What Are The Drone Anti-jamming Systems Technology?
Om0017 advanced production planning and control
1. Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
ASSIGNMENT
DRIVE SPRING 2014
SUBJECT CODE & NAME OM 0017 – ADVANCED PRODUCTION PLANNING AND
CONTROL
SEMESTER 4
BK ID
CREDITS 4
MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Q.1 Write short notes on:
PPC for batch production
Production control systems
Importance of forecasting
Inventory costs
Ans : PPC for batch production :
A variety of products are made but volume is not too large, to demand a separate line for each
product. Here, items are processed in lots or
Production control systems :
A production control system is concerned with planning and controlling all aspects of manufacturing,
including materials, scheduling machines and people, as well as coordinating suppliers and
customers. An effective production control system is critical to the success of any company. A
control system is a device, or
Importance of forecasting :
Forecasting is the process by which companies ponder and prepare for the future. It involves
predicting the future outcome of various business decisions. This includes the future of the business
as a whole, the future of an existing or proposed product or product line, and the future of the
industry in which the business operates, to
2. Inventory costs:
Inventory consists of the products that a company has stored for resale to its customers. Inventory
can be separated into three categories: raw materials, semi-finished goods and finished goods ready
for sale. Purchasing, processing,
Q.2 Explain in brief about priority rules for scheduling.
Ans : Priority rules
A priority rule contains information to construct a list of activities that ranks all project activities in a
certain order to determine the priorities in which the activities are assigned to the project schedule.
Such a list is constructed based on the project data in order to assign priorities to activities, as
follows:
Q.3 Describe computer aided manufacturing.
Ans : Computer aided manufacturing :
Computer-aided manufacturing (CAM) is the use of computer software to control machine tools and
related machinery in the manufacturing of work pieces. This is not the only definition for CAM, but it
is the most common; CAM may also refer to the use of a computer to assist in all operations of a
manufacturing plant, including planning,
Q. 4 Write short notes on:
Backward scheduling
Application of FMS in industries for exclusive parts
Need of synchronous manufacturing
Long term capacity planning
Ans: Backward scheduling :
Method of determining a production schedule by working backwards from the due date (or time) to
the start date (or time), and computing the materials and time required at every operation or stage.
Both material requirements
Application of FMS in industries for exclusive parts :
An Industrial Flexible Manufacturing System (FMS) consists of robots, Computer-controlled
Machines, Numerical controlled machines (CNC), instrumentation devices, computers, sensors, and
other stand alone systems such as
3. Need of synchronous manufacturing :
In synchronous manufacturing, production occurs in different production centers; some centers
have constraints that limit the rate of production and some centers do not. Both types of centers
must focus on using raw materials to produce goods that are nearly ready for shipment to
customers, with the
Long term capacity planning:
Over the long term, capacity planning relates primarily to strategic issues involving the firm's major
production facilities. In addition, long-term capacity issues are interrelated with location decisions.
Technology and transferability of the process to other products is also intertwined with long-term
capacity planning. Long-
Q.5 Explain aggregation techniques
Ans : Definition of aggregation techniques:
Aggregate planning is an operational activity that does an aggregate plan for the production process,
in advance of 2 to 18 months, to give an idea to management as to what quantity of materials and
other resources are to be procured and when, so that the total cost of operations of the organization
is kept to the minimum over that period..
Q.6 Explain make or buy decisions and when it is appropriate to consider each,
Ans : Explanation of make or buy decision :
The act of choosing between manufacturing a product in-house or purchasing it from an external
supplier. In a make-or-buy decision, the two most important factors to consider are cost and
availability of production capacity. An enterprise may decide to purchase the product rather than
producing it, if is cheaper to buy than make or if it does not have sufficient production capacity to
produce it in-house. With the phenomenal surge in global outsourcing over the past decades, the
make-or-buy decision is one that
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )