ASSIGNMENT 
DRIVE FALL 2014 
PROGRAM MBADS – (SEM 4/SEM 6) / MBAN2 / MBAFLEX – (SEM 4) / 
PGDISMN – (SEM 2) 
SUBJECT CODE & NAME OM 0017 – ADVANCED PRODUCTION AND PLANNING 
CONTROL 
BK ID B1342 
CREDITS 4 
MARKS 60 
Note: Answer all questions. Kindly note that answers for 10 marks questions should be 
approximately of 400 words. Each question is followed by evaluation scheme. 
Q1. Explain the classification of inventory items and control techniques 
Answer: Various inventory control methods exist. For the small business, the inventory control 
method used has a major impact on the business cash flow and operational cost. Whatever 
inventory control method a company uses, the goals for managing inventory hold true regardless of 
industry or product. These goals include maximizing customer service, lowering operational cost and 
minimizing inventory investment. 
ABC Control 
ABC inventory control is a method of classifying 
Q2. Elucidate capacity scheduling and aggregate capacity scheduling. 
Answer: Proper aggregate planning is the key to an organization’s performance. An aggregate plan 
defines a company’s production rates, workforce levels and inventory position with respect to 
market demand and available capacity. Aggregate planning balances market demand and the 
production rate of the organization. This enables the organizations to reduce costs, and helps in 
optimizing the utilization of available resources. Proper implementation of the aggregate plan 
enables an organization to use all available resources to the fullest extent without overloading the 
production system. The success of an 
Q3. Describe lean and agile manufacturing 
Answer: It was in 1989, that for the first time the world was introduced to the term ‘lean 
production’ as it was coined in by MIT. On the other hand, Agile Manufacturing can trace its origins 
in a research study by Lehigh University in the early 90s.
Before discussing lean and agile, it’s important to place lean manufacturing in context w ith the 
traditional mass production principles. Lean 
Q4. Outline scheduling guidelines and constraints. 
Answer: Scheduling guidelines 
TIERS 
When scheduling buildings and rooms for sections, Tier 1 and Tier 2 refer to the access a department 
will have to a specific building. If a department has Tier 1 access to a building it means that they 
have priority to book into the unrestricted rooms in that building. In between certain dates the 
building is only available to the Tier 1 holders for that building. After a certain date the building is 
released for Tier 2 booking. Tier 2 access allows all departments to book in any remaining 
unscheduled non-restricted rooms. 
Q5. Write short notes on: 
 Master Production schedule 
Answer: A Master Production Schedule or MPS is the plan that a company develops for 
production, inventory, staffing, etc. It sets the quantity of each end item to be completed in 
each week of the planning horizon. It is the plan for all future production of end items. 
The MPS gives production, planning, purchasing, and top management the information 
needed to plan and control the manufacturing operation. The application ties overall 
business 
 Gantt charts 
Answer: A Gantt chart is a horizontal bar chart developed as a production control tool in 
1917 by Henry L. Gantt, an American engineer and social scientist. Frequently used in project 
management, a Gantt chart provides a graphical illustration of a schedule that helps to plan, 
coordinate, and track specific tasks in a project. 
 Elements of FMS(Flexible Manufacturing System) 
Answer: Flexible Manufacturing System: 
A flexible manufacturing system (FMS) is a manufacturing system in which there is some amount of 
flexibility that allows the system to react in the case of changes, whether predicted or unpredicted. 
This flexibility is generally considered to fall into two categories, which both contain numerous 
subcategories. 
Components : 
. 
 Short term capacity planning
Answer: Capacity planning is the process of determining the production capacity needed by 
an organization to meet changing demands for its products. In the context of capacity 
planning, design capacity is the maximum amount of work that an organization is capable of 
completing in a given period. Effective capacity is the maximum amount of work that an 
organization is capable of completing in a given period due to constraints such as quality 
problems, delays, material 
Q6. What are the problems or criticisms of outsourcing 
Answer: India Outsourcing Problems 
Businesses in America began heavily outsourcing work to India in the 1990's. It was a way to save on 
overhead and production cost. Jobs such as manufacturing to telemarketing and customer service 
centres became a booming business in India. Outsourcing to India has not come without issues. 
Problems have surfaced in both customer service and product quality. Outsourcing has not come 
without heavy criticism. Many people believe that outsourcing has contributed to unemployment 
and security risks to Americans too. 
Lower Quality Standards 
Dear students get fully solved assignments 
Send your semester & Specialization name to our mail id : 
“ help.mbaassignments@gmail.com ” 
or 
Call us at : 08263069601

More Related Content

What's hot

Smu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignmentsSmu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignmentsPradeep Sharma
 
Bba501 production & operations management
Bba501   production & operations managementBba501   production & operations management
Bba501 production & operations managementsmumbahelp
 
Smu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignmentsSmu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignmentssolved_assignments
 
Smu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentsSmu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentssolved_assignments
 
Ms 05 management of machines and materials
Ms   05 management of machines and materialsMs   05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Smu mba sem 2 summer 2015 assignments
Smu mba sem 2 summer 2015 assignmentsSmu mba sem 2 summer 2015 assignments
Smu mba sem 2 summer 2015 assignmentssolved_assignments
 
Ms 5 management of machines
Ms 5 management of machinesMs 5 management of machines
Ms 5 management of machinessmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Om0013 advanced production and operations management
Om0013   advanced production  and operations managementOm0013   advanced production  and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Om 0016 quality management
Om 0016   quality managementOm 0016   quality management
Om 0016 quality managementsmumbahelp
 
Om 0011 enterprise resource planning
Om 0011   enterprise resource planningOm 0011   enterprise resource planning
Om 0011 enterprise resource planningsmumbahelp
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Smu mba sem 4 pm spring 2015 assignments
Smu mba sem 4 pm spring 2015  assignmentsSmu mba sem 4 pm spring 2015  assignments
Smu mba sem 4 pm spring 2015 assignmentssolved_assignments
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8Yonela Gaba
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Quantitative analysis for business decision (QABD)- Linear programming probl...
Quantitative analysis for business decision (QABD)- Linear  programming probl...Quantitative analysis for business decision (QABD)- Linear  programming probl...
Quantitative analysis for business decision (QABD)- Linear programming probl...Chandra Shekar Immani
 
Qm0011 principles & philosophies of quality management
Qm0011  principles & philosophies of quality managementQm0011  principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 

What's hot (20)

Smu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignmentsSmu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignments
 
Bba501 production & operations management
Bba501   production & operations managementBba501   production & operations management
Bba501 production & operations management
 
Smu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignmentsSmu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignments
 
Smu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentsSmu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignments
 
Ms 05 management of machines and materials
Ms   05 management of machines and materialsMs   05 management of machines and materials
Ms 05 management of machines and materials
 
Smu mba sem 2 summer 2015 assignments
Smu mba sem 2 summer 2015 assignmentsSmu mba sem 2 summer 2015 assignments
Smu mba sem 2 summer 2015 assignments
 
Ms 5 management of machines
Ms 5 management of machinesMs 5 management of machines
Ms 5 management of machines
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Om0013 advanced production and operations management
Om0013   advanced production  and operations managementOm0013   advanced production  and operations management
Om0013 advanced production and operations management
 
Om 0016 quality management
Om 0016   quality managementOm 0016   quality management
Om 0016 quality management
 
Cmmi high maturity handbook
Cmmi high maturity handbookCmmi high maturity handbook
Cmmi high maturity handbook
 
Om 0011 enterprise resource planning
Om 0011   enterprise resource planningOm 0011   enterprise resource planning
Om 0011 enterprise resource planning
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Om0013
Om0013Om0013
Om0013
 
Smu mba sem 4 pm spring 2015 assignments
Smu mba sem 4 pm spring 2015  assignmentsSmu mba sem 4 pm spring 2015  assignments
Smu mba sem 4 pm spring 2015 assignments
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Quantitative analysis for business decision (QABD)- Linear programming probl...
Quantitative analysis for business decision (QABD)- Linear  programming probl...Quantitative analysis for business decision (QABD)- Linear  programming probl...
Quantitative analysis for business decision (QABD)- Linear programming probl...
 
Qm0011 principles & philosophies of quality management
Qm0011  principles & philosophies of quality managementQm0011  principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES IIGE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
 

Viewers also liked

Defy Your Age
Defy Your AgeDefy Your Age
Defy Your Ageapappa
 
LITA 2010 Presentation: Library Materials Vending
LITA 2010 Presentation: Library Materials VendingLITA 2010 Presentation: Library Materials Vending
LITA 2010 Presentation: Library Materials VendingChristine Illichmann
 
Tsukasa owl key note
Tsukasa owl key noteTsukasa owl key note
Tsukasa owl key noteLaura Delgado
 
M2M Framework December 2012
M2M Framework December 2012M2M Framework December 2012
M2M Framework December 2012Chris Estes
 
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh Vinh
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh VinhCẩm Nang Ôn Luyện ĐH Nguyễn Anh Vinh
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh VinhHuynh ICT
 
My Garden Tchaikovsky
My Garden TchaikovskyMy Garden Tchaikovsky
My Garden Tchaikovskycab3032
 
AS Media: NME Music Magazine Analysis
AS Media: NME Music Magazine AnalysisAS Media: NME Music Magazine Analysis
AS Media: NME Music Magazine Analysismegancampbellmedia
 
Int Math 2 Section 6-8 1011
Int Math 2 Section 6-8 1011Int Math 2 Section 6-8 1011
Int Math 2 Section 6-8 1011Jimbo Lamb
 
Presentation1 for lab d
Presentation1 for lab dPresentation1 for lab d
Presentation1 for lab dYankees1986
 
Pre production
Pre productionPre production
Pre productionCika7
 
مسودة كتابة
مسودة كتابةمسودة كتابة
مسودة كتابةAzza Fathi
 
Trabajo de yamileth
Trabajo de yamilethTrabajo de yamileth
Trabajo de yamilethYAMILE1210
 
Permendikbud no-97-tahun-2013
Permendikbud no-97-tahun-2013Permendikbud no-97-tahun-2013
Permendikbud no-97-tahun-2013Hasto Harjadi
 
Spire Esomar Best Of Vietnam 23 Apr 2012
Spire Esomar Best Of Vietnam 23 Apr 2012Spire Esomar Best Of Vietnam 23 Apr 2012
Spire Esomar Best Of Vietnam 23 Apr 2012Jeffrey BAHAR
 

Viewers also liked (20)

A’ propos de stendhal
A’ propos de stendhalA’ propos de stendhal
A’ propos de stendhal
 
Defy Your Age
Defy Your AgeDefy Your Age
Defy Your Age
 
LITA 2010 Presentation: Library Materials Vending
LITA 2010 Presentation: Library Materials VendingLITA 2010 Presentation: Library Materials Vending
LITA 2010 Presentation: Library Materials Vending
 
Tsukasa owl key note
Tsukasa owl key noteTsukasa owl key note
Tsukasa owl key note
 
Carlos escobar y dario taipe
Carlos escobar y dario taipeCarlos escobar y dario taipe
Carlos escobar y dario taipe
 
M2M Framework December 2012
M2M Framework December 2012M2M Framework December 2012
M2M Framework December 2012
 
PYC Wednesday Night Rhodes 19 Six Pack Series
PYC Wednesday Night Rhodes 19 Six Pack SeriesPYC Wednesday Night Rhodes 19 Six Pack Series
PYC Wednesday Night Rhodes 19 Six Pack Series
 
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh Vinh
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh VinhCẩm Nang Ôn Luyện ĐH Nguyễn Anh Vinh
Cẩm Nang Ôn Luyện ĐH Nguyễn Anh Vinh
 
My Garden Tchaikovsky
My Garden TchaikovskyMy Garden Tchaikovsky
My Garden Tchaikovsky
 
AS Media: NME Music Magazine Analysis
AS Media: NME Music Magazine AnalysisAS Media: NME Music Magazine Analysis
AS Media: NME Music Magazine Analysis
 
Int Math 2 Section 6-8 1011
Int Math 2 Section 6-8 1011Int Math 2 Section 6-8 1011
Int Math 2 Section 6-8 1011
 
Lose Man Boobs Today
Lose Man Boobs TodayLose Man Boobs Today
Lose Man Boobs Today
 
Presentation1 for lab d
Presentation1 for lab dPresentation1 for lab d
Presentation1 for lab d
 
Cam mugueta.2
Cam mugueta.2Cam mugueta.2
Cam mugueta.2
 
Pre production
Pre productionPre production
Pre production
 
LEGEND NAMED M.B 1
LEGEND NAMED M.B 1LEGEND NAMED M.B 1
LEGEND NAMED M.B 1
 
مسودة كتابة
مسودة كتابةمسودة كتابة
مسودة كتابة
 
Trabajo de yamileth
Trabajo de yamilethTrabajo de yamileth
Trabajo de yamileth
 
Permendikbud no-97-tahun-2013
Permendikbud no-97-tahun-2013Permendikbud no-97-tahun-2013
Permendikbud no-97-tahun-2013
 
Spire Esomar Best Of Vietnam 23 Apr 2012
Spire Esomar Best Of Vietnam 23 Apr 2012Spire Esomar Best Of Vietnam 23 Apr 2012
Spire Esomar Best Of Vietnam 23 Apr 2012
 

Similar to Om0017 – advanced production and planning control

Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlStudy Stuff
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)Study Stuff
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 

Similar to Om0017 – advanced production and planning control (20)

Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and control
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance management
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 

Om0017 – advanced production and planning control

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS – (SEM 4/SEM 6) / MBAN2 / MBAFLEX – (SEM 4) / PGDISMN – (SEM 2) SUBJECT CODE & NAME OM 0017 – ADVANCED PRODUCTION AND PLANNING CONTROL BK ID B1342 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q1. Explain the classification of inventory items and control techniques Answer: Various inventory control methods exist. For the small business, the inventory control method used has a major impact on the business cash flow and operational cost. Whatever inventory control method a company uses, the goals for managing inventory hold true regardless of industry or product. These goals include maximizing customer service, lowering operational cost and minimizing inventory investment. ABC Control ABC inventory control is a method of classifying Q2. Elucidate capacity scheduling and aggregate capacity scheduling. Answer: Proper aggregate planning is the key to an organization’s performance. An aggregate plan defines a company’s production rates, workforce levels and inventory position with respect to market demand and available capacity. Aggregate planning balances market demand and the production rate of the organization. This enables the organizations to reduce costs, and helps in optimizing the utilization of available resources. Proper implementation of the aggregate plan enables an organization to use all available resources to the fullest extent without overloading the production system. The success of an Q3. Describe lean and agile manufacturing Answer: It was in 1989, that for the first time the world was introduced to the term ‘lean production’ as it was coined in by MIT. On the other hand, Agile Manufacturing can trace its origins in a research study by Lehigh University in the early 90s.
  • 2. Before discussing lean and agile, it’s important to place lean manufacturing in context w ith the traditional mass production principles. Lean Q4. Outline scheduling guidelines and constraints. Answer: Scheduling guidelines TIERS When scheduling buildings and rooms for sections, Tier 1 and Tier 2 refer to the access a department will have to a specific building. If a department has Tier 1 access to a building it means that they have priority to book into the unrestricted rooms in that building. In between certain dates the building is only available to the Tier 1 holders for that building. After a certain date the building is released for Tier 2 booking. Tier 2 access allows all departments to book in any remaining unscheduled non-restricted rooms. Q5. Write short notes on:  Master Production schedule Answer: A Master Production Schedule or MPS is the plan that a company develops for production, inventory, staffing, etc. It sets the quantity of each end item to be completed in each week of the planning horizon. It is the plan for all future production of end items. The MPS gives production, planning, purchasing, and top management the information needed to plan and control the manufacturing operation. The application ties overall business  Gantt charts Answer: A Gantt chart is a horizontal bar chart developed as a production control tool in 1917 by Henry L. Gantt, an American engineer and social scientist. Frequently used in project management, a Gantt chart provides a graphical illustration of a schedule that helps to plan, coordinate, and track specific tasks in a project.  Elements of FMS(Flexible Manufacturing System) Answer: Flexible Manufacturing System: A flexible manufacturing system (FMS) is a manufacturing system in which there is some amount of flexibility that allows the system to react in the case of changes, whether predicted or unpredicted. This flexibility is generally considered to fall into two categories, which both contain numerous subcategories. Components : .  Short term capacity planning
  • 3. Answer: Capacity planning is the process of determining the production capacity needed by an organization to meet changing demands for its products. In the context of capacity planning, design capacity is the maximum amount of work that an organization is capable of completing in a given period. Effective capacity is the maximum amount of work that an organization is capable of completing in a given period due to constraints such as quality problems, delays, material Q6. What are the problems or criticisms of outsourcing Answer: India Outsourcing Problems Businesses in America began heavily outsourcing work to India in the 1990's. It was a way to save on overhead and production cost. Jobs such as manufacturing to telemarketing and customer service centres became a booming business in India. Outsourcing to India has not come without issues. Problems have surfaced in both customer service and product quality. Outsourcing has not come without heavy criticism. Many people believe that outsourcing has contributed to unemployment and security risks to Americans too. Lower Quality Standards Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601