MB 0044 - PRODUCTION AND OPERATION MANAGEMENT - 4 CREDITS
(BOOK ID B1627)
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400
words. Each question is followed by evaluation scheme.
Q1. Explain the four basic varieties of layouts for manufacturing facilities.
(Process layout – 4 marks; Product layout- 3 marks; Group technology layout – 2 marks; Fixed position layout – 1
mark) 10 marks
Answer : Basic varieties of layouts for manufacturing facilities:
Facility layout means planning for the location of all machines, utilities, employee workstations, customer service
areas, material storage areas, aisles, rest rooms, lunch rooms, drinking fountains, internal walls, offices, and
computer rooms, and for the flow patterns of materials and people around, into, and within buildings.
1. Process layout :
Q2. The major decision areas in supply chain management have both strategic and operational elements .Explain
these decision areas in detail.
(Location decisions; Production decision; Inventory decisions; Transportation decisions- 10 marks, i.e 2.5 marks
each)10 marks
Answer : The major decision areas in supply chain management:
Location decisions:
The geographic placement of production facilities, stocking points, and sourcing points is the natural first step in
creating a supply chain. The location of facilities involves a commitment of resources to a long-term plan. Once the
size, number, and location of these are determined, so are the possible paths by which the product flows through
to the final customer. These decisions are of great significance to a firm since they represent the basic strategy for
accessing customer markets, and will have a considerable impact on revenue, cost, and level of service.
Q3. Business process is a total response that a business undertakes utilizing the resources and delivering the
outputs that create a value for the customer. Business process modeling refers to a set of activities undertaken
to optimize the business process. Business process modeling can be categorized into two parts – Logical
processing modeling and physical process modeling. Explain in detail of the two processes of modeling.
(Logical processing modeling : Definition – 1 mark , Steps to be followed to make the work smoother – 2 marks,
Explanation of logical process model including what it consists of , represents, improves and identifies; logical
modeling formats ;ways of representing logical process modeling – 4 marks; physical process modeling including
definition, what it deals with , why objects during physical modeling vary on the database software being used,
outcomes- 3 marks) 10 marks
Answer : Logical processing modeling:
Logical Process Modeling is the representation of a business process, detailing all the activities in the process from
gathering the initial data to reaching the desired outcome. Logical process modeling methods provide a description
of the logical flow of data through a business process.
Steps to be followed to make the work smoother:
These are the kinds of activities described in a logical process model:
Q4. In the recent times, operations are considered from end to end of value chain which means the operations
that start from sourcing of materials and other inputs to successful delivery of products to customers or end
users. Implementation is the process of executing the planned operations. When planning and controlling
functions are put together, we call it as Implementation of Operations. Tools for implementation are a set of
specialized techniques which can be standardized for ease of implementation and control . Write a brief note on
“implementation of operations” and tools for implementation.
(Explanation of planning , controlling – 1 mark; Implementation of operations :Estimating, Routing, Scheduling,
Dispatching and Expediting – 5 marks, i.e. 1 mark each , Tools for implementation : Gantt charts – 1 mark, Line
balancing and line of balance – 0.5 marks, Simulation models – 1 mark , Proper maintenance and analysis of
records – 0.5 marks; software – 1 mark)
Answer : Planning and controlling functions of operation management :
Planning means looking ahead and chalking out future courses of action to be followed. It is a preparatory step. It is
a systematic activity which determines when, how and who is going to perform a specific job. Planning is a detailed
programme regarding future courses of action. While Controlling consists of verifying whether everything occurs in
conformities with the plans adopted.
Q5. It is possible to work according to the project plan only by careful monitoring of the project progress. There
are various steps involved in monitoring and controlling a project from start to end. One of the steps is progress
control of a project which can be achieved by completing certain steps. Explain the steps of progress control.
(Monitor performance, Update schedule, Update costs, Re-plan stage schedule, Conduct team status review,
Create status report, Create flash report, Project status reports - 10 i.e. 1.25 marks each) 10 marks
Answer : Steps of progress control:
The project progress depends on many factors. All the factors contribute equally in monitoring and controlling the
project. The step of progress control is the important one. The progress control of a project can be achieved by
considering the following:
1. Monitor performance:
The first step for any project control mechanism is to monitor the progress. There are numerous ways to monitor
and measure various project parameters.
Q6. Value analysis is a methodology by which we try to minimize the cost and improve the revenue of a product
or an operation. Value analysis looks at the manufacturing activities with a view to make the components
simpler, processes faster, and the products better. Explain the process of value analysis.
(Explanation of steps : Data gathering, Analysis and valuation of functions, Idea generation and evaluation of
substitutes, Implementation and regulation – 10 marks i.e.2.5 marks each )
Answer : Process of value analysis :
There are four steps involved in the process of value analysis.
1. Data gathering:
All relevant information concerned with the product and the parts that go to make it are collected. The concerned
at this stage are raw material used, its dimensions , characteristics, availability , lead time , storage and rate of
consumption. All questions regarding each of them are asked. The available information is recorded and when
information is not available , tags can be attached for information gathering at later date. No information should be
considered irrelevant.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id
-> help.mbaassignments@gmail.com
or
call us at -> 08263069601

More Related Content

What's hot

Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project managementselinasimpson0501
 
business process management
business process managementbusiness process management
business process management
TayabaZahid
 
Production control
Production controlProduction control
Production control
deepu2000
 
Doc3
Doc3Doc3
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
nirajchaudhari27
 
Assessing Your Processes using ISO Standards
Assessing Your Processes using ISO StandardsAssessing Your Processes using ISO Standards
Assessing Your Processes using ISO Standards
PECB
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
kartik16star
 
Systems Life Cycle
Systems Life CycleSystems Life Cycle
Systems Life Cycle
Nirmal PR
 
Process of control- Controlling function of management
Process of control- Controlling function of managementProcess of control- Controlling function of management
Process of control- Controlling function of management
Alfred George
 
CONTROL
CONTROLCONTROL
CONTROL
Us MA
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
Shailendra Singh
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
selinasimpson1201
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
TabassumShaikh36
 
production planning and control division
production planning and control divisionproduction planning and control division
production planning and control division
Hossam Hassan
 
SEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTSSEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTS
solved_assignments
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
DjamadaMuhamedKAGUSU
 
MRP.pptx
MRP.pptxMRP.pptx
MRP.pptx
nirajchaudhari27
 
Software Testing & Quality Assurance
Software Testing & Quality Assurance Software Testing & Quality Assurance
Software Testing & Quality Assurance
Malik WaQas
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projects
selinasimpson311
 
Product design concept
Product design conceptProduct design concept
Product design concept
Nirjhar Chakravorti
 

What's hot (20)

Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project management
 
business process management
business process managementbusiness process management
business process management
 
Production control
Production controlProduction control
Production control
 
Doc3
Doc3Doc3
Doc3
 
5.2 DMADOV Phase.pptx
5.2 DMADOV  Phase.pptx5.2 DMADOV  Phase.pptx
5.2 DMADOV Phase.pptx
 
Assessing Your Processes using ISO Standards
Assessing Your Processes using ISO StandardsAssessing Your Processes using ISO Standards
Assessing Your Processes using ISO Standards
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Systems Life Cycle
Systems Life CycleSystems Life Cycle
Systems Life Cycle
 
Process of control- Controlling function of management
Process of control- Controlling function of managementProcess of control- Controlling function of management
Process of control- Controlling function of management
 
CONTROL
CONTROLCONTROL
CONTROL
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
 
production planning and control division
production planning and control divisionproduction planning and control division
production planning and control division
 
SEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTSSEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTS
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
MRP.pptx
MRP.pptxMRP.pptx
MRP.pptx
 
Software Testing & Quality Assurance
Software Testing & Quality Assurance Software Testing & Quality Assurance
Software Testing & Quality Assurance
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projects
 
Product design concept
Product design conceptProduct design concept
Product design concept
 

Viewers also liked

Mua bep-tu-o-dau-tot
Mua bep-tu-o-dau-totMua bep-tu-o-dau-tot
Mua bep-tu-o-dau-totLinh Phuong
 
Mb0047 management information system
Mb0047   management information systemMb0047   management information system
Mb0047 management information system
smumbahelp
 
Klöckner & Co - Ergebnisse 2. Quartal 2013
Klöckner & Co - Ergebnisse 2. Quartal 2013Klöckner & Co - Ergebnisse 2. Quartal 2013
Klöckner & Co - Ergebnisse 2. Quartal 2013
Klöckner & Co SE
 
Produksjonsprosessen: GIS som stöd i granskningsarbete
Produksjonsprosessen: GIS som stöd i granskningsarbeteProduksjonsprosessen: GIS som stöd i granskningsarbete
Produksjonsprosessen: GIS som stöd i granskningsarbete
Nordisk statistikermøte 2013
 
Construction management
Construction managementConstruction management
Construction management
smumbahelp
 
7.1.2 cvpları
7.1.2 cvpları7.1.2 cvpları
7.1.2 cvpları
ingilizceschool
 
Ma0044 & institutional banking
Ma0044 & institutional bankingMa0044 & institutional banking
Ma0044 & institutional banking
smumbahelp
 
Mu0018 – change management
Mu0018 – change managementMu0018 – change management
Mu0018 – change management
smumbahelp
 
Projeto interclasses
Projeto interclassesProjeto interclasses
Projeto interclasses
José Paulo da Conceição
 
Ib0018 – export import finance
Ib0018 – export import financeIb0018 – export import finance
Ib0018 – export import finance
smumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
smumbahelp
 
Mi0035 computer networks...
Mi0035  computer networks...Mi0035  computer networks...
Mi0035 computer networks...
smumbahelp
 
Ib0014 certificate in export import management
Ib0014   certificate in export import managementIb0014   certificate in export import management
Ib0014 certificate in export import management
smumbahelp
 
International business
International businessInternational business
International business
smumbahelp
 
Discar
DiscarDiscar
Discar
phone2b
 
Ml0017 mall management
Ml0017 mall managementMl0017 mall management
Ml0017 mall management
smumbahelp
 
R2 creative portfĂłlio_01
R2 creative portfĂłlio_01R2 creative portfĂłlio_01
R2 creative portfĂłlio_01
r2creative
 

Viewers also liked (17)

Mua bep-tu-o-dau-tot
Mua bep-tu-o-dau-totMua bep-tu-o-dau-tot
Mua bep-tu-o-dau-tot
 
Mb0047 management information system
Mb0047   management information systemMb0047   management information system
Mb0047 management information system
 
Klöckner & Co - Ergebnisse 2. Quartal 2013
Klöckner & Co - Ergebnisse 2. Quartal 2013Klöckner & Co - Ergebnisse 2. Quartal 2013
Klöckner & Co - Ergebnisse 2. Quartal 2013
 
Produksjonsprosessen: GIS som stöd i granskningsarbete
Produksjonsprosessen: GIS som stöd i granskningsarbeteProduksjonsprosessen: GIS som stöd i granskningsarbete
Produksjonsprosessen: GIS som stöd i granskningsarbete
 
Construction management
Construction managementConstruction management
Construction management
 
7.1.2 cvpları
7.1.2 cvpları7.1.2 cvpları
7.1.2 cvpları
 
Ma0044 & institutional banking
Ma0044 & institutional bankingMa0044 & institutional banking
Ma0044 & institutional banking
 
Mu0018 – change management
Mu0018 – change managementMu0018 – change management
Mu0018 – change management
 
Projeto interclasses
Projeto interclassesProjeto interclasses
Projeto interclasses
 
Ib0018 – export import finance
Ib0018 – export import financeIb0018 – export import finance
Ib0018 – export import finance
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mi0035 computer networks...
Mi0035  computer networks...Mi0035  computer networks...
Mi0035 computer networks...
 
Ib0014 certificate in export import management
Ib0014   certificate in export import managementIb0014   certificate in export import management
Ib0014 certificate in export import management
 
International business
International businessInternational business
International business
 
Discar
DiscarDiscar
Discar
 
Ml0017 mall management
Ml0017 mall managementMl0017 mall management
Ml0017 mall management
 
R2 creative portfĂłlio_01
R2 creative portfĂłlio_01R2 creative portfĂłlio_01
R2 creative portfĂłlio_01
 

Similar to Mb0044 production and operation management

Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management tools
smumbahelp
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
smumbahelp
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software development
Ratzman III
 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)
Flevy.com Best Practices
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
consult4solutions
 
02 Work study -Part_1.pdf
02 Work study -Part_1.pdf02 Work study -Part_1.pdf
02 Work study -Part_1.pdf
SugumarSarDurai
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
smumbahelp
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
Roy Antony Arnold G
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
Sumit Sanyal
 
Project management
Project managementProject management
Project management
Rohit Mishra
 
Project management
Project managementProject management
Project management
Rohit Mishra
 
ITIL Process Assessment - Service Strategy (XLS)
ITIL Process Assessment - Service Strategy (XLS)ITIL Process Assessment - Service Strategy (XLS)
ITIL Process Assessment - Service Strategy (XLS)
Flevy.com Best Practices
 
Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )
ChathamkulamInstitut
 
Case Study_Integrated Manufacturing Systems.pptx
Case Study_Integrated Manufacturing Systems.pptxCase Study_Integrated Manufacturing Systems.pptx
Case Study_Integrated Manufacturing Systems.pptx
jisoca7991
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
Sharad Srivastava
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
GIEDEEAM SOLAR and Gajanana Publications, LIC
 
Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)
ShudipPal
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
Hossam Maghrabi
 
Software project management
Software project managementSoftware project management
Software project management
Indu Sharma Bhardwaj
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
Indu Sharma Bhardwaj
 

Similar to Mb0044 production and operation management (20)

Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management tools
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Jurnal an example of using key performance indicators for software development
Jurnal   an example of using key performance indicators for software developmentJurnal   an example of using key performance indicators for software development
Jurnal an example of using key performance indicators for software development
 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
 
02 Work study -Part_1.pdf
02 Work study -Part_1.pdf02 Work study -Part_1.pdf
02 Work study -Part_1.pdf
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
 
Project management
Project managementProject management
Project management
 
Project management
Project managementProject management
Project management
 
ITIL Process Assessment - Service Strategy (XLS)
ITIL Process Assessment - Service Strategy (XLS)ITIL Process Assessment - Service Strategy (XLS)
ITIL Process Assessment - Service Strategy (XLS)
 
Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )Operations management module 1 ( calicut university )
Operations management module 1 ( calicut university )
 
Case Study_Integrated Manufacturing Systems.pptx
Case Study_Integrated Manufacturing Systems.pptxCase Study_Integrated Manufacturing Systems.pptx
Case Study_Integrated Manufacturing Systems.pptx
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
 
Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 

Recently uploaded

Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
saastr
 
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
Jeffrey Haguewood
 
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdfNunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
flufftailshop
 
dbms calicut university B. sc Cs 4th sem.pdf
dbms  calicut university B. sc Cs 4th sem.pdfdbms  calicut university B. sc Cs 4th sem.pdf
dbms calicut university B. sc Cs 4th sem.pdf
Shinana2
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 
Operating System Used by Users in day-to-day life.pptx
Operating System Used by Users in day-to-day life.pptxOperating System Used by Users in day-to-day life.pptx
Operating System Used by Users in day-to-day life.pptx
Pravash Chandra Das
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
DanBrown980551
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
SitimaJohn
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Alpen-Adria-Universität
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
HarisZaheer8
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
saastr
 
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
Tatiana Kojar
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
Zilliz
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
fredae14
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
Chart Kalyan
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 

Recently uploaded (20)

Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
Overcoming the PLG Trap: Lessons from Canva's Head of Sales & Head of EMEA Da...
 
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
Letter and Document Automation for Bonterra Impact Management (fka Social Sol...
 
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdfNunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
 
dbms calicut university B. sc Cs 4th sem.pdf
dbms  calicut university B. sc Cs 4th sem.pdfdbms  calicut university B. sc Cs 4th sem.pdf
dbms calicut university B. sc Cs 4th sem.pdf
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 
Operating System Used by Users in day-to-day life.pptx
Operating System Used by Users in day-to-day life.pptxOperating System Used by Users in day-to-day life.pptx
Operating System Used by Users in day-to-day life.pptx
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
 
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
Skybuffer AI: Advanced Conversational and Generative AI Solution on SAP Busin...
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 

Mb0044 production and operation management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id -> help.mbaassignments@gmail.com or call us at -> 08263069601 Summer 2013 MBA II SEMESTER MB 0044 - PRODUCTION AND OPERATION MANAGEMENT - 4 CREDITS (BOOK ID B1627) Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q1. Explain the four basic varieties of layouts for manufacturing facilities. (Process layout – 4 marks; Product layout- 3 marks; Group technology layout – 2 marks; Fixed position layout – 1 mark) 10 marks Answer : Basic varieties of layouts for manufacturing facilities: Facility layout means planning for the location of all machines, utilities, employee workstations, customer service areas, material storage areas, aisles, rest rooms, lunch rooms, drinking fountains, internal walls, offices, and computer rooms, and for the flow patterns of materials and people around, into, and within buildings. 1. Process layout : Q2. The major decision areas in supply chain management have both strategic and operational elements .Explain these decision areas in detail. (Location decisions; Production decision; Inventory decisions; Transportation decisions- 10 marks, i.e 2.5 marks each)10 marks Answer : The major decision areas in supply chain management: Location decisions: The geographic placement of production facilities, stocking points, and sourcing points is the natural first step in creating a supply chain. The location of facilities involves a commitment of resources to a long-term plan. Once the size, number, and location of these are determined, so are the possible paths by which the product flows through to the final customer. These decisions are of great significance to a firm since they represent the basic strategy for accessing customer markets, and will have a considerable impact on revenue, cost, and level of service.
  • 2. Q3. Business process is a total response that a business undertakes utilizing the resources and delivering the outputs that create a value for the customer. Business process modeling refers to a set of activities undertaken to optimize the business process. Business process modeling can be categorized into two parts – Logical processing modeling and physical process modeling. Explain in detail of the two processes of modeling. (Logical processing modeling : Definition – 1 mark , Steps to be followed to make the work smoother – 2 marks, Explanation of logical process model including what it consists of , represents, improves and identifies; logical modeling formats ;ways of representing logical process modeling – 4 marks; physical process modeling including definition, what it deals with , why objects during physical modeling vary on the database software being used, outcomes- 3 marks) 10 marks Answer : Logical processing modeling: Logical Process Modeling is the representation of a business process, detailing all the activities in the process from gathering the initial data to reaching the desired outcome. Logical process modeling methods provide a description of the logical flow of data through a business process. Steps to be followed to make the work smoother: These are the kinds of activities described in a logical process model: Q4. In the recent times, operations are considered from end to end of value chain which means the operations that start from sourcing of materials and other inputs to successful delivery of products to customers or end users. Implementation is the process of executing the planned operations. When planning and controlling functions are put together, we call it as Implementation of Operations. Tools for implementation are a set of specialized techniques which can be standardized for ease of implementation and control . Write a brief note on “implementation of operations” and tools for implementation. (Explanation of planning , controlling – 1 mark; Implementation of operations :Estimating, Routing, Scheduling, Dispatching and Expediting – 5 marks, i.e. 1 mark each , Tools for implementation : Gantt charts – 1 mark, Line balancing and line of balance – 0.5 marks, Simulation models – 1 mark , Proper maintenance and analysis of records – 0.5 marks; software – 1 mark) Answer : Planning and controlling functions of operation management : Planning means looking ahead and chalking out future courses of action to be followed. It is a preparatory step. It is a systematic activity which determines when, how and who is going to perform a specific job. Planning is a detailed programme regarding future courses of action. While Controlling consists of verifying whether everything occurs in conformities with the plans adopted. Q5. It is possible to work according to the project plan only by careful monitoring of the project progress. There are various steps involved in monitoring and controlling a project from start to end. One of the steps is progress control of a project which can be achieved by completing certain steps. Explain the steps of progress control. (Monitor performance, Update schedule, Update costs, Re-plan stage schedule, Conduct team status review, Create status report, Create flash report, Project status reports - 10 i.e. 1.25 marks each) 10 marks Answer : Steps of progress control: The project progress depends on many factors. All the factors contribute equally in monitoring and controlling the project. The step of progress control is the important one. The progress control of a project can be achieved by considering the following:
  • 3. 1. Monitor performance: The first step for any project control mechanism is to monitor the progress. There are numerous ways to monitor and measure various project parameters. Q6. Value analysis is a methodology by which we try to minimize the cost and improve the revenue of a product or an operation. Value analysis looks at the manufacturing activities with a view to make the components simpler, processes faster, and the products better. Explain the process of value analysis. (Explanation of steps : Data gathering, Analysis and valuation of functions, Idea generation and evaluation of substitutes, Implementation and regulation – 10 marks i.e.2.5 marks each ) Answer : Process of value analysis : There are four steps involved in the process of value analysis. 1. Data gathering: All relevant information concerned with the product and the parts that go to make it are collected. The concerned at this stage are raw material used, its dimensions , characteristics, availability , lead time , storage and rate of consumption. All questions regarding each of them are asked. The available information is recorded and when information is not available , tags can be attached for information gathering at later date. No information should be considered irrelevant. Dear students get fully solved assignments Send your semester & Specialization name to our mail id -> help.mbaassignments@gmail.com or call us at -> 08263069601