 
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTS
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTSTQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTS
TQM 4th SEMESTER WINTER 2013 SOLVED ASSIGNMENTS
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations management
 
Sc0009 supply chain cost management
Sc0009   supply chain cost managementSc0009   supply chain cost management
Sc0009 supply chain cost management
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations management
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasing
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations management
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Om0010 operations management
Om0010   operations managementOm0010   operations management
Om0010 operations management
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations management
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Implementing a New QMS Improvement System
Implementing a New QMS Improvement SystemImplementing a New QMS Improvement System
Implementing a New QMS Improvement System
 
Om 0012 supply chain management
Om 0012   supply chain managementOm 0012   supply chain management
Om 0012 supply chain management
 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Om 0017 advanced production and planning control

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id -> help.mbaassignments@gmail.com or call us at -> 08263069601 Summer 2013 Master of Business Administration- MBA Semester 4 OM 0017 - Advanced Production And Planning Control Q1. A large number of forecasting methods are available. Discuss the categories /classification of forecasting methods. (Opinion and judgmental (Predictive) methods : Explanation- 0.5 marks; Methods under this category- 4 marks, Time series methods or quantitative methods Explanation- 0.5 marks; Methods under this category- 5 marks) 10 marks Answer : Opinion and judgmental (Predictive) methods: The qualitative or judgment method is a method that translates the opinions of managers, experts in the field, consumer surveys, and sales force estimates into quantitative estimates. These methods range from a scientifically conducted opinion survey to the nominal group technique. There are four methods adopted under this category, namely: 1. Opinion survey method: Q2. Explain how economic order quantity can be calculated by Model 1: EOQ with Uniform Rate of Demand and Instantaneous Replenishment. (Type of model and how it is developed-1 mark; Assumptions of the model – 2 marks; Graphical representation of the varying inventory level with time (along with explanation)- 3 marks; Formulae for(Total annual inventory cost, Total annual ordering cost ,Total Annual Holding Cost)- 2 marks; Determination of EOQ for Model 1 – 2 marks) 10 marks Answer : Model 1: EOQ with Uniform Rate of Demand and Instantaneous Replenishment: This model is analytical. Initially a cost model is developed and inventory model is developed from it. In this model the assumptions made are: Assumptions : The demand is certain and constant over time.
  • 2. Stock replenishment is instantaneous (lead time is zero) i.e. the quantity of items will be realised instantly, as soon as the consumption reaches a point. Price of materials is fixed (no quantity discount is assumed).· Inventory carrying cost per unit is constant. Q3. The priority rule is a systematic procedure for assigning priorities for awaiting jobs. The common problem faced in most of the companies is assigning priority with respect to the job on hand for production. When there is a set of orders to be executed, the question of prioritising arises. Priority rules give the solution to the priority problems faced by companies. Explain in brief about priority rules for scheduling? (Major criteria for selecting priority rules- 1.75 marks; classification of priority rules – 1.25 marks; definition of major criteria rules- 4.5 marks; definition of priority criteria rules – 2.5 marks) 10 marks Answer : Major criteria for selecting priority rules : Due to the rapid development and strong competition amongst the manufacturing companies, needing a systematic planning in job shop manufacturing is crucial in order to enable smooth release of inventory and great assembling. Hence, it is needed to expose on the suitable method in managing small scale production, and what is it can be done to minimize the completion time of jobs, mean flow time, lateness of jobs, and processing cost. The main aim is to find out what is the effective priority rules in scheduling application used by the manufacturing companies that focus on job shop manufacturing. Q4. A Flexible Manufacturing System (FMS) is a manufacturing system comprising a set of similar and/or corresponding numerically controlled machines, which are connected through an automated transportation system. What are the fundamental building blocks and benefits of FMS? (Workstations.(explanation and list of various workstations) – 2 marks; Automated Material Handling and Storage system.(explanation and functions) – 2 marks; Computer Control System.(explanation and functions) – 2 marks; Potential benefits (tangible and intangible) of establishing FMS- 4 marks) Answer :A. Workstations : In present day applications , these workstations are typically numeric control machine tools that perform machine operations on family of parts. FMS is being designed with another type of processing equipment including inspection station assembly work etc. Various workstations : 1.Load/ unload 2. Machining Q5. Supply chain management is essential for the success of every company and to satisfy customer demand. Supply chain management plays a critical role in the success of the company. Supply chain management is equipped to deal with anything from flow of products to unexpected natural disasters. Supply chain management diagnoses the problem and innovatively works around the problems. Explain the impact Supply chain management has on business. (Explanation of impact on business Reduce operating costs – 3 marks; Improve financial position- 3 marks ; Boost customer service – 3 marks; conclusion -1 mark) 10 marks Answer : Impacts of SCM on business : 1. Reduce operating costs : The most-sought and most common result of applying supply chain management is reduced costs in the supply chain. A cost that exists throughout most supply chains and therefore is often the target of supply chain management is the cost of inventory, managing it and carrying it.
  • 3. Increased automation maximizes the efficiency of order processes. Integrate with public or private e-marketplaces to quickly and easily compare suppliers on a global basis. Q6. Quality Planning is defined as a “Systematic process that translates the quality policy into measurable objectives and requirements, and lays down a sequence of steps for realising them within a specified timeframe.” Explain the elements associated with quality plan. (Explanation of: What needs to be checked? – 2 marks; What is the most suitable way to check? - 2.5 marks; When should the check be carried out? – 2 marks; Who should be involved in the checking?- 1 mark; What quality materials should be used?- 2.5 marks) 10 marks Answer : Elements of quality planning : 1. What needs to be checked: Seven areas must be addressed to ensure that the proper goals are established: • Product performance • Competitive performance • Business improvement • Cost of poor quality • Performance of business processes • Customer satisfaction Dear students get fully solved assignments Send your semester & Specialization name to our mail id -> help.mbaassignments@gmail.com or call us at -> 08263069601